  "id": "2026-09-11-preview-3",
  "version": "0.3.0",
  "publishedAt": "2026-09-11",
  "title": "ANZ Compute Atlas — research preview",
  "coverage": "partial-research",
  "caveat": "A source-backed research preview, not a market census or national capacity estimate. Disclosed IT capacity includes source-reported built and approximate planned capacity; missing or non-comparable MW is excluded, never treated as zero. Australia is the primary market. Independent editorial review and continuing collection are pending.",
  "independentReview": "pending",
  "sources": [
    {
      "id": "nextdc-directory",
      "title": "NEXTDC data centre network",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Australia and New Zealand facility list; lifecycle labels",
      "summary": "Operator portfolio listing establishes names and cities. Directory power specifications are not treated as commissioned capacity."
    },
    {
      "id": "nextdc-fy26",
      "title": "NEXTDC FY26 Results Presentation",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/hubfs/Financial%20Reports/FY26/NEXTDC%20FY26%20Results%20Presentation.pdf",
      "accessedAt": "2026-09-10",
      "publishedAt": "2026-08-27",
      "locator": "Pages 18 and 30–32; page 18 footnotes 2–3 define in-progress and built capacity",
      "summary": "Dated built, fit-out and development disclosures. Built means designed power of fitted-out halls; customer infrastructure may require further investment."
    },
    {
      "id": "nextdc-operating-edge",
      "title": "A1 Adelaide and D1 Darwin achieve Certified Strategic status",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/news/expanding-australias-sovereign-digital-foundations-a1-adelaide-and-d1-darwin-achieve-certified-strategic-status",
      "accessedAt": "2026-09-10",
      "publishedAt": "2025-12-02",
      "locator": "Paragraphs 1–2: operated facilities and three operational edge facilities",
      "summary": "Confirms the operational edge facilities SC1, NE1 and PH1. Current certification scope is taken from the government register separately."
    },
    {
      "id": "hcf-register",
      "title": "Certified Service Providers",
      "publisher": "Australian Government — Hosting Certification Framework",
      "url": "https://www.hostingcertification.gov.au/node/8",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Data Centre facilities — Certified Strategic Facility and Certified Strategic Enclave lists",
      "summary": "Separates certified facilities, enclaves and cloud services. Enclave listing does not certify the entire site's capacity."
    },
    {
      "id": "nextdc-b2-page",
      "title": "NEXTDC B2 facility",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres/brisbane-data-centres/b2-brisbane",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "IT capacity, location and facility description",
      "summary": "Operator facility specification; power basis and location cross-check. Ultimate design capacity is kept separate from fitted-out phases."
    },
    {
      "id": "nextdc-m2-page",
      "title": "NEXTDC M2 facility",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres/melbourne-data-centres/m2-melbourne",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "IT capacity, location and facility description",
      "summary": "Operator facility specification; power basis and location cross-check. Ultimate design capacity is kept separate from fitted-out phases."
    },
    {
      "id": "nextdc-m3-page",
      "title": "NEXTDC M3 facility",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres/melbourne-data-centres/m3-melbourne",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "IT capacity, location and facility description",
      "summary": "Operator facility specification; power basis and location cross-check. Ultimate design capacity is kept separate from fitted-out phases."
    },
    {
      "id": "nextdc-p1-page",
      "title": "NEXTDC P1 facility",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres/perth-data-centres/p1-perth",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "IT capacity, location and facility description",
      "summary": "Operator facility specification; power basis and location cross-check. Ultimate design capacity is kept separate from fitted-out phases."
    },
    {
      "id": "nextdc-p2-page",
      "title": "NEXTDC P2 facility",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres/perth-data-centres/p2-perth",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "IT capacity, location and facility description",
      "summary": "Operator facility specification; power basis and location cross-check. Ultimate design capacity is kept separate from fitted-out phases."
    },
    {
      "id": "nextdc-s3-page",
      "title": "NEXTDC S3 facility",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres/sydney-data-centres/s3-sydney",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "IT capacity, location and facility description",
      "summary": "Operator facility specification; power basis and location cross-check. Ultimate design capacity is kept separate from fitted-out phases."
    },
    {
      "id": "nextdc-s4-page",
      "title": "NEXTDC S4 facility",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres/sydney-data-centres/s4-sydney",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "IT capacity, location and facility description",
      "summary": "Operator facility specification; power basis and location cross-check. Ultimate design capacity is kept separate from fitted-out phases."
    },
    {
      "id": "nextdc-s5-page",
      "title": "NEXTDC S5 facility",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres/sydney-data-centres/s5-sydney",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "IT capacity, location and facility description",
      "summary": "Operator facility specification; power basis and location cross-check. Ultimate design capacity is kept separate from fitted-out phases."
    },
    {
      "id": "nextdc-s6-page",
      "title": "NEXTDC S6 facility",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres/sydney-data-centres/s6-sydney",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "IT capacity, location and facility description",
      "summary": "Operator facility specification; power basis and location cross-check. Ultimate design capacity is kept separate from fitted-out phases."
    },
    {
      "id": "nextdc-s7-page",
      "title": "NEXTDC S7 facility",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres/sydney-data-centres/s7-sydney",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "IT capacity, location and facility description",
      "summary": "Operator facility specification; power basis and location cross-check. Ultimate design capacity is kept separate from fitted-out phases."
    },
    {
      "id": "nextdc-m4-page",
      "title": "NEXTDC M4 facility",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres/melbourne-data-centres/m4-melbourne",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "IT capacity, location and facility description",
      "summary": "Operator facility specification; power basis and location cross-check. Ultimate design capacity is kept separate from fitted-out phases."
    },
    {
      "id": "nextdc-ge1-page",
      "title": "NEXTDC GE1 facility",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres/geelong-data-centres/ge1-geelong",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "IT capacity, location and facility description",
      "summary": "Operator facility specification; power basis and location cross-check. Ultimate design capacity is kept separate from fitted-out phases."
    },
    {
      "id": "nextdc-d2-page",
      "title": "NEXTDC D2 facility",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres/darwin-data-centres/d2-darwin",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "IT capacity, location and facility description",
      "summary": "Operator facility specification; power basis and location cross-check. Ultimate design capacity is kept separate from fitted-out phases."
    },
    {
      "id": "nextdc-gc1-page",
      "title": "NEXTDC GC1 facility",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres/gold-coast-data-centres",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "IT capacity, location and facility description",
      "summary": "Operator facility specification; power basis and location cross-check. Ultimate design capacity is kept separate from fitted-out phases."
    },
    {
      "id": "nextdc-ak1-page",
      "title": "NEXTDC AK1 facility",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres/new-zealand-data-centres-colocation",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "IT capacity, location and facility description",
      "summary": "Operator facility specification; power basis and location cross-check. Ultimate design capacity is kept separate from fitted-out phases."
    },
    {
      "id": "cov-equinix-availability",
      "title": "Equinix colocation availability",
      "url": "https://docs.equinix.com/colocation/availability/",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "APAC > Australia table",
      "summary": "Operational coverage table identifies named Australian IBX facilities and metros. MW is not stated."
    },
    {
      "id": "cov-equinix-perth",
      "title": "Equinix Perth data centres",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/perth-data-centers",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Data center locations > PE1, PE2, PE3",
      "summary": "Operator lists colocation services at three Perth facilities."
    },
    {
      "id": "cov-equinix-sydney",
      "title": "Equinix Sydney data centres",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Data center locations",
      "summary": "Current market list omits SY8 despite its presence in the operational coverage documentation."
    },
    {
      "id": "cov-equinix-sy1",
      "title": "Equinix SY1 specifications",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy1",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address; building and service specifications",
      "summary": "Operator location: 639 Gardeners Road."
    },
    {
      "id": "cov-equinix-sy2",
      "title": "Equinix SY2 specifications",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy2",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address; building and service specifications",
      "summary": "Operator location: 639 Gardeners Road."
    },
    {
      "id": "cov-equinix-me1",
      "title": "Equinix ME1 specifications",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/melbourne-data-centers/me1",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address; building and service specifications",
      "summary": "Operator location: 578 Lorimer Street."
    },
    {
      "id": "cov-equinix-me2",
      "title": "Equinix ME2 specifications",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/melbourne-data-centers/me2",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address; building and service specifications",
      "summary": "Operator location: 578 Lorimer Street."
    },
    {
      "id": "cov-equinix-sy6",
      "title": "Equinix SY6 specifications",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy6",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address; building and service specifications",
      "summary": "Operator location: Sydney NSW 2128."
    },
    {
      "id": "cov-equinix-sy7",
      "title": "Equinix SY7 specifications",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy7",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address; building and service specifications",
      "summary": "Operator location: Wollongong NSW 2526."
    },
    {
      "id": "cov-airtrunk-story",
      "title": "AirTrunk company history",
      "url": "https://airtrunk.com/about-airtrunk/our-story/",
      "publisher": "AirTrunk",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Our history; Coming soon",
      "summary": "Confirms openings of SYD1, MEL1 and SYD2; SYD3 remains in the forthcoming list."
    },
    {
      "id": "cov-airtrunk-mel2-announcement",
      "title": "AirTrunk announces second Melbourne campus",
      "url": "https://airtrunk.com/airtrunk-expands-australian-platform-with-a-second-hyperscale-data-centre-campus-in-melbourne/",
      "publisher": "AirTrunk",
      "accessedAt": "2026-09-10",
      "publishedAt": "2025-12-24",
      "locator": "Announcement and Australian campus capacity list",
      "summary": "MEL2 site acquisition; figures describe platform/campus scale rather than current commissioned IT load."
    },
    {
      "id": "cov-airtrunk-syd3",
      "title": "AirTrunk SYD3",
      "url": "https://airtrunk.com/location/syd3-sydney-west/",
      "publisher": "AirTrunk",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Key features > Capacity; Location",
      "summary": "Sydney West campus. Published total campus capacity is not a commissioned IT-load observation."
    },
    {
      "id": "cov-airtrunk-mel2",
      "title": "AirTrunk MEL2",
      "url": "https://airtrunk.com/location/mel2-melbourne/",
      "publisher": "AirTrunk",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Key features > Capacity; Location",
      "summary": "Melbourne north-west campus specification; service commencement is not confirmed."
    },
    {
      "id": "cov-cdc-canberra",
      "title": "CDC Canberra locations",
      "url": "https://cdc.com/locations/canberra/",
      "publisher": "CDC",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "At a glance; Hume One, Hume Two, Fyshwick, Beard sections",
      "summary": "Campus lifecycle and capacity statements. Where the source says capacity without an IT-load definition, numeric observations are excluded from IT subtotals."
    },
    {
      "id": "cov-cdc-sydney",
      "title": "CDC Sydney locations",
      "url": "https://cdc.com/locations/sydney/",
      "publisher": "CDC",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "At a glance and named campus sections",
      "summary": "Campus lifecycle and capacity statements. Where the source says capacity without an IT-load definition, numeric observations are excluded from IT subtotals."
    },
    {
      "id": "cov-cdc-melbourne",
      "title": "CDC Melbourne locations",
      "url": "https://cdc.com/locations/melbourne/",
      "publisher": "CDC",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "At a glance and named campus sections",
      "summary": "Campus lifecycle and capacity statements. Where the source says capacity without an IT-load definition, numeric observations are excluded from IT subtotals."
    },
    {
      "id": "cov-cdc-auckland",
      "title": "CDC Auckland locations",
      "url": "https://cdc.com/locations/auckland/",
      "publisher": "CDC",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Silverdale One, Hobsonville One, Hobsonville Two sections",
      "summary": "Campus lifecycle and capacity statements. Where the source says capacity without an IT-load definition, numeric observations are excluded from IT subtotals."
    },
    {
      "id": "cov-cdc-perth",
      "title": "CDC Perth locations",
      "url": "https://cdc.com/locations/perth/",
      "publisher": "CDC",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "At a glance and named campus sections",
      "summary": "Campus lifecycle and capacity statements. Where the source says capacity without an IT-load definition, numeric observations are excluded from IT subtotals."
    },
    {
      "id": "cov-dci-locations",
      "title": "DCI data centre locations",
      "url": "https://dcidatacenters.com/locations/",
      "publisher": "DCI Data Centers",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Our Centers and Sites In Development",
      "summary": "Names AU/NZ operating locations and planned developments; AKL02 construction is explicit."
    },
    {
      "id": "cov-dci-sydney-01",
      "title": "DCI SYD01 Eastern Creek",
      "url": "https://dcidatacenters.com/locations/sydney-01/",
      "publisher": "DCI Data Centers",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Facility introduction; Key Features",
      "summary": "Operator facility/service page supports location and operation. Standalone IT MW is not disclosed."
    },
    {
      "id": "cov-dci-adelaide-01",
      "title": "DCI ADL01 Kidman Park",
      "url": "https://dcidatacenters.com/locations/adelaide-01/",
      "publisher": "DCI Data Centers",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Facility introduction; Key Features",
      "summary": "Operator facility/service page supports location and operation. Standalone IT MW is not disclosed."
    },
    {
      "id": "cov-dci-adelaide-02",
      "title": "DCI ADL02 Kidman Park",
      "url": "https://dcidatacenters.com/locations/adelaide-02/",
      "publisher": "DCI Data Centers",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Facility introduction; Key Features",
      "summary": "Operator facility/service page supports location and operation. Standalone IT MW is not disclosed."
    },
    {
      "id": "cov-dci-auckland-01",
      "title": "DCI AKL01 Westgate",
      "url": "https://dcidatacenters.com/locations/auckland-01/",
      "publisher": "DCI Data Centers",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Facility introduction; Key Features",
      "summary": "Operator facility/service page supports location and operation. Standalone IT MW is not disclosed."
    },
    {
      "id": "cov-dci-syd02-update",
      "title": "DCI SYD02 construction update",
      "url": "https://dcidatacenters.com/news/dci-advances-syd02-expansion-in-sydney-as-key-construction-milestones-near-completion/",
      "publisher": "DCI Data Centers",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "July 2026 article; opening paragraphs and construction staging",
      "summary": "Early demolition/tank works are near completion; expansion request and approved scope differ. No reliable service date or IT-MW basis."
    },
    {
      "id": "cov-macquarie-campuses",
      "title": "Macquarie Data Centres campus directory",
      "url": "https://www.macquariedatacentres.com/data-centres/",
      "publisher": "Macquarie Data Centres",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Our Data Centre Locations; Our Colocation Intellicentres table",
      "summary": "Lists six named facilities across three campuses; IC3 Super West is forthcoming. Campus totals must not be added to constituent buildings."
    },
    {
      "id": "cov-macquarie-first-fitout",
      "title": "Macquarie FY25 half-year investor presentation",
      "url": "https://www.macquarietechnologygroup.com/assets/wp-content/uploads/2025/02/FY25-Group-Investor-Preso-Half-Year-Results.pdf",
      "publisher": "Macquarie Technology Group",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Slide 18, Outlook: Data Centres",
      "summary": "IC3 Super West first phase includes 6 MW IT fit-out; 47 MW is the broader development envelope. Q3 2026 is a target."
    },
    {
      "id": "cov-macquarie-ic1",
      "title": "Macquarie IC1 Sydney CBD",
      "url": "https://www.macquariedatacentres.com/data-centres/sydney/sydney-cbd-campus-ic1/",
      "publisher": "Macquarie Data Centres",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Introduction; IT Load; Meet the facility",
      "summary": "Current facility service/specification page. Canberra individual IT loads are expressly undisclosed."
    },
    {
      "id": "cov-macquarie-ic2",
      "title": "Macquarie IC2 Macquarie Park",
      "url": "https://www.macquariedatacentres.com/data-centres/sydney/macquarie-park-campus/ic2/",
      "publisher": "Macquarie Data Centres",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Introduction; IT Load; Meet the facility",
      "summary": "Current facility service/specification page. Canberra individual IT loads are expressly undisclosed."
    },
    {
      "id": "cov-macquarie-ic3-east",
      "title": "Macquarie IC3 East Macquarie Park",
      "url": "https://www.macquariedatacentres.com/data-centres/sydney/macquarie-park-campus/ic3-east/",
      "publisher": "Macquarie Data Centres",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Introduction; IT Load; Meet the facility",
      "summary": "Current facility service/specification page. Canberra individual IT loads are expressly undisclosed."
    },
    {
      "id": "cov-macquarie-ic4",
      "title": "Macquarie IC4 Canberra Bunker",
      "url": "https://www.macquariedatacentres.com/data-centres/canberra/ic4/",
      "publisher": "Macquarie Data Centres",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Introduction; IT Load; Meet the facility",
      "summary": "Current facility service/specification page. Canberra individual IT loads are expressly undisclosed."
    },
    {
      "id": "cov-macquarie-ic5",
      "title": "Macquarie IC5 Canberra Bunker",
      "url": "https://www.macquariedatacentres.com/data-centres/canberra/ic5/",
      "publisher": "Macquarie Data Centres",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Introduction; IT Load; Meet the facility",
      "summary": "Current facility service/specification page. Canberra individual IT loads are expressly undisclosed."
    },
    {
      "id": "cov-macquarie-ic3-super-west",
      "title": "Macquarie IC3 Super West",
      "url": "https://www.macquariedatacentres.com/data-centres/sydney/macquarie-park-campus/ic3-super-west/",
      "publisher": "Macquarie Data Centres",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Introduction; Australia's first purpose-built AI and cloud data centre",
      "summary": "Construction is explicit; 47 MW end-state power secured, with 2026 service target."
    },
    {
      "id": "cov-datacom-locations",
      "title": "Datacom colocation locations",
      "url": "https://datacom.com/nz/en/products/data-centres/locations",
      "publisher": "Datacom",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "New Zealand facility cards; Australia service explanation",
      "summary": "Five named NZ facilities are listed; Australian services occupy AirTrunk halls and are not separate physical sites. Introductory reference to four NZ centres appears stale."
    },
    {
      "id": "cov-equinix-sy4",
      "title": "Equinix SY4 specifications",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy4",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address",
      "summary": "Operator address is 200 Bourke Road, Alexandria."
    },
    {
      "id": "cov-equinix-sy5",
      "title": "Equinix SY5 specifications",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy5",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address",
      "summary": "Operator address is Unit B, 200 Bourke Road, Alexandria."
    },
    {
      "id": "cov-equinix-perth-campus",
      "title": "Equinix opens PE3 beside PE2",
      "url": "https://blog.equinix.com/blog/2021/12/08/a-look-inside-equinixs-third-perth-data-center/",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": "2021-12-08",
      "locator": "PE3 location and secure link bridge",
      "summary": "PE3 opened adjacent to PE2 at Shenton Park, with a secure physical bridge connecting the facilities."
    },
    {
      "id": "cov-macquarie-ic3e-name",
      "title": "Macquarie identifies Intellicentre 3 East as IC3E",
      "url": "https://www.macquariedatacentres.com/blog/macquarie-data-centres-tops-out-hyperscale-ready-facility-in-sydney-north-zone/",
      "publisher": "Macquarie Data Centres",
      "accessedAt": "2026-09-10",
      "publishedAt": "2020-10-19",
      "locator": "Opening paragraph after facts and figures",
      "summary": "Explicitly expands IC3E to Intellicentre 3 East. Used only for identity resolution, not current lifecycle."
    },
    {
      "id": "cov-macquarie-hy26",
      "title": "Macquarie FY26 half-year management briefing",
      "url": "https://www.macquarietechnologygroup.com/wp-content/uploads/2026/02/Half-Year-Management-Briefing-to-Analysts.pdf",
      "publisher": "Macquarie Technology Group",
      "accessedAt": "2026-09-10",
      "publishedAt": "2026-02-26",
      "locator": "Slides 7, 8 and 19",
      "summary": "Portfolio installed capacity is 21 MW; first 6 MW IC3 SuperWest mechanical/electrical fit-out has commenced. Completion target September 2026; further equipment procurement is not another completed phase."
    },
    {
      "id": "exp-telstra-colocation",
      "title": "Telstra InfraCo data centre colocation",
      "url": "https://infraco.telstra.com.au/solutions/data-centre-colocation",
      "publisher": "Telstra InfraCo",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Video transcript 00:00; About our Data Centres",
      "summary": "Telstra explicitly says it operates seven named Australian data centres. Generator ratings are not IT capacity."
    },
    {
      "id": "exp-fujitsu-locations",
      "title": "Fujitsu Australian data centre locations",
      "url": "https://global.fujitsu/en-apac/local/about-data-centres",
      "publisher": "Fujitsu",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Locations: Western Sydney, Noble Park, Malaga, Homebush, North Ryde, Eight Mile Plains",
      "summary": "Current operator portfolio identifies six locations. Advertised IT-load specifications do not establish commissioned phase capacity."
    },
    {
      "id": "exp-stack-mel01",
      "title": "STACK MEL01 campus",
      "url": "https://www.stackinfra.com/locations/asia-pacific/melbourne/mel01/",
      "publisher": "STACK Infrastructure",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "MEL01 Campus; MEL01A–D",
      "summary": "Operator identifies the Truganina campus and four buildings. Its 180 MW campus headline is not treated as commissioned IT load."
    },
    {
      "id": "exp-stack-opening",
      "title": "STACK delivers its first Australian data centre",
      "url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-delivers-first-data-center-in-australia-launching-a-robust-apac-portfolio/",
      "publisher": "STACK Infrastructure",
      "accessedAt": "2026-09-11",
      "publishedAt": "2023-08-22",
      "locator": "Opening announcement, first two paragraphs",
      "summary": "A 36 MW Melbourne facility was completed on a 72 MW campus in August 2023; later campus plans must not be added as operating capacity."
    },
    {
      "id": "exp-stack-mel02",
      "title": "STACK MEL02 campus",
      "url": "https://www.stackinfra.com/locations/asia-pacific/melbourne/mel02/",
      "publisher": "STACK Infrastructure",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "MEL02 Campus",
      "summary": "Distinct Truganina campus near MEL01; advertised 252 MW and gross substation capacity are not commissioning evidence."
    },
    {
      "id": "exp-stack-sydney",
      "title": "STACK Sydney portfolio",
      "url": "https://www.stackinfra.com/locations/asia-pacific/sydney/",
      "publisher": "STACK Infrastructure",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Campus > SYD01",
      "summary": "Current portfolio lists the named SYD01 campus. Lifecycle and exact street address require further primary evidence."
    },
    {
      "id": "exp-goodman-syd01-development",
      "title": "Goodman begins SYD01 construction",
      "url": "https://au.goodman.com/en/about-goodman/media-centre/news/2026/syd01-construction",
      "publisher": "Goodman",
      "accessedAt": "2026-09-11",
      "publishedAt": "2026-03-02",
      "locator": "2 March 2026 announcement; project and phased-delivery paragraphs",
      "summary": "Construction began at Artarmon. Design is 61 MW IT across five phases, with first 12.2 MW targeted for Q2 2028; 90 MW secured utility power is a different metric."
    },
    {
      "id": "exp-goodman-portfolio",
      "title": "Goodman Australian data centre overview",
      "url": "https://au.goodman.com/en/data-centres",
      "publisher": "Goodman",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Global data centre power bank > Goodman SYD01",
      "summary": "Operator gives SYD01 address as 2 Lanceley Place, Artarmon NSW 2064."
    },
    {
      "id": "exp-digital-sydney",
      "title": "Digital Realty Sydney locations",
      "url": "https://www.digitalrealty.com/data-centers/asia-pacific/sydney",
      "publisher": "Digital Realty",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Sydney location cards SYD10 and SYD11",
      "summary": "Operator lists SYD10 at 1–12 Templar Road and SYD11 at 13–23 Templar Road, Erskine Park NSW 2759."
    },
    {
      "id": "exp-digital-melbourne",
      "title": "Digital Realty Melbourne locations",
      "url": "https://www.digitalrealty.com/data-centers/asia-pacific/melbourne",
      "publisher": "Digital Realty",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Melbourne location card MEL11",
      "summary": "Current colocation list identifies MEL11 at 72 Radnor Drive, Deer Park VIC 3023."
    },
    {
      "id": "exp-interactive-locations",
      "title": "Interactive data centre services and locations",
      "url": "https://www.interactive.com.au/services/data-centres/",
      "publisher": "Interactive",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Geographically diverse locations; Where are your data centre facilities?",
      "summary": "Operator explicitly describes six data centres across three physical sites and supplies their street addresses."
    },
    {
      "id": "exp-5gn-tours",
      "title": "5G Networks owned data centre tours",
      "url": "https://wholesale.5gnetworks.au/book-a-data-centre-tour/",
      "publisher": "5G Networks",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Explore our data centres",
      "summary": "Operator identifies its five owned facilities and street addresses; partner network locations are excluded."
    },
    {
      "id": "exp-ledc-newcastle",
      "title": "Leading Edge Newcastle facility",
      "url": "https://leadingedgedc.com/dc_location/newcastle/",
      "publisher": "Leading Edge Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Facility overview and capabilities",
      "summary": "Operator verifies a named regional location. Total-site and per-module specifications are not commissioned capacity."
    },
    {
      "id": "exp-ledc-tamworth",
      "title": "Leading Edge Tamworth facility",
      "url": "https://leadingedgedc.com/dc_location/tamworth/",
      "publisher": "Leading Edge Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Facility overview and capabilities",
      "summary": "Operator verifies a named regional location. Total-site and per-module specifications are not commissioned capacity."
    },
    {
      "id": "exp-ledc-dubbo",
      "title": "Leading Edge Dubbo facility",
      "url": "https://leadingedgedc.com/dc_location/dubbo/",
      "publisher": "Leading Edge Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Facility overview and capabilities",
      "summary": "Operator verifies a named regional location. Total-site and per-module specifications are not commissioned capacity."
    },
    {
      "id": "exp-ledc-albury",
      "title": "Leading Edge Albury facility",
      "url": "https://leadingedgedc.com/dc_location/albury/",
      "publisher": "Leading Edge Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Facility overview and capabilities",
      "summary": "Operator verifies a named regional location. Total-site and per-module specifications are not commissioned capacity."
    },
    {
      "id": "exp-ledc-coffs-harbour",
      "title": "Leading Edge Coffs Harbour facility",
      "url": "https://leadingedgedc.com/dc_location/coffs-harbour/",
      "publisher": "Leading Edge Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Facility overview and capabilities",
      "summary": "Operator verifies a named regional location. Total-site and per-module specifications are not commissioned capacity."
    },
    {
      "id": "exp-ledc-wagga-wagga",
      "title": "Leading Edge Wagga Wagga facility",
      "url": "https://leadingedgedc.com/dc_location/wagga-wagga/",
      "publisher": "Leading Edge Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Facility overview and capabilities",
      "summary": "Operator verifies a named regional location. Total-site and per-module specifications are not commissioned capacity."
    },
    {
      "id": "exp-ledc-openings",
      "title": "Leading Edge announces Dubbo opening",
      "url": "https://leadingedgedc.com/news_post/ledc-opens-dubbo-press-release/",
      "publisher": "Leading Edge Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": "2021-12-13",
      "locator": "Opening date and prior Newcastle/Tamworth facilities",
      "summary": "Dubbo opened on 10 December 2021, following Newcastle and Tamworth; this establishes those three facilities were built."
    },
    {
      "id": "exp-polaris",
      "title": "Polaris facility and location",
      "url": "https://www.polarisdatacentre.com.au/why-polaris/",
      "publisher": "Polaris Data Centre",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Scale; Location; Find us",
      "summary": "Operating Springfield Central facility at 11 Mary Mackenroth Lane. Its 9 MW is explicitly design IT capacity."
    },
    {
      "id": "exp-dxn-operations",
      "title": "DXN current operations",
      "url": "https://dxn.solutions/about-dxn/",
      "publisher": "DXN",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Data Centre Operations; Darwin contact",
      "summary": "Current operator says it owns and manages data centres in Darwin and Hobart. Manufacturing and corporate offices are excluded."
    },
    {
      "id": "exp-keppel-gore-hill",
      "title": "Keppel Australia portfolio",
      "url": "https://www.keppeldatacentres.com/locations/asia-pacific/australia/",
      "publisher": "Keppel Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Australia Data Centres; Gore Hill project",
      "summary": "Operator identifies Gore Hill Data Centre on Broadcast Way, Sydney; tenant halls are not additional sites."
    },
    {
      "id": "exp-iseek-eagle-expansion",
      "title": "iseek Brisbane adjacent expansion",
      "url": "https://iseek.com.au/blog/iseek-expands-brisbane-data-centre-in-response-to-increased-demand/",
      "publisher": "iseek",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Existing facility and adjacent new data centre",
      "summary": "iseek describes its Brisbane Airport expansion next to the existing facility; used with current DigiCo BNE1/BNE2/BNE3 pages to group the campus."
    },
    {
      "id": "exp-digico-bne",
      "title": "DigiCo BNE facility",
      "url": "https://www.digi-co.com.au/location/brisbane-bne/",
      "publisher": "DigiCo Infrastructure REIT",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Facility description beneath city heading",
      "summary": "Operator explicitly reports 0.3 MW installed IT capacity for BNE; source-effective date is not stated."
    },
    {
      "id": "exp-digico-bne1",
      "title": "DigiCo BNE1 facility",
      "url": "https://www.digi-co.com.au/location/brisbane-bne1/",
      "publisher": "DigiCo Infrastructure REIT",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Facility description beneath city heading",
      "summary": "Operator explicitly reports 1.8 MW installed IT capacity for BNE1; source-effective date is not stated."
    },
    {
      "id": "exp-digico-bne2",
      "title": "DigiCo BNE2 facility",
      "url": "https://www.digi-co.com.au/location/brisbane-bne2/",
      "publisher": "DigiCo Infrastructure REIT",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Facility description beneath city heading",
      "summary": "Operator explicitly reports 1.7 MW installed IT capacity for BNE2; source-effective date is not stated."
    },
    {
      "id": "exp-digico-bne3",
      "title": "DigiCo BNE3 facility",
      "url": "https://www.digi-co.com.au/location/brisbane-bne3/",
      "publisher": "DigiCo Infrastructure REIT",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Facility description beneath city heading",
      "summary": "BNE3 is a greenfield expansion option beside BNE2, estimated 19.6 MW IT with a 2027 completion target."
    },
    {
      "id": "exp-digico-adl1",
      "title": "DigiCo ADL1 facility",
      "url": "https://www.digi-co.com.au/location/adelaide-adl1/",
      "publisher": "DigiCo Infrastructure REIT",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Facility description beneath city heading",
      "summary": "Operator explicitly reports 1.2 MW installed IT capacity for ADL1; source-effective date is not stated."
    },
    {
      "id": "exp-digico-adl2",
      "title": "DigiCo ADL2 facility",
      "url": "https://www.digi-co.com.au/location/adelaide-adl2/",
      "publisher": "DigiCo Infrastructure REIT",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Facility description beneath city heading",
      "summary": "Operator explicitly reports 0.6 MW installed IT capacity for ADL2; source-effective date is not stated."
    },
    {
      "id": "exp-digico-tsv1",
      "title": "DigiCo TSV1 facility",
      "url": "https://www.digi-co.com.au/location/townsville-tsv1/",
      "publisher": "DigiCo Infrastructure REIT",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Facility description beneath city heading",
      "summary": "Operator explicitly reports 0.5 MW installed IT capacity for TSV1; source-effective date is not stated."
    },
    {
      "id": "exp-digico-syd1",
      "title": "DigiCo SYD1 facility",
      "url": "https://www.digi-co.com.au/location/sydney-syd1/",
      "publisher": "DigiCo Infrastructure REIT",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Facility description beneath city heading",
      "summary": "Operator explicitly reports 36 MW installed IT capacity for SYD1; source-effective date is not stated."
    },
    {
      "id": "exp-adc-locations",
      "title": "Australian Data Centres locations",
      "url": "https://www.ausdatacentre.com.au/locations/",
      "publisher": "Australian Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Our Locations: operational, development and planning lists",
      "summary": "Names operational Mitchell and Fyshwick. Other cities are market development intentions without individually identified sites."
    },
    {
      "id": "exp-dcwest",
      "title": "DC West data centre",
      "url": "https://www.dcwest.net.au/data-centre/",
      "publisher": "DC West",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Data Centre's Features",
      "summary": "Current operating colocation facility in Perth CBD."
    },
    {
      "id": "exp-iren-bundey",
      "title": "IREN announces first Australian campus at Bundey",
      "url": "https://iren.gcs-web.com/news-releases/news-release-details/iren-announces-first-australian-data-center-campus-800mw-south",
      "publisher": "IREN",
      "accessedAt": "2026-09-11",
      "publishedAt": "2026-06-03",
      "locator": "Highlights and introductory paragraph",
      "summary": "Planned Bundey campus with secured transmission connection and energisation targeted from 2028. Headline MW is not explicitly IT load."
    },
    {
      "id": "exp-pawsey-facility",
      "title": "The Pawsey Centre",
      "url": "https://pawsey.org.au/about-us/the-pawsey-centre/",
      "publisher": "Pawsey Supercomputing Research Centre",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Purpose-built supercomputing building description",
      "summary": "Current research compute facility at Technology Park, Kensington."
    },
    {
      "id": "exp-pawsey-map",
      "title": "Pawsey contact and location map",
      "url": "https://pawsey.org.au/contact/",
      "publisher": "Pawsey Supercomputing Research Centre",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "General enquiries address; HTML initMap myLatLng",
      "summary": "Operator supplies 1 Bryce Avenue, Kensington and embedded map coordinates -31.992603,115.883842."
    },
    {
      "id": "exp-nci-building",
      "title": "NCI building image gallery",
      "url": "https://nci.org.au/media/images",
      "publisher": "National Computational Infrastructure",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "The NCI Building",
      "summary": "Current purpose-built ANU building houses data centre, plant room and offices."
    },
    {
      "id": "exp-nci-contact",
      "title": "NCI contact locations",
      "url": "https://nci.org.au/contact",
      "publisher": "National Computational Infrastructure",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Location",
      "summary": "Lists 143 Ward Road and 56 Mills Road at ANU; physical data-centre versus office address requires further disambiguation."
    },
    {
      "id": "exp-42-24",
      "title": "42-24 colocation sites",
      "url": "https://42-24.com.au/co-locate/",
      "publisher": "42-24 / TasNetworks",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Data Centre and ownership statement",
      "summary": "Owns and operates two data centres at Derwent Park and Cambridge."
    },
    {
      "id": "exp-microsoft-woods-road",
      "title": "Microsoft Woods Road project overview",
      "url": "https://local.microsoft.com/blog/woods-road-datacentre-construction-overview/",
      "publisher": "Microsoft",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Dated project update sections",
      "summary": "February 2025: substation works and site completion update. Earlier mid-2025 target is not evidence of operation."
    },
    {
      "id": "exp-microsoft-garden-drive",
      "title": "Microsoft Garden Drive project overview",
      "url": "https://local.microsoft.com/blog/garden-drive-datacentre-construction-overview/",
      "publisher": "Microsoft",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Dated project update sections",
      "summary": "February 2025: fit-out and substation construction. Earlier target is not treated as actual opening."
    },
    {
      "id": "exp-microsoft-cawley-road",
      "title": "Microsoft Cawley Road project overview",
      "url": "https://local.microsoft.com/blog/cawley-road-datacentre-construction-overview/",
      "publisher": "Microsoft",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Dated project update sections",
      "summary": "June 2026 update refers to ongoing operations and customer service loads; February 2025 confirms Building One operational. Page conflicts on suburb (Truganina / Yarraville), so city only."
    },
    {
      "id": "exp-microsoft-station-road",
      "title": "Microsoft Station Road Seven Hills project overview",
      "url": "https://local.microsoft.com/blog/construction-updates-for-the-station-road-datacentres/",
      "publisher": "Microsoft",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Dated project update sections",
      "summary": "Latest dated update July 2024 describes construction of Building Two. Completion dates explicitly do not establish operation; current operating status needs refresh."
    },
    {
      "id": "exp-microsoft-kemps-creek",
      "title": "Microsoft Kemps Creek project overview",
      "url": "https://local.microsoft.com/blog/kemps-creek-datacentre-overview/",
      "publisher": "Microsoft",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Dated project update sections",
      "summary": "May 2026 confirms Building One (SYD05) completed and handed over to operations; later phase not assumed operating."
    },
    {
      "id": "exp-microsoft-huntingwood",
      "title": "Microsoft Huntingwood project overview",
      "url": "https://local.microsoft.com/blog/huntingwood-datacentre/",
      "publisher": "Microsoft",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Dated project update sections",
      "summary": "Proposed development at 6 Honeman Close; environmental documentation submitted 13 August 2026. Approval process underway, not evidence of construction."
    },
    {
      "id": "exp-tenpeaks-locations",
      "title": "TenPeaks national data centre footprint",
      "url": "https://tenpeaks.co.nz/data-centres",
      "publisher": "TenPeaks",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Auckland campuses; A diverse future map labels",
      "summary": "Current operator identifies three Auckland campuses and seven named metro locations."
    },
    {
      "id": "exp-tenpeaks-history",
      "title": "TenPeaks company history",
      "url": "https://tenpeaks.co.nz/about",
      "publisher": "TenPeaks",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Journey milestones",
      "summary": "Former Spark data-centre business launched as TenPeaks in February 2026; dates selected historical facility openings."
    },
    {
      "id": "exp-tenpeaks-north",
      "title": "TenPeaks North campus",
      "url": "https://tenpeaks.co.nz/data-centres/north",
      "publisher": "TenPeaks",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Campus design and land/resource consent",
      "summary": "Planned North campus with June 2024 resource consent; total potential capacity is not installed capacity."
    },
    {
      "id": "exp-planb-facilities",
      "title": "Plan B colocation product datasheet",
      "url": "https://www.planb.co.nz/assets/downloads/Plan-B-Data-Sheet-Colocation.pdf",
      "publisher": "Plan B",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Current Connectivity table / four locations",
      "summary": "Names Tarndale, Airedale, Tawa and Middleton facilities; MW not disclosed."
    },
    {
      "id": "exp-planb-footprint",
      "title": "Plan B primary and connected footprint",
      "url": "https://go.planb.co.nz/datacentre-colocation",
      "publisher": "Plan B",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Owned and operated Primary Data Centres",
      "summary": "Advertises five primary facilities, separately from 29 connected sites; fifth primary identity remains unresolved."
    },
    {
      "id": "exp-t4-operating",
      "title": "T4 operating locations and NTT partnership",
      "url": "https://t4group.nz/news/industry-leading-data-centre-secures-major-partnership",
      "publisher": "T4 NZ Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Operating locations paragraph",
      "summary": "Identifies operating Whangārei and Auckland facilities. Undated page's Southland project needs a current lifecycle check."
    },
    {
      "id": "exp-firmus-tasmania",
      "title": "Firmus Tasmania community hub",
      "url": "https://firmus.co/ourcommitments/tasmaniancommunity",
      "publisher": "Firmus",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Three sites, one region",
      "summary": "Names Launceston anchor under construction and future Bell Bay/Wesley Vale sites."
    },
    {
      "id": "exp-firmus-bell-bay",
      "title": "Firmus Bell Bay AI Factory project",
      "url": "https://firmus.co/bell-bay-industrial-precinct-ai-factory-project",
      "publisher": "Firmus",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Project FAQ: site, buildings and power",
      "summary": "Proposed two-hall project at Lot 1 East Tamar Highway, Long Reach. 288 MW is grid demand, not IT load."
    },
    {
      "id": "exp-firmus-wesley",
      "title": "Firmus Wesley Vale AI Factory project",
      "url": "https://firmus.co/wesley-vale-ai-factory-project",
      "publisher": "Firmus",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Project FAQ: site and electricity connection",
      "summary": "Proposed project at 226 Mill Road. 26 MW describes electricity connection, not IT capacity."
    },
    {
      "id": "exp-firmus-sa",
      "title": "Firmus South Australia community hub",
      "url": "https://firmus.co/ourcommitments/sa-community",
      "publisher": "Firmus",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Our South Australian Projects; Project Approvals",
      "summary": "Two separately named campuses: Tailem Bend approximately 1.0 GW and Stirling North approximately 1.3 GW critical IT at full build-out, subject to planning approval."
    },
    {
      "id": "exp-vantage-mel1",
      "title": "Vantage Melbourne MEL1 campus",
      "url": "https://vantage-dc.com/data-center-locations/apac/melbourne-australia/",
      "publisher": "Vantage Data Centers",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Melbourne overview; critical IT load",
      "summary": "Current page markets one 64 MW IT campus in Tullamarine using future tense but supplies no dated lifecycle milestone."
    },
    {
      "id": "exp-edgecentres-current",
      "title": "Edge Centres current locations",
      "url": "https://edgecentres.com/",
      "publisher": "Edge Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Global Edge Data Center Locations",
      "summary": "Current homepage lists Brisbane as Australian location; legacy regional portfolio needs reconciliation."
    },
    {
      "id": "exp-micron21-tour",
      "title": "Micron21 data centre tour",
      "url": "https://www.micron21.com/book-a-tour",
      "publisher": "Micron21",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Our Data Centre; Getting here",
      "summary": "Operating facility visitor instructions establish Kilsyth South site address."
    },
    {
      "id": "exp-colocity-locations",
      "title": "Colocity DC1 and DC3",
      "url": "https://colocity.com/our-data-centres/",
      "publisher": "Colocity",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Our locations: Pulteney Street DC1; Morphett Street DC3",
      "summary": "Two owned Adelaide facilities are offered for colocation."
    },
    {
      "id": "exp-colocity-history",
      "title": "Colocity history and milestones",
      "url": "https://colocity.com/about-colocity-data-centres/",
      "publisher": "Colocity",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Milestones: 2007, 2015, 2026",
      "summary": "DC1 operational in 2007; DC3 opened in 2015; a second DC3 hall started construction in 2026."
    },
    {
      "id": "exp-hostaway-colocation",
      "title": "HostAway colocation",
      "url": "https://www.hostaway.net.au/colocation/",
      "publisher": "HostAway",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Features; customer colocation offering",
      "summary": "Operating colocation infrastructure; no IT MW disclosed."
    },
    {
      "id": "exp-hostaway-home",
      "title": "HostAway Malaga data centre",
      "url": "https://www.hostaway.net.au/",
      "publisher": "HostAway",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Malaga data centre description",
      "summary": "Identifies the operator's Malaga data centre."
    },
    {
      "id": "exp-hostnetworks-facility",
      "title": "Host Networks Eight Mile Plains data centre",
      "url": "https://hostnetworks.com.au/about/our_data_centre",
      "publisher": "Host Networks / Edge Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Brandl St, Eight Mile Plains; footer",
      "summary": "Own primary colocation facility; footer names Edge Centres. Protected power is a facility metric, not an IT-load claim."
    },
    {
      "id": "exp-hostnetworks-contact",
      "title": "Host Networks equipment deliveries",
      "url": "https://hostnetworks.com.au/contact",
      "publisher": "Host Networks / Edge Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Additional Information: delivery address",
      "summary": "Customer hardware delivery address for the operator's NOC and colocation services."
    },
    {
      "id": "exp-quinbrook-supernode",
      "title": "Supernode digital and energy infrastructure project",
      "url": "https://www.quinbrook.com/our-portfolio/supernode/",
      "publisher": "Quinbrook",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "2026+ stages 4 and 5; 500 MW-IT potential capacity",
      "summary": "Data centre development is planned; battery operations and construction are separate. 500 MW-IT is potential campus capacity."
    },
    {
      "id": "exp-vocus-sa-address",
      "title": "Vocus connected South Australian data centres",
      "url": "https://gowith.vocus.com.au/rs/587-CSJ-470/images/sa-data-centres.html",
      "publisher": "Vocus",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "DCI Data Centers address row; primary search-index copy accessed 2026-09-11",
      "summary": "Carrier's own connected-site list places DCI at 340 Findon Road, matching 5G Networks' tour address. Direct page currently redirects; indexed source remains readable."
    },
    {
      "id": "nextdc-addresses-2026",
      "title": "NEXTDC Sydney technical specifications: national facility addresses",
      "url": "https://www.nextdc.com/hubfs/2026_NEXTDC_Tech_Specs_Sydney_Data_Centres%20(1).pdf",
      "publisher": "NEXTDC",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Page 3 national facility address panel; page 5 Sydney locations",
      "summary": "Published street addresses. Addresses do not by themselves establish site coordinates or commissioned capacity."
    },
    {
      "id": "nextdc-contact-locations",
      "title": "NEXTDC contact: facility addresses and directions",
      "url": "https://www.nextdc.com/contact",
      "publisher": "NEXTDC",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "NEXTDC Locations section; destination !3d latitude / !4d longitude in operator-published directions links",
      "summary": "Operator-selected map destinations are used, not the separate map viewport centre. These identify publicly advertised visitor locations, not a surveyed footprint."
    },
    {
      "id": "nextdc-history",
      "title": "NEXTDC company history",
      "url": "https://www.nextdc.com/about-us/our-history",
      "publisher": "NEXTDC",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Dated opening entries for B1, M1, C1, S1, P1, B2, M2, SC1, S3 and M3",
      "summary": "Month-level opening milestones only. Later design or built capacity is not attributed to these opening dates."
    },
    {
      "id": "nextdc-fy25-history",
      "title": "NEXTDC FY25 Results Presentation: dated capacity observations",
      "url": "https://nextdc.com/hubfs/ASX%20Announcements/FY25%20Full%20Year%20Results%20Presentation.pdf",
      "publisher": "NEXTDC",
      "accessedAt": "2026-09-11",
      "publishedAt": "2025-08-28",
      "locator": "Pages 16 and 32-33; built capacity definition, M2/M3/S3/S6 observations",
      "summary": "Selected fitted-out capacity snapshots are recorded on the report publication date. These are disclosure dates, not commissioning dates, and not the whole operator portfolio."
    },
    {
      "id": "nextdc-p2-commissioning",
      "title": "NEXTDC FY20 Environmental, Social and Governance Report",
      "url": "https://www.nextdc.com/hubfs/ASX%20Announcements/2104840.pdf",
      "publisher": "NEXTDC",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Page 18, cooling efficiency discussion",
      "summary": "States P2 was fully commissioned in July 2020. No numeric capacity is inferred from this statement."
    },
    {
      "id": "nextdc-1h25-openings",
      "title": "NEXTDC Half Year Report and Accounts to 31 December 2024",
      "url": "https://www.nextdc.com/hubfs/Half%20Year%20Report%20%26%20Accounts.pdf",
      "publisher": "NEXTDC",
      "accessedAt": "2026-09-11",
      "publishedAt": "2025-02-24",
      "locator": "Directors report, operational developments: A1, D1 and S6 opened to customers during the half-year",
      "summary": "Customer openings occurred during July-December 2024. Stored with year precision and the narrower half-year window preserved in the note."
    },
    {
      "id": "loc-equinix-ae1",
      "title": "Equinix AE1: address and location",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/adelaide-data-centers/ae1",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address section and the same named facility's public map initialisation: address1, address2, city, postalCode, latitude, longitude",
      "summary": "Street address and site marker published by the operator. Coordinates locate the site; they do not identify racks, entrances or an entire campus boundary."
    },
    {
      "id": "loc-equinix-br1",
      "title": "Equinix BR1: address and location",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/brisbane-data-centers/br1",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address section and the same named facility's public map initialisation: address1, address2, city, postalCode, latitude, longitude",
      "summary": "Street address and site marker published by the operator. Coordinates locate the site; they do not identify racks, entrances or an entire campus boundary."
    },
    {
      "id": "loc-equinix-ca1",
      "title": "Equinix CA1: address and location",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/canberra-data-centers/ca1",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address section and the same named facility's public map initialisation: address1, address2, city, postalCode, latitude, longitude",
      "summary": "Street address and site marker published by the operator. Coordinates locate the site; they do not identify racks, entrances or an entire campus boundary."
    },
    {
      "id": "loc-equinix-me1",
      "title": "Equinix ME1: address and location",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/melbourne-data-centers/me1",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address section and the same named facility's public map initialisation: address1, address2, city, postalCode, latitude, longitude",
      "summary": "Street address and site marker published by the operator. Coordinates locate the site; they do not identify racks, entrances or an entire campus boundary."
    },
    {
      "id": "loc-equinix-me2",
      "title": "Equinix ME2: address and location",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/melbourne-data-centers/me2",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address section and the same named facility's public map initialisation: address1, address2, city, postalCode, latitude, longitude",
      "summary": "Street address and site marker published by the operator. Coordinates locate the site; they do not identify racks, entrances or an entire campus boundary."
    },
    {
      "id": "loc-equinix-me4",
      "title": "Equinix ME4: address and location",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/melbourne-data-centers/me4",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address section and the same named facility's public map initialisation: address1, address2, city, postalCode, latitude, longitude",
      "summary": "Street address and site marker published by the operator. Coordinates locate the site; they do not identify racks, entrances or an entire campus boundary."
    },
    {
      "id": "loc-equinix-me5",
      "title": "Equinix ME5: address and location",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/melbourne-data-centers/me5",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address section and the same named facility's public map initialisation: address1, address2, city, postalCode, latitude, longitude",
      "summary": "Street address and site marker published by the operator. Coordinates locate the site; they do not identify racks, entrances or an entire campus boundary."
    },
    {
      "id": "loc-equinix-pe1",
      "title": "Equinix PE1: address and location",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/perth-data-centers/pe1",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address section and the same named facility's public map initialisation: address1, address2, city, postalCode, latitude, longitude",
      "summary": "Street address and site marker published by the operator. Coordinates locate the site; they do not identify racks, entrances or an entire campus boundary."
    },
    {
      "id": "loc-equinix-pe2",
      "title": "Equinix PE2: address and location",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/perth-data-centers/pe2",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address section and the same named facility's public map initialisation: address1, address2, city, postalCode, latitude, longitude",
      "summary": "Street address and site marker published by the operator. Coordinates locate the site; they do not identify racks, entrances or an entire campus boundary."
    },
    {
      "id": "loc-equinix-pe3",
      "title": "Equinix PE3: address and location",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/perth-data-centers/pe3",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address section and the same named facility's public map initialisation: address1, address2, city, postalCode, latitude, longitude",
      "summary": "Street address and site marker published by the operator. Coordinates locate the site; they do not identify racks, entrances or an entire campus boundary."
    },
    {
      "id": "loc-equinix-sy1",
      "title": "Equinix SY1: address and location",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy1",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address section and the same named facility's public map initialisation: address1, address2, city, postalCode, latitude, longitude",
      "summary": "Street address and site marker published by the operator. Coordinates locate the site; they do not identify racks, entrances or an entire campus boundary."
    },
    {
      "id": "loc-equinix-sy2",
      "title": "Equinix SY2: address and location",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy2",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address section and the same named facility's public map initialisation: address1, address2, city, postalCode, latitude, longitude",
      "summary": "Street address and site marker published by the operator. Coordinates locate the site; they do not identify racks, entrances or an entire campus boundary."
    },
    {
      "id": "loc-equinix-sy3",
      "title": "Equinix SY3: address and location",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy3",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address section and the same named facility's public map initialisation: address1, address2, city, postalCode, latitude, longitude",
      "summary": "Street address and site marker published by the operator. Coordinates locate the site; they do not identify racks, entrances or an entire campus boundary."
    },
    {
      "id": "loc-equinix-sy4",
      "title": "Equinix SY4: address and location",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy4",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address section and the same named facility's public map initialisation: address1, address2, city, postalCode, latitude, longitude",
      "summary": "Street address and site marker published by the operator. Coordinates locate the site; they do not identify racks, entrances or an entire campus boundary."
    },
    {
      "id": "loc-equinix-sy5",
      "title": "Equinix SY5: address and location",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy5",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address section and the same named facility's public map initialisation: address1, address2, city, postalCode, latitude, longitude",
      "summary": "Street address and site marker published by the operator. Coordinates locate the site; they do not identify racks, entrances or an entire campus boundary."
    },
    {
      "id": "loc-equinix-sy6",
      "title": "Equinix SY6: address and location",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy6",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address section and the same named facility's public map initialisation: address1, address2, city, postalCode, latitude, longitude",
      "summary": "Street address and site marker published by the operator. Coordinates locate the site; they do not identify racks, entrances or an entire campus boundary."
    },
    {
      "id": "loc-equinix-sy7",
      "title": "Equinix SY7: address and location",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy7",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address section and the same named facility's public map initialisation: address1, address2, city, postalCode, latitude, longitude",
      "summary": "Street address and site marker published by the operator. Coordinates locate the site; they do not identify racks, entrances or an entire campus boundary."
    },
    {
      "id": "loc-equinix-sy9x",
      "title": "Equinix SY9x: address and location",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy9x",
      "publisher": "Equinix",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Address section and the same named facility's public map initialisation: address1, address2, city, postalCode, latitude, longitude",
      "summary": "Street address and site marker published by the operator. Coordinates locate the site; they do not identify racks, entrances or an entire campus boundary."
    },
    {
      "id": "research-nem-data-centre-electricity-2026",
      "title": "2026 Electricity Statement of Opportunities: demand outlook",
      "url": "https://www.aemo.com.au/newsroom/media-release/2026-esoo",
      "publisher": "AEMO",
      "accessedAt": "2026-09-11",
      "publishedAt": "2026-08-25",
      "locator": "Data-centre forecast and methodology paragraphs",
      "summary": "AEMO forecasts NEM data-centre electricity consumption of approximately 5 TWh in 2025–26 and 34 TWh in 2035–36."
    },
    {
      "id": "research-nem-transmission-enquiries-q1-2026",
      "title": "Digital demand surge: transmission connection requests",
      "url": "https://www.aemo.com.au/newsroom/news-updates/digital-demand-surge",
      "publisher": "AEMO",
      "accessedAt": "2026-09-11",
      "publishedAt": "2026-06-01",
      "locator": "Supporting efficient connections; paragraph beginning For the first time",
      "summary": "At end-March 2026, 11 large data-centre projects represented 5.4 GW maximum demand in the NEM transmission connection process."
    },
    {
      "id": "research-transpower-five-scenarios-2026",
      "title": "Te Kanapu: our scenarios",
      "url": "https://www.transpower.co.nz/our-work/te-kanapu/our-scenarios",
      "publisher": "Transpower",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Where are we at? August 2026; Explore our scenarios disclaimer",
      "summary": "Transpower uses five future scenarios for its grid blueprint and explicitly says the scenario data is not an official forecast."
    },
    {
      "id": "research-transpower-ai-scenario-2026",
      "title": "Te Kanapu Future Scenarios, June 2026",
      "url": "https://static.transpower.co.nz/public/2026-06/Te%20Kanapu%20Future%20Scenarios%20June%202026.pdf?VersionId=Ql1LhibSc9e6MYD8CiBTpZ6PgRnrnQj9",
      "publisher": "Transpower",
      "accessedAt": "2026-09-11",
      "publishedAt": "2026-06",
      "locator": "Pages 22–24; Figure 18 and printed paragraph on page 24",
      "summary": "Transpower’s Aotearoa Intelligence scenario explores digital-sector growth, with data centres contributing materially to additional electricity demand.",
      "publishedDatePrecision": "month"
    },
    {
      "id": "research-transpower-connection-evidence",
      "title": "Transpower connection enquiry information",
      "url": "https://www.transpower.co.nz/connections/customer-information",
      "publisher": "Transpower",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Connection Enquiry Dashboard; Electricity Authority requirement for data collection",
      "summary": "Transpower’s connection-enquiry dashboard organises projects by type, region, delivery period and stage."
    },
    {
      "id": "research-training-inference-definition",
      "title": "AI inference and training definitions",
      "url": "https://www.nvidia.com/en-us/glossary/ai-inference/",
      "publisher": "NVIDIA",
      "accessedAt": "2026-09-11",
      "publishedAt": "2025-12-10",
      "locator": "Key Differences Between AI Training Versus Inference",
      "summary": "Training learns or changes model parameters; inference applies a trained model to new inputs."
    },
    {
      "id": "research-hpc-definition",
      "title": "High-performance computing definition",
      "url": "https://www.nvidia.com/en-us/glossary/high-performance-computing/",
      "publisher": "NVIDIA",
      "accessedAt": "2026-09-11",
      "publishedAt": "2025-06-05",
      "locator": "What is HPC?; What Is an HPC Cluster?",
      "summary": "HPC uses parallel computing for demanding workloads and can combine CPUs and accelerators; it overlaps with, but is not confined to, AI."
    },
    {
      "id": "research-ai-ready-is-not-fleet",
      "title": "How to size GPUs for AI inference",
      "url": "https://developer.nvidia.com/blog/how-to-size-gpus-for-ai-inference-and-tco-without-overspending/",
      "publisher": "NVIDIA",
      "accessedAt": "2026-09-11",
      "publishedAt": "2026-09-01",
      "locator": "Know your use case; Key sizing inputs for smarter TCO, main article body",
      "summary": "An AI-ready facility claim does not establish installed GPU quantity. Hardware sizing depends on model, concurrency, token lengths, latency and optimisation, so no fixed MW-to-GPU conversion is used."
    },
    {
      "id": "verify-cdc-sydney-20260911",
      "title": "CDC: sydney location and specifications, rechecked",
      "url": "https://cdc.com/locations/sydney/",
      "publisher": "CDC",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "At a glance; Eastern Creek Campus; Marsden Park Campus",
      "summary": "EC1–EC4 are operational; EC5/EC6 and Marsden Park are under construction. Planned campus envelopes are not current commissioned capacity."
    },
    {
      "id": "verify-cdc-auckland-20260911",
      "title": "CDC: auckland location and specifications, rechecked",
      "url": "https://cdc.com/locations/auckland/",
      "publisher": "CDC",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Silverdale Campus One; Hobsonville Campus One and Two",
      "summary": "The three campuses explicitly report operating capacity of 22, 22 and 54 MW respectively. The page does not define IT versus whole-facility electrical power."
    },
    {
      "id": "verify-cdc-canberra-20260911",
      "title": "CDC: canberra location and specifications, rechecked",
      "url": "https://cdc.com/locations/canberra/",
      "publisher": "CDC",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "At a glance; Hume One and Two; Fyshwick; Beard",
      "summary": "Hume One, Hume Two and Fyshwick are operating; Beard is under construction. The reported 21, 51, 45 and 39 MW do not have an explicit IT power definition on this page."
    },
    {
      "id": "verify-cdc-melbourne-20260911",
      "title": "CDC: melbourne location and specifications, rechecked",
      "url": "https://cdc.com/locations/melbourne/",
      "publisher": "CDC",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "At a glance; Brooklyn Campus; Laverton Campus",
      "summary": "BK1 is operating; the remaining Brooklyn facilities and Laverton campus are under construction. Ultimate campus figures are not a phase-by-phase commissioned power schedule."
    },
    {
      "id": "verify-airtrunk-syd3-20260911",
      "title": "AirTrunk: syd 3 location and specifications, rechecked",
      "url": "https://airtrunk.com/location/syd3-sydney-west/",
      "publisher": "AirTrunk",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Key features: capacity, size, power, efficiency",
      "summary": "The page describes a 400+ MW campus envelope, 8.3 ha, 42 data halls and design PUE 1.15. It does not establish an installed GPU inventory or a commissioned IT power split."
    },
    {
      "id": "verify-airtrunk-mel2-20260911",
      "title": "AirTrunk: mel 2 location and specifications, rechecked",
      "url": "https://airtrunk.com/location/mel2-melbourne/",
      "publisher": "AirTrunk",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Key features: capacity, size, power, efficiency",
      "summary": "The page describes a 354+ MW campus envelope, up to 32 data halls, 66 kV feeds and design PUE 1.15. It does not establish a commissioned IT power split."
    },
    {
      "id": "verify-cdc-marsden-planning-20260911",
      "title": "Marsden Park Data Centre: SSD-70889211 determination",
      "publisher": "NSW Planning Portal",
      "url": "https://www.planningportal.nsw.gov.au/major-projects/projects/marsden-park-data-centre",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Project description; Project Details, Decision and Determination Date",
      "summary": "The portal records approval on 27 November 2025 for a project described as six data centre buildings with 504 MW power consumption and a 720 MW substation."
    },
    {
      "id": "verify-datacom-highbrook",
      "title": "Highbrook, South Auckland's Data Centre, Secure & Scalable ",
      "publisher": "Datacom",
      "url": "https://datacom.com/nz/en/products/data-centres/locations/highbrook-auckland",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Opening acquisition paragraphs and upgrade description; Key features counter is not accepted as a capacity observation",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-datacom-kapua",
      "title": "Kapua, Hamilton's Data Centre, Secure & Scalable ",
      "publisher": "Datacom",
      "url": "https://datacom.com/nz/en/products/data-centres/locations/kapua-hamilton",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Opening location and capacity-to-grow description",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-datacom-locations",
      "title": "Colocation Data Centre Facilities In New Zealand and Australia",
      "publisher": "Datacom",
      "url": "https://datacom.com/nz/en/products/data-centres/locations",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Five individually named New Zealand location cards, not the stale four-centre introductory sentence",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-datacom-orbit",
      "title": "Orbit, Auckland's Data Centre, Secure & Scalable ",
      "publisher": "Datacom",
      "url": "https://datacom.com/nz/en/products/data-centres/locations/orbit-auckland",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Opening location and customer-sector description",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-digico-adl1",
      "title": "Adelaide ADL1 - DigiCo Infrastructure REIT",
      "publisher": "DigiCo Infrastructure REIT",
      "url": "https://www.digi-co.com.au/location/adelaide-adl1/",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Facility description and Installed IT capacity heading; BNE3 greenfield development paragraph",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-digico-adl2-fresh",
      "title": "Adelaide ADL2 - DigiCo Infrastructure REIT",
      "publisher": "DigiCo Infrastructure REIT",
      "url": "https://www.digi-co.com.au/location/adelaide-adl2/",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Facility description and Installed IT capacity heading; BNE3 greenfield development paragraph",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-digico-bne",
      "title": "Brisbane BNE - DigiCo Infrastructure REIT",
      "publisher": "DigiCo Infrastructure REIT",
      "url": "https://www.digi-co.com.au/location/brisbane-bne/",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Facility description and Installed IT capacity heading; BNE3 greenfield development paragraph",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-digico-bne1",
      "title": "Brisbane BNE1 - DigiCo Infrastructure REIT",
      "publisher": "DigiCo Infrastructure REIT",
      "url": "https://www.digi-co.com.au/location/brisbane-bne1/",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Facility description and Installed IT capacity heading; BNE3 greenfield development paragraph",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-digico-bne2",
      "title": "Brisbane BNE2 - DigiCo Infrastructure REIT",
      "publisher": "DigiCo Infrastructure REIT",
      "url": "https://www.digi-co.com.au/location/brisbane-bne2/",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Facility description and Installed IT capacity heading; BNE3 greenfield development paragraph",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-digico-bne3",
      "title": "Brisbane BNE3 - DigiCo Infrastructure REIT",
      "publisher": "DigiCo Infrastructure REIT",
      "url": "https://www.digi-co.com.au/location/brisbane-bne3/",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Facility description and Installed IT capacity heading; BNE3 greenfield development paragraph",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-digico-syd1-fresh",
      "title": "Sydney SYD1 - DigiCo Infrastructure REIT",
      "publisher": "DigiCo Infrastructure REIT",
      "url": "https://www.digi-co.com.au/location/sydney-syd1/",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Facility description and Installed IT capacity heading; BNE3 greenfield development paragraph",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-digico-tsv1",
      "title": "Townsville TSV1 - DigiCo Infrastructure REIT",
      "publisher": "DigiCo Infrastructure REIT",
      "url": "https://www.digi-co.com.au/location/townsville-tsv1/",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Facility description and Installed IT capacity heading; BNE3 greenfield development paragraph",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-nextdc-b1",
      "title": "B1 Brisbane",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres/brisbane-data-centres/b1-brisbane",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility main description and IT design specification",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-nextdc-c1",
      "title": "Canberra Data Centre | Government & Enterprise Colocation ",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres/canberra-data-centres-colocation",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility main description and IT design specification",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-nextdc-capital-plan",
      "title": "Record Contracted Growth and A$2.2bn Capital Plan to Scale AI-Ready Infrastructure",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/news/record-contracted-growth-and-a2.2bn-capital-plan-to-scale-ai-ready-infrastructure",
      "accessedAt": "2026-09-11",
      "publishedAt": "2026-04-20",
      "locator": "Named facility main description and IT design specification",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-nextdc-directory",
      "title": "Data Centres Australia | Tier III & IV for 100% Uptime",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Australian and New Zealand facility directory; specification cards and lifecycle labels",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-nextdc-fy26",
      "title": "NEXTDC FY26 Results Presentation",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/hubfs/Financial%20Reports/FY26/NEXTDC%20FY26%20Results%20Presentation.pdf",
      "accessedAt": "2026-09-11",
      "publishedAt": "2026-08-27",
      "locator": "PDF pp 4–6 (contracted, billing and forward order book), p 18 (built/in-progress table and definitions; visually checked), pp 30–32 (named development rows)",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-nextdc-h200",
      "title": "NVIDIA H200 Data Centres: GPU-Ready Colocation for Universities",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/blog/universities-supercharge-ai-research-with-nvidia-h200",
      "accessedAt": "2026-09-11",
      "publishedAt": "2025-06-30",
      "locator": "Dated article; Australian private-sector paragraph naming Sharon AI H200 supercluster at an unnamed Melbourne facility",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-nextdc-m1",
      "title": "M1 Melbourne",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres/melbourne-data-centres/m1-melbourne",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility main description and IT design specification",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-nextdc-openai",
      "title": "NEXTDC to Join OpenAI in Australia as an Infrastructure Partner",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/news/building-the-next-generation-of-sovereign-ai-infrastructure-in-australia",
      "accessedAt": "2026-09-11",
      "publishedAt": "2025-12-05",
      "locator": "Dated ASX announcement; National Infrastructure Partnership and S7 Hyperscale Campus sections",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-nextdc-s1",
      "title": "S1 Sydney NEXTDC Data Centre",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres/sydney-data-centres/s1-sydney",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility main description and IT design specification",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-nextdc-s2",
      "title": "S2 Sydney NEXTDC Data Centre",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres/sydney-data-centres/s2-sydney",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility main description and IT design specification",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-nextdc-s6",
      "title": "S6 Sydney: Australia's First AI Factory by NEXTDC",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres/sydney-data-centres/s6-sydney",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility main description and IT design specification",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-nextdc-s7",
      "title": "S7 Sydney",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/data-centres/sydney-data-centres/s7-sydney",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility main description and IT design specification",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-nextdc-sharon-ai",
      "title": "SharonAI customer story",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/customer-stories/sharon-ai",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "The solution (three east-coast facilities); The benefits (inference); company introduction (NVIDIA DGX)",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-nextdc-utilisation",
      "title": "NEXTDC announces historic increase in contracted utilisation",
      "publisher": "NEXTDC",
      "url": "https://www.nextdc.com/news/asx-utilisation-update",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility main description and IT design specification",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-tenpeaks-central",
      "title": "Central Data Centre Campus",
      "publisher": "TenPeaks",
      "url": "https://tenpeaks.co.nz/data-centres/central",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Body: Mayoral Drive/Airedale campus and proposed additional 15 MW building",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-tenpeaks-north",
      "title": "North Data Centre Campus",
      "publisher": "TenPeaks",
      "url": "https://tenpeaks.co.nz/data-centres/north",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Body: initial 40 MW, potential 80 MW+, June 2024 consent and land secured; 5–7 MW generation is a different metric",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "verify-tenpeaks-south",
      "title": "South Data Centre Campus",
      "publisher": "TenPeaks",
      "url": "https://tenpeaks.co.nz/data-centres/south",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Body: current 12.3 MW across two pods; consented Pod 3 15 MW; future Pods 4 and 5",
      "summary": "Primary operator source reviewed for the explicitly recorded fields. A page specification is not automatically installed capacity, and capability is not deployment."
    },
    {
      "id": "compute-firmus-tasmania-20260911",
      "title": "Firmus Tasmania community hub",
      "url": "https://firmus.co/ourcommitments/tasmaniancommunity",
      "publisher": "Firmus",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Three sites, one region",
      "summary": "Names Launceston under construction and Bell Bay/Wesley Vale as future sites."
    },
    {
      "id": "compute-firmus-southgate-20260911",
      "title": "Firmus Southgate infrastructure",
      "url": "https://firmus.co/infrastructure/southgate",
      "publisher": "Firmus",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Southgate Tasmania: Location and Capacity",
      "summary": "Names Launceston and 84 MW Critical IT Load; no installed fit-out quantity or commissioning date."
    },
    {
      "id": "compute-firmus-bellbay-20260911",
      "title": "Firmus Bell Bay industrial precinct project FAQ",
      "url": "https://firmus.co/bell-bay-industrial-precinct-ai-factory-project",
      "publisher": "Firmus",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "What is the project; Will it use a lot of energy; How does the cooling system work",
      "summary": "Proposed Bell Bay project, grid-demand rating, intended training workloads and compatible hardware architecture."
    },
    {
      "id": "compute-firmus-wesley-20260911",
      "title": "Firmus Wesley Vale project FAQ",
      "url": "https://firmus.co/wesley-vale-ai-factory-project",
      "publisher": "Firmus",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Will it use a lot of energy",
      "summary": "Initial 23 MW critical IT load with a larger expansion figure containing the literal unit typo WM."
    },
    {
      "id": "compute-firmus-sa-20260911",
      "title": "Firmus South Australia community hub",
      "url": "https://firmus.co/ourcommitments/sa-community",
      "publisher": "Firmus",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Our South Australian Projects; Policy in Action; Project Approvals",
      "summary": "Two proposed IT-capacity envelopes and a 600 MW electricity agreement, without per-site allocation."
    },
    {
      "id": "compute-firmus-expansion-20260911",
      "title": "Firmus expands Project Southgate across Australia",
      "url": "https://firmus.co/newsroom/southgate-expansion",
      "publisher": "Firmus",
      "accessedAt": "2026-09-11",
      "publishedAt": "2025-10",
      "locator": "First Stages Underway; Best-in-Class, Supported by NVIDIA; Built by CDC",
      "summary": "Historical Melbourne deployment target and planned DGX Cloud region; does not prove the target was reached.",
      "publishedDatePrecision": "month"
    },
    {
      "id": "compute-firmus-contract-20260911",
      "title": "Firmus signs multi-year agreement with global hyperscale customer",
      "url": "https://firmus.co/newsroom/firmus-signs-multi-year-agreement-with-global-hyperscale-customer-at-project-southgate",
      "publisher": "Firmus",
      "accessedAt": "2026-09-11",
      "publishedAt": "2026-03-02",
      "locator": "Opening paragraphs and paragraph before About Firmus",
      "summary": "Approximately 18,400 GB300 GPUs contracted for Melbourne; separate 36,800 GPU Tasmania construction plan."
    },
    {
      "id": "compute-firmus-batam-20260911",
      "title": "Firmus to build 170,000 GPU campus with NVIDIA",
      "url": "https://firmus.co/newsroom/firmus-to-build-170-000-gpu-ai-factor-y-campus-with-nvidia-for-global-ai-natives",
      "publisher": "Firmus",
      "accessedAt": "2026-09-11",
      "publishedAt": "2026-06",
      "locator": "Opening paragraph; agreement covers up to 170,000; committed offtake",
      "summary": "The 170,000 accelerator partnership and 360 MW campus are explicitly Batam Indonesia, outside ANZ.",
      "publishedDatePrecision": "month"
    },
    {
      "id": "compute-firmus-openai-20260911",
      "title": "Firmus adds OpenAI as anchor customer and expands into Malaysia",
      "url": "https://firmus.co/newsroom/firmus-surpasses-900-mw-contracted-capacity-adds-openai-as-anchor-customer-and-expands-into-malaysia",
      "publisher": "Firmus",
      "accessedAt": "2026-09-11",
      "publishedAt": "2026-09-08",
      "locator": "Sydney /8 September 2026; opening paragraphs; Australian engineering section",
      "summary": "OpenAI contract is for two Malaysian sites; over 900 MW is the entire customer portfolio, not Australian capacity."
    },
    {
      "id": "compute-iren-bundey-20260911",
      "title": "IREN announces first Australian campus",
      "url": "https://iren.gcs-web.com/news-releases/news-release-details/iren-announces-first-australian-data-center-campus-800mw-south",
      "publisher": "IREN",
      "accessedAt": "2026-09-11",
      "publishedAt": "2026-06-03",
      "locator": "Highlights and transmission connection agreement paragraphs",
      "summary": "800 MW transmission-connected project, planned energisation from 2028, approvals/early works prospective."
    },
    {
      "id": "compute-iren-bundey-site-20260911",
      "title": "IREN Bundey campus",
      "url": "https://iren.com/data-centers/bundey",
      "publisher": "IREN",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Capacity tiles and Bundey SA introduction",
      "summary": "Planned 2028,800 MW and 1300-acre site. Does not specify IT basis or GPU deployment."
    },
    {
      "id": "compute-iren-microsoft-20260911",
      "title": "IREN Microsoft AI cloud infrastructure agreement",
      "url": "https://iren.com/resources/blog/iren-signs97-billion-agreement-with-microsoft-to-deploy-ai-cloud-infrastructure",
      "publisher": "IREN",
      "accessedAt": "2026-09-11",
      "publishedAt": "2025-11-03",
      "locator": "Under the agreement paragraph",
      "summary": "Five-year Microsoft agreement for GB300 at Childress Texas, not Bundey."
    },
    {
      "id": "compute-iren-news-20260911",
      "title": "IREN investor news index",
      "url": "https://iren.com/investors/news",
      "publisher": "IREN",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "IREN Reports FY26 Results dated 27 August 2026",
      "summary": "Discovery source for latest issuer release; underlying PDF is the evidence source."
    },
    {
      "id": "compute-iren-fy26-20260911",
      "title": "IREN FY26 results and business update",
      "url": "https://iren.gcs-web.com/static-files/1cb9f4da-d4c7-4510-8bda-e475022b59f5",
      "publisher": "IREN",
      "accessedAt": "2026-09-11",
      "publishedAt": "2026-08-27",
      "locator": "PDF pp 1-2: Horizon 1 delivered to Microsoft; Executing global expansion",
      "summary": "Childress first 50 MW IT delivered; Bundey development progressing with no disclosed local GPUs."
    },
    {
      "id": "compute-macquarie-ai-20260911",
      "title": "Macquarie AI data centre solutions",
      "url": "https://www.macquariedatacentres.com/solutions/ai/",
      "publisher": "Macquarie Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Purpose-built AI and cloud data centres; cooling and high-density sections",
      "summary": "Markets support for training/inference and high-density systems; states September 2026 opening target."
    },
    {
      "id": "compute-macquarie-ic3w-20260911",
      "title": "Macquarie IC3 Super West facility",
      "url": "https://www.macquariedatacentres.com/data-centres/sydney/macquarie-park-campus/ic3-super-west/",
      "publisher": "Macquarie Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "IT Load; first purpose-built AI and cloud section",
      "summary": "47 MW IT end-state, under construction; no operational GPU count."
    },
    {
      "id": "compute-macquarie-project-20260911",
      "title": "Macquarie IC3 Super West project and statutory approvals",
      "url": "https://www.macquariedatacentres.com/data-centres/sydney/macquarie-park-campus/ic3-superwest-project/",
      "publisher": "Macquarie Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Statutory Approvals",
      "summary": "Links staged construction certificates; generic introductory copy is older than facility and investor updates."
    },
    {
      "id": "compute-macquarie-dell-20260911",
      "title": "Macquarie and Dell sovereign AI factories collaboration",
      "url": "https://www.macquariedatacentres.com/blog/mdc-and-dell-technologies-bring-sovereign-ai-factories-to-australia/",
      "publisher": "Macquarie Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": "2025-08-08",
      "locator": "Opening collaboration paragraphs; Sovereignty Meets Scalability",
      "summary": "Dell AI Factory with NVIDIA planned support at IC3 Super West; no disclosed accelerator model/count or end-user contract."
    },
    {
      "id": "compute-macquarie-hy26-20260911",
      "title": "Macquarie FY26 half-year management briefing",
      "url": "https://www.macquarietechnologygroup.com/wp-content/uploads/2026/02/Half-Year-Management-Briefing-to-Analysts.pdf",
      "publisher": "Macquarie Technology Group",
      "accessedAt": "2026-09-11",
      "publishedAt": "2026-02-26",
      "locator": "Slides 7,8 and 19",
      "summary": "21 MW installed portfolio; initial 6 MW SuperWest fit-out commenced with September 2026 target."
    },
    {
      "id": "compute-datagrid-home-20260911",
      "title": "Datagrid Data Centre Park",
      "url": "https://www.datagrid.nz/",
      "publisher": "Datagrid",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Scalable Capacity; Delivering What is Next; Sustainable Data Centre Park",
      "summary": "49-hectare Makarewa park,280 MW headline and three powered-shell modules, all proposed."
    },
    {
      "id": "compute-datagrid-es-20260911",
      "title": "Datagrid NZ Partnership resource consents",
      "url": "https://www.es.govt.nz/datagrid",
      "publisher": "Environment Southland",
      "accessedAt": "2026-09-11",
      "publishedAt": "2026-03-13",
      "locator": "Environment Southland resource consents; paragraph before consents list",
      "summary": "Authority confirms granted consents and up to 240 MW IT for AI training/processing/storage."
    },
    {
      "id": "compute-datagrid-sdc-20260911",
      "title": "Datagrid resource consent and compliance register",
      "url": "https://www.southlanddc.govt.nz/home-and-property/resource-consents/proposals-of-public-interest/",
      "publisher": "Southland District Council",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Opening address; What is proposed; Compliance documents",
      "summary": "342/370 Flora Road East; six halls, three modules,240 MW IT; access-road commencement document."
    },
    {
      "id": "compute-datagrid-commencement-20260911",
      "title": "Datagrid approved notice of commencement Stage 1",
      "url": "https://www.southlanddc.govt.nz/assets/Planning-Resource-Consent/datagrid/05-Compliance/Approved-Notice-of-Commencement-of-Work-Stage-1-28072026.PDF",
      "publisher": "Southland District Council / Datagrid",
      "accessedAt": "2026-09-11",
      "publishedAt": "2026-07-20",
      "locator": "Single-page form: Proposal; Work will start on; signature date",
      "summary": "Notice gives 28 July 2026 start for highway/Taylor Road works and a haul road, not data hall fit-out."
    },
    {
      "id": "compute-datagrid-mercury-20260911",
      "title": "Datagrid and Mercury 140 MW Power Purchase Option Agreement",
      "url": "https://www.datagrid.nz/pr1-rc/mercury",
      "publisher": "Datagrid",
      "accessedAt": "2026-09-11",
      "publishedAt": "2026-03-18",
      "locator": "Opening paragraphs; project delivery paragraph",
      "summary": "15-year 140 MW price-hedge option agreement;2028 project target. Not a compute customer contract."
    },
    {
      "id": "equinix-deep-ae1",
      "title": "Adelaide AE1",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/adelaide-data-centers/ae1",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility heading; opening service description; Building/Facilities specification tables; Available products. Original address and site marker separately retained in saved public inline configuration.",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-br1",
      "title": "Brisbane BR1",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/brisbane-data-centers/br1",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility heading; opening service description; Building/Facilities specification tables; Available products. Original address and site marker separately retained in saved public inline configuration.",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-ca1",
      "title": "Canberra CA1",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/canberra-data-centers/ca1",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility heading; opening service description; Building/Facilities specification tables; Available products. Original address and site marker separately retained in saved public inline configuration.",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-diraq",
      "title": "Diraq and Equinix to Deploy Australia’s First Quantum Computer Inside a Data Centre",
      "url": "https://newsroom.equinix.com/2026-09-01-Diraq-and-Equinix-to-Deploy-Australias-First-Quantum-Computer-Inside-a-Data-Centre",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": "2026-09-01",
      "locator": "Australian dateline 1 September 2026; planned eight-qubit system, <20 kW electrical draw and October 2026 installation target",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-groq",
      "title": "Equinix Supports Groq in Launching Low-Latency AI Inference in Australia",
      "url": "https://newsroom.equinix.com/2025-11-16-Equinix-Supports-Groq-in-Launching-Low-Latency-AI-Inference-in-Australia",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": "2025-11-17",
      "locator": "Australian dateline 17 November 2025; opening deployment paragraph, subsequent future-tense 4.5 MW facility statement and LPU inference highlights",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-harrison-ai",
      "title": "harrison.ai Deploys NVIDIA DGX A100s on Platform Equinix to Accelerate AI HealthTech Development",
      "url": "https://newsroom.equinix.com/2023-02-07-harrison-ai-Deploys-NVIDIA-DGX-A100s-on-Platform-Equinix-to-Accelerate-AI-HealthTech-Development",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": "2023-02-07",
      "locator": "Australian dateline 7 February 2023; eight DGX A100 systems deployed at unnamed Sydney IBX; Key Facts on model training",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-me1",
      "title": "Melbourne ME1",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/melbourne-data-centers/me1",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility heading; opening service description; Building/Facilities specification tables; Available products. Original address and site marker separately retained in saved public inline configuration.",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-me2",
      "title": "Melbourne ME2",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/melbourne-data-centers/me2",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility heading; opening service description; Building/Facilities specification tables; Available products. Original address and site marker separately retained in saved public inline configuration.",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-me4",
      "title": "Melbourne ME4",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/melbourne-data-centers/me4",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility heading; opening service description; Building/Facilities specification tables; Available products. Original address and site marker separately retained in saved public inline configuration.",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-me5",
      "title": "Melbourne ME5",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/melbourne-data-centers/me5",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility heading; opening service description; Building/Facilities specification tables; Available products. Original address and site marker separately retained in saved public inline configuration.",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-nvidia-together",
      "title": "Equinix Accelerates AI Inference for Enterprises with NVIDIA and Together AI",
      "url": "https://newsroom.equinix.com/2026-09-02-Equinix-Accelerates-AI-Inference-for-Enterprises-with-NVIDIA-and-Together-AI",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": "2026-09-02",
      "locator": "2 September 2026 announcement; Inference Exchange global scope and Q1 2027 availability; no named Australian deployment",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-pe1",
      "title": "Perth PE1",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/perth-data-centers/pe1",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility heading; opening service description; Building/Facilities specification tables; Available products. Original address and site marker separately retained in saved public inline configuration.",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-pe2",
      "title": "Perth PE2",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/perth-data-centers/pe2",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility heading; opening service description; Building/Facilities specification tables; Available products. Original address and site marker separately retained in saved public inline configuration.",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-pe3-opening",
      "title": "A Look Inside Equinix’s Third Perth Data Center",
      "url": "https://blog.equinix.com/blog/2021/12/08/a-look-inside-equinixs-third-perth-data-center/",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": "2021-12-08",
      "locator": "Dated opening paragraphs; adjacency to PE2 and secure link bridge; first-phase vs ultimate cabinet and floor-area specifications",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-pe3",
      "title": "Perth PE3",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/perth-data-centers/pe3",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility heading; opening service description; Building/Facilities specification tables; Available products. Original address and site marker separately retained in saved public inline configuration.",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-sy1",
      "title": "Sydney SY1",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy1",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility heading; opening service description; Building/Facilities specification tables; Available products. Original address and site marker separately retained in saved public inline configuration.",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-sy2",
      "title": "Sydney SY2",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy2",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility heading; opening service description; Building/Facilities specification tables; Available products. Original address and site marker separately retained in saved public inline configuration.",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-sy3",
      "title": "Sydney SY3",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy3",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility heading; opening service description; Building/Facilities specification tables; Available products. Original address and site marker separately retained in saved public inline configuration.",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-sy4",
      "title": "Sydney SY4",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy4",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility heading; opening service description; Building/Facilities specification tables; Available products. Original address and site marker separately retained in saved public inline configuration.",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-sy5",
      "title": "Sydney SY5",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy5",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility heading; opening service description; Building/Facilities specification tables; Available products. Original address and site marker separately retained in saved public inline configuration.",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-sy6",
      "title": "Sydney SY6",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy6",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility heading; opening service description; Building/Facilities specification tables; Available products. Original address and site marker separately retained in saved public inline configuration.",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-sy7",
      "title": "Sydney SY7",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy7",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility heading; opening service description; Building/Facilities specification tables; Available products. Original address and site marker separately retained in saved public inline configuration.",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-sy8-history",
      "title": "From an Idea to an Innovation Center: An Australian Story",
      "url": "https://blog.equinix.com/blog/2019/02/25/from-an-idea-to-an-innovation-center-an-australian-story/",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": "2019-02-25",
      "locator": "2019 history paragraph identifies SY6/SY7/SY8 as acquired centres; eighth centre under development is SY5, not SY8",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-sy8",
      "title": "Sydney Data Centers",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy8",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility heading; opening service description; Building/Facilities specification tables; Available products. Original address and site marker separately retained in saved public inline configuration.",
      "summary": "Requested SY8 facility URL redirects to the Sydney metro page, whose named facility list omits SY8. Status conflict remains against operational documentation."
    },
    {
      "id": "equinix-deep-sy9x-opening",
      "title": "Equinix and PGIM Real Estate Open First xScale™ Data Centre in Sydney for Hyperscalers",
      "url": "https://newsroom.equinix.com/2022-06-14-Equinix-and-PGIM-Real-Estate-Open-First-xScale-TM-Data-Centre-in-Sydney-for-Hyperscalers",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": "2022-06-14",
      "locator": "Australian dateline 14 June 2022; opening paragraph, >14 MW current/>28 MW full-build; JV equity and operator responsibilities",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-sy9x",
      "title": "Sydney SY9x",
      "url": "https://www.equinix.com/data-centers/asia-pacific-colocation/australia-colocation/sydney-data-centers/sy9x",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Named facility heading; opening service description; Building/Facilities specification tables; Available products. Original address and site marker separately retained in saved public inline configuration.",
      "summary": "Primary operator source. AU press-release dateline is used where newsroom display is a day earlier. Cabinet kVA, floor area, power capacity, installed IT and compute-system counts are kept distinct."
    },
    {
      "id": "equinix-deep-availability",
      "title": "Equinix colocation operational coverage",
      "url": "https://docs.equinix.com/colocation/availability/",
      "publisher": "Equinix",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "APAC > Australia table; explicit 24/7 or non-24/7 on-site operational coverage",
      "summary": "Freshly collected operational-coverage document. PE3 is absent and is corroborated separately; SY8 is listed but conflicts with the current metro-page omission."
    },
    {
      "id": "au-profile-telstra-colocation-20260911",
      "title": "Telstra InfraCo data centre colocation",
      "url": "https://infraco.telstra.com.au/solutions/data-centre-colocation",
      "publisher": "Telstra InfraCo",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Video transcript; About our Data Centres",
      "summary": "Names seven operating Australian facilities. Generator output is not IT capacity."
    },
    {
      "id": "au-profile-telstra-brochure-20260911",
      "title": "Telstra InfraCo data centre colocation brochure",
      "url": "https://infraco.telstra.com.au/content/dam/infraco/pdf/data-centre-colocation-brochure.pdf",
      "publisher": "Telstra InfraCo",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Comparison table: Details, Target power capacity, Rack capacity",
      "summary": "Target power and dual-feed specifications for St Leonards, Clayton and Deakin, without commissioned IT capacity."
    },
    {
      "id": "au-profile-fujitsu-locations-20260911",
      "title": "Fujitsu Australian data centre locations",
      "url": "https://global.fujitsu/en-apac/local/about-data-centres",
      "publisher": "Fujitsu",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Western Sydney, Noble Park, Malaga, Homebush, North Ryde and Eight Mile Plains",
      "summary": "Current operator site specifications labelled MW IT Load; Western Sydney explicitly describes ultimate capacity."
    },
    {
      "id": "au-profile-fujitsu-wsdc-20260911",
      "title": "Fujitsu Western Sydney data centre fact sheet",
      "url": "https://global.fujitsu/-/media/Project/Fujitsu/Fujitsu-HQ/local/about-data-centers/WSDC_DC_20092023_V4.pdf?sc_lang=en-PH",
      "publisher": "Fujitsu",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Electrical; Facilities",
      "summary": "Linked fact sheet gives 60 MVA site capacity. It does not reconcile commissioned scope with the current 92 MW IT specification."
    },
    {
      "id": "au-profile-fujitsu-noble-20260911",
      "title": "Fujitsu Noble Park data centre fact sheet",
      "url": "https://global.fujitsu/-/media/Project/Fujitsu/Fujitsu-HQ/local/about-data-centers/NoblePark_DC_20092023_V2.pdf?sc_lang=en-PH",
      "publisher": "Fujitsu",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Electrical; Facilities",
      "summary": "Linked fact sheet gives 12 MVA site capacity and dual 8 MVA feeds, not commissioned IT load."
    },
    {
      "id": "au-profile-fujitsu-malaga-20260911",
      "title": "Fujitsu Malaga data centre fact sheet",
      "url": "https://global.fujitsu/-/media/Project/Fujitsu/Fujitsu-HQ/local/about-data-centers/Malaga_DC_updated.pdf?sc_lang=en-PH",
      "publisher": "Fujitsu",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Electrical; Facilities",
      "summary": "Linked fact sheet gives 5 MVA site capacity; current portfolio page advertises 10 MW IT Load."
    },
    {
      "id": "au-profile-fujitsu-homebush-20260911",
      "title": "Fujitsu Homebush data centre fact sheet",
      "url": "https://global.fujitsu/-/media/Project/Fujitsu/Fujitsu-HQ/local/about-data-centers/Homebush_DC.pdf?sc_lang=en-PH",
      "publisher": "Fujitsu",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Electrical; Facilities",
      "summary": "Linked fact sheet gives 6 MVA site capacity, distinct from the current 3 MW IT specification."
    },
    {
      "id": "au-profile-fujitsu-ryde-20260911",
      "title": "Fujitsu North Ryde data centre fact sheet",
      "url": "https://global.fujitsu/-/media/Project/Fujitsu/Fujitsu-HQ/local/about-data-centers/NorthRyde_DC.pdf?sc_lang=en-PH",
      "publisher": "Fujitsu",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Electrical; Facilities",
      "summary": "Linked fact sheet gives 4.8 MVA site capacity, not an equivalent to 4.8 MW IT, and describes construction in 2001."
    },
    {
      "id": "au-profile-fujitsu-eightmile-20260911",
      "title": "Fujitsu Eight Mile Plains data centre fact sheet",
      "url": "https://global.fujitsu/-/media/Project/Fujitsu/Fujitsu-HQ/local/about-data-centers/EightMilePlains_DC.pdf?sc_lang=en-PH",
      "publisher": "Fujitsu",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Electrical; Facilities",
      "summary": "Explicitly states commissioning in 2006 and 2 MVA site capacity. The year does not date current IT capacity."
    },
    {
      "id": "au-profile-interactive-locations-20260911",
      "title": "Interactive Australian data centres",
      "url": "https://www.interactive.com.au/services/data-centres/",
      "publisher": "Interactive",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Locations; What are the key features of your data centres",
      "summary": "Publishes three physical addresses and says six data centres across three sites."
    },
    {
      "id": "au-profile-5gn-tours-20260911",
      "title": "5G Networks former wholesale data centre tour URL",
      "url": "https://wholesale.5gnetworks.au/book-a-data-centre-tour/",
      "publisher": "5G Networks",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Talk to the wholesale team",
      "summary": "Fresh retrieval now returns a contact page. The former facility address listing is absent; the office address must not replace a data centre address."
    },
    {
      "id": "au-profile-5gn-iso-20260911",
      "title": "ISO certifications and business management systems at 5GN",
      "url": "https://5gnetworks.au/news/iso-certifications-and-business-management-systems-at-5gn/",
      "publisher": "5G Networks",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "ISO 9001:2015 certified locations",
      "summary": "Operator labels four street addresses as data centres, including unit and level details. This is not independent certification verification."
    },
    {
      "id": "au-profile-5gn-pop-20260911",
      "title": "5G Networks points of presence",
      "url": "https://5gnetworks.au/data-centres/technical/points-of-presence/",
      "publisher": "5G Networks",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "City location tables; Brisbane",
      "summary": "Lists a network footprint spanning own and partner facilities. Rows must not be treated as an owned-site census."
    },
    {
      "id": "au-profile-5gn-data-centres-20260911",
      "title": "5G Networks data centres",
      "url": "https://5gnetworks.au/data-centres/",
      "publisher": "5G Networks",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Introduction; city location tables",
      "summary": "Says five owned data centres and over forty partners. Brisbane DCI network entry is insufficient to update the existing owned-site address."
    },
    {
      "id": "au-profile-ledc-newcastle-20260911",
      "title": "Leading Edge NTL1 Newcastle technical profile",
      "url": "https://leadingedgedc.com/dc_location/newcastle/",
      "publisher": "Leading Edge Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "NTL1; Total Site Capacity; Technical Specifications",
      "summary": "Advertises 1.5 MW total site capacity and 375 kW IT per module. Installed module count is not disclosed."
    },
    {
      "id": "au-profile-ledc-tamworth-20260911",
      "title": "Leading Edge TMW 1 Tamworth technical profile",
      "url": "https://leadingedgedc.com/dc_location/tamworth/",
      "publisher": "Leading Edge Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "TMW 1; Total Site Capacity; Technical Specifications",
      "summary": "Advertises 375 kW total site capacity and 375 kW IT per module. Does not quantify commissioned modules."
    },
    {
      "id": "au-profile-ledc-dubbo-20260911",
      "title": "Leading Edge DBO1 Dubbo technical profile",
      "url": "https://leadingedgedc.com/dc_location/dubbo/",
      "publisher": "Leading Edge Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "DBO1; Total Site Capacity; Technical Specifications",
      "summary": "Advertises 750 kW total site capacity and 375 kW IT per module. Does not quantify commissioned modules."
    },
    {
      "id": "au-profile-ledc-albury-20260911",
      "title": "Leading Edge ABX1 Albury technical profile",
      "url": "https://leadingedgedc.com/dc_location/albury/",
      "publisher": "Leading Edge Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "ABX1; Total Site Capacity; Technical Specifications",
      "summary": "Advertises 750 kW total site capacity and 375 kW IT per module. Actual service evidence is in the separate customer case study."
    },
    {
      "id": "au-profile-ledc-coffs-20260911",
      "title": "Leading Edge CFS1 Coffs Harbour technical profile",
      "url": "https://leadingedgedc.com/dc_location/coffs-harbour/",
      "publisher": "Leading Edge Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "CFS1; Total Site Capacity; Technical Specifications",
      "summary": "Advertises 300 kW total site capacity and 150 kW IT per module. The page does not establish opening status."
    },
    {
      "id": "au-profile-ledc-wagga-20260911",
      "title": "Leading Edge WGA1 Wagga Wagga technical profile",
      "url": "https://leadingedgedc.com/dc_location/wagga-wagga/",
      "publisher": "Leading Edge Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "WGA1; Total Site Capacity; Technical Specifications",
      "summary": "Advertises 300 kW total site capacity and 150 kW IT per module. The page does not establish opening status."
    },
    {
      "id": "au-profile-ledc-albury-case-20260911",
      "title": "Faded Servers expands its hosting business to Albury",
      "url": "https://leadingedgedc.com/case_studies/faded-servers-expands-hosting-business/",
      "publisher": "Leading Edge Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Faded Servers case study; What you will learn",
      "summary": "Describes a server hosting colocation service operating out of the Murray data centre in Albury, supporting an operating status review."
    },
    {
      "id": "au-profile-ledc-dubbo-opening-20260911",
      "title": "Leading Edge opens Dubbo data centre",
      "url": "https://leadingedgedc.com/news_post/ledc-opens-dubbo-press-release/",
      "publisher": "Leading Edge Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": "2021-12-13",
      "locator": "Opening announcement; ribbon-cutting paragraph",
      "summary": "Reports the 10 December 2021 opening and confirms Newcastle and Tamworth had opened. The 26-site figure is a historical plan."
    },
    {
      "id": "au-profile-ledc-cloud-20260911",
      "title": "Leading Edge cloud services announcement retrieval",
      "url": "https://leadingedgedc.com/news_post/ledc-cloud-services-media-release/",
      "publisher": "Leading Edge Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": "2023-02-14",
      "locator": "Article heading and date only; article body not returned",
      "summary": "Retrieval is incomplete for material contract claims. No deployment or commercial quantity is accepted from its heading."
    },
    {
      "id": "au-profile-ledc-tamworth-opening-20260911",
      "title": "Leading Edge Tamworth data centre grand opening",
      "url": "https://leadingedgedc.com/news_post/tamworth-data-centre-grand-opening/",
      "publisher": "Leading Edge Data Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": "2021-12-01",
      "locator": "Opening paragraph",
      "summary": "States that the facility opened on 5 November 2021, distinct from the 1 December publication date."
    },
    {
      "id": "au-profile-hostnetworks-facility-20260911",
      "title": "Host Networks Eight Mile Plains data centre",
      "url": "https://hostnetworks.com.au/about/our_data_centre",
      "publisher": "Host Networks",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Brandl St, Eight Mile Plains; Technical Details",
      "summary": "Current facility protected power is 550 kW, with 1.25 MW described for a potential Tier III upgrade. Neither is labelled IT load."
    },
    {
      "id": "au-profile-hostnetworks-contact-20260911",
      "title": "Host Networks contact and equipment delivery address",
      "url": "https://hostnetworks.com.au/contact",
      "publisher": "Host Networks",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Equipment Deliveries",
      "summary": "Publishes Unit 1, 53 Brandl Street, Eight Mile Plains QLD 4113 as the equipment delivery address."
    },
    {
      "id": "au-profile-hostnetworks-company-20260911",
      "title": "Host Networks company history and legal publisher",
      "url": "https://hostnetworks.com.au/about/our_company",
      "publisher": "Host Networks / Edge Centres Pty Ltd",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Host Networks Milestones; legal footer",
      "summary": "Records an April 2007 facility launch and identifies Edge Centres Pty Ltd in the current legal footer. Historical acquisition entries are not current ownership confirmation."
    },
    {
      "id": "au-profile-edgecentres-20260911",
      "title": "Edge Centres current public homepage",
      "url": "https://edgecentres.com/",
      "publisher": "Edge Centres",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Introduction",
      "summary": "Current minimal page states locations in Australia and the United States without a detailed facility census."
    },
    {
      "id": "au-profile-vocus-network-20260911",
      "title": "Vocus Australian network",
      "url": "https://www.vocus.com.au/about-vocus/our-network/australia",
      "publisher": "Vocus",
      "accessedAt": "2026-09-11",
      "publishedAt": null,
      "locator": "Our network: Australia",
      "summary": "States connectivity to 150 data centres. This is network reach, not facility ownership."
    },
    {
      "id": "natural-earth-cities",
      "title": "Natural Earth populated places, 1:10m",
      "publisher": "Natural Earth",
      "url": "https://github.com/nvkelso/natural-earth-vector/blob/master/geojson/ne_10m_populated_places_simple.geojson",
      "accessedAt": "2026-09-10",
      "publishedAt": null,
      "locator": "Australia and New Zealand populated-place features",
      "summary": "Public-domain city coordinates for approximate regional map grouping. These are not verified facility addresses."
    }
  ],
  "facilities": [
    {
      "id": "42-24-cambridge",
      "name": "42-24 Cambridge",
      "operator": "42-24",
      "country": "AU",
      "region": "TAS",
      "city": "Hobart",
      "entityKind": "facility",
      "physicalSiteId": "42-24-cambridge",
      "lat": -42.850009,
      "lon": 147.29503,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "42-24-cambridge-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-42-24"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-42-24",
        "natural-earth-cities"
      ],
      "notes": []
    },
    {
      "id": "42-24-derwent-park",
      "name": "42-24 Derwent Park",
      "operator": "42-24",
      "country": "AU",
      "region": "TAS",
      "city": "Hobart",
      "entityKind": "facility",
      "physicalSiteId": "42-24-derwent-park",
      "lat": -42.850009,
      "lon": 147.29503,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "42-24-derwent-park-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-42-24"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-42-24",
        "natural-earth-cities"
      ],
      "notes": []
    },
    {
      "id": "5gn-adelaide",
      "name": "5G Networks Adelaide",
      "operator": "5G Networks",
      "city": "Adelaide",
      "region": "South Australia",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "dci-kidman-park",
      "lat": -34.933042,
      "lon": 138.598059,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "5gn-adelaide-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-5gn-tours"
          ],
          "note": "Operating colocation offering is described by the operator; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-5gn-tours",
        "exp-vocus-sa-address",
        "au-profile-5gn-iso-20260911",
        "au-profile-5gn-data-centres-20260911",
        "au-profile-5gn-tours-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "5G Networks' 340 Findon Road address matches DCI in carrier Vocus' own connected-site listing. Grouped into the existing DCI Kidman Park physical site; separate operator/hall record is retained without adding MW."
      ],
      "address": {
        "street": "Level 2, 340 Findon Road",
        "locality": "Kidman Park",
        "region": "South Australia",
        "postalCode": "5025",
        "country": "AU",
        "sourceIds": [
          "exp-5gn-tours",
          "au-profile-5gn-iso-20260911"
        ],
        "verifiedOn": "2026-09-11"
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-5gn-iso-20260911",
            "au-profile-5gn-data-centres-20260911",
            "au-profile-5gn-tours-20260911"
          ],
          "note": "The operator labels the address as a data centre in its ISO article; the live network/colocation pages establish an active service portfolio."
        },
        {
          "field": "address",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-5gn-iso-20260911",
            "au-profile-5gn-data-centres-20260911",
            "au-profile-5gn-tours-20260911"
          ],
          "note": "The operator ISO article explicitly labels this street address as a data centre. Existing postcodes are retained from the earlier recorded address source; they are not newly verified by the ISO article."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-5gn-iso-20260911",
            "au-profile-5gn-data-centres-20260911",
            "au-profile-5gn-tours-20260911"
          ],
          "note": "No commissioned facility IT MW is established in the reviewed operator pages. Network points of presence and partner sites are not capacity or ownership evidence."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-5gn-data-centres-20260911",
            "au-profile-5gn-iso-20260911"
          ],
          "note": "Current colocation/network services and an operator-labelled data centre location support retaining operating status. No commissioning date or installed MW is established."
        }
      ]
    },
    {
      "id": "5gn-brisbane",
      "name": "5G Networks Brisbane",
      "operator": "5G Networks",
      "city": "Brisbane",
      "region": "Queensland",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "5gn-brisbane",
      "lat": -27.453085,
      "lon": 153.033147,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "5gn-brisbane-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-5gn-tours"
          ],
          "note": "Operating colocation offering is described by the operator; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-5gn-tours",
        "au-profile-5gn-tours-20260911",
        "au-profile-5gn-data-centres-20260911",
        "au-profile-5gn-pop-20260911",
        "natural-earth-cities"
      ],
      "notes": [],
      "address": {
        "street": "42 Amelia Street",
        "locality": "Fortitude Valley",
        "region": "Queensland",
        "postalCode": "4006",
        "country": "AU",
        "sourceIds": [
          "exp-5gn-tours"
        ],
        "verifiedOn": "2026-09-11"
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-5gn-tours-20260911",
            "au-profile-5gn-data-centres-20260911",
            "au-profile-5gn-pop-20260911"
          ],
          "note": "The current operator page says five owned data centres but the Brisbane table mixes partner and network locations. The existing specific Brisbane owned-site identity was not independently re-established in this bounded pass."
        },
        {
          "field": "address",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-5gn-tours-20260911",
            "au-profile-5gn-data-centres-20260911",
            "au-profile-5gn-pop-20260911"
          ],
          "note": "The previously cited tour URL now returns a contact page and does not re-establish 42 Amelia Street. The mixed Brisbane network table includes a 5G Networks (DCI) entry at 148 Brunswick Street; this is insufficient to replace the existing owned-site address."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-5gn-tours-20260911",
            "au-profile-5gn-data-centres-20260911",
            "au-profile-5gn-pop-20260911"
          ],
          "note": "No commissioned facility IT MW is established in the reviewed operator pages. Network points of presence and partner sites are not capacity or ownership evidence."
        }
      ]
    },
    {
      "id": "5gn-melbourne",
      "name": "5G Networks Melbourne",
      "operator": "5G Networks",
      "city": "Melbourne",
      "region": "Victoria",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "5gn-melbourne",
      "lat": -37.818086,
      "lon": 144.97307,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "5gn-melbourne-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-5gn-tours"
          ],
          "note": "Operating colocation offering is described by the operator; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-5gn-tours",
        "au-profile-5gn-iso-20260911",
        "au-profile-5gn-data-centres-20260911",
        "au-profile-5gn-tours-20260911",
        "natural-earth-cities"
      ],
      "notes": [],
      "address": {
        "street": "Level 15, 530 Collins Street",
        "locality": "Melbourne",
        "region": "Victoria",
        "postalCode": "3000",
        "country": "AU",
        "sourceIds": [
          "exp-5gn-tours",
          "au-profile-5gn-iso-20260911"
        ],
        "verifiedOn": "2026-09-11"
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-5gn-iso-20260911",
            "au-profile-5gn-data-centres-20260911",
            "au-profile-5gn-tours-20260911"
          ],
          "note": "The operator labels the address as a data centre in its ISO article; the live network/colocation pages establish an active service portfolio."
        },
        {
          "field": "address",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-5gn-iso-20260911",
            "au-profile-5gn-data-centres-20260911",
            "au-profile-5gn-tours-20260911"
          ],
          "note": "The operator ISO article explicitly labels this street address as a data centre. Existing postcodes are retained from the earlier recorded address source; they are not newly verified by the ISO article."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-5gn-iso-20260911",
            "au-profile-5gn-data-centres-20260911",
            "au-profile-5gn-tours-20260911"
          ],
          "note": "No commissioned facility IT MW is established in the reviewed operator pages. Network points of presence and partner sites are not capacity or ownership evidence."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-5gn-data-centres-20260911",
            "au-profile-5gn-iso-20260911"
          ],
          "note": "Current colocation/network services and an operator-labelled data centre location support retaining operating status. No commissioning date or installed MW is established."
        }
      ]
    },
    {
      "id": "5gn-north-sydney",
      "name": "5G Networks North Sydney",
      "operator": "5G Networks",
      "city": "Sydney",
      "region": "New South Wales",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "st-leonards-corporate-centre",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "5gn-north-sydney-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-5gn-tours"
          ],
          "note": "Operating colocation offering is described by the operator; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-5gn-tours",
        "au-profile-5gn-iso-20260911",
        "au-profile-5gn-data-centres-20260911",
        "au-profile-5gn-tours-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "Shares the 39 Herbert Street complex with Interactive's Sydney listing; one physical-site ID avoids counting the complex twice."
      ],
      "address": {
        "street": "Unit 17, 39 Herbert Street",
        "locality": "St Leonards",
        "region": "New South Wales",
        "postalCode": "2065",
        "country": "AU",
        "sourceIds": [
          "exp-5gn-tours",
          "au-profile-5gn-iso-20260911"
        ],
        "verifiedOn": "2026-09-11"
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-5gn-iso-20260911",
            "au-profile-5gn-data-centres-20260911",
            "au-profile-5gn-tours-20260911"
          ],
          "note": "The operator labels the address as a data centre in its ISO article; the live network/colocation pages establish an active service portfolio."
        },
        {
          "field": "address",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-5gn-iso-20260911",
            "au-profile-5gn-data-centres-20260911",
            "au-profile-5gn-tours-20260911"
          ],
          "note": "The operator ISO article explicitly labels this street address as a data centre. Existing postcodes are retained from the earlier recorded address source; they are not newly verified by the ISO article."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-5gn-iso-20260911",
            "au-profile-5gn-data-centres-20260911",
            "au-profile-5gn-tours-20260911"
          ],
          "note": "No commissioned facility IT MW is established in the reviewed operator pages. Network points of presence and partner sites are not capacity or ownership evidence."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-5gn-data-centres-20260911",
            "au-profile-5gn-iso-20260911"
          ],
          "note": "Current colocation/network services and an operator-labelled data centre location support retaining operating status. No commissioning date or installed MW is established."
        }
      ]
    },
    {
      "id": "5gn-sydney",
      "name": "5G Networks Sydney",
      "operator": "5G Networks",
      "city": "Sydney",
      "region": "New South Wales",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "5gn-sydney",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "5gn-sydney-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-5gn-tours"
          ],
          "note": "Operating colocation offering is described by the operator; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-5gn-tours",
        "au-profile-5gn-iso-20260911",
        "au-profile-5gn-data-centres-20260911",
        "au-profile-5gn-tours-20260911",
        "natural-earth-cities"
      ],
      "notes": [],
      "address": {
        "street": "55 Pyrmont Bridge Road",
        "locality": "Pyrmont",
        "region": "New South Wales",
        "postalCode": "2009",
        "country": "AU",
        "sourceIds": [
          "exp-5gn-tours",
          "au-profile-5gn-iso-20260911"
        ],
        "verifiedOn": "2026-09-11"
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-5gn-iso-20260911",
            "au-profile-5gn-data-centres-20260911",
            "au-profile-5gn-tours-20260911"
          ],
          "note": "The operator labels the address as a data centre in its ISO article; the live network/colocation pages establish an active service portfolio."
        },
        {
          "field": "address",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-5gn-iso-20260911",
            "au-profile-5gn-data-centres-20260911",
            "au-profile-5gn-tours-20260911"
          ],
          "note": "The operator ISO article explicitly labels this street address as a data centre. Existing postcodes are retained from the earlier recorded address source; they are not newly verified by the ISO article."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-5gn-iso-20260911",
            "au-profile-5gn-data-centres-20260911",
            "au-profile-5gn-tours-20260911"
          ],
          "note": "No commissioned facility IT MW is established in the reviewed operator pages. Network points of presence and partner sites are not capacity or ownership evidence."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-5gn-data-centres-20260911",
            "au-profile-5gn-iso-20260911"
          ],
          "note": "Current colocation/network services and an operator-labelled data centre location support retaining operating status. No commissioning date or installed MW is established."
        }
      ]
    },
    {
      "id": "airtrunk-mel1",
      "name": "AirTrunk MEL1 Melbourne",
      "operator": "AirTrunk",
      "country": "AU",
      "region": "VIC",
      "city": "Melbourne",
      "entityKind": "campus",
      "physicalSiteId": "airtrunk-mel1",
      "lat": -37.818086,
      "lon": 144.97307,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "airtrunk-mel1-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-airtrunk-story",
            "cov-airtrunk-mel2-announcement"
          ],
          "note": "Operator history confirms the campus has opened. Current commissioned IT MW is not separated from ultimate campus capacity in this evidence."
        }
      ],
      "certification": {
        "status": "strategic-facility",
        "scope": "AirTrunk MEL1 Melbourne: named facility on the official HCF register.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-airtrunk-story",
        "cov-airtrunk-mel2-announcement",
        "hcf-register",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate.",
        "Do not add Datacom's colocation service within this campus as another physical data centre."
      ]
    },
    {
      "id": "airtrunk-mel2",
      "name": "AirTrunk MEL2 Melbourne",
      "operator": "AirTrunk",
      "country": "AU",
      "region": "VIC",
      "city": "Melbourne",
      "entityKind": "campus",
      "physicalSiteId": "airtrunk-mel2",
      "lat": -37.818086,
      "lon": 144.97307,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "planned",
          "mw": 354,
          "mwBasis": "unknown",
          "scopeId": "airtrunk-mel2-planned",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-airtrunk-mel2-announcement",
            "cov-airtrunk-mel2"
          ],
          "note": "Announced campus scale is over 354 MW. MW basis and commissioned allocation are unconfirmed; excluded from IT totals. No verified opening date."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-airtrunk-mel2-announcement",
        "cov-airtrunk-mel2",
        "verify-airtrunk-mel2-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-airtrunk-mel2-20260911"
          ],
          "note": "The operator identifies this named campus on its own location page."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-airtrunk-mel2-20260911"
          ],
          "note": "The page describes a 354+ MW campus envelope, up to 32 data halls, 66 kV feeds and design PUE 1.15. It does not establish a commissioned IT power split."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-airtrunk-mel2-20260911"
          ],
          "note": "No site-level GPU model and quantity inventory is published in the location page checked."
        },
        {
          "field": "workloads",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-airtrunk-mel2-20260911"
          ],
          "note": "The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-airtrunk-mel2-20260911"
          ],
          "note": "No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked."
        }
      ]
    },
    {
      "id": "airtrunk-syd1",
      "name": "AirTrunk SYD1 Sydney West",
      "operator": "AirTrunk",
      "country": "AU",
      "region": "NSW",
      "city": "Sydney",
      "entityKind": "campus",
      "physicalSiteId": "airtrunk-syd1",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "airtrunk-syd1-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-airtrunk-story",
            "cov-airtrunk-mel2-announcement"
          ],
          "note": "Operator history confirms the campus has opened. Current commissioned IT MW is not separated from ultimate campus capacity in this evidence."
        }
      ],
      "certification": {
        "status": "strategic-facility",
        "scope": "AirTrunk SYD1 Sydney West: named facility on the official HCF register.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-airtrunk-story",
        "cov-airtrunk-mel2-announcement",
        "hcf-register",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate.",
        "Do not add Datacom's colocation service within this campus as another physical data centre."
      ]
    },
    {
      "id": "airtrunk-syd2",
      "name": "AirTrunk SYD2 Sydney North",
      "operator": "AirTrunk",
      "country": "AU",
      "region": "NSW",
      "city": "Sydney",
      "entityKind": "campus",
      "physicalSiteId": "airtrunk-syd2",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "airtrunk-syd2-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-airtrunk-story",
            "cov-airtrunk-mel2-announcement"
          ],
          "note": "Operator history confirms the campus has opened. Current commissioned IT MW is not separated from ultimate campus capacity in this evidence."
        }
      ],
      "certification": {
        "status": "strategic-facility",
        "scope": "AirTrunk SYD2 Sydney North: named facility on the official HCF register.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-airtrunk-story",
        "cov-airtrunk-mel2-announcement",
        "hcf-register",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate.",
        "Do not add Datacom's colocation service within this campus as another physical data centre."
      ]
    },
    {
      "id": "airtrunk-syd3",
      "name": "AirTrunk SYD3 Sydney West",
      "operator": "AirTrunk",
      "country": "AU",
      "region": "NSW",
      "city": "Sydney",
      "entityKind": "campus",
      "physicalSiteId": "airtrunk-syd3",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "planned",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "airtrunk-syd3-planned",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-airtrunk-story",
            "cov-airtrunk-syd3"
          ],
          "note": "Operator describes SYD3 as forthcoming. Development substage and commissioning date remain unverified; campus headline capacity is excluded from IT subtotals."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-airtrunk-story",
        "cov-airtrunk-syd3",
        "verify-airtrunk-syd3-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate.",
        "The live project page and December 2025 platform announcement contain different campus capacity figures. They must not be read as operational MW."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-airtrunk-syd3-20260911"
          ],
          "note": "The operator identifies this named campus on its own location page."
        },
        {
          "field": "capacity",
          "outcome": "conflicting",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-airtrunk-syd3-20260911",
            "cov-airtrunk-mel2-announcement"
          ],
          "note": "The current location page describes a 400+ MW campus, while the earlier platform announcement describes a different ultimate scale. Neither establishes commissioned IT power. Both sources are retained; the operating split remains unresolved."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-airtrunk-syd3-20260911"
          ],
          "note": "No site-level GPU model and quantity inventory is published in the location page checked."
        },
        {
          "field": "workloads",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-airtrunk-syd3-20260911"
          ],
          "note": "The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-airtrunk-syd3-20260911"
          ],
          "note": "No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked."
        }
      ]
    },
    {
      "id": "adc-fyshwick",
      "name": "Australian Data Centres Fyshwick",
      "operator": "Australian Data Centres",
      "country": "AU",
      "region": "ACT",
      "city": "Canberra",
      "entityKind": "facility",
      "physicalSiteId": "adc-fyshwick",
      "lat": -35.283029,
      "lon": 149.129026,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "adc-fyshwick-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-adc-locations"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-adc-locations",
        "natural-earth-cities"
      ],
      "notes": []
    },
    {
      "id": "adc-mitchell",
      "name": "Australian Data Centres Mitchell",
      "operator": "Australian Data Centres",
      "country": "AU",
      "region": "ACT",
      "city": "Canberra",
      "entityKind": "facility",
      "physicalSiteId": "adc-mitchell",
      "lat": -35.283029,
      "lon": 149.129026,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "adc-mitchell-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-adc-locations"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-adc-locations",
        "natural-earth-cities"
      ],
      "notes": []
    },
    {
      "id": "cdc-beard",
      "name": "CDC Beard Campus",
      "operator": "CDC",
      "country": "AU",
      "region": "ACT",
      "city": "Canberra",
      "entityKind": "campus",
      "physicalSiteId": "cdc-beard",
      "lat": -35.283029,
      "lon": 149.129026,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": 39,
          "mwBasis": "unknown",
          "scopeId": "cdc-beard-construction",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-cdc-canberra"
          ],
          "note": "Beard/BE1 is explicitly under construction. Published total capacity has no IT-load basis and is excluded from IT subtotals."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-cdc-canberra",
        "verify-cdc-canberra-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate.",
        "Individual campus buildings are not separately counted in this release."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "The operator identifies this named campus on its own location page."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "Hume One, Hume Two and Fyshwick are operating; Beard is under construction. The reported 21, 51, 45 and 39 MW do not have an explicit IT power definition on this page."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "No site-level GPU model and quantity inventory is published in the location page checked."
        },
        {
          "field": "workloads",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "Hume One, Hume Two and Fyshwick are operating; Beard is under construction. The reported 21, 51, 45 and 39 MW do not have an explicit IT power definition on this page."
        }
      ]
    },
    {
      "id": "cdc-brooklyn",
      "name": "CDC Brooklyn Campus",
      "operator": "CDC",
      "country": "AU",
      "region": "VIC",
      "city": "Melbourne",
      "entityKind": "campus",
      "physicalSiteId": "cdc-brooklyn",
      "lat": -37.818086,
      "lon": 144.97307,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "cdc-brooklyn-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-cdc-melbourne"
          ],
          "note": "BK1 is explicitly operational. Commissioned MW is not stated here."
        },
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "cdc-brooklyn-remainder",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-cdc-melbourne"
          ],
          "note": "Remaining campus facilities are under construction; incremental MW is not separately established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-cdc-melbourne",
        "verify-cdc-melbourne-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-melbourne-20260911"
          ],
          "note": "The operator identifies this named campus on its own location page."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-melbourne-20260911"
          ],
          "note": "BK1 is operating; the remaining Brooklyn facilities and Laverton campus are under construction. Ultimate campus figures are not a phase-by-phase commissioned power schedule."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-melbourne-20260911"
          ],
          "note": "No site-level GPU model and quantity inventory is published in the location page checked."
        },
        {
          "field": "workloads",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-melbourne-20260911"
          ],
          "note": "The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-melbourne-20260911"
          ],
          "note": "No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-melbourne-20260911"
          ],
          "note": "BK1 is operating; the remaining Brooklyn facilities and Laverton campus are under construction. Ultimate campus figures are not a phase-by-phase commissioned power schedule."
        }
      ]
    },
    {
      "id": "cdc-eastern-creek",
      "name": "CDC Eastern Creek Campus",
      "operator": "CDC",
      "country": "AU",
      "region": "NSW",
      "city": "Sydney",
      "entityKind": "campus",
      "physicalSiteId": "cdc-eastern-creek",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "cdc-eastern-creek-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-cdc-sydney"
          ],
          "note": "EC1–EC4 are explicitly operational; current commissioned campus MW is not separately stated."
        },
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "cdc-eastern-creek-ec5-ec6",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-cdc-sydney"
          ],
          "note": "EC5 and EC6 are explicitly under construction; separate incremental MW is unknown."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-cdc-sydney",
        "verify-cdc-sydney-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate.",
        "Campus record includes EC1–EC6; individual buildings are not also counted."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-sydney-20260911"
          ],
          "note": "The operator identifies this named campus on its own location page."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-sydney-20260911"
          ],
          "note": "EC1–EC4 are operational; EC5/EC6 and Marsden Park are under construction. Planned campus envelopes are not current commissioned capacity."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-sydney-20260911"
          ],
          "note": "No site-level GPU model and quantity inventory is published in the location page checked."
        },
        {
          "field": "workloads",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-sydney-20260911"
          ],
          "note": "The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-sydney-20260911"
          ],
          "note": "No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-sydney-20260911"
          ],
          "note": "EC1–EC4 are operational; EC5/EC6 and Marsden Park are under construction. Planned campus envelopes are not current commissioned capacity."
        }
      ]
    },
    {
      "id": "cdc-fyshwick",
      "name": "CDC Fyshwick Campus",
      "operator": "CDC",
      "country": "AU",
      "region": "ACT",
      "city": "Canberra",
      "entityKind": "campus",
      "physicalSiteId": "cdc-fyshwick",
      "lat": -35.283029,
      "lon": 149.129026,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 45,
          "mwBasis": "unknown",
          "scopeId": "cdc-fyshwick-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-cdc-canberra"
          ],
          "note": "Explicit current operating capacity at campus scope; the page does not define IT versus total facility power, so excluded from IT subtotals."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-cdc-canberra",
        "verify-cdc-canberra-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate.",
        "Individual campus buildings are not separately counted in this release."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "The operator identifies this named campus on its own location page."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "Hume One, Hume Two and Fyshwick are operating; Beard is under construction. The reported 21, 51, 45 and 39 MW do not have an explicit IT power definition on this page."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "No site-level GPU model and quantity inventory is published in the location page checked."
        },
        {
          "field": "workloads",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "Hume One, Hume Two and Fyshwick are operating; Beard is under construction. The reported 21, 51, 45 and 39 MW do not have an explicit IT power definition on this page."
        }
      ]
    },
    {
      "id": "cdc-hume-one",
      "name": "CDC Hume Campus One",
      "operator": "CDC",
      "country": "AU",
      "region": "ACT",
      "city": "Canberra",
      "entityKind": "campus",
      "physicalSiteId": "cdc-hume-one",
      "lat": -35.283029,
      "lon": 149.129026,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 21,
          "mwBasis": "unknown",
          "scopeId": "cdc-hume-one-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-cdc-canberra"
          ],
          "note": "Explicit current operating capacity at campus scope; the page does not define IT versus total facility power, so excluded from IT subtotals."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-cdc-canberra",
        "verify-cdc-canberra-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate.",
        "Individual campus buildings are not separately counted in this release."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "The operator identifies this named campus on its own location page."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "Hume One, Hume Two and Fyshwick are operating; Beard is under construction. The reported 21, 51, 45 and 39 MW do not have an explicit IT power definition on this page."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "No site-level GPU model and quantity inventory is published in the location page checked."
        },
        {
          "field": "workloads",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "Hume One, Hume Two and Fyshwick are operating; Beard is under construction. The reported 21, 51, 45 and 39 MW do not have an explicit IT power definition on this page."
        }
      ]
    },
    {
      "id": "cdc-hume-two",
      "name": "CDC Hume Campus Two",
      "operator": "CDC",
      "country": "AU",
      "region": "ACT",
      "city": "Canberra",
      "entityKind": "campus",
      "physicalSiteId": "cdc-hume-two",
      "lat": -35.283029,
      "lon": 149.129026,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 51,
          "mwBasis": "unknown",
          "scopeId": "cdc-hume-two-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-cdc-canberra"
          ],
          "note": "Explicit current operating capacity at campus scope; the page does not define IT versus total facility power, so excluded from IT subtotals."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-cdc-canberra",
        "verify-cdc-canberra-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate.",
        "Individual campus buildings are not separately counted in this release."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "The operator identifies this named campus on its own location page."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "Hume One, Hume Two and Fyshwick are operating; Beard is under construction. The reported 21, 51, 45 and 39 MW do not have an explicit IT power definition on this page."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "No site-level GPU model and quantity inventory is published in the location page checked."
        },
        {
          "field": "workloads",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-canberra-20260911"
          ],
          "note": "Hume One, Hume Two and Fyshwick are operating; Beard is under construction. The reported 21, 51, 45 and 39 MW do not have an explicit IT power definition on this page."
        }
      ]
    },
    {
      "id": "cdc-laverton",
      "name": "CDC Laverton Campus",
      "operator": "CDC",
      "country": "AU",
      "region": "VIC",
      "city": "Melbourne",
      "entityKind": "campus",
      "physicalSiteId": "cdc-laverton",
      "lat": -37.818086,
      "lon": 144.97307,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "cdc-laverton-construction",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-cdc-melbourne"
          ],
          "note": "Operator explicitly states construction. Its eventual campus capacity is not assigned entirely to the current construction phase."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-cdc-melbourne",
        "verify-cdc-melbourne-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-melbourne-20260911"
          ],
          "note": "The operator identifies this named campus on its own location page."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-melbourne-20260911"
          ],
          "note": "BK1 is operating; the remaining Brooklyn facilities and Laverton campus are under construction. Ultimate campus figures are not a phase-by-phase commissioned power schedule."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-melbourne-20260911"
          ],
          "note": "No site-level GPU model and quantity inventory is published in the location page checked."
        },
        {
          "field": "workloads",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-melbourne-20260911"
          ],
          "note": "The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-melbourne-20260911"
          ],
          "note": "No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-melbourne-20260911"
          ],
          "note": "BK1 is operating; the remaining Brooklyn facilities and Laverton campus are under construction. Ultimate campus figures are not a phase-by-phase commissioned power schedule."
        }
      ]
    },
    {
      "id": "cdc-maddington",
      "name": "CDC Maddington Campus",
      "operator": "CDC",
      "country": "AU",
      "region": "WA",
      "city": "Perth",
      "entityKind": "campus",
      "physicalSiteId": "cdc-maddington",
      "lat": -31.953069,
      "lon": 115.838053,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "planned",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "cdc-maddington-planned",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-cdc-perth"
          ],
          "note": "Operator identifies the Maddington development off Bickley Road. Physical construction commencement and staged MW have not yet been verified."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-cdc-perth",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate."
      ]
    },
    {
      "id": "cdc-marsden-park",
      "name": "CDC Marsden Park Campus",
      "operator": "CDC",
      "country": "AU",
      "region": "NSW",
      "city": "Sydney",
      "entityKind": "campus",
      "physicalSiteId": "cdc-marsden-park",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "cdc-marsden-park-construction",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-cdc-sydney"
          ],
          "note": "Operator describes early construction. Whole-campus planned capacity is not a measured amount currently under construction."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-cdc-sydney",
        "verify-cdc-sydney-20260911",
        "verify-cdc-marsden-planning-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-sydney-20260911"
          ],
          "note": "The operator identifies this named campus on its own location page."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-sydney-20260911"
          ],
          "note": "EC1–EC4 are operational; EC5/EC6 and Marsden Park are under construction. Planned campus envelopes are not current commissioned capacity."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-sydney-20260911"
          ],
          "note": "No site-level GPU model and quantity inventory is published in the location page checked."
        },
        {
          "field": "workloads",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-sydney-20260911"
          ],
          "note": "The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-sydney-20260911"
          ],
          "note": "No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-sydney-20260911",
            "verify-cdc-marsden-planning-20260911"
          ],
          "note": "NSW approval dated 27 November 2025 (SSD-70889211) is verified. CDC separately describes the campus as in early construction. Approval and construction are separate milestones."
        }
      ]
    },
    {
      "id": "colocity-dc1",
      "name": "Colocity DC1 Pulteney Street",
      "operator": "Colocity",
      "city": "Adelaide",
      "region": "SA",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "colocity-dc1",
      "lat": -34.933042,
      "lon": 138.598059,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "colocity-dc1-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-colocity-locations",
            "exp-colocity-history"
          ],
          "note": "Operator identifies this as one of its two owned and operated Adelaide facilities. IT capacity is not disclosed."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-colocity-locations",
        "exp-colocity-history",
        "natural-earth-cities"
      ],
      "notes": [
        "Operator identifies this as one of its two owned and operated Adelaide facilities. IT capacity is not disclosed."
      ],
      "commissioningEvents": [
        {
          "id": "colocity-dc1-opened",
          "label": "Facility opened",
          "date": "2007",
          "datePrecision": "year",
          "sourceIds": [
            "exp-colocity-history"
          ],
          "note": "Explicit year in the operator's milestones; no current MW backdated to opening."
        }
      ]
    },
    {
      "id": "colocity-dc3",
      "name": "Colocity DC3 Morphett Street",
      "operator": "Colocity",
      "city": "Adelaide",
      "region": "SA",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "colocity-dc3",
      "lat": -34.933042,
      "lon": 138.598059,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "colocity-dc3-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-colocity-locations",
            "exp-colocity-history"
          ],
          "note": "Operator identifies this as one of its two owned and operated Adelaide facilities. IT capacity is not disclosed."
        },
        {
          "asOf": "2026",
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "colocity-dc3-second-hall-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-colocity-history"
          ],
          "note": "Operator's 2026 milestone records start of construction of a second data hall. No completion date or phase MW disclosed."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-colocity-locations",
        "exp-colocity-history",
        "natural-earth-cities"
      ],
      "notes": [
        "Operator identifies this as one of its two owned and operated Adelaide facilities. IT capacity is not disclosed."
      ],
      "commissioningEvents": [
        {
          "id": "colocity-dc3-opened",
          "label": "Facility opened",
          "date": "2015",
          "datePrecision": "year",
          "sourceIds": [
            "exp-colocity-history"
          ],
          "note": "Explicit year in the operator's milestones; no current MW backdated to opening."
        }
      ]
    },
    {
      "id": "dcwest-perth",
      "name": "DC West Perth",
      "operator": "DC West",
      "country": "AU",
      "region": "WA",
      "city": "Perth",
      "entityKind": "facility",
      "physicalSiteId": "dcwest-perth",
      "lat": -31.953069,
      "lon": 115.838053,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "dcwest-perth-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-dcwest"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-dcwest",
        "natural-earth-cities"
      ],
      "notes": []
    },
    {
      "id": "dci-adelaide-01",
      "name": "DCI ADL01 Kidman Park",
      "operator": "DCI Data Centers",
      "country": "AU",
      "region": "SA",
      "city": "Adelaide",
      "entityKind": "facility",
      "physicalSiteId": "dci-kidman-park",
      "lat": -34.933042,
      "lon": 138.598059,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "dci-adelaide-01-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-dci-adelaide-01",
            "cov-dci-locations"
          ],
          "note": "Operator describes staffed, available data-centre services; standalone IT MW has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-dci-adelaide-01",
        "cov-dci-locations",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate."
      ]
    },
    {
      "id": "dci-adelaide-02",
      "name": "DCI ADL02 Kidman Park",
      "operator": "DCI Data Centers",
      "country": "AU",
      "region": "SA",
      "city": "Adelaide",
      "entityKind": "facility",
      "physicalSiteId": "dci-kidman-park",
      "lat": -34.933042,
      "lon": 138.598059,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "dci-adelaide-02-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-dci-adelaide-02",
            "cov-dci-locations"
          ],
          "note": "Operator describes staffed, available data-centre services; standalone IT MW has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-dci-adelaide-02",
        "cov-dci-locations",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate."
      ]
    },
    {
      "id": "dci-adelaide-03",
      "name": "DCI ADL03 Mawson Lakes",
      "operator": "DCI Data Centers",
      "country": "AU",
      "region": "SA",
      "city": "Adelaide",
      "entityKind": "facility",
      "physicalSiteId": "dci-adelaide-03",
      "lat": -34.933042,
      "lon": 138.598059,
      "locationPrecision": "city",
      "facilityType": "edge",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "planned",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "dci-adelaide-03-planned",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-dci-locations"
          ],
          "note": "Operator lists Mawson Lakes development. Construction and commissioned MW are not confirmed."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-dci-locations",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate."
      ]
    },
    {
      "id": "dci-canberra-01",
      "name": "DCI CBR01 Jerrabomberra",
      "operator": "DCI Data Centers",
      "country": "AU",
      "region": "NSW",
      "city": "Canberra",
      "entityKind": "facility",
      "physicalSiteId": "dci-canberra-01",
      "lat": -35.283029,
      "lon": 149.129026,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "planned",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "dci-canberra-01-planned",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-dci-locations"
          ],
          "note": "Development is identified in the Poplars Innovation Precinct at Jerrabomberra. Physical construction has not been verified."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-dci-locations",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate.",
        "Canberra market location; Jerrabomberra is in NSW, not the ACT."
      ]
    },
    {
      "id": "dci-sydney-01",
      "name": "DCI SYD01 Eastern Creek",
      "operator": "DCI Data Centers",
      "country": "AU",
      "region": "NSW",
      "city": "Sydney",
      "entityKind": "facility",
      "physicalSiteId": "dci-eastern-creek",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "dci-sydney-01-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-dci-sydney-01",
            "cov-dci-locations"
          ],
          "note": "Operator describes staffed, available data-centre services; standalone IT MW has not been established."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "DCI SYD01 Eastern Creek: certified enclave only. The entire building and its MW are not certified by this scope.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-dci-sydney-01",
        "cov-dci-locations",
        "hcf-register",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate."
      ]
    },
    {
      "id": "dci-sydney-02",
      "name": "DCI SYD02 Eastern Creek expansion",
      "operator": "DCI Data Centers",
      "country": "AU",
      "region": "NSW",
      "city": "Sydney",
      "entityKind": "facility",
      "physicalSiteId": "dci-eastern-creek",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "dci-sydney-02-construction",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-dci-syd02-update",
            "cov-dci-locations"
          ],
          "note": "Early works under way. A 63 MW modification is sought; approved and proposed capacities differ, and neither is confirmed commissioned IT load."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-dci-syd02-update",
        "cov-dci-locations",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate.",
        "Shares the existing SYD01 physical site. The locations page uses SYD02/SYD03; held as one development record until that relationship is resolved."
      ]
    },
    {
      "id": "digico-adl1",
      "name": "DigiCo ADL1 Adelaide",
      "operator": "DigiCo",
      "city": "Adelaide",
      "region": "South Australia",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "digico-adl1",
      "lat": -34.933042,
      "lon": 138.598059,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 1.2,
          "mwBasis": "IT",
          "scopeId": "digico-adl1-installed",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-digico-adl1"
          ],
          "note": "Installed IT capacity explicitly reported on the current operator page. Its effective date is unstated; this is not a historical commissioning observation."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-digico-adl1",
        "verify-digico-adl1",
        "natural-earth-cities"
      ],
      "notes": [],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-adl1"
          ],
          "note": "Named operator facility page reviewed; corporate footer office address is not used as a facility location."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-adl1"
          ],
          "note": "1.2 MW is explicitly labelled installed IT capacity. Effective installation date is unstated."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-adl1"
          ],
          "note": "Existing facility described with installed IT capacity; no inference from a forecast opening date."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-adl1"
          ],
          "note": "No installed GPU model or quantity disclosed in the reviewed facility page."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-adl1"
          ],
          "note": "No quantified customer IT-capacity commitment is disclosed in this facility profile. Customer-sector descriptions and property ownership are not GPU/MW offtake."
        }
      ]
    },
    {
      "id": "digico-adl2",
      "name": "DigiCo ADL2 Adelaide",
      "operator": "DigiCo",
      "city": "Adelaide",
      "region": "South Australia",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "digico-adl2",
      "lat": -34.933042,
      "lon": 138.598059,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 0.6,
          "mwBasis": "IT",
          "scopeId": "digico-adl2-installed",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-digico-adl2"
          ],
          "note": "Installed IT capacity explicitly reported on the current operator page. Its effective date is unstated; this is not a historical commissioning observation."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-digico-adl2",
        "verify-digico-adl2-fresh",
        "natural-earth-cities"
      ],
      "notes": [],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-adl2-fresh"
          ],
          "note": "Named operator facility page reviewed; corporate footer office address is not used as a facility location."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-adl2-fresh"
          ],
          "note": "0.6 MW is explicitly labelled installed IT capacity. Effective installation date is unstated."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-adl2-fresh"
          ],
          "note": "Existing facility described with installed IT capacity; no inference from a forecast opening date."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-adl2-fresh"
          ],
          "note": "No installed GPU model or quantity disclosed in the reviewed facility page."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-adl2-fresh"
          ],
          "note": "No quantified customer IT-capacity commitment is disclosed in this facility profile. Customer-sector descriptions and property ownership are not GPU/MW offtake."
        }
      ]
    },
    {
      "id": "digico-bne",
      "name": "DigiCo BNE Brisbane",
      "operator": "DigiCo",
      "city": "Brisbane",
      "region": "Queensland",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "digico-bne",
      "lat": -27.453085,
      "lon": 153.033147,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 0.3,
          "mwBasis": "IT",
          "scopeId": "digico-bne-installed",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-digico-bne"
          ],
          "note": "Installed IT capacity explicitly reported on the current operator page. Its effective date is unstated; this is not a historical commissioning observation."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-digico-bne",
        "verify-digico-bne",
        "natural-earth-cities"
      ],
      "notes": [],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-bne"
          ],
          "note": "Named operator facility page reviewed; corporate footer office address is not used as a facility location."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-bne"
          ],
          "note": "0.3 MW is explicitly labelled installed IT capacity. Effective installation date is unstated."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-bne"
          ],
          "note": "Existing facility described with installed IT capacity; no inference from a forecast opening date."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-bne"
          ],
          "note": "No installed GPU model or quantity disclosed in the reviewed facility page."
        },
        {
          "field": "contracts",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-bne"
          ],
          "note": "Property lease with RW Wiley expires 2035; this is not a compute/offtake contract."
        }
      ]
    },
    {
      "id": "digico-bne1",
      "name": "DigiCo BNE1 Brisbane",
      "operator": "DigiCo",
      "city": "Brisbane",
      "region": "Queensland",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "digico-eagle-farm-campus",
      "lat": -27.453085,
      "lon": 153.033147,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 1.8,
          "mwBasis": "IT",
          "scopeId": "digico-bne1-installed",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-digico-bne1"
          ],
          "note": "Installed IT capacity explicitly reported on the current operator page. Its effective date is unstated; this is not a historical commissioning observation."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-digico-bne1",
        "exp-iseek-eagle-expansion",
        "verify-digico-bne1",
        "natural-earth-cities"
      ],
      "notes": [
        "Adjacent Eagle Farm facilities and greenfield expansion are grouped as one physical campus."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-bne1"
          ],
          "note": "Named operator facility page reviewed; corporate footer office address is not used as a facility location."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-bne1"
          ],
          "note": "1.8 MW is explicitly labelled installed IT capacity. Effective installation date is unstated."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-bne1"
          ],
          "note": "Existing facility described with installed IT capacity; no inference from a forecast opening date."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-bne1"
          ],
          "note": "No installed GPU model or quantity disclosed in the reviewed facility page."
        },
        {
          "field": "contracts",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-bne1"
          ],
          "note": "Brisbane Airport Corporation land, core and shell lease expires 2049. Possible head-lease extension to 2096 is an option, not an existing data-centre compute commitment."
        }
      ]
    },
    {
      "id": "digico-bne2",
      "name": "DigiCo BNE2 Brisbane",
      "operator": "DigiCo",
      "city": "Brisbane",
      "region": "Queensland",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "digico-eagle-farm-campus",
      "lat": -27.453085,
      "lon": 153.033147,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 1.7,
          "mwBasis": "IT",
          "scopeId": "digico-bne2-installed",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-digico-bne2"
          ],
          "note": "Installed IT capacity explicitly reported on the current operator page. Its effective date is unstated; this is not a historical commissioning observation."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-digico-bne2",
        "exp-iseek-eagle-expansion",
        "verify-digico-bne2",
        "natural-earth-cities"
      ],
      "notes": [
        "Adjacent Eagle Farm facilities and greenfield expansion are grouped as one physical campus."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-bne2"
          ],
          "note": "Named operator facility page reviewed; corporate footer office address is not used as a facility location."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-bne2"
          ],
          "note": "1.7 MW is explicitly labelled installed IT capacity. Effective installation date is unstated."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-bne2"
          ],
          "note": "Existing facility described with installed IT capacity; no inference from a forecast opening date."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-bne2"
          ],
          "note": "No installed GPU model or quantity disclosed in the reviewed facility page."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-bne2"
          ],
          "note": "No quantified customer IT-capacity commitment is disclosed in this facility profile. Customer-sector descriptions and property ownership are not GPU/MW offtake."
        }
      ]
    },
    {
      "id": "digico-bne3",
      "name": "DigiCo BNE3 Brisbane",
      "operator": "DigiCo",
      "city": "Brisbane",
      "region": "Queensland",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "digico-eagle-farm-campus",
      "lat": -27.453085,
      "lon": 153.033147,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "approximate",
          "stage": "planned",
          "mw": 19.6,
          "mwBasis": "IT",
          "scopeId": "digico-bne3-greenfield",
          "includedInTotals": true,
          "expectedYear": 2027,
          "dateConfidence": "target",
          "sourceIds": [
            "exp-digico-bne3"
          ],
          "note": "Greenfield development on land adjacent to BNE2; lease option and estimated 2027 completion do not establish that construction has begun."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-digico-bne3",
        "exp-iseek-eagle-expansion",
        "verify-digico-bne3",
        "natural-earth-cities"
      ],
      "notes": [
        "Adjacent Eagle Farm facilities and greenfield expansion are grouped as one physical campus."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-bne3"
          ],
          "note": "Named operator facility page reviewed; corporate footer office address is not used as a facility location."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-bne3"
          ],
          "note": "19.6 MW IT is a greenfield development estimate, not installed capacity."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-bne3"
          ],
          "note": "Lease-expansion option and planned greenfield development; completion estimated calendar 2027. No evidence of construction commencement in this source."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-bne3"
          ],
          "note": "No installed GPU model or quantity disclosed in the reviewed facility page."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-bne3"
          ],
          "note": "No quantified customer IT-capacity commitment is disclosed in this facility profile. Customer-sector descriptions and property ownership are not GPU/MW offtake."
        }
      ]
    },
    {
      "id": "digico-syd1",
      "name": "DigiCo SYD1 Sydney",
      "operator": "DigiCo",
      "city": "Sydney",
      "region": "New South Wales",
      "country": "AU",
      "entityKind": "campus",
      "physicalSiteId": "digico-syd1",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 36,
          "mwBasis": "IT",
          "scopeId": "digico-syd1-installed",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-digico-syd1"
          ],
          "note": "Installed IT capacity explicitly reported on the current operator page. Its effective date is unstated; this is not a historical commissioning observation."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-digico-syd1",
        "verify-digico-syd1-fresh",
        "natural-earth-cities"
      ],
      "notes": [
        "Two adjoining data centre sites are represented as one campus. The advertised 88 MW planned figure is withheld from totals until its relationship to installed capacity and expansion phases is reconciled."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-syd1-fresh"
          ],
          "note": "Named operator facility page reviewed; corporate footer office address is not used as a facility location."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-syd1-fresh"
          ],
          "note": "36 MW is explicitly labelled installed IT capacity. Effective installation date is unstated. A forced fresh scrape replaced a stale 26 MW cached snapshot; current page modification metadata is 2026-09-10, which is not a commissioning date."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-syd1-fresh"
          ],
          "note": "Existing facility described with installed IT capacity; no inference from a forecast opening date."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-syd1-fresh"
          ],
          "note": "No installed GPU model or quantity disclosed in the reviewed facility page."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-syd1-fresh"
          ],
          "note": "No quantified customer IT-capacity commitment is disclosed in this facility profile. Customer-sector descriptions and property ownership are not GPU/MW offtake."
        }
      ]
    },
    {
      "id": "digico-tsv1",
      "name": "DigiCo TSV1 Townsville",
      "operator": "DigiCo",
      "city": "Townsville",
      "region": "Queensland",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "digico-tsv1",
      "lat": -19.24995,
      "lon": 146.769997,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 0.5,
          "mwBasis": "IT",
          "scopeId": "digico-tsv1-installed",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-digico-tsv1"
          ],
          "note": "Installed IT capacity explicitly reported on the current operator page. Its effective date is unstated; this is not a historical commissioning observation."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-digico-tsv1",
        "verify-digico-tsv1",
        "natural-earth-cities"
      ],
      "notes": [],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-tsv1"
          ],
          "note": "Named operator facility page reviewed; corporate footer office address is not used as a facility location."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-tsv1"
          ],
          "note": "0.5 MW is explicitly labelled installed IT capacity. Effective installation date is unstated."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-tsv1"
          ],
          "note": "Existing facility described with installed IT capacity; no inference from a forecast opening date."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-tsv1"
          ],
          "note": "No installed GPU model or quantity disclosed in the reviewed facility page."
        },
        {
          "field": "contracts",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-digico-tsv1"
          ],
          "note": "Townsville City Council property lease expires 2049; this is not a compute/offtake commitment."
        }
      ]
    },
    {
      "id": "digital-realty-mel11",
      "name": "Digital Realty MEL11 Deer Park",
      "operator": "Digital Realty",
      "city": "Melbourne",
      "region": "Victoria",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "digital-realty-mel11",
      "lat": -37.818086,
      "lon": 144.97307,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "digital-realty-mel11-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-digital-melbourne"
          ],
          "note": "Operating colocation offering is described by the operator; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-digital-melbourne",
        "natural-earth-cities"
      ],
      "notes": [],
      "address": {
        "street": "72 Radnor Drive",
        "locality": "Deer Park",
        "region": "Victoria",
        "postalCode": "3023",
        "country": "AU",
        "sourceIds": [
          "exp-digital-melbourne"
        ],
        "verifiedOn": "2026-09-11"
      }
    },
    {
      "id": "digital-realty-syd10",
      "name": "Digital Realty SYD10 Erskine Park",
      "operator": "Digital Realty",
      "city": "Sydney",
      "region": "New South Wales",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "digital-realty-erskine-park",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "digital-realty-syd10-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-digital-sydney"
          ],
          "note": "Operating colocation offering is described by the operator; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-digital-sydney",
        "natural-earth-cities"
      ],
      "notes": [
        "Grouped within the contiguous Erskine Park campus; building records are not additional campuses."
      ],
      "address": {
        "street": "1–12 Templar Road",
        "locality": "Erskine Park",
        "region": "New South Wales",
        "postalCode": "2759",
        "country": "AU",
        "sourceIds": [
          "exp-digital-sydney"
        ],
        "verifiedOn": "2026-09-11"
      }
    },
    {
      "id": "digital-realty-syd11",
      "name": "Digital Realty SYD11 Erskine Park",
      "operator": "Digital Realty",
      "city": "Sydney",
      "region": "New South Wales",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "digital-realty-erskine-park",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "digital-realty-syd11-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-digital-sydney"
          ],
          "note": "Operating colocation offering is described by the operator; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-digital-sydney",
        "natural-earth-cities"
      ],
      "notes": [
        "Grouped within the contiguous Erskine Park campus; building records are not additional campuses."
      ],
      "address": {
        "street": "13–23 Templar Road",
        "locality": "Erskine Park",
        "region": "New South Wales",
        "postalCode": "2759",
        "country": "AU",
        "sourceIds": [
          "exp-digital-sydney"
        ],
        "verifiedOn": "2026-09-11"
      }
    },
    {
      "id": "dxn-darwin",
      "name": "DXN SDC Darwin",
      "operator": "DXN",
      "city": "Darwin",
      "region": "Northern Territory",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "dxn-darwin",
      "lat": -12.425354,
      "lon": 130.850039,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "dxn-darwin-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-dxn-operations"
          ],
          "note": "Operating colocation offering is described by the operator; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-dxn-operations",
        "natural-earth-cities"
      ],
      "notes": [
        "Darwin physical data centre verified; the corporate/contact list is not used as sufficient proof of its exact facility address."
      ]
    },
    {
      "id": "dxn-hobart",
      "name": "DXN TAS01 Hobart",
      "operator": "DXN",
      "city": "Hobart",
      "region": "Tasmania",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "dxn-hobart",
      "lat": -42.850009,
      "lon": 147.29503,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "dxn-hobart-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-dxn-operations"
          ],
          "note": "Operating colocation offering is described by the operator; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-dxn-operations",
        "natural-earth-cities"
      ],
      "notes": []
    },
    {
      "id": "edgecentres-brisbane",
      "entityKind": "facility",
      "physicalSiteId": "edgecentres-brisbane",
      "name": "Edge Centres Brisbane (Host Networks)",
      "operator": "Edge Centres",
      "country": "AU",
      "region": "QLD",
      "city": "Brisbane",
      "lat": -27.453085,
      "lon": 153.033147,
      "locationPrecision": "city",
      "facilityType": "edge",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "edgecentres-brisbane-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-hostnetworks-facility"
          ],
          "note": "Host Networks describes its own operating Eight Mile Plains facility; the current publisher footer is Edge Centres. Protected power is not treated as IT load."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-edgecentres-current",
        "exp-hostnetworks-facility",
        "exp-hostnetworks-contact",
        "au-profile-hostnetworks-facility-20260911",
        "au-profile-hostnetworks-contact-20260911",
        "au-profile-hostnetworks-company-20260911",
        "au-profile-edgecentres-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "Current Host Networks facility documentation and Edge Centres legal footer resolve this broad Brisbane entry to Eight Mile Plains. Kept as one record to avoid counting parent and brand twice.",
        "The company history describes a facility launch in April 2007. Its identity as the current Brandl Street site is not explicitly established, so this event is excluded from the site timeline."
      ],
      "address": {
        "street": "Unit 1, 53 Brandl Street",
        "locality": "Eight Mile Plains",
        "region": "QLD",
        "postalCode": "4113",
        "country": "AU",
        "sourceIds": [
          "exp-hostnetworks-contact",
          "au-profile-hostnetworks-contact-20260911"
        ],
        "verifiedOn": "2026-09-11"
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-hostnetworks-facility-20260911",
            "au-profile-hostnetworks-company-20260911"
          ],
          "note": "Host Networks describes its own Brandl Street data centre in Eight Mile Plains. The current website legal footer identifies Edge Centres Pty Ltd; this does not establish a wider acquisition chronology."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-hostnetworks-facility-20260911"
          ],
          "note": "The operator describes current facility services and protected power at its Eight Mile Plains facility, supporting operating status."
        },
        {
          "field": "address",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-hostnetworks-contact-20260911",
            "au-profile-hostnetworks-facility-20260911"
          ],
          "note": "The equipment delivery address is Unit 1, 53 Brandl Street, Eight Mile Plains QLD 4113 and matches the facility page locality."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-hostnetworks-facility-20260911"
          ],
          "note": "Current protected power is 550 kW; 1.25 MW belongs to the described Tier III upgrade possibility. These are not labelled IT load, and per-cabinet density cannot establish installed site IT capacity."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-hostnetworks-facility-20260911"
          ],
          "note": "No installed accelerator model or GPU count is disclosed in the reviewed facility technical specification."
        }
      ],
      "commissioningEvents": []
    },
    {
      "id": "equinix-ae1",
      "name": "Equinix AE1",
      "operator": "Equinix",
      "country": "AU",
      "region": "SA",
      "city": "Adelaide",
      "entityKind": "facility",
      "physicalSiteId": "equinix-ae1",
      "lat": -34.92313331233103,
      "lon": 138.5890807985474,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "equinix-ae1-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-equinix-availability"
          ],
          "note": "Operator lists operational colocation coverage/services. Facility MW has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-equinix-availability",
        "loc-equinix-ae1",
        "equinix-deep-ae1",
        "equinix-deep-availability"
      ],
      "notes": [],
      "address": {
        "street": "Adelaide, 274 Hindley St",
        "locality": "Adelaide",
        "region": "SA",
        "postalCode": "",
        "country": "AU",
        "sourceIds": [
          "loc-equinix-ae1"
        ],
        "verifiedOn": "2026-09-10"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "loc-equinix-ae1"
        ],
        "verifiedOn": "2026-09-10",
        "note": "Coordinates from Equinix's AE1 map configuration, checked against its displayed street address. Site marker, not a surveyed boundary."
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-ae1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Fresh dedicated facility heading identifies AE1; service descriptions and facility-specific specification tables were reviewed."
        },
        {
          "field": "status",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-ae1",
            "equinix-deep-availability"
          ],
          "checkedOn": "2026-09-11",
          "note": "The fresh operational-coverage document explicitly lists this named facility's on-site operational coverage; facility page provides current services. Non-24/7 coverage describes staffing, not a non-operating data centre."
        },
        {
          "field": "address",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-ae1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Original operator inline address configuration rechecked: 274 Hindley St, Adelaide, Adelaide. Original HTML saved 2026-09-10 in tmp/research/equinix/ae 1.html; fresh main-content page separately checked 2026-09-11. Existing address retained. Operator raw postcode SA 50002 is malformed; retain unknown postal code rather than silently correcting it."
        },
        {
          "field": "coordinates",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-ae1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Saved named-facility public inline map marker -34.92313331233103, 138.5890807985474 exactly matches the existing pin. Original HTML evidence is from 2026-09-10. Fresh rendered map view-centre is not treated as a replacement site coordinate."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-ae1"
          ],
          "checkedOn": "2026-09-11",
          "note": "The reviewed specification gives 414 m² colocation area and 3 kVA minimum cabinet density, not installed facility IT MW. Do not multiply cabinet density or area into a MW estimate."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-ae1"
          ],
          "checkedOn": "2026-09-11",
          "note": "No installed GPU/accelerator model-and-quantity inventory is disclosed on this named facility page. DGX-ready branding, cloud connectivity or high-density cooling would describe capability only."
        },
        {
          "field": "workloads",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-ae1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Verified service capability is colocation/interconnection. No measured training-versus-inference workload split is disclosed. Regional announcements with unnamed facilities are not allocated to this site."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-ae1"
          ],
          "checkedOn": "2026-09-11",
          "note": "No quantified named customer compute offtake commitment is disclosed in this named facility page. Cloud on-ramps, generic customer ecosystems and capital/JV agreements are not tenant MW contracts."
        }
      ]
    },
    {
      "id": "equinix-br1",
      "name": "Equinix BR1",
      "operator": "Equinix",
      "country": "AU",
      "region": "QLD",
      "city": "Brisbane",
      "entityKind": "facility",
      "physicalSiteId": "equinix-br1",
      "lat": -27.455078844667092,
      "lon": 153.0339718774864,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "equinix-br1-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-equinix-availability"
          ],
          "note": "Operator lists operational colocation coverage/services. Facility MW has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-equinix-availability",
        "loc-equinix-br1",
        "equinix-deep-br1",
        "equinix-deep-availability"
      ],
      "notes": [],
      "address": {
        "street": "Fortitude Valley, 54-58 Alfred Street",
        "locality": "Brisbane",
        "region": "QLD",
        "postalCode": "4006",
        "country": "AU",
        "sourceIds": [
          "loc-equinix-br1"
        ],
        "verifiedOn": "2026-09-10"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "loc-equinix-br1"
        ],
        "verifiedOn": "2026-09-10",
        "note": "Coordinates from Equinix's BR1 map configuration, checked against its displayed street address. Site marker, not a surveyed boundary."
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-br1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Fresh dedicated facility heading identifies BR1; service descriptions and facility-specific specification tables were reviewed."
        },
        {
          "field": "status",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-br1",
            "equinix-deep-availability"
          ],
          "checkedOn": "2026-09-11",
          "note": "The fresh operational-coverage document explicitly lists this named facility's on-site operational coverage; facility page provides current services. Non-24/7 coverage describes staffing, not a non-operating data centre."
        },
        {
          "field": "address",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-br1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Original operator inline address configuration rechecked: 54-58 Alfred Street, Fortitude Valley, Brisbane. Original HTML saved 2026-09-10 in tmp/research/equinix/br 1.html; fresh main-content page separately checked 2026-09-11. Existing address retained."
        },
        {
          "field": "coordinates",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-br1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Saved named-facility public inline map marker -27.455078844667092, 153.0339718774864 exactly matches the existing pin. Original HTML evidence is from 2026-09-10. Fresh rendered map view-centre is not treated as a replacement site coordinate."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-br1"
          ],
          "checkedOn": "2026-09-11",
          "note": "The reviewed specification gives 832 m² colocation area and 3 kVA minimum cabinet density, not installed facility IT MW. Do not multiply cabinet density or area into a MW estimate."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-br1"
          ],
          "checkedOn": "2026-09-11",
          "note": "No installed GPU/accelerator model-and-quantity inventory is disclosed on this named facility page. DGX-ready branding, cloud connectivity or high-density cooling would describe capability only."
        },
        {
          "field": "workloads",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-br1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Verified service capability is colocation/interconnection. No measured training-versus-inference workload split is disclosed. Regional announcements with unnamed facilities are not allocated to this site."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-br1"
          ],
          "checkedOn": "2026-09-11",
          "note": "No quantified named customer compute offtake commitment is disclosed in this named facility page. Cloud on-ramps, generic customer ecosystems and capital/JV agreements are not tenant MW contracts."
        }
      ]
    },
    {
      "id": "equinix-ca1",
      "name": "Equinix CA1",
      "operator": "Equinix",
      "country": "AU",
      "region": "ACT",
      "city": "Canberra",
      "entityKind": "facility",
      "physicalSiteId": "equinix-ca1",
      "lat": -35.207349759044426,
      "lon": 149.13558601059958,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "equinix-ca1-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-equinix-availability"
          ],
          "note": "Operator lists operational colocation coverage/services. Facility MW has not been established."
        }
      ],
      "certification": {
        "status": "strategic-facility",
        "scope": "Equinix CA1: named facility on the official HCF register.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-equinix-availability",
        "loc-equinix-ca1",
        "equinix-deep-ca1",
        "equinix-deep-availability",
        "hcf-register"
      ],
      "notes": [],
      "address": {
        "street": "Mitchell, 51 Dacre St",
        "locality": "Canberra",
        "region": "ACT",
        "postalCode": "2911",
        "country": "AU",
        "sourceIds": [
          "loc-equinix-ca1"
        ],
        "verifiedOn": "2026-09-10"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "loc-equinix-ca1"
        ],
        "verifiedOn": "2026-09-10",
        "note": "Coordinates from Equinix's CA1 map configuration, checked against its displayed street address. Site marker, not a surveyed boundary."
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-ca1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Fresh dedicated facility heading identifies CA1; service descriptions and facility-specific specification tables were reviewed."
        },
        {
          "field": "status",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-ca1",
            "equinix-deep-availability"
          ],
          "checkedOn": "2026-09-11",
          "note": "The fresh operational-coverage document explicitly lists this named facility's on-site operational coverage; facility page provides current services. Non-24/7 coverage describes staffing, not a non-operating data centre."
        },
        {
          "field": "address",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-ca1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Original operator inline address configuration rechecked: 51 Dacre St, Mitchell, Canberra. Original HTML saved 2026-09-10 in tmp/research/equinix/ca 1.html; fresh main-content page separately checked 2026-09-11. Existing address retained."
        },
        {
          "field": "coordinates",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-ca1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Saved named-facility public inline map marker -35.207349759044426, 149.13558601059958 exactly matches the existing pin. Original HTML evidence is from 2026-09-10. Fresh rendered map view-centre is not treated as a replacement site coordinate."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-ca1"
          ],
          "checkedOn": "2026-09-11",
          "note": "The reviewed specification gives 577 m² colocation area and 3 kVA minimum cabinet density, not installed facility IT MW. Do not multiply cabinet density or area into a MW estimate."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-ca1"
          ],
          "checkedOn": "2026-09-11",
          "note": "No installed GPU/accelerator model-and-quantity inventory is disclosed on this named facility page. DGX-ready branding, cloud connectivity or high-density cooling would describe capability only."
        },
        {
          "field": "workloads",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-ca1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Verified service capability is colocation/interconnection. No measured training-versus-inference workload split is disclosed. Regional announcements with unnamed facilities are not allocated to this site."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-ca1"
          ],
          "checkedOn": "2026-09-11",
          "note": "No quantified named customer compute offtake commitment is disclosed in this named facility page. Cloud on-ramps, generic customer ecosystems and capital/JV agreements are not tenant MW contracts."
        }
      ]
    },
    {
      "id": "equinix-me1",
      "name": "Equinix ME1",
      "operator": "Equinix",
      "country": "AU",
      "region": "VIC",
      "city": "Melbourne",
      "entityKind": "facility",
      "physicalSiteId": "equinix-578-lorimer-street",
      "lat": -37.82279528289286,
      "lon": 144.91490263491866,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "equinix-me1-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-equinix-availability",
            "cov-equinix-me1"
          ],
          "note": "Operator lists operational colocation coverage/services. Facility MW has not been established."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "Equinix ME1: certified enclave only. The entire building and its MW are not certified by this scope.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-equinix-availability",
        "cov-equinix-me1",
        "loc-equinix-me1",
        "equinix-deep-me1",
        "equinix-deep-availability",
        "hcf-register"
      ],
      "notes": [
        "Operator location: 578 Lorimer Street."
      ],
      "address": {
        "street": "Port Melbourne, 578 Lorimer Street",
        "locality": "Melbourne",
        "region": "VIC",
        "postalCode": "3207",
        "country": "AU",
        "sourceIds": [
          "loc-equinix-me1"
        ],
        "verifiedOn": "2026-09-10"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "loc-equinix-me1"
        ],
        "verifiedOn": "2026-09-10",
        "note": "Coordinates from Equinix's ME1 map configuration, checked against its displayed street address. Site marker, not a surveyed boundary."
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-me1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Fresh dedicated facility heading identifies ME1; service descriptions and facility-specific specification tables were reviewed."
        },
        {
          "field": "status",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-me1",
            "equinix-deep-availability"
          ],
          "checkedOn": "2026-09-11",
          "note": "The fresh operational-coverage document explicitly lists this named facility's on-site operational coverage; facility page provides current services. Non-24/7 coverage describes staffing, not a non-operating data centre."
        },
        {
          "field": "address",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-me1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Original operator inline address configuration rechecked: 578 Lorimer Street, Port Melbourne, Melbourne. Original HTML saved 2026-09-10 in tmp/research/equinix/me 1.html; fresh main-content page separately checked 2026-09-11. Existing address retained."
        },
        {
          "field": "coordinates",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-me1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Saved named-facility public inline map marker -37.82279528289286, 144.91490263491866 exactly matches the existing pin. Original HTML evidence is from 2026-09-10. Fresh rendered map view-centre is not treated as a replacement site coordinate."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-me1"
          ],
          "checkedOn": "2026-09-11",
          "note": "The reviewed specification gives 3326 m² colocation area and 4 kVA minimum cabinet density, not installed facility IT MW. Do not multiply cabinet density or area into a MW estimate."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-me1"
          ],
          "checkedOn": "2026-09-11",
          "note": "No installed GPU/accelerator model-and-quantity inventory is disclosed on this named facility page. DGX-ready branding, cloud connectivity or high-density cooling would describe capability only."
        },
        {
          "field": "workloads",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-me1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Verified service capability is colocation/interconnection. No measured training-versus-inference workload split is disclosed. Regional announcements with unnamed facilities are not allocated to this site."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-me1"
          ],
          "checkedOn": "2026-09-11",
          "note": "No quantified named customer compute offtake commitment is disclosed in this named facility page. Cloud on-ramps, generic customer ecosystems and capital/JV agreements are not tenant MW contracts."
        }
      ]
    },
    {
      "id": "equinix-me2",
      "name": "Equinix ME2",
      "operator": "Equinix",
      "country": "AU",
      "region": "VIC",
      "city": "Melbourne",
      "entityKind": "facility",
      "physicalSiteId": "equinix-578-lorimer-street",
      "lat": -37.82179312782866,
      "lon": 144.91513598710299,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "equinix-me2-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-equinix-availability",
            "cov-equinix-me2"
          ],
          "note": "Operator lists operational colocation coverage/services. Facility MW has not been established."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "Equinix ME2: certified enclave only. The entire building and its MW are not certified by this scope.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-equinix-availability",
        "cov-equinix-me2",
        "loc-equinix-me2",
        "equinix-deep-me2",
        "equinix-deep-availability",
        "hcf-register"
      ],
      "notes": [
        "Operator location: 578 Lorimer Street."
      ],
      "address": {
        "street": "Port Melbourne, 578 Lorimer Street",
        "locality": "Melbourne",
        "region": "VIC",
        "postalCode": "3207",
        "country": "AU",
        "sourceIds": [
          "loc-equinix-me2"
        ],
        "verifiedOn": "2026-09-10"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "loc-equinix-me2"
        ],
        "verifiedOn": "2026-09-10",
        "note": "Coordinates from Equinix's ME2 map configuration, checked against its displayed street address. Site marker, not a surveyed boundary."
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-me2"
          ],
          "checkedOn": "2026-09-11",
          "note": "Fresh dedicated facility heading identifies ME2; service descriptions and facility-specific specification tables were reviewed."
        },
        {
          "field": "status",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-me2",
            "equinix-deep-availability"
          ],
          "checkedOn": "2026-09-11",
          "note": "The fresh operational-coverage document explicitly lists this named facility's on-site operational coverage; facility page provides current services. Non-24/7 coverage describes staffing, not a non-operating data centre."
        },
        {
          "field": "address",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-me2"
          ],
          "checkedOn": "2026-09-11",
          "note": "Original operator inline address configuration rechecked: 578 Lorimer Street, Port Melbourne, Melbourne. Original HTML saved 2026-09-10 in tmp/research/equinix/me 2.html; fresh main-content page separately checked 2026-09-11. Existing address retained."
        },
        {
          "field": "coordinates",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-me2"
          ],
          "checkedOn": "2026-09-11",
          "note": "Saved named-facility public inline map marker -37.82179312782866, 144.91513598710299 exactly matches the existing pin. Original HTML evidence is from 2026-09-10. Fresh rendered map view-centre is not treated as a replacement site coordinate."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-me2"
          ],
          "checkedOn": "2026-09-11",
          "note": "The reviewed specification gives 8172 m² colocation area and 4 kVA minimum cabinet density, not installed facility IT MW. Do not multiply cabinet density or area into a MW estimate."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-me2"
          ],
          "checkedOn": "2026-09-11",
          "note": "No installed GPU/accelerator model-and-quantity inventory is disclosed on this named facility page. DGX-ready branding, cloud connectivity or high-density cooling would describe capability only."
        },
        {
          "field": "workloads",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-me2"
          ],
          "checkedOn": "2026-09-11",
          "note": "Verified service capability is colocation with explicitly listed High-Density Cooling. No measured training-versus-inference workload split is disclosed. Regional announcements with unnamed facilities are not allocated to this site."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-me2"
          ],
          "checkedOn": "2026-09-11",
          "note": "No quantified named customer compute offtake commitment is disclosed in this named facility page. Cloud on-ramps, generic customer ecosystems and capital/JV agreements are not tenant MW contracts."
        }
      ]
    },
    {
      "id": "equinix-me4",
      "name": "Equinix ME4",
      "operator": "Equinix",
      "country": "AU",
      "region": "VIC",
      "city": "Melbourne",
      "entityKind": "facility",
      "physicalSiteId": "equinix-me4",
      "lat": -37.78789823037266,
      "lon": 144.78502916644163,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "equinix-me4-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-equinix-availability"
          ],
          "note": "Operator lists operational colocation coverage/services. Facility MW has not been established."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "Equinix ME4: certified enclave only. The entire building and its MW are not certified by this scope.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-equinix-availability",
        "loc-equinix-me4",
        "equinix-deep-me4",
        "equinix-deep-availability",
        "hcf-register"
      ],
      "notes": [],
      "address": {
        "street": "Derrimut, 2 Davis Ct",
        "locality": "Melbourne",
        "region": "VIC",
        "postalCode": "3026",
        "country": "AU",
        "sourceIds": [
          "loc-equinix-me4"
        ],
        "verifiedOn": "2026-09-10"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "loc-equinix-me4"
        ],
        "verifiedOn": "2026-09-10",
        "note": "Coordinates from Equinix's ME4 map configuration, checked against its displayed street address. Site marker, not a surveyed boundary."
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-me4"
          ],
          "checkedOn": "2026-09-11",
          "note": "Fresh dedicated facility heading identifies ME4; service descriptions and facility-specific specification tables were reviewed."
        },
        {
          "field": "status",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-me4",
            "equinix-deep-availability"
          ],
          "checkedOn": "2026-09-11",
          "note": "The fresh operational-coverage document explicitly lists this named facility's on-site operational coverage; facility page provides current services. Non-24/7 coverage describes staffing, not a non-operating data centre."
        },
        {
          "field": "address",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-me4"
          ],
          "checkedOn": "2026-09-11",
          "note": "Original operator inline address configuration rechecked: 2 Davis Ct, Derrimut, Melbourne. Original HTML saved 2026-09-10 in tmp/research/equinix/me 4.html; fresh main-content page separately checked 2026-09-11. Existing address retained."
        },
        {
          "field": "coordinates",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-me4"
          ],
          "checkedOn": "2026-09-11",
          "note": "Saved named-facility public inline map marker -37.78789823037266, 144.78502916644163 exactly matches the existing pin. Original HTML evidence is from 2026-09-10. Fresh rendered map view-centre is not treated as a replacement site coordinate."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-me4"
          ],
          "checkedOn": "2026-09-11",
          "note": "The reviewed specification gives 3460 m² colocation area and 3 kVA minimum cabinet density, not installed facility IT MW. Do not multiply cabinet density or area into a MW estimate."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-me4"
          ],
          "checkedOn": "2026-09-11",
          "note": "No installed GPU/accelerator model-and-quantity inventory is disclosed on this named facility page. DGX-ready branding, cloud connectivity or high-density cooling would describe capability only."
        },
        {
          "field": "workloads",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-me4"
          ],
          "checkedOn": "2026-09-11",
          "note": "Verified service capability is colocation/interconnection. No measured training-versus-inference workload split is disclosed. Regional announcements with unnamed facilities are not allocated to this site."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-me4"
          ],
          "checkedOn": "2026-09-11",
          "note": "No quantified named customer compute offtake commitment is disclosed in this named facility page. Cloud on-ramps, generic customer ecosystems and capital/JV agreements are not tenant MW contracts."
        }
      ]
    },
    {
      "id": "equinix-me5",
      "name": "Equinix ME5",
      "operator": "Equinix",
      "country": "AU",
      "region": "VIC",
      "city": "Melbourne",
      "entityKind": "facility",
      "physicalSiteId": "equinix-me5",
      "lat": -37.80816073237537,
      "lon": 144.95325451460343,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "equinix-me5-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-equinix-availability"
          ],
          "note": "Operator lists operational colocation coverage/services. Facility MW has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-equinix-availability",
        "loc-equinix-me5",
        "equinix-deep-me5",
        "equinix-deep-availability"
      ],
      "notes": [],
      "address": {
        "street": "West Melbourne, 22-36 Walsh Street",
        "locality": "Melbourne",
        "region": "VIC",
        "postalCode": "3003",
        "country": "AU",
        "sourceIds": [
          "loc-equinix-me5"
        ],
        "verifiedOn": "2026-09-10"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "loc-equinix-me5"
        ],
        "verifiedOn": "2026-09-10",
        "note": "Coordinates from Equinix's ME5 map configuration, checked against its displayed street address. Site marker, not a surveyed boundary."
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-me5"
          ],
          "checkedOn": "2026-09-11",
          "note": "Fresh dedicated facility heading identifies ME5; service descriptions and facility-specific specification tables were reviewed."
        },
        {
          "field": "status",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-me5",
            "equinix-deep-availability"
          ],
          "checkedOn": "2026-09-11",
          "note": "The fresh operational-coverage document explicitly lists this named facility's on-site operational coverage; facility page provides current services. Non-24/7 coverage describes staffing, not a non-operating data centre."
        },
        {
          "field": "address",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-me5"
          ],
          "checkedOn": "2026-09-11",
          "note": "Original operator inline address configuration rechecked: 22-36 Walsh Street, West Melbourne, Melbourne. Original HTML saved 2026-09-10 in tmp/research/equinix/me 5.html; fresh main-content page separately checked 2026-09-11. Existing address retained."
        },
        {
          "field": "coordinates",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-me5"
          ],
          "checkedOn": "2026-09-11",
          "note": "Saved named-facility public inline map marker -37.80816073237537, 144.95325451460343 exactly matches the existing pin. Original HTML evidence is from 2026-09-10. Fresh rendered map view-centre is not treated as a replacement site coordinate."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-me5"
          ],
          "checkedOn": "2026-09-11",
          "note": "The reviewed specification gives 3150 m² colocation area and 2 kVA minimum cabinet density, not installed facility IT MW. Do not multiply cabinet density or area into a MW estimate."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-me5"
          ],
          "checkedOn": "2026-09-11",
          "note": "No installed GPU/accelerator model-and-quantity inventory is disclosed on this named facility page. DGX-ready branding, cloud connectivity or high-density cooling would describe capability only."
        },
        {
          "field": "workloads",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-me5"
          ],
          "checkedOn": "2026-09-11",
          "note": "Verified service capability is colocation/interconnection. No measured training-versus-inference workload split is disclosed. Regional announcements with unnamed facilities are not allocated to this site."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-me5"
          ],
          "checkedOn": "2026-09-11",
          "note": "No quantified named customer compute offtake commitment is disclosed in this named facility page. Cloud on-ramps, generic customer ecosystems and capital/JV agreements are not tenant MW contracts."
        }
      ]
    },
    {
      "id": "equinix-pe1",
      "name": "Equinix PE1",
      "operator": "Equinix",
      "country": "AU",
      "region": "WA",
      "city": "Perth",
      "entityKind": "facility",
      "physicalSiteId": "equinix-pe1",
      "lat": -31.949713020241084,
      "lon": 115.87707242956134,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "equinix-pe1-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-equinix-availability"
          ],
          "note": "Operator lists operational colocation coverage/services. Facility MW has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-equinix-availability",
        "loc-equinix-pe1",
        "equinix-deep-pe1",
        "equinix-deep-availability"
      ],
      "notes": [],
      "address": {
        "street": "East Perth, 3 Tully Road",
        "locality": "Perth",
        "region": "WA",
        "postalCode": "6004",
        "country": "AU",
        "sourceIds": [
          "loc-equinix-pe1"
        ],
        "verifiedOn": "2026-09-10"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "loc-equinix-pe1"
        ],
        "verifiedOn": "2026-09-10",
        "note": "Coordinates from Equinix's PE1 map configuration, checked against its displayed street address. Site marker, not a surveyed boundary."
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-pe1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Fresh dedicated facility heading identifies PE1; service descriptions and facility-specific specification tables were reviewed."
        },
        {
          "field": "status",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-pe1",
            "equinix-deep-availability"
          ],
          "checkedOn": "2026-09-11",
          "note": "The fresh operational-coverage document explicitly lists this named facility's on-site operational coverage; facility page provides current services. Non-24/7 coverage describes staffing, not a non-operating data centre."
        },
        {
          "field": "address",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-pe1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Original operator inline address configuration rechecked: 3 Tully Road, East Perth, Perth. Original HTML saved 2026-09-10 in tmp/research/equinix/pe 1.html; fresh main-content page separately checked 2026-09-11. Existing address retained."
        },
        {
          "field": "coordinates",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-pe1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Saved named-facility public inline map marker -31.949713020241084, 115.87707242956134 exactly matches the existing pin. Original HTML evidence is from 2026-09-10. Fresh rendered map view-centre is not treated as a replacement site coordinate."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-pe1"
          ],
          "checkedOn": "2026-09-11",
          "note": "The reviewed specification gives 464 m² colocation area and 2 kVA minimum cabinet density, not installed facility IT MW. Do not multiply cabinet density or area into a MW estimate."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-pe1"
          ],
          "checkedOn": "2026-09-11",
          "note": "No installed GPU/accelerator model-and-quantity inventory is disclosed on this named facility page. DGX-ready branding, cloud connectivity or high-density cooling would describe capability only."
        },
        {
          "field": "workloads",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-pe1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Verified service capability is colocation/interconnection. No measured training-versus-inference workload split is disclosed. Regional announcements with unnamed facilities are not allocated to this site."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-pe1"
          ],
          "checkedOn": "2026-09-11",
          "note": "No quantified named customer compute offtake commitment is disclosed in this named facility page. Cloud on-ramps, generic customer ecosystems and capital/JV agreements are not tenant MW contracts."
        }
      ]
    },
    {
      "id": "equinix-pe2",
      "name": "Equinix PE2",
      "operator": "Equinix",
      "country": "AU",
      "region": "WA",
      "city": "Perth",
      "entityKind": "facility",
      "physicalSiteId": "equinix-shenton-park-campus",
      "lat": -31.95579313711294,
      "lon": 115.79765031792948,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "equinix-pe2-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-equinix-availability"
          ],
          "note": "Operator lists operational colocation coverage/services. Facility MW has not been established."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "Equinix PE2: certified enclave only. The entire building and its MW are not certified by this scope.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-equinix-availability",
        "cov-equinix-perth-campus",
        "loc-equinix-pe2",
        "equinix-deep-pe2",
        "equinix-deep-availability",
        "hcf-register"
      ],
      "notes": [
        "PE2 and PE3 share the operator's Shenton Park campus, with a secure link bridge. Counted as one physical site."
      ],
      "address": {
        "street": "Shenton Park, Unit 13, 37 Lemnos St",
        "locality": "Perth",
        "region": "WA",
        "postalCode": "6008",
        "country": "AU",
        "sourceIds": [
          "loc-equinix-pe2"
        ],
        "verifiedOn": "2026-09-10"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "loc-equinix-pe2"
        ],
        "verifiedOn": "2026-09-10",
        "note": "Coordinates from Equinix's PE2 map configuration, checked against its displayed street address. Site marker, not a surveyed boundary."
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-pe2"
          ],
          "checkedOn": "2026-09-11",
          "note": "Fresh dedicated facility heading identifies PE2; service descriptions and facility-specific specification tables were reviewed."
        },
        {
          "field": "status",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-pe2",
            "equinix-deep-availability"
          ],
          "checkedOn": "2026-09-11",
          "note": "The fresh operational-coverage document explicitly lists this named facility's on-site operational coverage; facility page provides current services. Non-24/7 coverage describes staffing, not a non-operating data centre."
        },
        {
          "field": "address",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-pe2"
          ],
          "checkedOn": "2026-09-11",
          "note": "Original operator inline address configuration rechecked: Unit 13, 37 Lemnos St, Shenton Park, Perth. Original HTML saved 2026-09-10 in tmp/research/equinix/pe 2.html; fresh main-content page separately checked 2026-09-11. Existing address retained."
        },
        {
          "field": "coordinates",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-pe2"
          ],
          "checkedOn": "2026-09-11",
          "note": "Saved named-facility public inline map marker -31.95579313711294, 115.79765031792948 exactly matches the existing pin. Original HTML evidence is from 2026-09-10. Fresh rendered map view-centre is not treated as a replacement site coordinate."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-pe2"
          ],
          "checkedOn": "2026-09-11",
          "note": "The reviewed specification gives 1170 m² colocation area and 3 kVA minimum cabinet density, not installed facility IT MW. Do not multiply cabinet density or area into a MW estimate."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-pe2"
          ],
          "checkedOn": "2026-09-11",
          "note": "No installed GPU/accelerator model-and-quantity inventory is disclosed on this named facility page. DGX-ready branding, cloud connectivity or high-density cooling would describe capability only."
        },
        {
          "field": "workloads",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-pe2"
          ],
          "checkedOn": "2026-09-11",
          "note": "Verified service capability is colocation/interconnection. No measured training-versus-inference workload split is disclosed. Regional announcements with unnamed facilities are not allocated to this site."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-pe2"
          ],
          "checkedOn": "2026-09-11",
          "note": "No quantified named customer compute offtake commitment is disclosed in this named facility page. Cloud on-ramps, generic customer ecosystems and capital/JV agreements are not tenant MW contracts."
        }
      ]
    },
    {
      "id": "equinix-pe3",
      "name": "Equinix PE3",
      "operator": "Equinix",
      "country": "AU",
      "region": "WA",
      "city": "Perth",
      "entityKind": "facility",
      "physicalSiteId": "equinix-shenton-park-campus",
      "lat": -31.95530673937548,
      "lon": 115.79765561235831,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "equinix-pe3-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-equinix-perth"
          ],
          "note": "Operator lists operational colocation coverage/services. Facility MW has not been established."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "Equinix PE3: certified enclave only. The entire building and its MW are not certified by this scope.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-equinix-perth",
        "cov-equinix-perth-campus",
        "loc-equinix-pe3",
        "equinix-deep-pe3",
        "equinix-deep-pe3-opening",
        "hcf-register"
      ],
      "notes": [
        "PE2 and PE3 share the operator's Shenton Park campus, with a secure link bridge. Counted as one physical site."
      ],
      "address": {
        "street": "Shenton Park, Unit 11, 37 Lemnos Street",
        "locality": "Perth",
        "region": "WA",
        "postalCode": "6008",
        "country": "AU",
        "sourceIds": [
          "loc-equinix-pe3"
        ],
        "verifiedOn": "2026-09-10"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "loc-equinix-pe3"
        ],
        "verifiedOn": "2026-09-10",
        "note": "Coordinates from Equinix's PE3 map configuration, checked against its displayed street address. Site marker, not a surveyed boundary."
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-pe3"
          ],
          "checkedOn": "2026-09-11",
          "note": "Fresh dedicated facility heading identifies PE3; service descriptions and facility-specific specification tables were reviewed."
        },
        {
          "field": "status",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-pe3",
            "equinix-deep-pe3-opening"
          ],
          "checkedOn": "2026-09-11",
          "note": "Current page states PE3 provides services; operator announced its opening on 8 December 2021. This is explicit service/opening evidence, not mere directory presence."
        },
        {
          "field": "address",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-pe3"
          ],
          "checkedOn": "2026-09-11",
          "note": "Original operator inline address configuration rechecked: Unit 11, 37 Lemnos Street, Shenton Park, Perth. Original HTML saved 2026-09-10 in tmp/research/equinix/pe 3.html; fresh main-content page separately checked 2026-09-11. Existing address retained."
        },
        {
          "field": "coordinates",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-pe3"
          ],
          "checkedOn": "2026-09-11",
          "note": "Saved named-facility public inline map marker -31.95530673937548, 115.79765561235831 exactly matches the existing pin. Original HTML evidence is from 2026-09-10. Fresh rendered map view-centre is not treated as a replacement site coordinate."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-pe3"
          ],
          "checkedOn": "2026-09-11",
          "note": "The reviewed specification gives 1951 m² colocation area and 4 kVA minimum cabinet density, not installed facility IT MW. Do not multiply cabinet density or area into a MW estimate."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-pe3"
          ],
          "checkedOn": "2026-09-11",
          "note": "No installed GPU/accelerator model-and-quantity inventory is disclosed on this named facility page. DGX-ready branding, cloud connectivity or high-density cooling would describe capability only."
        },
        {
          "field": "workloads",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-pe3"
          ],
          "checkedOn": "2026-09-11",
          "note": "Verified service capability is colocation with explicitly listed High-Density Cooling. No measured training-versus-inference workload split is disclosed. Regional announcements with unnamed facilities are not allocated to this site."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-pe3"
          ],
          "checkedOn": "2026-09-11",
          "note": "No quantified named customer compute offtake commitment is disclosed in this named facility page. Cloud on-ramps, generic customer ecosystems and capital/JV agreements are not tenant MW contracts."
        }
      ],
      "commissioningEvents": [
        {
          "id": "equinix-pe3-opening-announced",
          "label": "PE3 opening announced",
          "date": "2021-12-08",
          "datePrecision": "day",
          "sourceIds": [
            "equinix-deep-pe3-opening"
          ],
          "note": "Operator announced the opening on this day. This is not an exact electrical-commissioning timestamp and no MW is backfilled to it."
        }
      ]
    },
    {
      "id": "equinix-sy1",
      "name": "Equinix SY1",
      "operator": "Equinix",
      "country": "AU",
      "region": "NSW",
      "city": "Sydney",
      "entityKind": "facility",
      "physicalSiteId": "equinix-639-gardeners-road",
      "lat": -33.921145028496845,
      "lon": 151.18786997092667,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "equinix-sy1-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-equinix-availability",
            "cov-equinix-sy1"
          ],
          "note": "Operator lists operational colocation coverage/services. Facility MW has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-equinix-availability",
        "cov-equinix-sy1",
        "loc-equinix-sy1",
        "equinix-deep-sy1",
        "equinix-deep-availability"
      ],
      "notes": [
        "Operator location: 639 Gardeners Road."
      ],
      "address": {
        "street": "Unit B, 639 Gardeners Road",
        "locality": "Sydney",
        "region": "NSW",
        "postalCode": "2020",
        "country": "AU",
        "sourceIds": [
          "loc-equinix-sy1"
        ],
        "verifiedOn": "2026-09-10"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "loc-equinix-sy1"
        ],
        "verifiedOn": "2026-09-10",
        "note": "Coordinates from Equinix's SY1 map configuration, checked against its displayed street address. Site marker, not a surveyed boundary."
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Fresh dedicated facility heading identifies SY1; service descriptions and facility-specific specification tables were reviewed."
        },
        {
          "field": "status",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy1",
            "equinix-deep-availability"
          ],
          "checkedOn": "2026-09-11",
          "note": "The fresh operational-coverage document explicitly lists this named facility's on-site operational coverage; facility page provides current services. Non-24/7 coverage describes staffing, not a non-operating data centre."
        },
        {
          "field": "address",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Original operator inline address configuration rechecked: 639 Gardeners Road, Unit B, Sydney. Original HTML saved 2026-09-10 in tmp/research/equinix/sy 1.html; fresh main-content page separately checked 2026-09-11. Existing address retained."
        },
        {
          "field": "coordinates",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Saved named-facility public inline map marker -33.921145028496845, 151.18786997092667 exactly matches the existing pin. Original HTML evidence is from 2026-09-10. Fresh rendered map view-centre is not treated as a replacement site coordinate."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy1"
          ],
          "checkedOn": "2026-09-11",
          "note": "The reviewed specification gives 3088 m² colocation area and 2 kVA minimum cabinet density, not installed facility IT MW. Do not multiply cabinet density or area into a MW estimate."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy1"
          ],
          "checkedOn": "2026-09-11",
          "note": "No installed GPU/accelerator model-and-quantity inventory is disclosed on this named facility page. DGX-ready branding, cloud connectivity or high-density cooling would describe capability only."
        },
        {
          "field": "workloads",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy1"
          ],
          "checkedOn": "2026-09-11",
          "note": "Verified service capability is colocation/interconnection. No measured training-versus-inference workload split is disclosed. Regional announcements with unnamed facilities are not allocated to this site."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy1"
          ],
          "checkedOn": "2026-09-11",
          "note": "No quantified named customer compute offtake commitment is disclosed in this named facility page. Cloud on-ramps, generic customer ecosystems and capital/JV agreements are not tenant MW contracts."
        }
      ]
    },
    {
      "id": "equinix-sy2",
      "name": "Equinix SY2",
      "operator": "Equinix",
      "country": "AU",
      "region": "NSW",
      "city": "Sydney",
      "entityKind": "facility",
      "physicalSiteId": "equinix-639-gardeners-road",
      "lat": -33.921740062612685,
      "lon": 151.18835626616152,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "equinix-sy2-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-equinix-availability",
            "cov-equinix-sy2"
          ],
          "note": "Operator lists operational colocation coverage/services. Facility MW has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-equinix-availability",
        "cov-equinix-sy2",
        "loc-equinix-sy2",
        "equinix-deep-sy2",
        "equinix-deep-availability"
      ],
      "notes": [
        "Operator location: 639 Gardeners Road."
      ],
      "address": {
        "street": "Unit C, 639 Gardeners Road",
        "locality": "Sydney",
        "region": "NSW",
        "postalCode": "2020",
        "country": "AU",
        "sourceIds": [
          "loc-equinix-sy2"
        ],
        "verifiedOn": "2026-09-10"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "loc-equinix-sy2"
        ],
        "verifiedOn": "2026-09-10",
        "note": "Coordinates from Equinix's SY2 map configuration, checked against its displayed street address. Site marker, not a surveyed boundary."
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy2"
          ],
          "checkedOn": "2026-09-11",
          "note": "Fresh dedicated facility heading identifies SY2; service descriptions and facility-specific specification tables were reviewed."
        },
        {
          "field": "status",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy2",
            "equinix-deep-availability"
          ],
          "checkedOn": "2026-09-11",
          "note": "The fresh operational-coverage document explicitly lists this named facility's on-site operational coverage; facility page provides current services. Non-24/7 coverage describes staffing, not a non-operating data centre."
        },
        {
          "field": "address",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy2"
          ],
          "checkedOn": "2026-09-11",
          "note": "Original operator inline address configuration rechecked: 639 Gardeners Road, Unit C, Sydney. Original HTML saved 2026-09-10 in tmp/research/equinix/sy 2.html; fresh main-content page separately checked 2026-09-11. Existing address retained."
        },
        {
          "field": "coordinates",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy2"
          ],
          "checkedOn": "2026-09-11",
          "note": "Saved named-facility public inline map marker -33.921740062612685, 151.18835626616152 exactly matches the existing pin. Original HTML evidence is from 2026-09-10. Fresh rendered map view-centre is not treated as a replacement site coordinate."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy2"
          ],
          "checkedOn": "2026-09-11",
          "note": "The reviewed specification gives 1586 m² colocation area and 4 kVA minimum cabinet density, not installed facility IT MW. Do not multiply cabinet density or area into a MW estimate."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy2"
          ],
          "checkedOn": "2026-09-11",
          "note": "No installed GPU/accelerator model-and-quantity inventory is disclosed on this named facility page. DGX-ready branding, cloud connectivity or high-density cooling would describe capability only."
        },
        {
          "field": "workloads",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy2"
          ],
          "checkedOn": "2026-09-11",
          "note": "Verified service capability is colocation with explicitly listed High-Density Cooling. No measured training-versus-inference workload split is disclosed. Regional announcements with unnamed facilities are not allocated to this site."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy2"
          ],
          "checkedOn": "2026-09-11",
          "note": "No quantified named customer compute offtake commitment is disclosed in this named facility page. Cloud on-ramps, generic customer ecosystems and capital/JV agreements are not tenant MW contracts."
        }
      ]
    },
    {
      "id": "equinix-sy3",
      "name": "Equinix SY3",
      "operator": "Equinix",
      "country": "AU",
      "region": "NSW",
      "city": "Sydney",
      "entityKind": "facility",
      "physicalSiteId": "equinix-sy3",
      "lat": -33.91161647922653,
      "lon": 151.19177901104013,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "equinix-sy3-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-equinix-availability"
          ],
          "note": "Operator lists operational colocation coverage/services. Facility MW has not been established."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "Equinix SY3: certified enclave only. The entire building and its MW are not certified by this scope.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-equinix-availability",
        "loc-equinix-sy3",
        "equinix-deep-sy3",
        "equinix-deep-availability",
        "hcf-register"
      ],
      "notes": [],
      "address": {
        "street": "Alexandria, 47 Bourke Road",
        "locality": "Sydney",
        "region": "NSW",
        "postalCode": "2015",
        "country": "AU",
        "sourceIds": [
          "loc-equinix-sy3"
        ],
        "verifiedOn": "2026-09-10"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "loc-equinix-sy3"
        ],
        "verifiedOn": "2026-09-10",
        "note": "Coordinates from Equinix's SY3 map configuration, checked against its displayed street address. Site marker, not a surveyed boundary."
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy3"
          ],
          "checkedOn": "2026-09-11",
          "note": "Fresh dedicated facility heading identifies SY3; service descriptions and facility-specific specification tables were reviewed."
        },
        {
          "field": "status",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy3",
            "equinix-deep-availability"
          ],
          "checkedOn": "2026-09-11",
          "note": "The fresh operational-coverage document explicitly lists this named facility's on-site operational coverage; facility page provides current services. Non-24/7 coverage describes staffing, not a non-operating data centre."
        },
        {
          "field": "address",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy3"
          ],
          "checkedOn": "2026-09-11",
          "note": "Original operator inline address configuration rechecked: 47 Bourke Road, Alexandria, Sydney. Original HTML saved 2026-09-10 in tmp/research/equinix/sy 3.html; fresh main-content page separately checked 2026-09-11. Existing address retained."
        },
        {
          "field": "coordinates",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy3"
          ],
          "checkedOn": "2026-09-11",
          "note": "Saved named-facility public inline map marker -33.91161647922653, 151.19177901104013 exactly matches the existing pin. Original HTML evidence is from 2026-09-10. Fresh rendered map view-centre is not treated as a replacement site coordinate."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy3"
          ],
          "checkedOn": "2026-09-11",
          "note": "The reviewed specification gives 6894 m² colocation area and 4 kVA minimum cabinet density, not installed facility IT MW. Do not multiply cabinet density or area into a MW estimate."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy3"
          ],
          "checkedOn": "2026-09-11",
          "note": "No installed GPU/accelerator model-and-quantity inventory is disclosed on this named facility page. DGX-ready branding, cloud connectivity or high-density cooling would describe capability only."
        },
        {
          "field": "workloads",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy3"
          ],
          "checkedOn": "2026-09-11",
          "note": "Verified service capability is colocation with explicitly listed High-Density Cooling. No measured training-versus-inference workload split is disclosed. Regional announcements with unnamed facilities are not allocated to this site."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy3"
          ],
          "checkedOn": "2026-09-11",
          "note": "No quantified named customer compute offtake commitment is disclosed in this named facility page. Cloud on-ramps, generic customer ecosystems and capital/JV agreements are not tenant MW contracts."
        }
      ]
    },
    {
      "id": "equinix-sy4",
      "name": "Equinix SY4",
      "operator": "Equinix",
      "country": "AU",
      "region": "NSW",
      "city": "Sydney",
      "entityKind": "facility",
      "physicalSiteId": "equinix-200-bourke-road",
      "lat": -33.918419537385915,
      "lon": 151.18885325163427,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "equinix-sy4-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-equinix-availability"
          ],
          "note": "Operator lists operational colocation coverage/services. Facility MW has not been established."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "Equinix SY4: certified enclave only. The entire building and its MW are not certified by this scope.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-equinix-availability",
        "cov-equinix-sy4",
        "loc-equinix-sy4",
        "equinix-deep-sy4",
        "equinix-deep-availability",
        "hcf-register"
      ],
      "notes": [
        "Shares the 200 Bourke Road site with SY5; distinct facility records, one physical site."
      ],
      "address": {
        "street": "Alexandria, 200 Bourke Road",
        "locality": "Sydney",
        "region": "NSW",
        "postalCode": "2015",
        "country": "AU",
        "sourceIds": [
          "loc-equinix-sy4"
        ],
        "verifiedOn": "2026-09-10"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "loc-equinix-sy4"
        ],
        "verifiedOn": "2026-09-10",
        "note": "Coordinates from Equinix's SY4 map configuration, checked against its displayed street address. Site marker, not a surveyed boundary."
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy4"
          ],
          "checkedOn": "2026-09-11",
          "note": "Fresh dedicated facility heading identifies SY4; service descriptions and facility-specific specification tables were reviewed."
        },
        {
          "field": "status",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy4",
            "equinix-deep-availability"
          ],
          "checkedOn": "2026-09-11",
          "note": "The fresh operational-coverage document explicitly lists this named facility's on-site operational coverage; facility page provides current services. Non-24/7 coverage describes staffing, not a non-operating data centre."
        },
        {
          "field": "address",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy4"
          ],
          "checkedOn": "2026-09-11",
          "note": "Original operator inline address configuration rechecked: 200 Bourke Road, Alexandria, Sydney. Original HTML saved 2026-09-10 in tmp/research/equinix/sy 4.html; fresh main-content page separately checked 2026-09-11. Existing address retained."
        },
        {
          "field": "coordinates",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy4"
          ],
          "checkedOn": "2026-09-11",
          "note": "Saved named-facility public inline map marker -33.918419537385915, 151.18885325163427 exactly matches the existing pin. Original HTML evidence is from 2026-09-10. Fresh rendered map view-centre is not treated as a replacement site coordinate."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy4"
          ],
          "checkedOn": "2026-09-11",
          "note": "The reviewed specification gives 7445 m² colocation area and 4 kVA minimum cabinet density, not installed facility IT MW. Do not multiply cabinet density or area into a MW estimate."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy4"
          ],
          "checkedOn": "2026-09-11",
          "note": "No installed GPU/accelerator model-and-quantity inventory is disclosed on this named facility page. DGX-ready branding, cloud connectivity or high-density cooling would describe capability only."
        },
        {
          "field": "workloads",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy4"
          ],
          "checkedOn": "2026-09-11",
          "note": "Verified service capability is colocation/interconnection. No measured training-versus-inference workload split is disclosed. Regional announcements with unnamed facilities are not allocated to this site."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy4"
          ],
          "checkedOn": "2026-09-11",
          "note": "No quantified named customer compute offtake commitment is disclosed in this named facility page. Cloud on-ramps, generic customer ecosystems and capital/JV agreements are not tenant MW contracts."
        }
      ]
    },
    {
      "id": "equinix-sy5",
      "name": "Equinix SY5",
      "operator": "Equinix",
      "country": "AU",
      "region": "NSW",
      "city": "Sydney",
      "entityKind": "facility",
      "physicalSiteId": "equinix-200-bourke-road",
      "lat": -33.919960243270964,
      "lon": 151.19028826016864,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "equinix-sy5-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-equinix-availability"
          ],
          "note": "Operator lists operational colocation coverage/services. Facility MW has not been established."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "Equinix SY5: certified enclave only. The entire building and its MW are not certified by this scope.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-equinix-availability",
        "cov-equinix-sy5",
        "loc-equinix-sy5",
        "equinix-deep-sy5",
        "equinix-deep-availability",
        "hcf-register"
      ],
      "notes": [
        "Shares the 200 Bourke Road site with SY4; distinct facility records, one physical site."
      ],
      "address": {
        "street": "Alexandria, Unit B, 200 Bourke Road",
        "locality": "Sydney",
        "region": "NSW",
        "postalCode": "2015",
        "country": "AU",
        "sourceIds": [
          "loc-equinix-sy5"
        ],
        "verifiedOn": "2026-09-10"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "loc-equinix-sy5"
        ],
        "verifiedOn": "2026-09-10",
        "note": "Coordinates from Equinix's SY5 map configuration, checked against its displayed street address. Site marker, not a surveyed boundary."
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy5"
          ],
          "checkedOn": "2026-09-11",
          "note": "Fresh dedicated facility heading identifies SY5; service descriptions and facility-specific specification tables were reviewed."
        },
        {
          "field": "status",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy5",
            "equinix-deep-availability"
          ],
          "checkedOn": "2026-09-11",
          "note": "The fresh operational-coverage document explicitly lists this named facility's on-site operational coverage; facility page provides current services. Non-24/7 coverage describes staffing, not a non-operating data centre."
        },
        {
          "field": "address",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy5"
          ],
          "checkedOn": "2026-09-11",
          "note": "Original operator inline address configuration rechecked: Unit B, 200 Bourke Road, Alexandria, Sydney. Original HTML saved 2026-09-10 in tmp/research/equinix/sy 5.html; fresh main-content page separately checked 2026-09-11. Existing address retained."
        },
        {
          "field": "coordinates",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy5"
          ],
          "checkedOn": "2026-09-11",
          "note": "Saved named-facility public inline map marker -33.919960243270964, 151.19028826016864 exactly matches the existing pin. Original HTML evidence is from 2026-09-10. Fresh rendered map view-centre is not treated as a replacement site coordinate."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy5"
          ],
          "checkedOn": "2026-09-11",
          "note": "The reviewed specification gives 4948 m² colocation area and 5 kVA minimum cabinet density, not installed facility IT MW. Do not multiply cabinet density or area into a MW estimate."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy5"
          ],
          "checkedOn": "2026-09-11",
          "note": "No installed GPU/accelerator model-and-quantity inventory is disclosed on this named facility page. DGX-ready branding, cloud connectivity or high-density cooling would describe capability only."
        },
        {
          "field": "workloads",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy5"
          ],
          "checkedOn": "2026-09-11",
          "note": "Verified service capability is colocation with explicitly listed High-Density Cooling. No measured training-versus-inference workload split is disclosed. Regional announcements with unnamed facilities are not allocated to this site."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy5"
          ],
          "checkedOn": "2026-09-11",
          "note": "No quantified named customer compute offtake commitment is disclosed in this named facility page. Cloud on-ramps, generic customer ecosystems and capital/JV agreements are not tenant MW contracts."
        }
      ]
    },
    {
      "id": "equinix-sy6",
      "name": "Equinix SY6",
      "operator": "Equinix",
      "country": "AU",
      "region": "NSW",
      "city": "Sydney",
      "entityKind": "facility",
      "physicalSiteId": "equinix-sy6",
      "lat": -33.83623636823831,
      "lon": 151.05354340406245,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "equinix-sy6-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-equinix-availability",
            "cov-equinix-sy6"
          ],
          "note": "Operator lists operational colocation coverage/services. Facility MW has not been established."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "Equinix SY6: certified enclave only. The entire building and its MW are not certified by this scope.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-equinix-availability",
        "cov-equinix-sy6",
        "loc-equinix-sy6",
        "equinix-deep-sy6",
        "equinix-deep-availability",
        "hcf-register"
      ],
      "notes": [
        "Operator location: Sydney NSW 2128."
      ],
      "address": {
        "street": "Silverwater, 8-14 Egerton St",
        "locality": "Sydney",
        "region": "NSW",
        "postalCode": "2128",
        "country": "AU",
        "sourceIds": [
          "loc-equinix-sy6"
        ],
        "verifiedOn": "2026-09-10"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "loc-equinix-sy6"
        ],
        "verifiedOn": "2026-09-10",
        "note": "Coordinates from Equinix's SY6 map configuration, checked against its displayed street address. Site marker, not a surveyed boundary."
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy6"
          ],
          "checkedOn": "2026-09-11",
          "note": "Fresh dedicated facility heading identifies SY6; service descriptions and facility-specific specification tables were reviewed."
        },
        {
          "field": "status",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy6",
            "equinix-deep-availability"
          ],
          "checkedOn": "2026-09-11",
          "note": "The fresh operational-coverage document explicitly lists this named facility's on-site operational coverage; facility page provides current services. Non-24/7 coverage describes staffing, not a non-operating data centre."
        },
        {
          "field": "address",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy6"
          ],
          "checkedOn": "2026-09-11",
          "note": "Original operator inline address configuration rechecked: 8-14 Egerton St, Silverwater, Sydney. Original HTML saved 2026-09-10 in tmp/research/equinix/sy 6.html; fresh main-content page separately checked 2026-09-11. Existing address retained."
        },
        {
          "field": "coordinates",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy6"
          ],
          "checkedOn": "2026-09-11",
          "note": "Saved named-facility public inline map marker -33.83623636823831, 151.05354340406245 exactly matches the existing pin. Original HTML evidence is from 2026-09-10. Fresh rendered map view-centre is not treated as a replacement site coordinate."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy6"
          ],
          "checkedOn": "2026-09-11",
          "note": "The reviewed specification gives 2364 m² colocation area and 4 kVA minimum cabinet density, not installed facility IT MW. Do not multiply cabinet density or area into a MW estimate."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy6"
          ],
          "checkedOn": "2026-09-11",
          "note": "No installed GPU/accelerator model-and-quantity inventory is disclosed on this named facility page. DGX-ready branding, cloud connectivity or high-density cooling would describe capability only."
        },
        {
          "field": "workloads",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy6"
          ],
          "checkedOn": "2026-09-11",
          "note": "Verified service capability is colocation with explicitly listed High-Density Cooling. No measured training-versus-inference workload split is disclosed. Regional announcements with unnamed facilities are not allocated to this site."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy6"
          ],
          "checkedOn": "2026-09-11",
          "note": "No quantified named customer compute offtake commitment is disclosed in this named facility page. Cloud on-ramps, generic customer ecosystems and capital/JV agreements are not tenant MW contracts."
        }
      ]
    },
    {
      "id": "equinix-sy7",
      "name": "Equinix SY7",
      "operator": "Equinix",
      "country": "AU",
      "region": "NSW",
      "city": "Wollongong",
      "entityKind": "facility",
      "physicalSiteId": "equinix-sy7",
      "lat": -34.46289581409525,
      "lon": 150.85860082291265,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "equinix-sy7-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-equinix-availability",
            "cov-equinix-sy7"
          ],
          "note": "Operator lists operational colocation coverage/services. Facility MW has not been established."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "Equinix SY7: certified enclave only. The entire building and its MW are not certified by this scope.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-equinix-availability",
        "cov-equinix-sy7",
        "loc-equinix-sy7",
        "equinix-deep-sy7",
        "equinix-deep-availability",
        "hcf-register"
      ],
      "notes": [
        "Operator location: Wollongong NSW 2526."
      ],
      "address": {
        "street": "Unanderra, Lot 102 Lathe Place",
        "locality": "Wollongong",
        "region": "NSW",
        "postalCode": "2526",
        "country": "AU",
        "sourceIds": [
          "loc-equinix-sy7"
        ],
        "verifiedOn": "2026-09-10"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "loc-equinix-sy7"
        ],
        "verifiedOn": "2026-09-10",
        "note": "Coordinates from Equinix's SY7 map configuration, checked against its displayed street address. Site marker, not a surveyed boundary."
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy7"
          ],
          "checkedOn": "2026-09-11",
          "note": "Fresh dedicated facility heading identifies SY7; service descriptions and facility-specific specification tables were reviewed."
        },
        {
          "field": "status",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy7",
            "equinix-deep-availability"
          ],
          "checkedOn": "2026-09-11",
          "note": "The fresh operational-coverage document explicitly lists this named facility's on-site operational coverage; facility page provides current services. Non-24/7 coverage describes staffing, not a non-operating data centre."
        },
        {
          "field": "address",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy7"
          ],
          "checkedOn": "2026-09-11",
          "note": "Original operator inline address configuration rechecked: Lot 102 Lathe Place, Unanderra, Wollongong. Original HTML saved 2026-09-10 in tmp/research/equinix/sy 7.html; fresh main-content page separately checked 2026-09-11. Existing address retained."
        },
        {
          "field": "coordinates",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy7"
          ],
          "checkedOn": "2026-09-11",
          "note": "Saved named-facility public inline map marker -34.46289581409525, 150.85860082291265 exactly matches the existing pin. Original HTML evidence is from 2026-09-10. Fresh rendered map view-centre is not treated as a replacement site coordinate."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy7"
          ],
          "checkedOn": "2026-09-11",
          "note": "The reviewed specification gives 1513 m² colocation area and 3 kVA minimum cabinet density, not installed facility IT MW. Do not multiply cabinet density or area into a MW estimate."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy7"
          ],
          "checkedOn": "2026-09-11",
          "note": "No installed GPU/accelerator model-and-quantity inventory is disclosed on this named facility page. DGX-ready branding, cloud connectivity or high-density cooling would describe capability only."
        },
        {
          "field": "workloads",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy7"
          ],
          "checkedOn": "2026-09-11",
          "note": "Verified service capability is colocation/interconnection. No measured training-versus-inference workload split is disclosed. Regional announcements with unnamed facilities are not allocated to this site."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy7"
          ],
          "checkedOn": "2026-09-11",
          "note": "No quantified named customer compute offtake commitment is disclosed in this named facility page. Cloud on-ramps, generic customer ecosystems and capital/JV agreements are not tenant MW contracts."
        }
      ]
    },
    {
      "id": "equinix-sy8",
      "name": "Equinix SY8",
      "operator": "Equinix",
      "country": "AU",
      "region": "NSW",
      "city": "Sydney",
      "entityKind": "facility",
      "physicalSiteId": "equinix-sy8",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "unknown",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "equinix-sy8-unknown",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-equinix-availability",
            "cov-equinix-sydney"
          ],
          "note": "Status review required: operational coverage documentation lists SY8, but its facility URL redirects to the metro page and the current metro list omits it."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-equinix-availability",
        "cov-equinix-sydney",
        "equinix-deep-sy8-history",
        "equinix-deep-availability",
        "equinix-deep-sy8",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate.",
        "Not treated as an operating facility until the conflicting directory evidence is resolved."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy8-history",
            "equinix-deep-availability"
          ],
          "checkedOn": "2026-09-11",
          "note": "Historical operator article explicitly identifies acquired SY8, and the current operational-coverage document retains this code. The 2019 article's eighth new centre is SY5; ordinal position is not an alias."
        },
        {
          "field": "status",
          "outcome": "conflicting",
          "sourceIds": [
            "equinix-deep-sy8",
            "equinix-deep-availability"
          ],
          "checkedOn": "2026-09-11",
          "note": "Fresh SY8 URL redirects to the metro page and SY8 is absent from its facility list, while fresh operational documentation lists non-24/7 on-site coverage. Retain unknown status until current physical identity/lifecycle is resolved."
        },
        {
          "field": "address",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy8"
          ],
          "checkedOn": "2026-09-11",
          "note": "The response is a metro page, not a named SY8 site address. Do not use its map centre as a facility pin."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy8",
            "equinix-deep-availability"
          ],
          "checkedOn": "2026-09-11",
          "note": "No reliable current SY8 installed IT capacity is disclosed in these conflicting directory sources."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy8"
          ],
          "checkedOn": "2026-09-11",
          "note": "No current SY8 model/count inventory established; generic Sydney AI content is not site-specific evidence."
        }
      ]
    },
    {
      "id": "equinix-sy9x",
      "name": "Equinix SY9x",
      "operator": "Equinix",
      "country": "AU",
      "region": "NSW",
      "city": "Sydney",
      "entityKind": "facility",
      "physicalSiteId": "equinix-sy9x",
      "lat": -33.820948,
      "lon": 151.033218,
      "locationPrecision": "site",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "equinix-sy9x-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-equinix-availability"
          ],
          "note": "Operator lists operational colocation coverage/services. Facility MW has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-equinix-availability",
        "loc-equinix-sy9x",
        "equinix-deep-sy9x",
        "equinix-deep-availability"
      ],
      "notes": [],
      "address": {
        "street": "Lot 9 DP 1275083, 8A Grand Avenue, Rosehill",
        "locality": "Sydney",
        "region": "NSW",
        "postalCode": "2142",
        "country": "AU",
        "sourceIds": [
          "loc-equinix-sy9x"
        ],
        "verifiedOn": "2026-09-10"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "loc-equinix-sy9x"
        ],
        "verifiedOn": "2026-09-10",
        "note": "Coordinates from Equinix's SY9x map configuration, checked against its displayed street address. Site marker, not a surveyed boundary."
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy9x"
          ],
          "checkedOn": "2026-09-11",
          "note": "Fresh dedicated facility heading identifies SY9X; service descriptions and facility-specific specification tables were reviewed."
        },
        {
          "field": "status",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy9x",
            "equinix-deep-availability"
          ],
          "checkedOn": "2026-09-11",
          "note": "The fresh operational-coverage document explicitly lists this named facility's on-site operational coverage; facility page provides current services. Non-24/7 coverage describes staffing, not a non-operating data centre."
        },
        {
          "field": "address",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy9x"
          ],
          "checkedOn": "2026-09-11",
          "note": "Original operator inline address configuration rechecked: 8A Grand Avenue, Rosehill, Lot 9 DP 1275083, Sydney. Original HTML saved 2026-09-10 in tmp/research/equinix/sy 9x.html; fresh main-content page separately checked 2026-09-11. Existing address retained."
        },
        {
          "field": "coordinates",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy9x"
          ],
          "checkedOn": "2026-09-11",
          "note": "Saved named-facility public inline map marker -33.820948, 151.033218 exactly matches the existing pin. Original HTML evidence is from 2026-09-10. Fresh rendered map view-centre is not treated as a replacement site coordinate."
        },
        {
          "field": "capacity",
          "outcome": "conflicting",
          "sourceIds": [
            "equinix-deep-sy9x"
          ],
          "checkedOn": "2026-09-11",
          "note": "Main prose says current >14 MW power and >28 MW full-build; IT electrical basis is unstated. The facilities table says Total Sellable Capacity 14kVA, an inconsistent unit/scale. Preserve reported prose as noncomparable context; no numeric IT-stage acceptance."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy9x"
          ],
          "checkedOn": "2026-09-11",
          "note": "No installed GPU/accelerator model-and-quantity inventory is disclosed on this named facility page. DGX-ready branding, cloud connectivity or high-density cooling would describe capability only."
        },
        {
          "field": "workloads",
          "outcome": "verified",
          "sourceIds": [
            "equinix-deep-sy9x"
          ],
          "checkedOn": "2026-09-11",
          "note": "Verified service capability is hyperscale core deployment. No measured training-versus-inference workload split is disclosed. Regional announcements with unnamed facilities are not allocated to this site."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "sourceIds": [
            "equinix-deep-sy9x"
          ],
          "checkedOn": "2026-09-11",
          "note": "No quantified named customer compute offtake commitment is disclosed in this named facility page. Cloud on-ramps, generic customer ecosystems and capital/JV agreements are not tenant MW contracts."
        }
      ],
      "commissioningEvents": [
        {
          "id": "equinix-sy9x-opening-announced",
          "label": "SY9x opening announced",
          "date": "2022-06-14",
          "datePrecision": "day",
          "sourceIds": [
            "equinix-deep-sy9x-opening"
          ],
          "note": "Australian press-release dateline records opening announcement. Source's >14 MW power is not converted to installed IT history without a confirmed boundary."
        }
      ]
    },
    {
      "id": "firmus-bell-bay",
      "entityKind": "campus",
      "physicalSiteId": "firmus-bell-bay",
      "name": "Firmus Bell Bay AI Factory",
      "operator": "Firmus",
      "country": "AU",
      "region": "TAS",
      "city": "Bell Bay",
      "lat": null,
      "lon": null,
      "locationPrecision": "unknown",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "planned",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "firmus-bell-bay-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-firmus-bell-bay"
          ],
          "note": "Proposed campus on former Gunns Pulp Mill land; two halls counted once. 288 MW grid demand excluded from IT subtotals."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-firmus-bell-bay",
        "compute-firmus-bellbay-20260911",
        "compute-firmus-contract-20260911",
        "compute-firmus-openai-20260911"
      ],
      "notes": [
        "Proposed campus on former Gunns Pulp Mill land; two halls counted once. 288 MW grid demand excluded from IT subtotals."
      ],
      "address": {
        "street": "Lot 1 East Tamar Highway",
        "locality": "Long Reach",
        "region": "TAS",
        "postalCode": "",
        "country": "AU",
        "sourceIds": [
          "exp-firmus-bell-bay"
        ],
        "verifiedOn": "2026-09-11"
      },
      "fieldReviews": [
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-firmus-bellbay-20260911",
            "compute-firmus-contract-20260911"
          ],
          "note": "No installed site-specific model/quantity verified. GB300 Tasmania programme and Melbourne contracts cannot be allocated by inference."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-firmus-bellbay-20260911",
            "compute-firmus-contract-20260911",
            "compute-firmus-openai-20260911"
          ],
          "note": "No public compute customer contract tied to this exact physical site found in the reviewed sources. Gunvor is an energy agreement and OpenAI is Malaysia-only."
        }
      ]
    },
    {
      "id": "firmus-launceston",
      "entityKind": "campus",
      "physicalSiteId": "firmus-launceston",
      "name": "Firmus Launceston AI Factory",
      "operator": "Firmus",
      "country": "AU",
      "region": "TAS",
      "city": "Launceston",
      "lat": -41.449836,
      "lon": 147.130182,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "firmus-launceston-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-firmus-tasmania"
          ],
          "note": "Current hub explicitly labels the anchor site under construction. Separate older R&D equipment is not an extra physical-site record."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-firmus-tasmania",
        "compute-firmus-southgate-20260911",
        "compute-firmus-contract-20260911",
        "compute-firmus-openai-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "Current hub explicitly labels the anchor site under construction. Separate older R&D equipment is not an extra physical-site record."
      ],
      "fieldReviews": [
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-firmus-southgate-20260911",
            "compute-firmus-contract-20260911"
          ],
          "note": "No installed site-specific model/quantity verified. GB300 Tasmania programme and Melbourne contracts cannot be allocated by inference."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-firmus-southgate-20260911",
            "compute-firmus-contract-20260911",
            "compute-firmus-openai-20260911"
          ],
          "note": "No public compute customer contract tied to this exact physical site found in the reviewed sources. Gunvor is an energy agreement and OpenAI is Malaysia-only."
        }
      ]
    },
    {
      "id": "firmus-stirling-north",
      "entityKind": "campus",
      "physicalSiteId": "firmus-stirling-north",
      "name": "Firmus Stirling North AI Factory",
      "operator": "Firmus",
      "country": "AU",
      "region": "SA",
      "city": "Port Augusta",
      "lat": -32.490021,
      "lon": 137.77003,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "approximate",
          "stage": "planned",
          "mw": 1300,
          "mwBasis": "IT",
          "scopeId": "firmus-stirling-north-capacity",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-firmus-sa"
          ],
          "note": "Approximate ultimate critical IT load, subject to planning approval. Undated full-build-out plan; no commissioning year or construction assertion. Power connection MW is not added."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-firmus-sa",
        "compute-firmus-sa-20260911",
        "compute-firmus-contract-20260911",
        "compute-firmus-openai-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "Approximate ultimate critical IT load, subject to planning approval. Undated full-build-out plan; no commissioning year or construction assertion. Power connection MW is not added."
      ],
      "fieldReviews": [
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-firmus-sa-20260911",
            "compute-firmus-contract-20260911"
          ],
          "note": "No installed site-specific model/quantity verified. GB300 Tasmania programme and Melbourne contracts cannot be allocated by inference."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-firmus-sa-20260911",
            "compute-firmus-contract-20260911",
            "compute-firmus-openai-20260911"
          ],
          "note": "No public compute customer contract tied to this exact physical site found in the reviewed sources. Gunvor is an energy agreement and OpenAI is Malaysia-only."
        }
      ]
    },
    {
      "id": "firmus-tailem-bend",
      "entityKind": "campus",
      "physicalSiteId": "firmus-tailem-bend",
      "name": "Firmus Tailem Bend AI Factory",
      "operator": "Firmus",
      "country": "AU",
      "region": "SA",
      "city": "Tailem Bend",
      "lat": null,
      "lon": null,
      "locationPrecision": "unknown",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "approximate",
          "stage": "planned",
          "mw": 1000,
          "mwBasis": "IT",
          "scopeId": "firmus-tailem-bend-capacity",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-firmus-sa"
          ],
          "note": "Approximate ultimate critical IT load, subject to planning approval. Undated full-build-out plan; no commissioning year or construction assertion. Power connection MW is not added."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-firmus-sa",
        "compute-firmus-sa-20260911",
        "compute-firmus-contract-20260911",
        "compute-firmus-openai-20260911"
      ],
      "notes": [
        "Approximate ultimate critical IT load, subject to planning approval. Undated full-build-out plan; no commissioning year or construction assertion. Power connection MW is not added."
      ],
      "fieldReviews": [
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-firmus-sa-20260911",
            "compute-firmus-contract-20260911"
          ],
          "note": "No installed site-specific model/quantity verified. GB300 Tasmania programme and Melbourne contracts cannot be allocated by inference."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-firmus-sa-20260911",
            "compute-firmus-contract-20260911",
            "compute-firmus-openai-20260911"
          ],
          "note": "No public compute customer contract tied to this exact physical site found in the reviewed sources. Gunvor is an energy agreement and OpenAI is Malaysia-only."
        }
      ]
    },
    {
      "id": "firmus-wesley-vale",
      "entityKind": "campus",
      "physicalSiteId": "firmus-wesley-vale",
      "name": "Firmus Wesley Vale AI Factory",
      "operator": "Firmus",
      "country": "AU",
      "region": "TAS",
      "city": "Wesley Vale",
      "lat": null,
      "lon": null,
      "locationPrecision": "unknown",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "planned",
          "mw": 23,
          "mwBasis": "IT",
          "scopeId": "firmus-wesley-vale-initial-it",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "compute-firmus-wesley-20260911"
          ],
          "note": "The planned initial stage explicitly discloses 23 MW critical IT load inside approximately 26 MW electrical capacity. No dated delivery is established. The later electrical maximum is approximately 52 MW; its IT figure is printed as 46 WM, so that later stage is held for clarification and is not added."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-firmus-wesley",
        "compute-firmus-wesley-20260911",
        "compute-firmus-contract-20260911",
        "compute-firmus-openai-20260911"
      ],
      "notes": [
        "Planned facility on former pulp mill land. 26 MW connection rating excluded from IT capacity subtotals.",
        "The initial planned stage is 23 MW critical IT. The 26 MW electrical connection is an enclosing boundary, not additional server power."
      ],
      "address": {
        "street": "226 Mill Road",
        "locality": "Wesley Vale",
        "region": "TAS",
        "postalCode": "",
        "country": "AU",
        "sourceIds": [
          "compute-firmus-wesley-20260911"
        ],
        "verifiedOn": "2026-09-11"
      },
      "fieldReviews": [
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-firmus-wesley-20260911",
            "compute-firmus-contract-20260911"
          ],
          "note": "No installed site-specific model/quantity verified. GB300 Tasmania programme and Melbourne contracts cannot be allocated by inference."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-firmus-wesley-20260911",
            "compute-firmus-contract-20260911",
            "compute-firmus-openai-20260911"
          ],
          "note": "No public compute customer contract tied to this exact physical site found in the reviewed sources. Gunvor is an energy agreement and OpenAI is Malaysia-only."
        },
        {
          "field": "address",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-firmus-wesley-20260911"
          ],
          "note": "The operator identifies 226 Mill Road, Wesley Vale as the proposed project address. Exact coordinates have not been verified."
        }
      ]
    },
    {
      "id": "fujitsu-eight-mile-plains",
      "name": "Fujitsu Eight Mile Plains",
      "operator": "Fujitsu",
      "city": "Brisbane",
      "region": "Queensland",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "fujitsu-eight-mile-plains",
      "lat": -27.453085,
      "lon": 153.033147,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "fujitsu-eight-mile-plains-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-fujitsu-locations"
          ],
          "note": "Current operator listing verifies the facility; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-fujitsu-locations",
        "au-profile-fujitsu-locations-20260911",
        "au-profile-fujitsu-eightmile-20260911",
        "natural-earth-cities"
      ],
      "notes": [],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-eightmile-20260911"
          ],
          "note": "The current operator portfolio and its linked fact sheet identify this data centre."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-eightmile-20260911"
          ],
          "note": "Current operator colocation offering and facility description support retaining the operating classification; this does not verify the entire advertised IT specification is commissioned."
        },
        {
          "field": "address",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-eightmile-20260911"
          ],
          "note": "The reviewed first-party portfolio page and fact sheet identify locality but do not publish a street address. No carrier directory address has been substituted."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-eightmile-20260911"
          ],
          "note": "The current page advertises 2 MW IT Load; the linked fact sheet specifies 2 MVA site capacity. The current page labels the figure IT Load but does not identify a commissioned phase or measurement date. These are different electrical bases and potentially different development scopes, so commissioned IT remains unknown."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-eightmile-20260911"
          ],
          "note": "No facility-specific installed GPU model or unit count was found in the reviewed portfolio entry and linked technical fact sheet."
        }
      ],
      "commissioningEvents": [
        {
          "id": "fujitsu-eight-mile-plains-commissioned-2006",
          "label": "Facility commissioned",
          "date": "2006",
          "datePrecision": "year",
          "sourceIds": [
            "au-profile-fujitsu-eightmile-20260911"
          ],
          "note": "The fact sheet explicitly states commissioning in 2006. No current capacity is backdated to this event."
        }
      ]
    },
    {
      "id": "fujitsu-homebush",
      "name": "Fujitsu Homebush",
      "operator": "Fujitsu",
      "city": "Sydney",
      "region": "New South Wales",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "fujitsu-homebush",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "fujitsu-homebush-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-fujitsu-locations"
          ],
          "note": "Current operator listing verifies the facility; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-fujitsu-locations",
        "au-profile-fujitsu-locations-20260911",
        "au-profile-fujitsu-homebush-20260911",
        "natural-earth-cities"
      ],
      "notes": [],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-homebush-20260911"
          ],
          "note": "The current operator portfolio and its linked fact sheet identify this data centre."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-homebush-20260911"
          ],
          "note": "Current operator colocation offering and facility description support retaining the operating classification; this does not verify the entire advertised IT specification is commissioned."
        },
        {
          "field": "address",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-homebush-20260911"
          ],
          "note": "The reviewed first-party portfolio page and fact sheet identify locality but do not publish a street address. No carrier directory address has been substituted."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-homebush-20260911"
          ],
          "note": "The current page advertises 3 MW IT Load; the linked fact sheet specifies 6 MVA site capacity. The current page labels the figure IT Load but does not identify a commissioned phase or measurement date. These are different electrical bases and potentially different development scopes, so commissioned IT remains unknown."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-homebush-20260911"
          ],
          "note": "No facility-specific installed GPU model or unit count was found in the reviewed portfolio entry and linked technical fact sheet."
        }
      ]
    },
    {
      "id": "fujitsu-malaga",
      "name": "Fujitsu Malaga",
      "operator": "Fujitsu",
      "city": "Perth",
      "region": "Western Australia",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "fujitsu-malaga",
      "lat": -31.953069,
      "lon": 115.838053,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "fujitsu-malaga-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-fujitsu-locations"
          ],
          "note": "Current operator listing verifies the facility; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-fujitsu-locations",
        "au-profile-fujitsu-locations-20260911",
        "au-profile-fujitsu-malaga-20260911",
        "natural-earth-cities"
      ],
      "notes": [],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-malaga-20260911"
          ],
          "note": "The current operator portfolio and its linked fact sheet identify this data centre."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-malaga-20260911"
          ],
          "note": "Current operator colocation offering and facility description support retaining the operating classification; this does not verify the entire advertised IT specification is commissioned."
        },
        {
          "field": "address",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-malaga-20260911"
          ],
          "note": "The reviewed first-party portfolio page and fact sheet identify locality but do not publish a street address. No carrier directory address has been substituted."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-malaga-20260911"
          ],
          "note": "The current page advertises 10 MW IT Load; the linked fact sheet specifies 5 MVA site capacity. The current page labels the figure IT Load but does not identify a commissioned phase or measurement date. These are different electrical bases and potentially different development scopes, so commissioned IT remains unknown."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-malaga-20260911"
          ],
          "note": "No facility-specific installed GPU model or unit count was found in the reviewed portfolio entry and linked technical fact sheet."
        }
      ]
    },
    {
      "id": "fujitsu-noble-park",
      "name": "Fujitsu Noble Park",
      "operator": "Fujitsu",
      "city": "Melbourne",
      "region": "Victoria",
      "country": "AU",
      "entityKind": "campus",
      "physicalSiteId": "fujitsu-noble-park",
      "lat": -37.818086,
      "lon": 144.97307,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "fujitsu-noble-park-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-fujitsu-locations"
          ],
          "note": "Current operator listing verifies the facility; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-fujitsu-locations",
        "au-profile-fujitsu-locations-20260911",
        "au-profile-fujitsu-noble-20260911",
        "natural-earth-cities"
      ],
      "notes": [],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-noble-20260911"
          ],
          "note": "The current operator portfolio and its linked fact sheet identify this data centre."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-noble-20260911"
          ],
          "note": "Current operator colocation offering and facility description support retaining the operating classification; this does not verify the entire advertised IT specification is commissioned."
        },
        {
          "field": "address",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-noble-20260911"
          ],
          "note": "The reviewed first-party portfolio page and fact sheet identify locality but do not publish a street address. No carrier directory address has been substituted."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-noble-20260911"
          ],
          "note": "The current page advertises 28 MW IT Load; the linked fact sheet specifies 12 MVA site capacity. The current page labels the figure IT Load but does not identify a commissioned phase or measurement date. These are different electrical bases and potentially different development scopes, so commissioned IT remains unknown."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-noble-20260911"
          ],
          "note": "No facility-specific installed GPU model or unit count was found in the reviewed portfolio entry and linked technical fact sheet."
        }
      ]
    },
    {
      "id": "fujitsu-north-ryde",
      "name": "Fujitsu North Ryde",
      "operator": "Fujitsu",
      "city": "Sydney",
      "region": "New South Wales",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "fujitsu-north-ryde",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "fujitsu-north-ryde-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-fujitsu-locations"
          ],
          "note": "Current operator listing verifies the facility; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-fujitsu-locations",
        "au-profile-fujitsu-locations-20260911",
        "au-profile-fujitsu-ryde-20260911",
        "natural-earth-cities"
      ],
      "notes": [],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-ryde-20260911"
          ],
          "note": "The current operator portfolio and its linked fact sheet identify this data centre."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-ryde-20260911"
          ],
          "note": "Current operator colocation offering and facility description support retaining the operating classification; this does not verify the entire advertised IT specification is commissioned."
        },
        {
          "field": "address",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-ryde-20260911"
          ],
          "note": "The reviewed first-party portfolio page and fact sheet identify locality but do not publish a street address. No carrier directory address has been substituted."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-ryde-20260911"
          ],
          "note": "The current page advertises 4.8 MW IT Load; the linked fact sheet specifies 4.8 MVA site capacity. The current page labels the figure IT Load but does not identify a commissioned phase or measurement date. These are different electrical bases and potentially different development scopes, so commissioned IT remains unknown."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-ryde-20260911"
          ],
          "note": "No facility-specific installed GPU model or unit count was found in the reviewed portfolio entry and linked technical fact sheet."
        }
      ]
    },
    {
      "id": "fujitsu-western-sydney",
      "name": "Fujitsu Western Sydney",
      "operator": "Fujitsu",
      "city": "Sydney",
      "region": "New South Wales",
      "country": "AU",
      "entityKind": "campus",
      "physicalSiteId": "fujitsu-western-sydney",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "fujitsu-western-sydney-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-fujitsu-locations"
          ],
          "note": "Current operator listing verifies the facility; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-fujitsu-locations",
        "au-profile-fujitsu-locations-20260911",
        "au-profile-fujitsu-wsdc-20260911",
        "natural-earth-cities"
      ],
      "notes": [],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-wsdc-20260911"
          ],
          "note": "The current operator portfolio and its linked fact sheet identify this data centre."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-wsdc-20260911"
          ],
          "note": "Current operator colocation offering and facility description support retaining the operating classification; this does not verify the entire advertised IT specification is commissioned."
        },
        {
          "field": "address",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-wsdc-20260911"
          ],
          "note": "The reviewed first-party portfolio page and fact sheet identify locality but do not publish a street address. No carrier directory address has been substituted."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-wsdc-20260911"
          ],
          "note": "The current page advertises 92 MW IT Load; the linked fact sheet specifies 60 MVA site capacity. The current page explicitly calls the 92 MW figure ultimate capacity. These are different electrical bases and potentially different development scopes, so commissioned IT remains unknown."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-fujitsu-locations-20260911",
            "au-profile-fujitsu-wsdc-20260911"
          ],
          "note": "No facility-specific installed GPU model or unit count was found in the reviewed portfolio entry and linked technical fact sheet."
        }
      ]
    },
    {
      "id": "goodman-syd01",
      "name": "Goodman SYD01 Artarmon",
      "operator": "Goodman",
      "city": "Sydney",
      "region": "New South Wales",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "goodman-syd01",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": "2026-03-02",
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": null,
          "mwBasis": "IT",
          "scopeId": "goodman-syd01-unquantified",
          "includedInTotals": false,
          "expectedYear": 2028,
          "dateConfidence": "target",
          "sourceIds": [
            "exp-goodman-syd01-development"
          ],
          "note": "Construction commencement confirmed. First 12.2 MW phase targeted for Q2 2028; 61 MW is the five-phase ultimate IT design, not an additional commissioned amount."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-goodman-syd01-development",
        "exp-goodman-portfolio",
        "natural-earth-cities"
      ],
      "notes": [
        "Exact street address is source-backed; no exact map coordinates have been verified."
      ],
      "address": {
        "street": "2 Lanceley Place",
        "locality": "Artarmon",
        "region": "New South Wales",
        "postalCode": "2064",
        "country": "AU",
        "sourceIds": [
          "exp-goodman-portfolio"
        ],
        "verifiedOn": "2026-09-11"
      }
    },
    {
      "id": "hostaway-malaga",
      "name": "HostAway Malaga",
      "operator": "HostAway",
      "city": "Perth",
      "region": "WA",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "hostaway-malaga",
      "lat": -31.953069,
      "lon": 115.838053,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "hostaway-malaga-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-hostaway-colocation",
            "exp-hostaway-home"
          ],
          "note": "Operating Malaga colocation facility. Head-office address is withheld until explicitly tied to the physical data centre."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-hostaway-colocation",
        "exp-hostaway-home",
        "natural-earth-cities"
      ],
      "notes": [
        "Operating Malaga colocation facility. Head-office address is withheld until explicitly tied to the physical data centre."
      ]
    },
    {
      "id": "interactive-brisbane",
      "name": "Interactive Brisbane campus",
      "operator": "Interactive",
      "city": "Brisbane",
      "region": "Queensland",
      "country": "AU",
      "entityKind": "campus",
      "physicalSiteId": "interactive-brisbane",
      "lat": -27.453085,
      "lon": 153.033147,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "interactive-brisbane-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-interactive-locations"
          ],
          "note": "Operating colocation offering is described by the operator; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-interactive-locations",
        "au-profile-interactive-locations-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "One campus record; the operator's six data centres across three sites are not counted as six separate sites."
      ],
      "address": {
        "street": "19 McKechnie Drive",
        "locality": "Eight Mile Plains",
        "region": "Queensland",
        "postalCode": "4113",
        "country": "AU",
        "sourceIds": [
          "exp-interactive-locations",
          "au-profile-interactive-locations-20260911"
        ],
        "verifiedOn": "2026-09-11"
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-interactive-locations-20260911"
          ],
          "note": "The operator identifies this physical campus in its three-city location listing. Its six data centre units across three sites do not create six separately mapped physical sites."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-interactive-locations-20260911"
          ],
          "note": "The operator describes a current colocation and technical support service at its listed locations."
        },
        {
          "field": "address",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-interactive-locations-20260911"
          ],
          "note": "The operator publishes 19 McKechnie Drive, Eight Mile Plains 4113."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-interactive-locations-20260911"
          ],
          "note": "No total commissioned IT MW for this site is given. The advertised density of up to 32 kW is not a site-wide capacity figure."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-interactive-locations-20260911"
          ],
          "note": "The reviewed service and location page does not identify an installed accelerator model or GPU quantity for this site."
        }
      ]
    },
    {
      "id": "interactive-melbourne",
      "name": "Interactive Melbourne campus",
      "operator": "Interactive",
      "city": "Melbourne",
      "region": "Victoria",
      "country": "AU",
      "entityKind": "campus",
      "physicalSiteId": "interactive-melbourne",
      "lat": -37.818086,
      "lon": 144.97307,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "interactive-melbourne-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-interactive-locations"
          ],
          "note": "Operating colocation offering is described by the operator; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-interactive-locations",
        "au-profile-interactive-locations-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "One campus record; the operator's six data centres across three sites are not counted as six separate sites."
      ],
      "address": {
        "street": "461 Williamstown Road",
        "locality": "Port Melbourne",
        "region": "Victoria",
        "postalCode": "3207",
        "country": "AU",
        "sourceIds": [
          "exp-interactive-locations",
          "au-profile-interactive-locations-20260911"
        ],
        "verifiedOn": "2026-09-11"
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-interactive-locations-20260911"
          ],
          "note": "The operator identifies this physical campus in its three-city location listing. Its six data centre units across three sites do not create six separately mapped physical sites."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-interactive-locations-20260911"
          ],
          "note": "The operator describes a current colocation and technical support service at its listed locations."
        },
        {
          "field": "address",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-interactive-locations-20260911"
          ],
          "note": "The operator publishes 461 Williamstown Road, Port Melbourne 3207."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-interactive-locations-20260911"
          ],
          "note": "No total commissioned IT MW for this site is given. The advertised density of up to 32 kW is not a site-wide capacity figure."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-interactive-locations-20260911"
          ],
          "note": "The reviewed service and location page does not identify an installed accelerator model or GPU quantity for this site."
        }
      ]
    },
    {
      "id": "interactive-sydney",
      "name": "Interactive Sydney campus",
      "operator": "Interactive",
      "city": "Sydney",
      "region": "New South Wales",
      "country": "AU",
      "entityKind": "campus",
      "physicalSiteId": "st-leonards-corporate-centre",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "interactive-sydney-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-interactive-locations"
          ],
          "note": "Operating colocation offering is described by the operator; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-interactive-locations",
        "au-profile-interactive-locations-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "One campus record; the operator's six data centres across three sites are not counted as six separate sites."
      ],
      "address": {
        "street": "Tower B, 39 Herbert Street",
        "locality": "St Leonards",
        "region": "New South Wales",
        "postalCode": "2065",
        "country": "AU",
        "sourceIds": [
          "exp-interactive-locations",
          "au-profile-interactive-locations-20260911"
        ],
        "verifiedOn": "2026-09-11"
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-interactive-locations-20260911"
          ],
          "note": "The operator identifies this physical campus in its three-city location listing. Its six data centre units across three sites do not create six separately mapped physical sites."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-interactive-locations-20260911"
          ],
          "note": "The operator describes a current colocation and technical support service at its listed locations."
        },
        {
          "field": "address",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-interactive-locations-20260911"
          ],
          "note": "The operator publishes Tower B, 39 Herbert Street, St Leonards 2065."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-interactive-locations-20260911"
          ],
          "note": "No total commissioned IT MW for this site is given. The advertised density of up to 32 kW is not a site-wide capacity figure."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-interactive-locations-20260911"
          ],
          "note": "The reviewed service and location page does not identify an installed accelerator model or GPU quantity for this site."
        }
      ]
    },
    {
      "id": "iren-bundey",
      "name": "IREN Bundey campus",
      "operator": "IREN",
      "country": "AU",
      "region": "SA",
      "city": "Bundey",
      "entityKind": "campus",
      "physicalSiteId": "iren-bundey",
      "lat": null,
      "lon": null,
      "locationPrecision": "unknown",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": "2026-06-03",
          "mwQualifier": "reported",
          "stage": "planned",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "iren-bundey-capacity",
          "includedInTotals": false,
          "expectedYear": 2028,
          "dateConfidence": "target",
          "sourceIds": [
            "exp-iren-bundey"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-iren-bundey",
        "compute-iren-bundey-20260911",
        "compute-iren-bundey-site-20260911",
        "compute-iren-fy26-20260911",
        "compute-iren-microsoft-20260911"
      ],
      "notes": [
        "800 MW headline is not treated as IT load; no construction commencement is stated."
      ],
      "fieldReviews": [
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-iren-bundey-20260911",
            "compute-iren-bundey-site-20260911",
            "compute-iren-fy26-20260911"
          ],
          "note": "Planned/development;2028 energisation target. No commissioned compute confirmed."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-iren-bundey-20260911"
          ],
          "note": "800 MW transmission support is disclosed; IT basis remains unverified."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-iren-bundey-20260911",
            "compute-iren-bundey-site-20260911",
            "compute-iren-fy26-20260911"
          ],
          "note": "No Bundey GPU model or count; group/Childress hardware is outside this site."
        },
        {
          "field": "workloads",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-iren-bundey-20260911",
            "compute-iren-fy26-20260911"
          ],
          "note": "General AI purpose is explicit; site-specific training/inference deployment split is not."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-iren-bundey-20260911",
            "compute-iren-fy26-20260911",
            "compute-iren-microsoft-20260911"
          ],
          "note": "No exact Bundey compute tenant/offtake identified. Microsoft deployment is Texas."
        },
        {
          "field": "address",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-iren-bundey-20260911",
            "compute-iren-bundey-site-20260911"
          ],
          "note": "Locality and 1300-acre land area, but no public street address established here."
        }
      ]
    },
    {
      "id": "keppel-gore-hill",
      "name": "Keppel Gore Hill Data Centre",
      "operator": "Keppel Data Centres",
      "city": "Sydney",
      "region": "New South Wales",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "keppel-gore-hill",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "keppel-gore-hill-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-keppel-gore-hill"
          ],
          "note": "Operating colocation offering is described by the operator; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-keppel-gore-hill",
        "natural-earth-cities"
      ],
      "notes": [
        "Potential iseek/DigiCo leased-hall aliases require reconciliation; no separate tenant site has been added."
      ]
    },
    {
      "id": "leading-edge-albury",
      "name": "Leading Edge ABX1 Albury",
      "operator": "Leading Edge Data Centres",
      "city": "Albury",
      "region": "New South Wales",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "leading-edge-albury",
      "lat": -36.060035,
      "lon": 146.920014,
      "locationPrecision": "city",
      "facilityType": "edge",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "leading-edge-albury-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-ledc-albury",
            "au-profile-ledc-albury-case-20260911"
          ],
          "note": "The operator describes an actual customer hosting colocation service in Albury. Opening date, installed module count and commissioned IT MW remain unquantified."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-ledc-albury",
        "au-profile-ledc-albury-20260911",
        "au-profile-ledc-albury-case-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "An operator customer case study supports current hosting operations at Albury. A precise opening date and installed IT capacity have not been disclosed in the reviewed evidence."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-albury-20260911"
          ],
          "note": "The operator technical profile identifies ABX1 in Albury."
        },
        {
          "field": "address",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-albury-20260911"
          ],
          "note": "No public street address is given in the reviewed location profile. The downloadable information flow is gated; no form was submitted."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-albury-20260911"
          ],
          "note": "The page labels 750 kW as total site capacity and separately specifies 375 kW IT load per module. Installed module count and commissioned IT load are not given; no module count is inferred by division."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-albury-20260911",
            "au-profile-ledc-albury-case-20260911"
          ],
          "note": "The operator case study describes an actual Faded Servers hosting colocation service at its Murray data centre in Albury, supporting operating status. No opening date or commissioned MW is disclosed."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-albury-20260911"
          ],
          "note": "The reviewed location specification does not publish a deployed GPU model or count. Modular IT capacity is not a hardware inventory."
        }
      ]
    },
    {
      "id": "leading-edge-coffs-harbour",
      "name": "Leading Edge Coffs Harbour",
      "operator": "Leading Edge Data Centres",
      "city": "Coffs Harbour",
      "region": "New South Wales",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "leading-edge-coffs-harbour",
      "lat": -30.307053,
      "lon": 153.112297,
      "locationPrecision": "city",
      "facilityType": "edge",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "unknown",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "leading-edge-coffs-harbour-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-ledc-coffs-harbour"
          ],
          "note": "Named location and technical specification verified; current opening/construction status remains unconfirmed."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-ledc-coffs-harbour",
        "au-profile-ledc-coffs-20260911",
        "au-profile-ledc-dubbo-opening-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "Historic opening targets are not used as evidence that the site is operating."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-coffs-20260911"
          ],
          "note": "The operator technical profile identifies CFS1 in Coffs Harbour."
        },
        {
          "field": "address",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-coffs-20260911"
          ],
          "note": "No public street address is given in the reviewed location profile. The downloadable information flow is gated; no form was submitted."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-coffs-20260911"
          ],
          "note": "The page labels 300 kW as total site capacity and separately specifies 150 kW IT load per module. Installed module count and commissioned IT load are not given; no module count is inferred by division."
        },
        {
          "field": "status",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-coffs-20260911",
            "au-profile-ledc-dubbo-opening-20260911"
          ],
          "note": "The technical profile and a historical pipeline list establish a named location, but neither establishes current operation or construction. Status remains unknown."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-coffs-20260911"
          ],
          "note": "The reviewed location specification does not publish a deployed GPU model or count. Modular IT capacity is not a hardware inventory."
        }
      ],
      "aliases": [
        "CFS1 Coffs Harbour"
      ]
    },
    {
      "id": "leading-edge-dubbo",
      "name": "Leading Edge DBO1 Dubbo",
      "operator": "Leading Edge Data Centres",
      "city": "Dubbo",
      "region": "New South Wales",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "leading-edge-dubbo",
      "lat": -32.259957,
      "lon": 148.597327,
      "locationPrecision": "city",
      "facilityType": "edge",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "leading-edge-dubbo-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-ledc-dubbo",
            "exp-ledc-openings",
            "exp-ledc-openings"
          ],
          "note": "Facility opening has been announced by the operator; installed module capacity is unquantified."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-ledc-dubbo",
        "exp-ledc-openings",
        "au-profile-ledc-dubbo-20260911",
        "au-profile-ledc-dubbo-opening-20260911",
        "natural-earth-cities"
      ],
      "notes": [],
      "commissioningEvents": [
        {
          "id": "leading-edge-dubbo-opening",
          "label": "Facility opened",
          "date": "2021-12-10",
          "datePrecision": "day",
          "sourceIds": [
            "exp-ledc-openings",
            "au-profile-ledc-dubbo-opening-20260911"
          ],
          "note": "Operator records ribbon-cutting opening on 10 December; no current capacity is backdated."
        }
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-dubbo-20260911"
          ],
          "note": "The operator technical profile identifies DBO1 in Dubbo."
        },
        {
          "field": "address",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-dubbo-20260911"
          ],
          "note": "No public street address is given in the reviewed location profile. The downloadable information flow is gated; no form was submitted."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-dubbo-20260911"
          ],
          "note": "The page labels 750 kW as total site capacity and separately specifies 375 kW IT load per module. Installed module count and commissioned IT load are not given; no module count is inferred by division."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-dubbo-20260911",
            "au-profile-ledc-dubbo-opening-20260911"
          ],
          "note": "An operator opening announcement supports operating status; current technical specifications are not backdated to the opening."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-dubbo-20260911"
          ],
          "note": "The reviewed location specification does not publish a deployed GPU model or count. Modular IT capacity is not a hardware inventory."
        }
      ]
    },
    {
      "id": "leading-edge-newcastle",
      "name": "Leading Edge NTL1 Newcastle",
      "operator": "Leading Edge Data Centres",
      "city": "Newcastle",
      "region": "New South Wales",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "leading-edge-newcastle",
      "lat": -32.929508,
      "lon": 151.770249,
      "locationPrecision": "city",
      "facilityType": "edge",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "leading-edge-newcastle-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-ledc-newcastle",
            "exp-ledc-openings",
            "exp-ledc-openings"
          ],
          "note": "Facility opening has been announced by the operator; installed module capacity is unquantified."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-ledc-newcastle",
        "exp-ledc-openings",
        "au-profile-ledc-newcastle-20260911",
        "au-profile-ledc-dubbo-opening-20260911",
        "natural-earth-cities"
      ],
      "notes": [],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-newcastle-20260911"
          ],
          "note": "The operator technical profile identifies NTL1 in Newcastle."
        },
        {
          "field": "address",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-newcastle-20260911"
          ],
          "note": "No public street address is given in the reviewed location profile. The downloadable information flow is gated; no form was submitted."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-newcastle-20260911"
          ],
          "note": "The page labels 1500 kW as total site capacity and separately specifies 375 kW IT load per module. Installed module count and commissioned IT load are not given; no module count is inferred by division."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-newcastle-20260911",
            "au-profile-ledc-dubbo-opening-20260911"
          ],
          "note": "An operator opening announcement supports operating status; current technical specifications are not backdated to the opening."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-newcastle-20260911"
          ],
          "note": "The reviewed location specification does not publish a deployed GPU model or count. Modular IT capacity is not a hardware inventory."
        }
      ]
    },
    {
      "id": "leading-edge-tamworth",
      "name": "Leading Edge TMW1 Tamworth",
      "operator": "Leading Edge Data Centres",
      "city": "Tamworth",
      "region": "New South Wales",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "leading-edge-tamworth",
      "lat": -31.102612,
      "lon": 150.917134,
      "locationPrecision": "city",
      "facilityType": "edge",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "leading-edge-tamworth-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-ledc-tamworth",
            "exp-ledc-openings",
            "exp-ledc-openings"
          ],
          "note": "Facility opening has been announced by the operator; installed module capacity is unquantified."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-ledc-tamworth",
        "exp-ledc-openings",
        "au-profile-ledc-tamworth-20260911",
        "au-profile-ledc-tamworth-opening-20260911",
        "natural-earth-cities"
      ],
      "notes": [],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-tamworth-20260911"
          ],
          "note": "The operator technical profile identifies TMW 1 in Tamworth."
        },
        {
          "field": "address",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-tamworth-20260911"
          ],
          "note": "No public street address is given in the reviewed location profile. The downloadable information flow is gated; no form was submitted."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-tamworth-20260911"
          ],
          "note": "The page labels 375 kW as total site capacity and separately specifies 375 kW IT load per module. Installed module count and commissioned IT load are not given; no module count is inferred by division."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-tamworth-20260911",
            "au-profile-ledc-tamworth-opening-20260911"
          ],
          "note": "An operator opening announcement supports operating status; current technical specifications are not backdated to the opening."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-tamworth-20260911"
          ],
          "note": "The reviewed location specification does not publish a deployed GPU model or count. Modular IT capacity is not a hardware inventory."
        }
      ],
      "commissioningEvents": [
        {
          "id": "leading-edge-tamworth-opening",
          "label": "Facility opened",
          "date": "2021-11-05",
          "datePrecision": "day",
          "sourceIds": [
            "au-profile-ledc-tamworth-opening-20260911"
          ],
          "note": "Operator article published on 1 December 2021 explicitly states opening on 5 November 2021. No current capacity is backdated."
        }
      ]
    },
    {
      "id": "leading-edge-wagga-wagga",
      "name": "Leading Edge Wagga Wagga",
      "operator": "Leading Edge Data Centres",
      "city": "Wagga Wagga",
      "region": "New South Wales",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "leading-edge-wagga-wagga",
      "lat": -35.12216,
      "lon": 147.339988,
      "locationPrecision": "city",
      "facilityType": "edge",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "unknown",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "leading-edge-wagga-wagga-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-ledc-wagga-wagga"
          ],
          "note": "Named location and technical specification verified; current opening/construction status remains unconfirmed."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-ledc-wagga-wagga",
        "au-profile-ledc-wagga-20260911",
        "au-profile-ledc-dubbo-opening-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "Historic opening targets are not used as evidence that the site is operating."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-wagga-20260911"
          ],
          "note": "The operator technical profile identifies WGA1 in Wagga Wagga."
        },
        {
          "field": "address",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-wagga-20260911"
          ],
          "note": "No public street address is given in the reviewed location profile. The downloadable information flow is gated; no form was submitted."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-wagga-20260911"
          ],
          "note": "The page labels 300 kW as total site capacity and separately specifies 150 kW IT load per module. Installed module count and commissioned IT load are not given; no module count is inferred by division."
        },
        {
          "field": "status",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-wagga-20260911",
            "au-profile-ledc-dubbo-opening-20260911"
          ],
          "note": "The technical profile and a historical pipeline list establish a named location, but neither establishes current operation or construction. Status remains unknown."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-ledc-wagga-20260911"
          ],
          "note": "The reviewed location specification does not publish a deployed GPU model or count. Modular IT capacity is not a hardware inventory."
        }
      ],
      "aliases": [
        "WGA1 Wagga Wagga"
      ]
    },
    {
      "id": "macquarie-ic1",
      "name": "Macquarie IC1 Sydney CBD",
      "operator": "Macquarie Data Centres",
      "country": "AU",
      "region": "NSW",
      "city": "Sydney",
      "entityKind": "facility",
      "physicalSiteId": "macquarie-sydney-cbd",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 2,
          "mwBasis": "IT",
          "scopeId": "macquarie-ic1-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-macquarie-ic1",
            "cov-macquarie-campuses",
            "cov-macquarie-hy26"
          ],
          "note": "Published IT-load specification for an operating facility, not an explicit commissioned fit-out observation. Excluded from commissioned IT subtotals pending reconciliation with the 21 MW portfolio installed-capacity statement."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "Macquarie IC1 Sydney CBD: certified enclave only. The entire building and its MW are not certified by this scope.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-macquarie-ic1",
        "cov-macquarie-campuses",
        "cov-macquarie-hy26",
        "compute-macquarie-ai-20260911",
        "compute-macquarie-dell-20260911",
        "compute-macquarie-hy26-20260911",
        "hcf-register",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate."
      ],
      "fieldReviews": [
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-macquarie-ai-20260911",
            "compute-macquarie-dell-20260911",
            "compute-macquarie-hy26-20260911"
          ],
          "note": "No installed accelerator model/quantity attributable to this individual facility in this bounded source set."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-macquarie-hy26-20260911",
            "compute-macquarie-dell-20260911"
          ],
          "note": "Portfolio customers are not mapped to named buildings. Dell/NVIDIA is a supplier collaboration, not a named tenant contract."
        }
      ]
    },
    {
      "id": "macquarie-ic2",
      "name": "Macquarie IC2 Macquarie Park",
      "operator": "Macquarie Data Centres",
      "country": "AU",
      "region": "NSW",
      "city": "Sydney",
      "entityKind": "facility",
      "physicalSiteId": "macquarie-park-campus",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 6,
          "mwBasis": "IT",
          "scopeId": "macquarie-ic2-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-macquarie-ic2",
            "cov-macquarie-campuses",
            "cov-macquarie-hy26"
          ],
          "note": "Published IT-load specification for an operating facility, not an explicit commissioned fit-out observation. Excluded from commissioned IT subtotals pending reconciliation with the 21 MW portfolio installed-capacity statement."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "Macquarie IC2 Macquarie Park: certified enclave only. The entire building and its MW are not certified by this scope.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-macquarie-ic2",
        "cov-macquarie-campuses",
        "cov-macquarie-hy26",
        "compute-macquarie-ai-20260911",
        "compute-macquarie-dell-20260911",
        "compute-macquarie-hy26-20260911",
        "hcf-register",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate."
      ],
      "fieldReviews": [
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-macquarie-ai-20260911",
            "compute-macquarie-dell-20260911",
            "compute-macquarie-hy26-20260911"
          ],
          "note": "No installed accelerator model/quantity attributable to this individual facility in this bounded source set."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-macquarie-hy26-20260911",
            "compute-macquarie-dell-20260911"
          ],
          "note": "Portfolio customers are not mapped to named buildings. Dell/NVIDIA is a supplier collaboration, not a named tenant contract."
        }
      ]
    },
    {
      "id": "macquarie-ic3-east",
      "name": "Macquarie IC3 East Macquarie Park",
      "operator": "Macquarie Data Centres",
      "country": "AU",
      "region": "NSW",
      "city": "Sydney",
      "entityKind": "facility",
      "physicalSiteId": "macquarie-park-campus",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 12,
          "mwBasis": "IT",
          "scopeId": "macquarie-ic3-east-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-macquarie-ic3-east",
            "cov-macquarie-campuses",
            "cov-macquarie-hy26"
          ],
          "note": "Published IT-load specification for an operating facility, not an explicit commissioned fit-out observation. Excluded from commissioned IT subtotals pending reconciliation with the 21 MW portfolio installed-capacity statement."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "IC3 East (IC3E) enclave only; no enclave-specific MW disclosed",
        "sourceIds": [
          "cov-macquarie-ic3e-name",
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-macquarie-ic3-east",
        "cov-macquarie-campuses",
        "cov-macquarie-hy26",
        "cov-macquarie-ic3e-name",
        "compute-macquarie-ai-20260911",
        "compute-macquarie-dell-20260911",
        "compute-macquarie-hy26-20260911",
        "hcf-register",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate."
      ],
      "fieldReviews": [
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-macquarie-ai-20260911",
            "compute-macquarie-dell-20260911",
            "compute-macquarie-hy26-20260911"
          ],
          "note": "No installed accelerator model/quantity attributable to this individual facility in this bounded source set."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-macquarie-hy26-20260911",
            "compute-macquarie-dell-20260911"
          ],
          "note": "Portfolio customers are not mapped to named buildings. Dell/NVIDIA is a supplier collaboration, not a named tenant contract."
        }
      ]
    },
    {
      "id": "macquarie-ic3-super-west",
      "name": "Macquarie IC3 Super West",
      "operator": "Macquarie Data Centres",
      "country": "AU",
      "region": "NSW",
      "city": "Sydney",
      "entityKind": "facility",
      "physicalSiteId": "macquarie-park-campus",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": 6,
          "mwBasis": "IT",
          "scopeId": "macquarie-ic3-super-west-construction",
          "includedInTotals": true,
          "expectedYear": 2026,
          "dateConfidence": "target",
          "sourceIds": [
            "cov-macquarie-ic3-super-west",
            "cov-macquarie-first-fitout",
            "cov-macquarie-campuses",
            "cov-macquarie-hy26"
          ],
          "note": "First 6 MW mechanical/electrical fit-out had commenced by 26 February 2026 (slide 8). IT-load basis is explicit in the earlier first-phase investor disclosure. September 2026 remains a target; 47 MW end-state is not an additional delivery."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-macquarie-ic3-super-west",
        "cov-macquarie-first-fitout",
        "cov-macquarie-campuses",
        "cov-macquarie-hy26",
        "compute-macquarie-ai-20260911",
        "compute-macquarie-dell-20260911",
        "compute-macquarie-hy26-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate.",
        "A target in 2026 does not prove opening. The live operator page still describes construction."
      ],
      "fieldReviews": [
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-macquarie-ai-20260911",
            "compute-macquarie-dell-20260911",
            "compute-macquarie-hy26-20260911"
          ],
          "note": "No installed accelerator model/quantity attributable to this individual facility in this bounded source set."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-macquarie-hy26-20260911",
            "compute-macquarie-dell-20260911"
          ],
          "note": "Portfolio customers are not mapped to named buildings. Dell/NVIDIA is a supplier collaboration, not a named tenant contract."
        }
      ]
    },
    {
      "id": "macquarie-ic4",
      "name": "Macquarie IC4 Canberra Bunker",
      "operator": "Macquarie Data Centres",
      "country": "AU",
      "region": "ACT",
      "city": "Canberra",
      "entityKind": "facility",
      "physicalSiteId": "macquarie-canberra-campus",
      "lat": -35.283029,
      "lon": 149.129026,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "IT",
          "scopeId": "macquarie-ic4-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-macquarie-ic4",
            "cov-macquarie-campuses"
          ],
          "note": "Operator expressly withholds this facility's IT load. No allocation from a campus aggregate is inferred."
        }
      ],
      "certification": {
        "status": "strategic-facility",
        "scope": "Macquarie IC4 Canberra Bunker: named facility on the official HCF register.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-macquarie-ic4",
        "cov-macquarie-campuses",
        "compute-macquarie-ai-20260911",
        "compute-macquarie-dell-20260911",
        "compute-macquarie-hy26-20260911",
        "hcf-register",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate."
      ],
      "fieldReviews": [
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-macquarie-ai-20260911",
            "compute-macquarie-dell-20260911",
            "compute-macquarie-hy26-20260911"
          ],
          "note": "No installed accelerator model/quantity attributable to this individual facility in this bounded source set."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-macquarie-hy26-20260911",
            "compute-macquarie-dell-20260911"
          ],
          "note": "Portfolio customers are not mapped to named buildings. Dell/NVIDIA is a supplier collaboration, not a named tenant contract."
        }
      ]
    },
    {
      "id": "macquarie-ic5",
      "name": "Macquarie IC5 Canberra Bunker",
      "operator": "Macquarie Data Centres",
      "country": "AU",
      "region": "ACT",
      "city": "Canberra",
      "entityKind": "facility",
      "physicalSiteId": "macquarie-canberra-campus",
      "lat": -35.283029,
      "lon": 149.129026,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "IT",
          "scopeId": "macquarie-ic5-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-macquarie-ic5",
            "cov-macquarie-campuses"
          ],
          "note": "Operator expressly withholds this facility's IT load. No allocation from a campus aggregate is inferred."
        }
      ],
      "certification": {
        "status": "strategic-facility",
        "scope": "Macquarie IC5 Canberra Bunker: named facility on the official HCF register.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-macquarie-ic5",
        "cov-macquarie-campuses",
        "compute-macquarie-ai-20260911",
        "compute-macquarie-dell-20260911",
        "compute-macquarie-hy26-20260911",
        "hcf-register",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate."
      ],
      "fieldReviews": [
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-macquarie-ai-20260911",
            "compute-macquarie-dell-20260911",
            "compute-macquarie-hy26-20260911"
          ],
          "note": "No installed accelerator model/quantity attributable to this individual facility in this bounded source set."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-macquarie-hy26-20260911",
            "compute-macquarie-dell-20260911"
          ],
          "note": "Portfolio customers are not mapped to named buildings. Dell/NVIDIA is a supplier collaboration, not a named tenant contract."
        }
      ]
    },
    {
      "id": "micron21-kilsyth-south",
      "name": "Micron21 Kilsyth South",
      "operator": "Micron21",
      "city": "Melbourne",
      "region": "VIC",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "micron21-kilsyth-south",
      "lat": -37.818086,
      "lon": 144.97307,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "micron21-kilsyth-south-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-micron21-tour"
          ],
          "note": "Operator describes an operating facility and provides visitor directions. Network points of presence elsewhere are not additional Micron21-owned sites."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-micron21-tour",
        "natural-earth-cities"
      ],
      "notes": [
        "Operator describes an operating facility and provides visitor directions. Network points of presence elsewhere are not additional Micron21-owned sites."
      ],
      "address": {
        "street": "7 Eastspur Court",
        "locality": "Kilsyth South",
        "region": "VIC",
        "postalCode": "3137",
        "country": "AU",
        "sourceIds": [
          "exp-micron21-tour"
        ],
        "verifiedOn": "2026-09-11"
      }
    },
    {
      "id": "microsoft-cawley-road",
      "name": "Microsoft Cawley Road",
      "operator": "Microsoft",
      "country": "AU",
      "region": "VIC",
      "city": "Melbourne",
      "entityKind": "campus",
      "physicalSiteId": "microsoft-cawley-road",
      "lat": -37.818086,
      "lon": 144.97307,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": "2026-06",
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "microsoft-cawley-road-building-one",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-microsoft-cawley-road"
          ],
          "note": "Operating evidence applies to Building One; its IT MW is undisclosed."
        },
        {
          "asOf": "2025-02",
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "microsoft-cawley-road-building-two",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-microsoft-cawley-road"
          ],
          "note": "February 2025 update describes Building Two fit-out; later June 2026 operations notice confirms existing operations but does not date Building Two commissioning."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-microsoft-cawley-road",
        "natural-earth-cities"
      ],
      "notes": [
        "June 2026 update refers to ongoing operations and customer service loads; February 2025 confirms Building One operational. Page conflicts on suburb (Truganina / Yarraville), so city only."
      ],
      "commissioningEvents": [
        {
          "id": "microsoft-cawley-one-operating",
          "label": "Building One reported operational",
          "date": "2025-02",
          "datePrecision": "month",
          "sourceIds": [
            "exp-microsoft-cawley-road"
          ],
          "note": "Operational by the February update; exact commissioning date and MW not disclosed."
        }
      ]
    },
    {
      "id": "microsoft-garden-drive",
      "name": "Microsoft Garden Drive",
      "operator": "Microsoft",
      "country": "AU",
      "region": "VIC",
      "city": "Melbourne",
      "entityKind": "campus",
      "physicalSiteId": "microsoft-garden-drive",
      "lat": -37.818086,
      "lon": 144.97307,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": "2025-02",
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "microsoft-garden-drive-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-microsoft-garden-drive"
          ],
          "note": "February 2025: fit-out and substation construction. Earlier target is not treated as actual opening."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-microsoft-garden-drive",
        "natural-earth-cities"
      ],
      "notes": [
        "February 2025: fit-out and substation construction. Earlier target is not treated as actual opening."
      ]
    },
    {
      "id": "microsoft-huntingwood",
      "name": "Microsoft Huntingwood",
      "operator": "Microsoft",
      "country": "AU",
      "region": "NSW",
      "city": "Sydney",
      "entityKind": "campus",
      "physicalSiteId": "microsoft-huntingwood",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": "2026-08-13",
          "mwQualifier": "reported",
          "stage": "planned",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "microsoft-huntingwood-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-microsoft-huntingwood"
          ],
          "note": "Proposed development at 6 Honeman Close; environmental documentation submitted 13 August 2026. Approval process underway, not evidence of construction."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-microsoft-huntingwood",
        "natural-earth-cities"
      ],
      "notes": [
        "Proposed development at 6 Honeman Close; environmental documentation submitted 13 August 2026. Approval process underway, not evidence of construction."
      ],
      "address": {
        "street": "6 Honeman Close",
        "locality": "Huntingwood",
        "region": "NSW",
        "postalCode": "",
        "country": "AU",
        "sourceIds": [
          "exp-microsoft-huntingwood"
        ],
        "verifiedOn": "2026-09-11"
      }
    },
    {
      "id": "microsoft-kemps-creek",
      "name": "Microsoft Kemps Creek",
      "operator": "Microsoft",
      "country": "AU",
      "region": "NSW",
      "city": "Sydney",
      "entityKind": "campus",
      "physicalSiteId": "microsoft-kemps-creek",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": "2026-05",
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "microsoft-kemps-creek-building-one",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-microsoft-kemps-creek"
          ],
          "note": "Operating evidence applies to Building One; its IT MW is undisclosed."
        },
        {
          "asOf": "2026-05",
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "microsoft-kemps-creek-building-two",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-microsoft-kemps-creek"
          ],
          "note": "Building Two construction continues in the operator's May 2026 update; no phase IT MW disclosed."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-microsoft-kemps-creek",
        "natural-earth-cities"
      ],
      "notes": [
        "May 2026 confirms Building One (SYD05) completed and handed over to operations; later phase not assumed operating."
      ],
      "commissioningEvents": [
        {
          "id": "microsoft-kemps-one-handover",
          "label": "Building One handed over to operations",
          "date": "2026-05",
          "datePrecision": "month",
          "sourceIds": [
            "exp-microsoft-kemps-creek"
          ],
          "note": "Handover month as reported; no MW inferred."
        }
      ]
    },
    {
      "id": "microsoft-station-road",
      "name": "Microsoft Station Road Seven Hills",
      "operator": "Microsoft",
      "country": "AU",
      "region": "NSW",
      "city": "Sydney",
      "entityKind": "campus",
      "physicalSiteId": "microsoft-station-road",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": "2024-07",
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "microsoft-station-road-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-microsoft-station-road"
          ],
          "note": "Latest dated update July 2024 describes construction of Building Two. Completion dates explicitly do not establish operation; current operating status needs refresh."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-microsoft-station-road",
        "natural-earth-cities"
      ],
      "notes": [
        "Latest dated update July 2024 describes construction of Building Two. Completion dates explicitly do not establish operation; current operating status needs refresh."
      ]
    },
    {
      "id": "microsoft-woods-road",
      "name": "Microsoft Woods Road",
      "operator": "Microsoft",
      "country": "AU",
      "region": "VIC",
      "city": "Melbourne",
      "entityKind": "campus",
      "physicalSiteId": "microsoft-woods-road",
      "lat": -37.818086,
      "lon": 144.97307,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": "2025-02",
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "microsoft-woods-road-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-microsoft-woods-road"
          ],
          "note": "February 2025: substation works and site completion update. Earlier mid-2025 target is not evidence of operation."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-microsoft-woods-road",
        "natural-earth-cities"
      ],
      "notes": [
        "February 2025: substation works and site completion update. Earlier mid-2025 target is not evidence of operation."
      ]
    },
    {
      "id": "nci-anu",
      "name": "NCI ANU data centre",
      "operator": "National Computational Infrastructure",
      "country": "AU",
      "region": "ACT",
      "city": "Canberra",
      "entityKind": "facility",
      "physicalSiteId": "nci-anu",
      "lat": -35.283029,
      "lon": 149.129026,
      "locationPrecision": "city",
      "facilityType": "enterprise",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "nci-anu-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-nci-building",
            "exp-nci-contact"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-nci-building",
        "exp-nci-contact",
        "natural-earth-cities"
      ],
      "notes": [
        "ANU research/HPC facility. Contact page has two locations, so a specific data-centre street address is not yet assigned."
      ]
    },
    {
      "id": "nextdc-a1",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-a1",
      "name": "NEXTDC A1 Adelaide",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Adelaide",
      "region": "South Australia",
      "lat": -34.933042,
      "lon": 138.598059,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "nextdc-a1-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-directory",
            "nextdc-operating-edge"
          ],
          "note": "Operator identifies an operational facility. Commissioned IT capacity has not been separately reconciled; directory design MW is not used as live MW."
        },
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": 2,
          "mwBasis": "IT",
          "scopeId": "nextdc-a1-construction",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26"
          ],
          "note": "FY26 page 18 reports an additional 2 MW in progress for AI deployment. Operating MW has not been separately reconciled."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "A1 enclave only; no enclave-specific MW published in the selected evidence.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "profile-reviewed",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-operating-edge",
        "nextdc-fy26",
        "hcf-register",
        "verify-nextdc-directory",
        "verify-nextdc-fy26",
        "natural-earth-cities"
      ],
      "notes": [
        "City map markers are approximate. No exact facility coordinates have been verified in this release."
      ],
      "address": {
        "street": "125 Frome Street",
        "locality": "Adelaide",
        "region": "SA",
        "postalCode": "5000",
        "country": "AU",
        "sourceIds": [
          "nextdc-addresses-2026"
        ],
        "verifiedOn": "2026-09-11"
      },
      "commissioningEvents": [
        {
          "id": "nextdc-a1-customer-opening",
          "label": "Opened to customers",
          "date": "2024",
          "datePrecision": "year",
          "sourceIds": [
            "nextdc-1h25-openings"
          ],
          "note": "The half-year accounts state that customer opening occurred during July-December 2024 (1H FY25). Exact month/day was not disclosed. A later launch ceremony would be a separate event."
        }
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-fy26"
          ],
          "note": "The operator identifies NEXTDC A1 Adelaide; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-fy26"
          ],
          "note": "A separate current built/commissioned capacity allocation was not found for A1. Directory design specifications cannot fill the 69.8 MW difference between NEXTDC's Australian aggregate and named-site subtotal. The separate 2 MW construction scope is reaffirmed by FY26 p 18."
        }
      ]
    },
    {
      "id": "nextdc-b1",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-b1",
      "name": "NEXTDC B1 Brisbane",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Brisbane",
      "region": "Queensland",
      "lat": -27.4655235,
      "lon": 153.0296446,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "nextdc-b1-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-directory",
            "nextdc-operating-edge"
          ],
          "note": "Operator identifies an operational facility. Commissioned IT capacity has not been separately reconciled; directory design MW is not used as live MW."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "B1 enclave only; no enclave-specific MW published in the selected evidence.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-operating-edge",
        "hcf-register",
        "verify-nextdc-directory",
        "verify-nextdc-b1",
        "verify-nextdc-fy26"
      ],
      "notes": [],
      "address": {
        "street": "20 Wharf Street",
        "locality": "Brisbane City",
        "region": "QLD",
        "postalCode": "4000",
        "country": "AU",
        "sourceIds": [
          "nextdc-addresses-2026"
        ],
        "verifiedOn": "2026-09-11"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "nextdc-contact-locations"
        ],
        "verifiedOn": "2026-09-11",
        "note": "Coordinates are the destination point in NEXTDC’s public Get directions link for this facility. They are not a surveyed boundary or the map viewport centre."
      },
      "commissioningEvents": [
        {
          "id": "nextdc-b1-opening",
          "label": "Facility opened",
          "date": "2011-10",
          "datePrecision": "month",
          "sourceIds": [
            "nextdc-history"
          ],
          "note": "Operator history records the opening month. The current capacity was not necessarily installed at this date; no MW is inferred from the opening event."
        }
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-b1"
          ],
          "note": "The operator identifies NEXTDC B1 Brisbane; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-b1",
            "verify-nextdc-fy26"
          ],
          "note": "A separate current built/commissioned capacity allocation was not found for B1. Directory design specifications cannot fill the 69.8 MW difference between NEXTDC's Australian aggregate and named-site subtotal."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-b1"
          ],
          "note": "This facility page does not disclose an installed GPU inventory with model and count. AI-ready or NVIDIA programme capability is not a hardware inventory."
        }
      ]
    },
    {
      "id": "nextdc-b2",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-b2",
      "name": "NEXTDC B2 Brisbane",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Brisbane",
      "region": "Queensland",
      "lat": -27.4539022,
      "lon": 153.0332005,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 6,
          "mwBasis": "IT",
          "scopeId": "nextdc-b2-operating",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-b2-page"
          ],
          "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply."
        },
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": 2,
          "mwBasis": "IT",
          "scopeId": "nextdc-b2-construction",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-b2-page"
          ],
          "note": "FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "B2 enclave only; no enclave-specific MW published in the selected evidence.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "profile-reviewed",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-fy26",
        "nextdc-b2-page",
        "hcf-register",
        "verify-nextdc-directory",
        "verify-nextdc-fy26"
      ],
      "notes": [
        "Fortitude Valley. Remaining ultimate design capacity is not automatically treated as construction."
      ],
      "address": {
        "street": "454 St Pauls Terrace",
        "locality": "Fortitude Valley",
        "region": "QLD",
        "postalCode": "4006",
        "country": "AU",
        "sourceIds": [
          "nextdc-addresses-2026"
        ],
        "verifiedOn": "2026-09-11"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "nextdc-contact-locations"
        ],
        "verifiedOn": "2026-09-11",
        "note": "Coordinates are the destination point in NEXTDC’s public Get directions link for this facility. They are not a surveyed boundary or the map viewport centre."
      },
      "commissioningEvents": [
        {
          "id": "nextdc-b2-opening",
          "label": "Facility opened",
          "date": "2017-09",
          "datePrecision": "month",
          "sourceIds": [
            "nextdc-history"
          ],
          "note": "Operator history records the opening month. The current capacity was not necessarily installed at this date; no MW is inferred from the opening event."
        }
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-fy26"
          ],
          "note": "The operator identifies NEXTDC B2 Brisbane; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Existing accepted scope values match the named FY26 development disclosures: operating 6 MW IT; construction 2 MW IT. Built means designed power of fitted-out halls; no ultimate-campus amount is added to its included phases."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
        }
      ]
    },
    {
      "id": "nextdc-c1",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-c1",
      "name": "NEXTDC C1 Canberra",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Canberra",
      "region": "Australian Capital Territory",
      "lat": -35.245383,
      "lon": 149.0961936,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "nextdc-c1-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-directory",
            "nextdc-operating-edge"
          ],
          "note": "Operator identifies an operational facility. Commissioned IT capacity has not been separately reconciled; directory design MW is not used as live MW."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "C1 enclave only; no enclave-specific MW published in the selected evidence.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-operating-edge",
        "hcf-register",
        "verify-nextdc-directory",
        "verify-nextdc-c1",
        "verify-nextdc-fy26"
      ],
      "notes": [],
      "address": {
        "street": "19 Battye Street",
        "locality": "Bruce",
        "region": "ACT",
        "postalCode": "2617",
        "country": "AU",
        "sourceIds": [
          "nextdc-addresses-2026"
        ],
        "verifiedOn": "2026-09-11"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "nextdc-contact-locations"
        ],
        "verifiedOn": "2026-09-11",
        "note": "Coordinates are the destination point in NEXTDC’s public Get directions link for this facility. They are not a surveyed boundary or the map viewport centre."
      },
      "commissioningEvents": [
        {
          "id": "nextdc-c1-opening",
          "label": "Facility opened",
          "date": "2012-08",
          "datePrecision": "month",
          "sourceIds": [
            "nextdc-history"
          ],
          "note": "Operator history records the opening month. The current capacity was not necessarily installed at this date; no MW is inferred from the opening event."
        }
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-c1"
          ],
          "note": "The operator identifies NEXTDC C1 Canberra; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-c1",
            "verify-nextdc-fy26"
          ],
          "note": "A separate current built/commissioned capacity allocation was not found for C1. Directory design specifications cannot fill the 69.8 MW difference between NEXTDC's Australian aggregate and named-site subtotal."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-c1"
          ],
          "note": "This facility page does not disclose an installed GPU inventory with model and count. AI-ready or NVIDIA programme capability is not a hardware inventory."
        }
      ]
    },
    {
      "id": "nextdc-d1",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-d1",
      "name": "NEXTDC D1 Darwin",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Darwin",
      "region": "Northern Territory",
      "lat": -12.425354,
      "lon": 130.850039,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "nextdc-d1-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-directory",
            "nextdc-operating-edge"
          ],
          "note": "Operator identifies an operational facility. Commissioned IT capacity has not been separately reconciled; directory design MW is not used as live MW."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "D1 enclave only; no enclave-specific MW published in the selected evidence.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-operating-edge",
        "hcf-register",
        "verify-nextdc-directory",
        "verify-nextdc-fy26",
        "natural-earth-cities"
      ],
      "notes": [
        "City map markers are approximate. No exact facility coordinates have been verified in this release."
      ],
      "address": {
        "street": "2 Harvey Street",
        "locality": "Darwin",
        "region": "NT",
        "postalCode": "0800",
        "country": "AU",
        "sourceIds": [
          "nextdc-addresses-2026"
        ],
        "verifiedOn": "2026-09-11"
      },
      "commissioningEvents": [
        {
          "id": "nextdc-d1-customer-opening",
          "label": "Opened to customers",
          "date": "2024",
          "datePrecision": "year",
          "sourceIds": [
            "nextdc-1h25-openings"
          ],
          "note": "The half-year accounts state that customer opening occurred during July-December 2024 (1H FY25). Exact month/day was not disclosed. A later launch ceremony would be a separate event."
        }
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory"
          ],
          "note": "The operator identifies NEXTDC D1 Darwin; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-fy26"
          ],
          "note": "A separate current built/commissioned capacity allocation was not found for D1. Directory design specifications cannot fill the 69.8 MW difference between NEXTDC's Australian aggregate and named-site subtotal."
        }
      ]
    },
    {
      "id": "nextdc-d2",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-d2",
      "name": "NEXTDC D2 Darwin",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Darwin",
      "region": "Northern Territory",
      "lat": -12.425354,
      "lon": 130.850039,
      "locationPrecision": "city",
      "facilityType": "edge",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "approximate",
          "stage": "construction",
          "mw": 1.5,
          "mwBasis": "IT",
          "scopeId": "nextdc-d2-construction",
          "includedInTotals": true,
          "expectedYear": 2026,
          "dateConfidence": "target",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-d2-page"
          ],
          "note": "Approximately 1.5 MW initial fit-out. Practical completion target 1HFY27 means July–December 2026; the target is not proof of commissioning."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "profile-reviewed",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-fy26",
        "nextdc-d2-page",
        "verify-nextdc-directory",
        "verify-nextdc-fy26",
        "natural-earth-cities"
      ],
      "notes": [
        "The approximately 6 MW+ ultimate plan includes the initial phase and is not added again.",
        "City map markers are approximate. No exact facility coordinates have been verified in this release."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-fy26"
          ],
          "note": "The operator identifies NEXTDC D2 Darwin; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Existing accepted scope values match the named FY26 development disclosures: construction 1.5 MW IT. Built means designed power of fitted-out halls; no ultimate-campus amount is added to its included phases."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
        }
      ]
    },
    {
      "id": "nextdc-gc1",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-gc1",
      "name": "NEXTDC GC1 Gold Coast",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Gold Coast",
      "region": "Queensland",
      "lat": -28.081504,
      "lon": 153.448246,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "approximate",
          "stage": "planned",
          "mw": 6,
          "mwBasis": "IT",
          "scopeId": "nextdc-gc1-planned",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-gc1-page"
          ],
          "note": "Approximately 6 MW target, subject to development approval; design and town planning. Initial 1 MW forms part of this target."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "profile-reviewed",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-fy26",
        "nextdc-gc1-page",
        "verify-nextdc-directory",
        "verify-nextdc-fy26",
        "natural-earth-cities"
      ],
      "notes": [
        "City map markers are approximate. No exact facility coordinates have been verified in this release."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-fy26"
          ],
          "note": "The operator identifies NEXTDC GC1 Gold Coast; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Existing accepted scope values match the named FY26 development disclosures: planned 6 MW IT. Built means designed power of fitted-out halls; no ultimate-campus amount is added to its included phases."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
        }
      ]
    },
    {
      "id": "nextdc-ge1",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-ge1",
      "name": "NEXTDC GE1 Geelong",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Geelong",
      "region": "Victoria",
      "lat": -38.167495,
      "lon": 144.395634,
      "locationPrecision": "city",
      "facilityType": "edge",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "approximate",
          "stage": "construction",
          "mw": 1,
          "mwBasis": "IT",
          "scopeId": "nextdc-ge1-construction",
          "includedInTotals": true,
          "expectedYear": 2027,
          "dateConfidence": "target",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-ge1-page"
          ],
          "note": "Approximately 1 MW initial fit-out. Practical completion target 2HFY27 means January–June 2027; it is not evidence of opening."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "profile-reviewed",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-fy26",
        "nextdc-ge1-page",
        "verify-nextdc-directory",
        "verify-nextdc-fy26",
        "natural-earth-cities"
      ],
      "notes": [
        "Corio. Facility page lists 4.4 MW ultimate IT capacity; FY26 rounds the total plan to approximately 4 MW. Neither is represented as live capacity or added to the initial phase.",
        "City map markers are approximate. No exact facility coordinates have been verified in this release."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-fy26"
          ],
          "note": "The operator identifies NEXTDC GE1 Geelong; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Existing accepted scope values match the named FY26 development disclosures: construction 1 MW IT. Built means designed power of fitted-out halls; no ultimate-campus amount is added to its included phases."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
        }
      ]
    },
    {
      "id": "nextdc-m1",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-m1",
      "name": "NEXTDC M1 Melbourne",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Melbourne",
      "region": "Victoria",
      "lat": -37.8226336,
      "lon": 144.9321061,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "nextdc-m1-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-directory",
            "nextdc-operating-edge"
          ],
          "note": "Operator identifies an operational facility. Commissioned IT capacity has not been separately reconciled; directory design MW is not used as live MW."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "M1 enclave only; no enclave-specific MW published in the selected evidence.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-operating-edge",
        "hcf-register",
        "verify-nextdc-directory",
        "verify-nextdc-m1",
        "verify-nextdc-fy26"
      ],
      "notes": [],
      "address": {
        "street": "826 Lorimer Street",
        "locality": "Port Melbourne",
        "region": "VIC",
        "postalCode": "3207",
        "country": "AU",
        "sourceIds": [
          "nextdc-addresses-2026"
        ],
        "verifiedOn": "2026-09-11"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "nextdc-contact-locations"
        ],
        "verifiedOn": "2026-09-11",
        "note": "Coordinates are the destination point in NEXTDC’s public Get directions link for this facility. They are not a surveyed boundary or the map viewport centre."
      },
      "commissioningEvents": [
        {
          "id": "nextdc-m1-opening",
          "label": "Facility opened",
          "date": "2012-07",
          "datePrecision": "month",
          "sourceIds": [
            "nextdc-history"
          ],
          "note": "Operator history records the opening month. The current capacity was not necessarily installed at this date; no MW is inferred from the opening event."
        }
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-m1"
          ],
          "note": "The operator identifies NEXTDC M1 Melbourne; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-m1",
            "verify-nextdc-fy26"
          ],
          "note": "A separate current built/commissioned capacity allocation was not found for M1. Directory design specifications cannot fill the 69.8 MW difference between NEXTDC's Australian aggregate and named-site subtotal."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-m1"
          ],
          "note": "This facility page does not disclose an installed GPU inventory with model and count. AI-ready or NVIDIA programme capability is not a hardware inventory."
        }
      ]
    },
    {
      "id": "nextdc-m2",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-m2",
      "name": "NEXTDC M2 Melbourne",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Melbourne",
      "region": "Victoria",
      "lat": -37.7080294,
      "lon": 144.8756939,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 60,
          "mwBasis": "IT",
          "scopeId": "nextdc-m2-operating",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-m2-page"
          ],
          "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply."
        },
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": 60,
          "mwBasis": "IT",
          "scopeId": "nextdc-m2-construction",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-m2-page"
          ],
          "note": "FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "M2 enclave only; no enclave-specific MW published in the selected evidence.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "profile-reviewed",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-fy26",
        "nextdc-m2-page",
        "hcf-register",
        "verify-nextdc-directory",
        "verify-nextdc-fy26"
      ],
      "notes": [
        "Tullamarine. Do not add the 120 MW+ ultimate specification to the fitted-out and in-progress phases."
      ],
      "address": {
        "street": "75 Sharps Road",
        "locality": "Tullamarine",
        "region": "VIC",
        "postalCode": "3043",
        "country": "AU",
        "sourceIds": [
          "nextdc-addresses-2026"
        ],
        "verifiedOn": "2026-09-11"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "nextdc-contact-locations"
        ],
        "verifiedOn": "2026-09-11",
        "note": "Coordinates are the destination point in NEXTDC’s public Get directions link for this facility. They are not a surveyed boundary or the map viewport centre."
      },
      "commissioningEvents": [
        {
          "id": "nextdc-m2-opening",
          "label": "Facility opened",
          "date": "2017-11",
          "datePrecision": "month",
          "sourceIds": [
            "nextdc-history"
          ],
          "note": "Operator history records the opening month. The current capacity was not necessarily installed at this date; no MW is inferred from the opening event."
        }
      ],
      "capacityObservations": [
        {
          "id": "nextdc-m2-built-fy25",
          "scopeId": "nextdc-m2-whole-facility-built",
          "date": "2025-08-28",
          "datePrecision": "day",
          "dateBasis": "reported-on",
          "mw": 48,
          "mwBasis": "IT",
          "measure": "built",
          "scope": "facility-total",
          "includedInHistory": true,
          "sourceIds": [
            "nextdc-fy25-history"
          ],
          "note": "Selected report-date observation of total designed IT power in fitted-out halls. Customer-specific investment may still be required. This disclosure date is not the commissioning date. No earlier annual values are inferred."
        },
        {
          "id": "nextdc-m2-built-fy26",
          "scopeId": "nextdc-m2-whole-facility-built",
          "date": "2026-08-27",
          "datePrecision": "day",
          "dateBasis": "reported-on",
          "mw": 60,
          "mwBasis": "IT",
          "measure": "built",
          "scope": "facility-total",
          "includedInHistory": true,
          "sourceIds": [
            "nextdc-fy26"
          ],
          "note": "Selected report-date observation of total designed IT power in fitted-out halls. Customer-specific investment may still be required. This disclosure date is not the commissioning date. No earlier annual values are inferred."
        }
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-fy26"
          ],
          "note": "The operator identifies NEXTDC M2 Melbourne; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Existing accepted scope values match the named FY26 development disclosures: operating 60 MW IT; construction 60 MW IT. Built means designed power of fitted-out halls; no ultimate-campus amount is added to its included phases."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
        }
      ]
    },
    {
      "id": "nextdc-m3",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-m3",
      "name": "NEXTDC M3 Melbourne",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Melbourne",
      "region": "Victoria",
      "lat": -37.818086,
      "lon": 144.97307,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 60,
          "mwBasis": "IT",
          "scopeId": "nextdc-m3-operating",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-m3-page"
          ],
          "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply."
        },
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": 165,
          "mwBasis": "IT",
          "scopeId": "nextdc-m3-construction",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-m3-page"
          ],
          "note": "FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "M3 enclave only; no enclave-specific MW published in the selected evidence.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "profile-reviewed",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-fy26",
        "nextdc-m3-page",
        "hcf-register",
        "verify-nextdc-directory",
        "verify-nextdc-fy26",
        "natural-earth-cities"
      ],
      "notes": [
        "West Footscray. The 225 MW ultimate plan is already represented by the two disclosed phases.",
        "City map markers are approximate. No exact facility coordinates have been verified in this release."
      ],
      "address": {
        "street": "25 Indwe Street",
        "locality": "West Footscray",
        "region": "VIC",
        "postalCode": "3012",
        "country": "AU",
        "sourceIds": [
          "nextdc-addresses-2026"
        ],
        "verifiedOn": "2026-09-11"
      },
      "commissioningEvents": [
        {
          "id": "nextdc-m3-opening",
          "label": "Stage 1 opened",
          "date": "2022-10",
          "datePrecision": "month",
          "sourceIds": [
            "nextdc-history"
          ],
          "note": "Operator history records the opening month. The current capacity was not necessarily installed at this date; no MW is inferred from the opening event."
        }
      ],
      "capacityObservations": [
        {
          "id": "nextdc-m3-built-fy25",
          "scopeId": "nextdc-m3-whole-facility-built",
          "date": "2025-08-28",
          "datePrecision": "day",
          "dateBasis": "reported-on",
          "mw": 18,
          "mwBasis": "IT",
          "measure": "built",
          "scope": "facility-total",
          "includedInHistory": true,
          "sourceIds": [
            "nextdc-fy25-history"
          ],
          "note": "Selected report-date observation of total designed IT power in fitted-out halls. Customer-specific investment may still be required. This disclosure date is not the commissioning date. No earlier annual values are inferred."
        },
        {
          "id": "nextdc-m3-built-fy26",
          "scopeId": "nextdc-m3-whole-facility-built",
          "date": "2026-08-27",
          "datePrecision": "day",
          "dateBasis": "reported-on",
          "mw": 60,
          "mwBasis": "IT",
          "measure": "built",
          "scope": "facility-total",
          "includedInHistory": true,
          "sourceIds": [
            "nextdc-fy26"
          ],
          "note": "Selected report-date observation of total designed IT power in fitted-out halls. Customer-specific investment may still be required. This disclosure date is not the commissioning date. No earlier annual values are inferred."
        }
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-fy26"
          ],
          "note": "The operator identifies NEXTDC M3 Melbourne; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Existing accepted scope values match the named FY26 development disclosures: operating 60 MW IT; construction 165 MW IT. Built means designed power of fitted-out halls; no ultimate-campus amount is added to its included phases."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
        }
      ]
    },
    {
      "id": "nextdc-m4",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-m4",
      "name": "NEXTDC M4 Melbourne",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Melbourne",
      "region": "Victoria",
      "lat": -37.818086,
      "lon": 144.97307,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": 10,
          "mwBasis": "IT",
          "scopeId": "nextdc-m4-construction",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-m4-page"
          ],
          "note": "FY26 page 18 reports early works and 10 MW in progress."
        },
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "planned",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "nextdc-m4-planned",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-m4-page"
          ],
          "note": "Ultimate target is approximately 150 MW including the 10 MW phase. The residual plan has not been independently reconciled; not added to totals."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "profile-reviewed",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-fy26",
        "nextdc-m4-page",
        "verify-nextdc-directory",
        "verify-nextdc-fy26",
        "natural-earth-cities"
      ],
      "notes": [
        "Port Melbourne; development approval obtained. Ultimate and phase specifications must not be added together.",
        "City map markers are approximate. No exact facility coordinates have been verified in this release."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-fy26"
          ],
          "note": "The operator identifies NEXTDC M4 Melbourne; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Existing accepted scope values match the named FY26 development disclosures: construction 10 MW IT; planned unknown. Built means designed power of fitted-out halls; no ultimate-campus amount is added to its included phases."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
        }
      ]
    },
    {
      "id": "nextdc-m5",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-m5",
      "name": "NEXTDC M5 Melbourne",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Melbourne",
      "region": "Victoria",
      "lat": -37.818086,
      "lon": 144.97307,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "approximate",
          "stage": "planned",
          "mw": 1200,
          "mwBasis": "IT",
          "scopeId": "nextdc-m5-planned",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26"
          ],
          "note": "FY26 target approximately 1.2 GW, subject to development approval; design and town planning. Converted at 1 GW = 1,000 MW."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "profile-reviewed",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-fy26",
        "verify-nextdc-directory",
        "verify-nextdc-fy26",
        "natural-earth-cities"
      ],
      "notes": [
        "City-level location only. Initial capacity and delivery timing are not disclosed in the selected evidence.",
        "City map markers are approximate. No exact facility coordinates have been verified in this release."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-fy26"
          ],
          "note": "The operator identifies NEXTDC M5 Melbourne; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Existing accepted scope values match the named FY26 development disclosures: planned 1200 MW IT. Built means designed power of fitted-out halls; no ultimate-campus amount is added to its included phases."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
        }
      ]
    },
    {
      "id": "nextdc-ne1",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-ne1",
      "name": "NEXTDC NE1 Newman",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Newman",
      "region": "Western Australia",
      "lat": -23.366598,
      "lon": 119.733301,
      "locationPrecision": "city",
      "facilityType": "edge",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "nextdc-ne1-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-directory",
            "nextdc-operating-edge"
          ],
          "note": "Operator identifies an operational facility. Commissioned IT capacity has not been separately reconciled; directory design MW is not used as live MW."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-operating-edge",
        "verify-nextdc-directory",
        "verify-nextdc-fy26",
        "natural-earth-cities"
      ],
      "notes": [
        "City map markers are approximate. No exact facility coordinates have been verified in this release."
      ],
      "address": {
        "street": "96 Woodstock Street",
        "locality": "Newman",
        "region": "WA",
        "postalCode": "6753",
        "country": "AU",
        "sourceIds": [
          "nextdc-addresses-2026"
        ],
        "verifiedOn": "2026-09-11"
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory"
          ],
          "note": "The operator identifies NEXTDC NE1 Newman; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-fy26"
          ],
          "note": "A separate current built/commissioned capacity allocation was not found for NE1. Directory design specifications cannot fill the 69.8 MW difference between NEXTDC's Australian aggregate and named-site subtotal."
        }
      ]
    },
    {
      "id": "nextdc-p1",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-p1",
      "name": "NEXTDC P1 Perth",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Perth",
      "region": "Western Australia",
      "lat": -31.8644016,
      "lon": 115.895935,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 5.5,
          "mwBasis": "IT",
          "scopeId": "nextdc-p1-operating",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-p1-page"
          ],
          "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply."
        },
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": 2,
          "mwBasis": "IT",
          "scopeId": "nextdc-p1-construction",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-p1-page"
          ],
          "note": "FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "P1 enclave only; no enclave-specific MW published in the selected evidence.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "profile-reviewed",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-fy26",
        "nextdc-p1-page",
        "hcf-register",
        "verify-nextdc-directory",
        "verify-nextdc-fy26"
      ],
      "notes": [
        "Malaga. The 10 MW+ design headline includes future expansion and is not added to these phases."
      ],
      "address": {
        "street": "4 Millrose Drive",
        "locality": "Malaga",
        "region": "WA",
        "postalCode": "6090",
        "country": "AU",
        "sourceIds": [
          "nextdc-addresses-2026"
        ],
        "verifiedOn": "2026-09-11"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "nextdc-contact-locations"
        ],
        "verifiedOn": "2026-09-11",
        "note": "Coordinates are the destination point in NEXTDC’s public Get directions link for this facility. They are not a surveyed boundary or the map viewport centre."
      },
      "commissioningEvents": [
        {
          "id": "nextdc-p1-opening",
          "label": "Facility opened",
          "date": "2014-02",
          "datePrecision": "month",
          "sourceIds": [
            "nextdc-history"
          ],
          "note": "Operator history records the opening month. The current capacity was not necessarily installed at this date; no MW is inferred from the opening event."
        }
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-fy26"
          ],
          "note": "The operator identifies NEXTDC P1 Perth; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Existing accepted scope values match the named FY26 development disclosures: operating 5.5 MW IT; construction 2 MW IT. Built means designed power of fitted-out halls; no ultimate-campus amount is added to its included phases."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
        }
      ]
    },
    {
      "id": "nextdc-p2",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-p2",
      "name": "NEXTDC P2 Perth",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Perth",
      "region": "Western Australia",
      "lat": -31.9496948,
      "lon": 115.8685493,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 6,
          "mwBasis": "IT",
          "scopeId": "nextdc-p2-operating",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-p2-page"
          ],
          "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply."
        },
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": 4,
          "mwBasis": "IT",
          "scopeId": "nextdc-p2-construction",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-p2-page"
          ],
          "note": "FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "P2 enclave only; no enclave-specific MW published in the selected evidence.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "profile-reviewed",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-fy26",
        "nextdc-p2-page",
        "hcf-register",
        "verify-nextdc-directory",
        "verify-nextdc-fy26"
      ],
      "notes": [
        "Perth CBD. Ultimate design capacity is not fully fitted out in the selected FY26 disclosure."
      ],
      "address": {
        "street": "11 Newcastle Street",
        "locality": "Perth",
        "region": "WA",
        "postalCode": "6000",
        "country": "AU",
        "sourceIds": [
          "nextdc-addresses-2026"
        ],
        "verifiedOn": "2026-09-11"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "nextdc-contact-locations"
        ],
        "verifiedOn": "2026-09-11",
        "note": "Coordinates are the destination point in NEXTDC’s public Get directions link for this facility. They are not a surveyed boundary or the map viewport centre."
      },
      "commissioningEvents": [
        {
          "id": "nextdc-p2-commissioning",
          "label": "Facility commissioned",
          "date": "2020-07",
          "datePrecision": "month",
          "sourceIds": [
            "nextdc-p2-commissioning"
          ],
          "note": "The operator states P2 was fully commissioned in July 2020. This is distinct from the earlier P2 microsite. No MW is inferred."
        }
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-fy26"
          ],
          "note": "The operator identifies NEXTDC P2 Perth; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Existing accepted scope values match the named FY26 development disclosures: operating 6 MW IT; construction 4 MW IT. Built means designed power of fitted-out halls; no ultimate-campus amount is added to its included phases."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
        }
      ]
    },
    {
      "id": "nextdc-ph1",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-ph1",
      "name": "NEXTDC PH1 Port Hedland",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Port Hedland",
      "region": "Western Australia",
      "lat": -20.310402,
      "lon": 118.606032,
      "locationPrecision": "city",
      "facilityType": "edge",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "nextdc-ph1-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-directory",
            "nextdc-operating-edge"
          ],
          "note": "Operator identifies an operational facility. Commissioned IT capacity has not been separately reconciled; directory design MW is not used as live MW."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-operating-edge",
        "verify-nextdc-directory",
        "verify-nextdc-fy26",
        "natural-earth-cities"
      ],
      "notes": [
        "City map markers are approximate. No exact facility coordinates have been verified in this release."
      ],
      "address": {
        "street": "17 Loreto Circuit",
        "locality": "Port Hedland",
        "region": "WA",
        "postalCode": "6721",
        "country": "AU",
        "sourceIds": [
          "nextdc-addresses-2026"
        ],
        "verifiedOn": "2026-09-11"
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory"
          ],
          "note": "The operator identifies NEXTDC PH1 Port Hedland; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-fy26"
          ],
          "note": "A separate current built/commissioned capacity allocation was not found for PH1. Directory design specifications cannot fill the 69.8 MW difference between NEXTDC's Australian aggregate and named-site subtotal."
        }
      ]
    },
    {
      "id": "nextdc-s1",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-s1",
      "name": "NEXTDC S1 Sydney",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Sydney",
      "region": "New South Wales",
      "lat": -33.7852629,
      "lon": 151.1314902,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "nextdc-s1-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-directory",
            "nextdc-operating-edge"
          ],
          "note": "Operator identifies an operational facility. Commissioned IT capacity has not been separately reconciled; directory design MW is not used as live MW."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "S1 enclave only; no enclave-specific MW published in the selected evidence.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-operating-edge",
        "hcf-register",
        "verify-nextdc-directory",
        "verify-nextdc-s1",
        "verify-nextdc-fy26"
      ],
      "notes": [],
      "address": {
        "street": "4 Eden Park Drive",
        "locality": "Macquarie Park",
        "region": "NSW",
        "postalCode": "2113",
        "country": "AU",
        "sourceIds": [
          "nextdc-addresses-2026"
        ],
        "verifiedOn": "2026-09-11"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "nextdc-contact-locations"
        ],
        "verifiedOn": "2026-09-11",
        "note": "Coordinates are the destination point in NEXTDC’s public Get directions link for this facility. They are not a surveyed boundary or the map viewport centre."
      },
      "commissioningEvents": [
        {
          "id": "nextdc-s1-opening",
          "label": "Facility opened",
          "date": "2013-09",
          "datePrecision": "month",
          "sourceIds": [
            "nextdc-history"
          ],
          "note": "Operator history records the opening month. The current capacity was not necessarily installed at this date; no MW is inferred from the opening event."
        }
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-s1"
          ],
          "note": "The operator identifies NEXTDC S1 Sydney; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-s1",
            "verify-nextdc-fy26"
          ],
          "note": "A separate current built/commissioned capacity allocation was not found for S1. Directory design specifications cannot fill the 69.8 MW difference between NEXTDC's Australian aggregate and named-site subtotal."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-s1"
          ],
          "note": "This facility page does not disclose an installed GPU inventory with model and count. AI-ready or NVIDIA programme capability is not a hardware inventory."
        }
      ]
    },
    {
      "id": "nextdc-s2",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-s2",
      "name": "NEXTDC S2 Sydney",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Sydney",
      "region": "New South Wales",
      "lat": -33.785125,
      "lon": 151.1253009,
      "locationPrecision": "site",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "nextdc-s2-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-directory",
            "nextdc-operating-edge"
          ],
          "note": "Operator identifies an operational facility. Commissioned IT capacity has not been separately reconciled; directory design MW is not used as live MW."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "S2 enclave only; no enclave-specific MW published in the selected evidence.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-operating-edge",
        "hcf-register",
        "verify-nextdc-directory",
        "verify-nextdc-s2",
        "verify-nextdc-fy26"
      ],
      "notes": [],
      "address": {
        "street": "6-8 Giffnock Avenue",
        "locality": "Macquarie Park",
        "region": "NSW",
        "postalCode": "2113",
        "country": "AU",
        "sourceIds": [
          "nextdc-addresses-2026"
        ],
        "verifiedOn": "2026-09-11"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "nextdc-contact-locations"
        ],
        "verifiedOn": "2026-09-11",
        "note": "Coordinates are the destination point in NEXTDC’s public Get directions link for this facility. They are not a surveyed boundary or the map viewport centre."
      },
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-s2"
          ],
          "note": "The operator identifies NEXTDC S2 Sydney; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-s2",
            "verify-nextdc-fy26"
          ],
          "note": "A separate current built/commissioned capacity allocation was not found for S2. Directory design specifications cannot fill the 69.8 MW difference between NEXTDC's Australian aggregate and named-site subtotal."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-s2"
          ],
          "note": "This facility page does not disclose an installed GPU inventory with model and count. AI-ready or NVIDIA programme capability is not a hardware inventory."
        }
      ]
    },
    {
      "id": "nextdc-s3",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-s3",
      "name": "NEXTDC S3 Sydney",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Sydney",
      "region": "New South Wales",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 68,
          "mwBasis": "IT",
          "scopeId": "nextdc-s3-operating",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-s3-page"
          ],
          "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply."
        },
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": 12,
          "mwBasis": "IT",
          "scopeId": "nextdc-s3-construction",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-s3-page"
          ],
          "note": "FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
        }
      ],
      "certification": {
        "status": "strategic-enclave",
        "scope": "S3 enclave only; no enclave-specific MW published in the selected evidence.",
        "sourceIds": [
          "hcf-register"
        ]
      },
      "evidenceStatus": "profile-reviewed",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-fy26",
        "nextdc-s3-page",
        "hcf-register",
        "verify-nextdc-directory",
        "verify-nextdc-fy26",
        "natural-earth-cities"
      ],
      "notes": [
        "Artarmon. The 80 MW ultimate specification comprises the built and in-progress phases; it is not added again.",
        "City map markers are approximate. No exact facility coordinates have been verified in this release."
      ],
      "address": {
        "street": "2 Broadcast Way",
        "locality": "Artarmon",
        "region": "NSW",
        "postalCode": "2064",
        "country": "AU",
        "sourceIds": [
          "nextdc-addresses-2026"
        ],
        "verifiedOn": "2026-09-11"
      },
      "commissioningEvents": [
        {
          "id": "nextdc-s3-opening",
          "label": "Stage 1 opened",
          "date": "2022-09",
          "datePrecision": "month",
          "sourceIds": [
            "nextdc-history"
          ],
          "note": "Operator history records the opening month. The current capacity was not necessarily installed at this date; no MW is inferred from the opening event."
        }
      ],
      "capacityObservations": [
        {
          "id": "nextdc-s3-built-fy25",
          "scopeId": "nextdc-s3-whole-facility-built",
          "date": "2025-08-28",
          "datePrecision": "day",
          "dateBasis": "reported-on",
          "mw": 52,
          "mwBasis": "IT",
          "measure": "built",
          "scope": "facility-total",
          "includedInHistory": true,
          "sourceIds": [
            "nextdc-fy25-history"
          ],
          "note": "Selected report-date observation of total designed IT power in fitted-out halls. Customer-specific investment may still be required. This disclosure date is not the commissioning date. No earlier annual values are inferred."
        },
        {
          "id": "nextdc-s3-built-fy26",
          "scopeId": "nextdc-s3-whole-facility-built",
          "date": "2026-08-27",
          "datePrecision": "day",
          "dateBasis": "reported-on",
          "mw": 68,
          "mwBasis": "IT",
          "measure": "built",
          "scope": "facility-total",
          "includedInHistory": true,
          "sourceIds": [
            "nextdc-fy26"
          ],
          "note": "Selected report-date observation of total designed IT power in fitted-out halls. Customer-specific investment may still be required. This disclosure date is not the commissioning date. No earlier annual values are inferred."
        }
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-fy26"
          ],
          "note": "The operator identifies NEXTDC S3 Sydney; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Existing accepted scope values match the named FY26 development disclosures: operating 68 MW IT; construction 12 MW IT. Built means designed power of fitted-out halls; no ultimate-campus amount is added to its included phases."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
        }
      ]
    },
    {
      "id": "nextdc-s4",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-s4",
      "name": "NEXTDC S4 Sydney",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Sydney",
      "region": "New South Wales",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": 250,
          "mwBasis": "IT",
          "scopeId": "nextdc-s4-construction",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-s4-page"
          ],
          "note": "FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
        },
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "planned",
          "mw": 115,
          "mwBasis": "IT",
          "scopeId": "nextdc-s4-planned",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-s4-page"
          ],
          "note": "FY26 page 18 explicitly separates the remaining 115 MW in plan from 250 MW in progress."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "profile-reviewed",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-fy26",
        "nextdc-s4-page",
        "verify-nextdc-directory",
        "verify-nextdc-fy26",
        "natural-earth-cities"
      ],
      "notes": [
        "Horsley Park. FY26 discloses 365 MW total; the facility page's older 350 MW headline is superseded for the numeric split. Separate planning applications are not added as extra sites or capacity.",
        "City map markers are approximate. No exact facility coordinates have been verified in this release."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-fy26"
          ],
          "note": "The operator identifies NEXTDC S4 Sydney; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Existing accepted scope values match the named FY26 development disclosures: construction 250 MW IT; planned 115 MW IT. Built means designed power of fitted-out halls; no ultimate-campus amount is added to its included phases."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
        }
      ]
    },
    {
      "id": "nextdc-s5",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-s5",
      "name": "NEXTDC S5 Sydney",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Sydney",
      "region": "New South Wales",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "minimum",
          "stage": "planned",
          "mw": 80,
          "mwBasis": "IT",
          "scopeId": "nextdc-s5-planned",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-s5-page"
          ],
          "note": "FY26 target approximately 80 MW or more, subject to development approval; design and town planning."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "profile-reviewed",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-fy26",
        "nextdc-s5-page",
        "verify-nextdc-directory",
        "verify-nextdc-fy26",
        "natural-earth-cities"
      ],
      "notes": [
        "Macquarie Park. Initial 20 MW is part of the total target and is not counted again.",
        "City map markers are approximate. No exact facility coordinates have been verified in this release."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-fy26"
          ],
          "note": "The operator identifies NEXTDC S5 Sydney; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Existing accepted scope values match the named FY26 development disclosures: planned 80 MW IT. Built means designed power of fitted-out halls; no ultimate-campus amount is added to its included phases."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
        }
      ]
    },
    {
      "id": "nextdc-s6",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-s6",
      "name": "NEXTDC S6 Sydney",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Sydney",
      "region": "New South Wales",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 2.7,
          "mwBasis": "IT",
          "scopeId": "nextdc-s6-operating",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-s6-page"
          ],
          "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply."
        },
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": 10.8,
          "mwBasis": "IT",
          "scopeId": "nextdc-s6-construction",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-s6-page"
          ],
          "note": "FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "profile-reviewed",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-fy26",
        "nextdc-s6-page",
        "verify-nextdc-directory",
        "verify-nextdc-s6",
        "verify-nextdc-fy26",
        "natural-earth-cities"
      ],
      "notes": [
        "Artarmon. The 13.5 MW target includes both phases; installed GPU numbers remain unverified.",
        "City map markers are approximate. No exact facility coordinates have been verified in this release."
      ],
      "address": {
        "street": "3 Broadcast Way",
        "locality": "Artarmon",
        "region": "NSW",
        "postalCode": "2064",
        "country": "AU",
        "sourceIds": [
          "nextdc-addresses-2026"
        ],
        "verifiedOn": "2026-09-11"
      },
      "commissioningEvents": [
        {
          "id": "nextdc-s6-customer-opening",
          "label": "Opened to customers",
          "date": "2024",
          "datePrecision": "year",
          "sourceIds": [
            "nextdc-1h25-openings"
          ],
          "note": "The half-year accounts state that customer opening occurred during July-December 2024 (1H FY25). Exact month/day was not disclosed. A later launch ceremony would be a separate event."
        }
      ],
      "capacityObservations": [
        {
          "id": "nextdc-s6-built-fy25",
          "scopeId": "nextdc-s6-whole-facility-built",
          "date": "2025-08-28",
          "datePrecision": "day",
          "dateBasis": "reported-on",
          "mw": 2.7,
          "mwBasis": "IT",
          "measure": "built",
          "scope": "facility-total",
          "includedInHistory": true,
          "sourceIds": [
            "nextdc-fy25-history"
          ],
          "note": "Selected report-date observation of total designed IT power in fitted-out halls. Customer-specific investment may still be required. This disclosure date is not the commissioning date. No earlier annual values are inferred."
        },
        {
          "id": "nextdc-s6-built-fy26",
          "scopeId": "nextdc-s6-whole-facility-built",
          "date": "2026-08-27",
          "datePrecision": "day",
          "dateBasis": "reported-on",
          "mw": 2.7,
          "mwBasis": "IT",
          "measure": "built",
          "scope": "facility-total",
          "includedInHistory": true,
          "sourceIds": [
            "nextdc-fy26"
          ],
          "note": "Selected report-date observation of total designed IT power in fitted-out halls. Customer-specific investment may still be required. This disclosure date is not the commissioning date. No earlier annual values are inferred."
        }
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-s6",
            "verify-nextdc-fy26"
          ],
          "note": "The operator identifies NEXTDC S6 Sydney; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Existing accepted scope values match the named FY26 development disclosures: operating 2.7 MW IT; construction 10.8 MW IT. Built means designed power of fitted-out halls; no ultimate-campus amount is added to its included phases."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-s6"
          ],
          "note": "This facility page does not disclose an installed GPU inventory with model and count. AI-ready or NVIDIA programme capability is not a hardware inventory."
        },
        {
          "field": "workloads",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-s6"
          ],
          "note": "Training and inference are explicitly stated design capabilities; deployment-specific inventory and workload share remain unknown."
        }
      ]
    },
    {
      "id": "nextdc-s7",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-s7",
      "name": "NEXTDC S7 Sydney",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Sydney",
      "region": "New South Wales",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "minimum",
          "stage": "planned",
          "mw": 550,
          "mwBasis": "IT",
          "scopeId": "nextdc-s7-planned",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-s7-page"
          ],
          "note": "FY26 target approximately 550 MW or more, subject to development approval; design and town planning."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "profile-reviewed",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-fy26",
        "nextdc-s7-page",
        "verify-nextdc-directory",
        "verify-nextdc-s7",
        "verify-nextdc-fy26",
        "verify-nextdc-openai",
        "natural-earth-cities"
      ],
      "notes": [
        "Eastern Creek; an announced development target is not built supply.",
        "City map markers are approximate. No exact facility coordinates have been verified in this release."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-s7",
            "verify-nextdc-fy26"
          ],
          "note": "The operator identifies NEXTDC S7 Sydney; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Existing accepted scope values match the named FY26 development disclosures: planned 550 MW IT. Built means designed power of fitted-out halls; no ultimate-campus amount is added to its included phases."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-s7"
          ],
          "note": "This facility page does not disclose an installed GPU inventory with model and count. AI-ready or NVIDIA programme capability is not a hardware inventory."
        },
        {
          "field": "contracts",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-openai"
          ],
          "note": "OpenAI MoU announced 2025-12-05. This review does not establish a binding capacity lease, contract MW or GPU quantities."
        }
      ]
    },
    {
      "id": "nextdc-sc1",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-sc1",
      "name": "NEXTDC SC1 Sunshine Coast",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Sunshine Coast",
      "region": "Queensland",
      "lat": -26.679988,
      "lon": 153.050027,
      "locationPrecision": "city",
      "facilityType": "edge",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "nextdc-sc1-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-directory",
            "nextdc-operating-edge"
          ],
          "note": "Operator identifies an operational facility. Commissioned IT capacity has not been separately reconciled; directory design MW is not used as live MW."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-operating-edge",
        "verify-nextdc-directory",
        "verify-nextdc-fy26",
        "natural-earth-cities"
      ],
      "notes": [
        "City map markers are approximate. No exact facility coordinates have been verified in this release."
      ],
      "address": {
        "street": "44 Maud Street",
        "locality": "Maroochydore",
        "region": "QLD",
        "postalCode": "4558",
        "country": "AU",
        "sourceIds": [
          "nextdc-addresses-2026"
        ],
        "verifiedOn": "2026-09-11"
      },
      "commissioningEvents": [
        {
          "id": "nextdc-sc1-opening",
          "label": "Facility opened",
          "date": "2021-12",
          "datePrecision": "month",
          "sourceIds": [
            "nextdc-history"
          ],
          "note": "Operator history records the opening month. The current capacity was not necessarily installed at this date; no MW is inferred from the opening event."
        }
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory"
          ],
          "note": "The operator identifies NEXTDC SC1 Sunshine Coast; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-fy26"
          ],
          "note": "A separate current built/commissioned capacity allocation was not found for SC1. Directory design specifications cannot fill the 69.8 MW difference between NEXTDC's Australian aggregate and named-site subtotal."
        }
      ]
    },
    {
      "id": "nextdc-sc2",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-sc2",
      "name": "NEXTDC SC2 Sunshine Coast",
      "operator": "NEXTDC",
      "country": "AU",
      "city": "Sunshine Coast",
      "region": "Queensland",
      "lat": -26.679988,
      "lon": 153.050027,
      "locationPrecision": "city",
      "facilityType": "edge",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "approximate",
          "stage": "construction",
          "mw": 1,
          "mwBasis": "IT",
          "scopeId": "nextdc-sc2-construction",
          "includedInTotals": true,
          "expectedYear": 2027,
          "dateConfidence": "target",
          "sourceIds": [
            "nextdc-fy26"
          ],
          "note": "Approximately 1 MW initial fit-out. Practical completion target 1HFY28 means July–December 2027; not a guaranteed operating date."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "profile-reviewed",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-fy26",
        "verify-nextdc-directory",
        "verify-nextdc-fy26",
        "natural-earth-cities"
      ],
      "notes": [
        "The 6 MW ultimate development plan includes this initial phase.",
        "City map markers are approximate. No exact facility coordinates have been verified in this release."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-fy26"
          ],
          "note": "The operator identifies NEXTDC SC2 Sunshine Coast; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Existing accepted scope values match the named FY26 development disclosures: construction 1 MW IT. Built means designed power of fitted-out halls; no ultimate-campus amount is added to its included phases."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
        }
      ]
    },
    {
      "id": "pawsey-kensington",
      "name": "Pawsey Supercomputing Research Centre",
      "operator": "Pawsey",
      "country": "AU",
      "region": "WA",
      "city": "Perth",
      "entityKind": "facility",
      "physicalSiteId": "pawsey-kensington",
      "lat": -31.992603,
      "lon": 115.883842,
      "locationPrecision": "site",
      "facilityType": "enterprise",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "pawsey-kensington-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-pawsey-facility",
            "exp-pawsey-map"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-pawsey-facility",
        "exp-pawsey-map"
      ],
      "notes": [
        "Research/HPC facility, not a public colocation capacity claim."
      ],
      "address": {
        "street": "1 Bryce Avenue",
        "locality": "Kensington",
        "region": "WA",
        "postalCode": "6151",
        "country": "AU",
        "sourceIds": [
          "exp-pawsey-map"
        ],
        "verifiedOn": "2026-09-11"
      },
      "locationEvidence": {
        "method": "operator-map",
        "sourceIds": [
          "exp-pawsey-map"
        ],
        "verifiedOn": "2026-09-11",
        "note": "Coordinate is the marker literal supplied by the operator's contact-page map."
      }
    },
    {
      "id": "polaris-springfield",
      "name": "Polaris Springfield Central",
      "operator": "Polaris Data Centre",
      "city": "Brisbane",
      "region": "Queensland",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "polaris-springfield",
      "lat": -27.453085,
      "lon": 153.033147,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "polaris-springfield-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-polaris"
          ],
          "note": "Operating colocation offering is described by the operator; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-polaris",
        "natural-earth-cities"
      ],
      "notes": [
        "Advertised 9 MW is design IT capacity, so it is not included as commissioned capacity."
      ],
      "address": {
        "street": "11 Mary Mackenroth Lane",
        "locality": "Springfield Central",
        "region": "Queensland",
        "postalCode": "4300",
        "country": "AU",
        "sourceIds": [
          "exp-polaris"
        ],
        "verifiedOn": "2026-09-11"
      }
    },
    {
      "id": "quinbrook-supernode",
      "name": "Supernode data centre campus",
      "operator": "Quinbrook",
      "city": "Brisbane",
      "region": "QLD",
      "country": "AU",
      "entityKind": "campus",
      "physicalSiteId": "quinbrook-supernode",
      "lat": -27.453085,
      "lon": 153.033147,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "planned",
          "mw": 500,
          "mwBasis": "IT",
          "scopeId": "quinbrook-supernode-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-quinbrook-supernode"
          ],
          "note": "500 MW-IT is potential full campus capacity. Excluded from disclosed pipeline totals pending assessment of committed development scope; battery MW and MWh are unrelated."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-quinbrook-supernode",
        "natural-earth-cities"
      ],
      "notes": [
        "Planned data centre development at Brendale is distinct from the campus battery project. Operational battery stages do not establish operating data centre capacity."
      ]
    },
    {
      "id": "stack-mel01",
      "name": "STACK MEL01 campus",
      "operator": "STACK Infrastructure",
      "city": "Melbourne",
      "region": "Victoria",
      "country": "AU",
      "entityKind": "campus",
      "physicalSiteId": "stack-mel01",
      "lat": -37.818086,
      "lon": 144.97307,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "stack-mel01-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-stack-mel01",
            "exp-stack-opening"
          ],
          "note": "Current operator listing verifies the facility; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-stack-mel01",
        "exp-stack-opening",
        "natural-earth-cities"
      ],
      "notes": [
        "Truganina campus. MEL01A, B, C and D remain within one physical-site record. Marketing campus power and the 2023 completion announcement require phase reconciliation before MW aggregation."
      ]
    },
    {
      "id": "stack-mel02",
      "name": "STACK MEL02 campus",
      "operator": "STACK Infrastructure",
      "city": "Melbourne",
      "region": "Victoria",
      "country": "AU",
      "entityKind": "campus",
      "physicalSiteId": "stack-mel02",
      "lat": -37.818086,
      "lon": 144.97307,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "unknown",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "stack-mel02-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-stack-mel02"
          ],
          "note": "Campus identity verified; current commissioning or construction status not established by the portfolio page."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-stack-mel02",
        "natural-earth-cities"
      ],
      "notes": [
        "Distinct from nearby MEL01; Truganina locality disclosed."
      ]
    },
    {
      "id": "stack-syd01",
      "name": "STACK SYD01 campus",
      "operator": "STACK Infrastructure",
      "city": "Sydney",
      "region": "New South Wales",
      "country": "AU",
      "entityKind": "campus",
      "physicalSiteId": "stack-syd01",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "unknown",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "stack-syd01-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-stack-sydney"
          ],
          "note": "Named campus is listed by the operator; its current lifecycle is unverified."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-stack-sydney",
        "natural-earth-cities"
      ],
      "notes": []
    },
    {
      "id": "telstra-clayton",
      "name": "Telstra InfraCo Clayton",
      "operator": "Telstra InfraCo",
      "city": "Melbourne",
      "region": "Victoria",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "telstra-clayton",
      "lat": -37.818086,
      "lon": 144.97307,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "telstra-clayton-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-telstra-colocation"
          ],
          "note": "Current operator listing verifies the facility; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-telstra-colocation",
        "au-profile-telstra-colocation-20260911",
        "au-profile-telstra-brochure-20260911",
        "natural-earth-cities"
      ],
      "notes": [],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911"
          ],
          "note": "The operator explicitly names this facility among its seven Australian data centres."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911"
          ],
          "note": "The current operator page says it operates the seven named data centres, supporting the existing operating classification."
        },
        {
          "field": "address",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911",
            "au-profile-telstra-brochure-20260911"
          ],
          "note": "No public street address for this facility was identified in the reviewed operator page and, where applicable, linked brochure. This does not assert that no address is public elsewhere."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911",
            "au-profile-telstra-brochure-20260911"
          ],
          "note": "No commissioned IT total is established. The brochure specifies target power capacity; dual feeds and generator ratings must not be counted as IT load."
        }
      ]
    },
    {
      "id": "telstra-deakin",
      "name": "Telstra InfraCo Deakin",
      "operator": "Telstra InfraCo",
      "city": "Canberra",
      "region": "Australian Capital Territory",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "telstra-deakin",
      "lat": -35.283029,
      "lon": 149.129026,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "telstra-deakin-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-telstra-colocation"
          ],
          "note": "Current operator listing verifies the facility; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-telstra-colocation",
        "au-profile-telstra-colocation-20260911",
        "au-profile-telstra-brochure-20260911",
        "natural-earth-cities"
      ],
      "notes": [],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911"
          ],
          "note": "The operator explicitly names this facility among its seven Australian data centres."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911"
          ],
          "note": "The current operator page says it operates the seven named data centres, supporting the existing operating classification."
        },
        {
          "field": "address",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911",
            "au-profile-telstra-brochure-20260911"
          ],
          "note": "No public street address for this facility was identified in the reviewed operator page and, where applicable, linked brochure. This does not assert that no address is public elsewhere."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911",
            "au-profile-telstra-brochure-20260911"
          ],
          "note": "No commissioned IT total is established. The brochure specifies target power capacity; dual feeds and generator ratings must not be counted as IT load."
        }
      ]
    },
    {
      "id": "telstra-exhibition",
      "name": "Telstra InfraCo Exhibition",
      "operator": "Telstra InfraCo",
      "city": "Melbourne",
      "region": "Victoria",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "telstra-exhibition",
      "lat": -37.818086,
      "lon": 144.97307,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "telstra-exhibition-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-telstra-colocation"
          ],
          "note": "Current operator listing verifies the facility; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-telstra-colocation",
        "au-profile-telstra-colocation-20260911",
        "natural-earth-cities"
      ],
      "notes": [],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911"
          ],
          "note": "The operator explicitly names this facility among its seven Australian data centres."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911"
          ],
          "note": "The current operator page says it operates the seven named data centres, supporting the existing operating classification."
        },
        {
          "field": "address",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911"
          ],
          "note": "No public street address for this facility was identified in the reviewed operator page and, where applicable, linked brochure. This does not assert that no address is public elsewhere."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911"
          ],
          "note": "No facility-specific commissioned IT load was found in the reviewed operator page."
        }
      ]
    },
    {
      "id": "telstra-st-leonards",
      "name": "Telstra InfraCo St Leonards",
      "operator": "Telstra InfraCo",
      "city": "Sydney",
      "region": "New South Wales",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "telstra-st-leonards",
      "lat": -33.871373,
      "lon": 151.212548,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "telstra-st-leonards-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-telstra-colocation"
          ],
          "note": "Current operator listing verifies the facility; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-telstra-colocation",
        "au-profile-telstra-colocation-20260911",
        "au-profile-telstra-brochure-20260911",
        "natural-earth-cities"
      ],
      "notes": [],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911"
          ],
          "note": "The operator explicitly names this facility among its seven Australian data centres."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911"
          ],
          "note": "The current operator page says it operates the seven named data centres, supporting the existing operating classification."
        },
        {
          "field": "address",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911",
            "au-profile-telstra-brochure-20260911"
          ],
          "note": "No public street address for this facility was identified in the reviewed operator page and, where applicable, linked brochure. This does not assert that no address is public elsewhere."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911",
            "au-profile-telstra-brochure-20260911"
          ],
          "note": "No commissioned IT total is established. The brochure specifies target power capacity; dual feeds and generator ratings must not be counted as IT load."
        }
      ]
    },
    {
      "id": "telstra-waymouth",
      "name": "Telstra InfraCo Waymouth",
      "operator": "Telstra InfraCo",
      "city": "Adelaide",
      "region": "South Australia",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "telstra-waymouth",
      "lat": -34.933042,
      "lon": 138.598059,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "telstra-waymouth-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-telstra-colocation"
          ],
          "note": "Current operator listing verifies the facility; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-telstra-colocation",
        "au-profile-telstra-colocation-20260911",
        "natural-earth-cities"
      ],
      "notes": [],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911"
          ],
          "note": "The operator explicitly names this facility among its seven Australian data centres."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911"
          ],
          "note": "The current operator page says it operates the seven named data centres, supporting the existing operating classification."
        },
        {
          "field": "address",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911"
          ],
          "note": "No public street address for this facility was identified in the reviewed operator page and, where applicable, linked brochure. This does not assert that no address is public elsewhere."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911"
          ],
          "note": "No facility-specific commissioned IT load was found in the reviewed operator page."
        }
      ]
    },
    {
      "id": "telstra-wellington",
      "name": "Telstra InfraCo Wellington",
      "operator": "Telstra InfraCo",
      "city": "Perth",
      "region": "Western Australia",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "telstra-wellington",
      "lat": -31.953069,
      "lon": 115.838053,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "telstra-wellington-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-telstra-colocation"
          ],
          "note": "Current operator listing verifies the facility; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-telstra-colocation",
        "au-profile-telstra-colocation-20260911",
        "natural-earth-cities"
      ],
      "notes": [],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911"
          ],
          "note": "The operator explicitly names this facility among its seven Australian data centres."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911"
          ],
          "note": "The current operator page says it operates the seven named data centres, supporting the existing operating classification."
        },
        {
          "field": "address",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911"
          ],
          "note": "No public street address for this facility was identified in the reviewed operator page and, where applicable, linked brochure. This does not assert that no address is public elsewhere."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911"
          ],
          "note": "No facility-specific commissioned IT load was found in the reviewed operator page."
        }
      ]
    },
    {
      "id": "telstra-woolloongabba",
      "name": "Telstra InfraCo Woolloongabba",
      "operator": "Telstra InfraCo",
      "city": "Brisbane",
      "region": "Queensland",
      "country": "AU",
      "entityKind": "facility",
      "physicalSiteId": "telstra-woolloongabba",
      "lat": -27.453085,
      "lon": 153.033147,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "telstra-woolloongabba-unquantified",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-telstra-colocation"
          ],
          "note": "Current operator listing verifies the facility; commissioned IT capacity has not been established."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-telstra-colocation",
        "au-profile-telstra-colocation-20260911",
        "natural-earth-cities"
      ],
      "notes": [],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911"
          ],
          "note": "The operator explicitly names this facility among its seven Australian data centres."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911"
          ],
          "note": "The current operator page says it operates the seven named data centres, supporting the existing operating classification."
        },
        {
          "field": "address",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911"
          ],
          "note": "No public street address for this facility was identified in the reviewed operator page and, where applicable, linked brochure. This does not assert that no address is public elsewhere."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "au-profile-telstra-colocation-20260911"
          ],
          "note": "No facility-specific commissioned IT load was found in the reviewed operator page."
        }
      ]
    },
    {
      "id": "vantage-mel1",
      "entityKind": "campus",
      "physicalSiteId": "vantage-mel1",
      "name": "Vantage MEL1 Melbourne",
      "operator": "Vantage Data Centers",
      "country": "AU",
      "region": "VIC",
      "city": "Melbourne",
      "lat": -37.818086,
      "lon": 144.97307,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "unknown",
          "mw": 64,
          "mwBasis": "IT",
          "scopeId": "vantage-mel1-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-vantage-mel1"
          ],
          "note": "64 MW critical IT is advertised future campus capacity. Lifecycle and actual deployed capacity not confirmed from a dated source."
        }
      ],
      "certification": {
        "status": "unknown",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-vantage-mel1",
        "natural-earth-cities"
      ],
      "notes": [
        "64 MW critical IT is advertised future campus capacity. Lifecycle and actual deployed capacity not confirmed from a dated source."
      ]
    },
    {
      "id": "cdc-hobsonville-one",
      "name": "CDC Hobsonville Campus One",
      "operator": "CDC",
      "country": "NZ",
      "region": "Auckland",
      "city": "Auckland",
      "entityKind": "campus",
      "physicalSiteId": "cdc-hobsonville-one",
      "lat": -36.848055,
      "lon": 174.763027,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 22,
          "mwBasis": "unknown",
          "scopeId": "cdc-hobsonville-one-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-cdc-auckland"
          ],
          "note": "Explicit operating capacity at campus scope; IT versus total facility power is not defined, so excluded from IT subtotals."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-cdc-auckland",
        "verify-cdc-auckland-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate.",
        "Campus buildings are not counted as additional facility records."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-auckland-20260911"
          ],
          "note": "The operator identifies this named campus on its own location page."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-auckland-20260911"
          ],
          "note": "The three campuses explicitly report operating capacity of 22, 22 and 54 MW respectively. The page does not define IT versus whole-facility electrical power."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-auckland-20260911"
          ],
          "note": "No site-level GPU model and quantity inventory is published in the location page checked."
        },
        {
          "field": "workloads",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-auckland-20260911"
          ],
          "note": "The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-auckland-20260911"
          ],
          "note": "No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-auckland-20260911"
          ],
          "note": "The three campuses explicitly report operating capacity of 22, 22 and 54 MW respectively. The page does not define IT versus whole-facility electrical power."
        }
      ]
    },
    {
      "id": "cdc-hobsonville-two",
      "name": "CDC Hobsonville Campus Two",
      "operator": "CDC",
      "country": "NZ",
      "region": "Auckland",
      "city": "Auckland",
      "entityKind": "campus",
      "physicalSiteId": "cdc-hobsonville-two",
      "lat": -36.848055,
      "lon": 174.763027,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 54,
          "mwBasis": "unknown",
          "scopeId": "cdc-hobsonville-two-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-cdc-auckland"
          ],
          "note": "Explicit operating capacity at campus scope; IT versus total facility power is not defined, so excluded from IT subtotals."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-cdc-auckland",
        "verify-cdc-auckland-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate.",
        "Campus buildings are not counted as additional facility records."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-auckland-20260911"
          ],
          "note": "The operator identifies this named campus on its own location page."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-auckland-20260911"
          ],
          "note": "The three campuses explicitly report operating capacity of 22, 22 and 54 MW respectively. The page does not define IT versus whole-facility electrical power."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-auckland-20260911"
          ],
          "note": "No site-level GPU model and quantity inventory is published in the location page checked."
        },
        {
          "field": "workloads",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-auckland-20260911"
          ],
          "note": "The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-auckland-20260911"
          ],
          "note": "No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-auckland-20260911"
          ],
          "note": "The three campuses explicitly report operating capacity of 22, 22 and 54 MW respectively. The page does not define IT versus whole-facility electrical power."
        }
      ]
    },
    {
      "id": "cdc-silverdale-one",
      "name": "CDC Silverdale Campus One",
      "operator": "CDC",
      "country": "NZ",
      "region": "Auckland",
      "city": "Auckland",
      "entityKind": "campus",
      "physicalSiteId": "cdc-silverdale-one",
      "lat": -36.848055,
      "lon": 174.763027,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": 22,
          "mwBasis": "unknown",
          "scopeId": "cdc-silverdale-one-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-cdc-auckland"
          ],
          "note": "Explicit operating capacity at campus scope; IT versus total facility power is not defined, so excluded from IT subtotals."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-cdc-auckland",
        "verify-cdc-auckland-20260911",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate.",
        "Campus buildings are not counted as additional facility records."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-auckland-20260911"
          ],
          "note": "The operator identifies this named campus on its own location page."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-auckland-20260911"
          ],
          "note": "The three campuses explicitly report operating capacity of 22, 22 and 54 MW respectively. The page does not define IT versus whole-facility electrical power."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-auckland-20260911"
          ],
          "note": "No site-level GPU model and quantity inventory is published in the location page checked."
        },
        {
          "field": "workloads",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-auckland-20260911"
          ],
          "note": "The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads."
        },
        {
          "field": "contracts",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-auckland-20260911"
          ],
          "note": "No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-cdc-auckland-20260911"
          ],
          "note": "The three campuses explicitly report operating capacity of 22, 22 and 54 MW respectively. The page does not define IT versus whole-facility electrical power."
        }
      ]
    },
    {
      "id": "datacom-abel",
      "name": "Datacom Abel Wellington",
      "operator": "Datacom",
      "country": "NZ",
      "region": "Wellington",
      "city": "Wellington",
      "entityKind": "facility",
      "physicalSiteId": "datacom-abel",
      "lat": -41.292068,
      "lon": 174.777201,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "datacom-abel-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-datacom-locations"
          ],
          "note": "Operator advertises colocation at this named NZ facility. MW is not converted from rack counts or scalable power limits."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-datacom-locations",
        "verify-datacom-locations",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-datacom-locations"
          ],
          "note": "Datacom's current location cards name this New Zealand facility."
        }
      ]
    },
    {
      "id": "datacom-gloucester",
      "name": "Datacom Gloucester Christchurch",
      "operator": "Datacom",
      "country": "NZ",
      "region": "Canterbury",
      "city": "Christchurch",
      "entityKind": "facility",
      "physicalSiteId": "datacom-gloucester",
      "lat": -43.535022,
      "lon": 172.630023,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "datacom-gloucester-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-datacom-locations"
          ],
          "note": "Operator advertises colocation at this named NZ facility. MW is not converted from rack counts or scalable power limits."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-datacom-locations",
        "verify-datacom-locations",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-datacom-locations"
          ],
          "note": "Datacom's current location cards name this New Zealand facility."
        }
      ]
    },
    {
      "id": "datacom-highbrook",
      "name": "Datacom Highbrook Auckland South",
      "operator": "Datacom",
      "country": "NZ",
      "region": "Auckland",
      "city": "Auckland",
      "entityKind": "facility",
      "physicalSiteId": "datacom-highbrook",
      "lat": -36.848055,
      "lon": 174.763027,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "datacom-highbrook-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-datacom-locations"
          ],
          "note": "Operator advertises colocation at this named NZ facility. MW is not converted from rack counts or scalable power limits."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-datacom-locations",
        "verify-datacom-highbrook",
        "exp-t4-operating",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate.",
        "Formerly T4 Auckland. Datacom identifies this as the acquired Highbrook facility; the historical T4 profile now redirects here. One physical site is counted."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-datacom-highbrook"
          ],
          "note": "Datacom expressly identifies Highbrook as the acquired T4 Auckland data centre. It is one physical facility, not two current operator sites."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-datacom-highbrook"
          ],
          "note": "Animated feature-counter digits are not a reliable extracted numeric observation, and the MW basis is not sufficiently established as installed IT. No current MW change proposed."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-datacom-highbrook"
          ],
          "note": "No model-and-count GPU deployment inventory was found. Reused customer-story carousel is not evidence that those customers occupy this facility."
        },
        {
          "field": "workloads",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-datacom-highbrook"
          ],
          "note": "The acquired facility will be upgraded for AI-ready high-density workloads and liquid cooling. This is a future upgrade statement, not evidence of installed GPU training or inference clusters."
        }
      ],
      "aliases": [
        "T4 Auckland"
      ]
    },
    {
      "id": "datacom-kapua",
      "name": "Datacom Kapua Hamilton",
      "operator": "Datacom",
      "country": "NZ",
      "region": "Waikato",
      "city": "Hamilton",
      "entityKind": "facility",
      "physicalSiteId": "datacom-kapua",
      "lat": -37.778269,
      "lon": 175.289578,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "datacom-kapua-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-datacom-locations"
          ],
          "note": "Operator advertises colocation at this named NZ facility. MW is not converted from rack counts or scalable power limits."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-datacom-locations",
        "verify-datacom-kapua",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-datacom-kapua"
          ],
          "note": "Datacom's current location cards name this New Zealand facility."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-datacom-kapua"
          ],
          "note": "14 MW is capacity to grow / usable-power specification; current installed IT, phase and date are not established. Keep excluded from installed totals."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-datacom-kapua"
          ],
          "note": "No model-and-count GPU deployment inventory was found. Reused customer-story carousel is not evidence that those customers occupy this facility."
        }
      ]
    },
    {
      "id": "datacom-orbit",
      "name": "Datacom Orbit Auckland North",
      "operator": "Datacom",
      "country": "NZ",
      "region": "Auckland",
      "city": "Auckland",
      "entityKind": "facility",
      "physicalSiteId": "datacom-orbit",
      "lat": -36.848055,
      "lon": 174.763027,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "datacom-orbit-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-datacom-locations"
          ],
          "note": "Operator advertises colocation at this named NZ facility. MW is not converted from rack counts or scalable power limits."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-datacom-locations",
        "verify-datacom-orbit",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-datacom-orbit"
          ],
          "note": "Datacom's current location cards name this New Zealand facility."
        },
        {
          "field": "capacity",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-datacom-orbit"
          ],
          "note": "Animated feature-counter digits are not a reliable extracted numeric observation, and the MW basis is not sufficiently established as installed IT. No current MW change proposed."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-datacom-orbit"
          ],
          "note": "No model-and-count GPU deployment inventory was found. Reused customer-story carousel is not evidence that those customers occupy this facility."
        }
      ]
    },
    {
      "id": "datagrid-makarewa",
      "entityKind": "campus",
      "physicalSiteId": "datagrid-makarewa",
      "name": "Datagrid Makarewa Data Centre Park",
      "operator": "Datagrid",
      "country": "NZ",
      "region": "Southland",
      "city": "Makarewa",
      "lat": null,
      "lon": null,
      "locationPrecision": "unknown",
      "address": {
        "street": "342 and 370 Flora Road East",
        "locality": "Makarewa",
        "region": "Southland",
        "postalCode": "",
        "country": "NZ",
        "sourceIds": [
          "compute-datagrid-sdc-20260911"
        ],
        "verifiedOn": "2026-09-11"
      },
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": "2026-03-13",
          "mwQualifier": "maximum",
          "stage": "planned",
          "mw": 240,
          "mwBasis": "IT",
          "scopeId": "datagrid-makarewa-consented-it",
          "includedInTotals": false,
          "expectedYear": 2028,
          "dateConfidence": "target",
          "sourceIds": [
            "compute-datagrid-sdc-20260911",
            "compute-datagrid-es-20260911",
            "compute-datagrid-mercury-20260911"
          ],
          "note": "Consented design ceiling of up to 240 MW IT across six halls in three modules. A maximum is not an expected phase allocation and is excluded from additive subtotals. The 280 MW marketing headline has a different or unspecified power basis. Full delivery in 2028 is an operator target; the July road-work notice does not establish data-hall construction."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "compute-datagrid-home-20260911",
        "compute-datagrid-sdc-20260911",
        "compute-datagrid-es-20260911",
        "compute-datagrid-mercury-20260911",
        "compute-datagrid-commencement-20260911"
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-datagrid-sdc-20260911",
            "compute-datagrid-home-20260911"
          ],
          "note": "Single Makarewa campus: six halls across three modules. Do not count each hall/module as an independent campus."
        },
        {
          "field": "address",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-datagrid-sdc-20260911"
          ],
          "note": "The council identifies 342 and 370 Flora Road East, Makarewa. No latitude or longitude has been inferred."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-datagrid-sdc-20260911",
            "compute-datagrid-es-20260911"
          ],
          "note": "Up to 240 MW critical IT ceiling in consent summary;280 MW operator headline is a separate non-IT-specified quantity."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-datagrid-sdc-20260911",
            "compute-datagrid-commencement-20260911"
          ],
          "note": "Consented/planned with documented access-road early-works notice; no data-hall construction or opening established."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-datagrid-home-20260911",
            "compute-datagrid-sdc-20260911",
            "compute-datagrid-mercury-20260911"
          ],
          "note": "No accelerator manufacturer/model/unit count found in the reviewed primary sources."
        },
        {
          "field": "workloads",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-datagrid-sdc-20260911",
            "compute-datagrid-es-20260911"
          ],
          "note": "AI training, data processing and storage are explicit proposed uses; no live workload mix or explicit inference claim."
        },
        {
          "field": "contracts",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "compute-datagrid-mercury-20260911"
          ],
          "note": "Mercury 15-year 140 MW power purchase option is public. No public named compute tenant/offtake found in this source set."
        }
      ],
      "notes": [
        "Single 49-hectare campus with six halls across three modules.280 MW marketing headline must not be added to 240 MW permitted IT.",
        "GPU inventory and compute customers remain unknown. Mercury agreement is an electricity price hedge option, not GPU demand or commissioning evidence.",
        "28 July 2026 commencement notice concerns road realignment/upgrades/haul-road works only."
      ]
    },
    {
      "id": "dci-auckland-01",
      "name": "DCI AKL01 Westgate",
      "operator": "DCI Data Centers",
      "country": "NZ",
      "region": "Auckland",
      "city": "Auckland",
      "entityKind": "facility",
      "physicalSiteId": "dci-auckland-westgate",
      "lat": -36.848055,
      "lon": 174.763027,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "dci-auckland-01-operating",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-dci-auckland-01",
            "cov-dci-locations"
          ],
          "note": "Operator describes staffed, available data-centre services; standalone IT MW has not been established."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-dci-auckland-01",
        "cov-dci-locations",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate."
      ]
    },
    {
      "id": "dci-auckland-02",
      "name": "DCI AKL02 North Shore",
      "operator": "DCI Data Centers",
      "country": "NZ",
      "region": "Auckland",
      "city": "Auckland",
      "entityKind": "facility",
      "physicalSiteId": "dci-auckland-02",
      "lat": -36.848055,
      "lon": 174.763027,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "construction",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "dci-auckland-02-construction",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "cov-dci-locations"
          ],
          "note": "Construction is explicitly described as under way. The combined AKL01/AKL02 platform capacity is not allocated to this facility."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "cov-dci-locations",
        "natural-earth-cities"
      ],
      "notes": [
        "Map location, when supplied, represents the city rather than a verified facility coordinate."
      ]
    },
    {
      "id": "nextdc-ak1",
      "entityKind": "facility",
      "physicalSiteId": "nextdc-ak1",
      "name": "NEXTDC AK1 Auckland",
      "operator": "NEXTDC",
      "country": "NZ",
      "city": "Auckland",
      "region": "Auckland",
      "lat": -36.848055,
      "lon": 174.763027,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "minimum",
          "stage": "planned",
          "mw": 15,
          "mwBasis": "IT",
          "scopeId": "nextdc-ak1-planned",
          "includedInTotals": true,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "nextdc-fy26",
            "nextdc-ak1-page"
          ],
          "note": "Approximately 15 MW+ ultimate target subject to consent; FY26 status is under review and resource consent application lodged. No construction or opening inferred."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": null,
        "sourceIds": []
      },
      "evidenceStatus": "profile-reviewed",
      "sourceIds": [
        "nextdc-directory",
        "nextdc-fy26",
        "nextdc-ak1-page",
        "verify-nextdc-directory",
        "verify-nextdc-fy26",
        "natural-earth-cities"
      ],
      "notes": [
        "Initial 1.7 MW forms part of the ultimate plan, not extra capacity. Australian HCF classification does not apply.",
        "City map markers are approximate. No exact facility coordinates have been verified in this release."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-directory",
            "verify-nextdc-fy26"
          ],
          "note": "The operator identifies NEXTDC AK1 Auckland; this pass does not reverify its government certification or exact map coordinates."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Existing accepted scope values match the named FY26 development disclosures: planned 15 MW IT. Built means designed power of fitted-out halls; no ultimate-campus amount is added to its included phases."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-nextdc-fy26"
          ],
          "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
        }
      ]
    },
    {
      "id": "planb-airedale",
      "name": "Plan B Airedale",
      "operator": "Plan B",
      "country": "NZ",
      "region": "Auckland",
      "city": "Auckland",
      "entityKind": "facility",
      "physicalSiteId": "planb-airedale",
      "lat": -36.848055,
      "lon": 174.763027,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "planb-airedale-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-planb-facilities",
            "exp-planb-footprint"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": "Australian Hosting Certification Framework does not apply to this New Zealand facility.",
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-planb-facilities",
        "exp-planb-footprint",
        "natural-earth-cities"
      ],
      "notes": [
        "Fifth primary facility and exact addresses require current operator reconciliation."
      ]
    },
    {
      "id": "planb-middleton",
      "name": "Plan B Middleton",
      "operator": "Plan B",
      "country": "NZ",
      "region": "Canterbury",
      "city": "Christchurch",
      "entityKind": "facility",
      "physicalSiteId": "planb-middleton",
      "lat": -43.535022,
      "lon": 172.630023,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "planb-middleton-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-planb-facilities",
            "exp-planb-footprint"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": "Australian Hosting Certification Framework does not apply to this New Zealand facility.",
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-planb-facilities",
        "exp-planb-footprint",
        "natural-earth-cities"
      ],
      "notes": [
        "Fifth primary facility and exact addresses require current operator reconciliation."
      ]
    },
    {
      "id": "planb-tarndale",
      "name": "Plan B Tarndale",
      "operator": "Plan B",
      "country": "NZ",
      "region": "Auckland",
      "city": "Auckland",
      "entityKind": "facility",
      "physicalSiteId": "planb-tarndale",
      "lat": -36.848055,
      "lon": 174.763027,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "planb-tarndale-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-planb-facilities",
            "exp-planb-footprint"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": "Australian Hosting Certification Framework does not apply to this New Zealand facility.",
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-planb-facilities",
        "exp-planb-footprint",
        "natural-earth-cities"
      ],
      "notes": [
        "Fifth primary facility and exact addresses require current operator reconciliation."
      ]
    },
    {
      "id": "planb-tawa",
      "name": "Plan B Tawa",
      "operator": "Plan B",
      "country": "NZ",
      "region": "Wellington",
      "city": "Wellington",
      "entityKind": "facility",
      "physicalSiteId": "planb-tawa",
      "lat": -41.292068,
      "lon": 174.777201,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "planb-tawa-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-planb-facilities",
            "exp-planb-footprint"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": "Australian Hosting Certification Framework does not apply to this New Zealand facility.",
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-planb-facilities",
        "exp-planb-footprint",
        "natural-earth-cities"
      ],
      "notes": [
        "Fifth primary facility and exact addresses require current operator reconciliation."
      ]
    },
    {
      "id": "t4-whangarei",
      "name": "T4 Whangārei",
      "operator": "T4 NZ Data Centres",
      "country": "NZ",
      "region": "Northland",
      "city": "Whangarei",
      "entityKind": "facility",
      "physicalSiteId": "t4-whangarei",
      "lat": -35.725571,
      "lon": 174.322971,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "t4-whangarei-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-t4-operating"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": "Australian Hosting Certification Framework does not apply to this New Zealand facility.",
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-t4-operating",
        "natural-earth-cities"
      ],
      "notes": []
    },
    {
      "id": "tenpeaks-albany",
      "name": "TenPeaks Albany",
      "operator": "TenPeaks",
      "country": "NZ",
      "region": "Auckland",
      "city": "Auckland",
      "entityKind": "facility",
      "physicalSiteId": "tenpeaks-albany",
      "lat": -36.848055,
      "lon": 174.763027,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "tenpeaks-albany-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-tenpeaks-locations",
            "exp-tenpeaks-history"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": "Australian Hosting Certification Framework does not apply to this New Zealand facility.",
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-tenpeaks-locations",
        "exp-tenpeaks-history",
        "natural-earth-cities"
      ],
      "notes": [
        "Former Spark facility portfolio; no capacity allocated from group totals."
      ]
    },
    {
      "id": "tenpeaks-aotea",
      "name": "TenPeaks Central Aotea",
      "operator": "TenPeaks",
      "country": "NZ",
      "region": "Auckland",
      "city": "Auckland",
      "entityKind": "campus",
      "physicalSiteId": "tenpeaks-aotea",
      "lat": -36.848055,
      "lon": 174.763027,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "tenpeaks-aotea-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-tenpeaks-locations",
            "exp-tenpeaks-history"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": "Australian Hosting Certification Framework does not apply to this New Zealand facility.",
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-tenpeaks-locations",
        "exp-tenpeaks-history",
        "verify-tenpeaks-central",
        "natural-earth-cities"
      ],
      "notes": [
        "Former Spark facility portfolio; no capacity allocated from group totals."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-tenpeaks-central"
          ],
          "note": "Current TenPeaks named campus page reviewed."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-tenpeaks-central"
          ],
          "note": "Body proposes an additional 15 MW building; IT basis and existing installed amount are unspecified. Animated headline counter is not reliable evidence. No comparable installed IT addition is proposed."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-tenpeaks-central"
          ],
          "note": "Existing Mayoral Drive / Airedale campus operating; additional multi-level building in design/site planning."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-tenpeaks-central"
          ],
          "note": "GPU models, installed GPU counts and named compute offtake are not disclosed."
        }
      ]
    },
    {
      "id": "tenpeaks-christchurch-central",
      "name": "TenPeaks Christchurch Central",
      "operator": "TenPeaks",
      "country": "NZ",
      "region": "Canterbury",
      "city": "Christchurch",
      "entityKind": "facility",
      "physicalSiteId": "tenpeaks-christchurch-central",
      "lat": -43.535022,
      "lon": 172.630023,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "tenpeaks-christchurch-central-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-tenpeaks-locations",
            "exp-tenpeaks-history"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": "Australian Hosting Certification Framework does not apply to this New Zealand facility.",
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-tenpeaks-locations",
        "exp-tenpeaks-history",
        "natural-earth-cities"
      ],
      "notes": [
        "Former Spark facility portfolio; no capacity allocated from group totals."
      ]
    },
    {
      "id": "tenpeaks-christchurch-west",
      "name": "TenPeaks Christchurch West",
      "operator": "TenPeaks",
      "country": "NZ",
      "region": "Canterbury",
      "city": "Christchurch",
      "entityKind": "facility",
      "physicalSiteId": "tenpeaks-christchurch-west",
      "lat": -43.535022,
      "lon": 172.630023,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "tenpeaks-christchurch-west-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-tenpeaks-locations",
            "exp-tenpeaks-history"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": "Australian Hosting Certification Framework does not apply to this New Zealand facility.",
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-tenpeaks-locations",
        "exp-tenpeaks-history",
        "natural-earth-cities"
      ],
      "notes": [
        "Former Spark facility portfolio; no capacity allocated from group totals."
      ]
    },
    {
      "id": "tenpeaks-dunedin",
      "name": "TenPeaks Dunedin",
      "operator": "TenPeaks",
      "country": "NZ",
      "region": "Otago",
      "city": "Dunedin",
      "entityKind": "facility",
      "physicalSiteId": "tenpeaks-dunedin",
      "lat": -45.885423,
      "lon": 170.491016,
      "locationPrecision": "city",
      "facilityType": "edge",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "tenpeaks-dunedin-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-tenpeaks-locations",
            "exp-tenpeaks-history"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": "Australian Hosting Certification Framework does not apply to this New Zealand facility.",
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-tenpeaks-locations",
        "exp-tenpeaks-history",
        "natural-earth-cities"
      ],
      "notes": [
        "Former Spark facility portfolio; no capacity allocated from group totals."
      ]
    },
    {
      "id": "tenpeaks-hamilton",
      "name": "TenPeaks Hamilton",
      "operator": "TenPeaks",
      "country": "NZ",
      "region": "Waikato",
      "city": "Hamilton",
      "entityKind": "facility",
      "physicalSiteId": "tenpeaks-hamilton",
      "lat": -37.778269,
      "lon": 175.289578,
      "locationPrecision": "city",
      "facilityType": "edge",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "tenpeaks-hamilton-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-tenpeaks-locations",
            "exp-tenpeaks-history"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": "Australian Hosting Certification Framework does not apply to this New Zealand facility.",
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-tenpeaks-locations",
        "exp-tenpeaks-history",
        "natural-earth-cities"
      ],
      "notes": [
        "Former Spark facility portfolio; no capacity allocated from group totals."
      ]
    },
    {
      "id": "tenpeaks-north",
      "name": "TenPeaks North campus",
      "operator": "TenPeaks",
      "country": "NZ",
      "region": "Auckland",
      "city": "Auckland",
      "entityKind": "campus",
      "physicalSiteId": "tenpeaks-north",
      "lat": -36.848055,
      "lon": 174.763027,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "planned",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "tenpeaks-north-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-tenpeaks-locations",
            "exp-tenpeaks-history",
            "exp-tenpeaks-north"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": "Australian Hosting Certification Framework does not apply to this New Zealand facility.",
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-tenpeaks-locations",
        "exp-tenpeaks-history",
        "exp-tenpeaks-north",
        "verify-tenpeaks-north",
        "natural-earth-cities"
      ],
      "notes": [
        "Former Spark facility portfolio; no capacity allocated from group totals."
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-tenpeaks-north"
          ],
          "note": "Current TenPeaks named campus page reviewed."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-tenpeaks-north"
          ],
          "note": "Body describes 40 MW initial and 80 MW+ potential design scale, with basis not explicitly IT. 5–7 MW renewable generation is a separate metric and cannot enter IT capacity totals. No comparable installed IT addition is proposed."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-tenpeaks-north"
          ],
          "note": "Land secured and resource consent June 2024; final design collaboration described. Planned status retained; no construction/opening inferred."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-tenpeaks-north"
          ],
          "note": "GPU models, installed GPU counts and named compute offtake are not disclosed."
        }
      ]
    },
    {
      "id": "tenpeaks-takanini",
      "name": "TenPeaks South Takanini",
      "operator": "TenPeaks",
      "country": "NZ",
      "region": "Auckland",
      "city": "Auckland",
      "entityKind": "campus",
      "physicalSiteId": "tenpeaks-takanini",
      "lat": -36.848055,
      "lon": 174.763027,
      "locationPrecision": "city",
      "facilityType": "hyperscale",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "tenpeaks-takanini-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-tenpeaks-locations",
            "exp-tenpeaks-history"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": "Australian Hosting Certification Framework does not apply to this New Zealand facility.",
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-tenpeaks-locations",
        "exp-tenpeaks-history",
        "verify-tenpeaks-south",
        "natural-earth-cities"
      ],
      "notes": [
        "Former Spark facility portfolio; no capacity allocated from group totals."
      ],
      "commissioningEvents": [
        {
          "id": "tenpeaks-takanini-opening",
          "label": "Takanini facility opened",
          "date": "2014-10",
          "datePrecision": "month",
          "sourceIds": [
            "exp-tenpeaks-history"
          ],
          "note": "Campus opening; present capacity is not backdated."
        }
      ],
      "fieldReviews": [
        {
          "field": "identity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-tenpeaks-south"
          ],
          "note": "Current TenPeaks named campus page reviewed."
        },
        {
          "field": "capacity",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-tenpeaks-south"
          ],
          "note": "Body states 12.3 MW currently operating across two pods, 15 MW consented Pod 3, and future Pods 4/5. IT basis is not explicit. Animated headline is not accepted as the current value. No comparable installed IT addition is proposed."
        },
        {
          "field": "status",
          "outcome": "verified",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-tenpeaks-south"
          ],
          "note": "Existing two pods operating; Pod 3 consented/planned, not automatically construction."
        },
        {
          "field": "hardware",
          "outcome": "not-found",
          "checkedOn": "2026-09-11",
          "sourceIds": [
            "verify-tenpeaks-south"
          ],
          "note": "GPU models, installed GPU counts and named compute offtake are not disclosed."
        }
      ]
    },
    {
      "id": "tenpeaks-upper-hutt",
      "name": "TenPeaks Upper Hutt",
      "operator": "TenPeaks",
      "country": "NZ",
      "region": "Wellington",
      "city": "Wellington",
      "entityKind": "facility",
      "physicalSiteId": "tenpeaks-upper-hutt",
      "lat": -41.292068,
      "lon": 174.777201,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "tenpeaks-upper-hutt-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-tenpeaks-locations",
            "exp-tenpeaks-history"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": "Australian Hosting Certification Framework does not apply to this New Zealand facility.",
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-tenpeaks-locations",
        "exp-tenpeaks-history",
        "natural-earth-cities"
      ],
      "notes": [
        "Former Spark facility portfolio; no capacity allocated from group totals."
      ]
    },
    {
      "id": "tenpeaks-wellington-central",
      "name": "TenPeaks Wellington Central",
      "operator": "TenPeaks",
      "country": "NZ",
      "region": "Wellington",
      "city": "Wellington",
      "entityKind": "facility",
      "physicalSiteId": "tenpeaks-wellington-central",
      "lat": -41.292068,
      "lon": 174.777201,
      "locationPrecision": "city",
      "facilityType": "colocation",
      "stages": [
        {
          "asOf": null,
          "mwQualifier": "reported",
          "stage": "operating",
          "mw": null,
          "mwBasis": "unknown",
          "scopeId": "tenpeaks-wellington-central-capacity",
          "includedInTotals": false,
          "expectedYear": null,
          "dateConfidence": "unknown",
          "sourceIds": [
            "exp-tenpeaks-locations",
            "exp-tenpeaks-history"
          ],
          "note": "No comparable installed IT capacity verified."
        }
      ],
      "certification": {
        "status": "not-applicable",
        "scope": "Australian Hosting Certification Framework does not apply to this New Zealand facility.",
        "sourceIds": []
      },
      "evidenceStatus": "directory-verified",
      "sourceIds": [
        "exp-tenpeaks-locations",
        "exp-tenpeaks-history",
        "natural-earth-cities"
      ],
      "notes": [
        "Former Spark facility portfolio; no capacity allocated from group totals."
      ]
    }
  ],
  "research": [
    {
      "id": "nem-data-centre-electricity-2026",
      "category": "demand",
      "title": "AEMO expects a much larger electricity footprint.",
      "summary": "AEMO forecasts NEM data-centre electricity consumption of approximately 5 TWh in 2025–26 and 34 TWh in 2035–36.",
      "geography": "AU",
      "operator": null,
      "scope": "regional",
      "facilityIds": [],
      "status": "forecast",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Annual data centre electricity",
          "value": 5,
          "unit": "TWh/year",
          "period": "2025–26",
          "qualifier": "approximate"
        },
        {
          "label": "Annual data centre electricity",
          "value": 34,
          "unit": "TWh/year",
          "period": "2035–36",
          "qualifier": "approximate"
        },
        {
          "label": "Share of grid-supplied electricity",
          "value": 3,
          "unit": "percent of grid-supplied electricity",
          "period": "2025–26",
          "qualifier": "approximate"
        },
        {
          "label": "Share of grid-supplied electricity",
          "value": 13,
          "unit": "percent of grid-supplied electricity",
          "period": "2035–36",
          "qualifier": "approximate"
        }
      ],
      "asOf": "2026-08-25",
      "sourceIds": [
        "research-nem-data-centre-electricity-2026"
      ],
      "limitations": "Forecast, not measured national facility total. NEM geography is not all Australia. Incorporates attrition, consumption-versus-connection distinction and ramp-up. Do not convert to GPUs or combine annual points with older forecast vintages."
    },
    {
      "id": "nem-transmission-enquiries-q1-2026",
      "category": "demand",
      "title": "Connection requests reveal a large, early-stage pipeline.",
      "summary": "At end-March 2026, 11 large data-centre projects represented 5.4 GW maximum demand in the NEM transmission connection process.",
      "geography": "AU",
      "operator": null,
      "scope": "regional",
      "facilityIds": [],
      "status": "reported",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Large transmission projects",
          "value": 11,
          "unit": "projects",
          "period": "2026-03-31",
          "qualifier": "reported"
        },
        {
          "label": "Maximum connection demand",
          "value": 5.4,
          "unit": "GW maximum demand",
          "period": "2026-03-31",
          "qualifier": "reported"
        }
      ],
      "asOf": "2026-03-31",
      "sourceIds": [
        "research-nem-transmission-enquiries-q1-2026"
      ],
      "limitations": "Projects above 5 MW; most early-stage. Not commissioned or contracted capacity. Power, not annual energy. Distribution projects are outside this stated transmission scope."
    },
    {
      "id": "transpower-ai-scenario-2026",
      "category": "demand",
      "title": "New Zealand: digital growth is a scenario, not a forecast.",
      "summary": "Transpower’s Aotearoa Intelligence scenario explores digital-sector growth, with data centres contributing materially to additional electricity demand.",
      "geography": "NZ",
      "operator": null,
      "scope": "national",
      "facilityIds": [],
      "status": "scenario",
      "workloads": [],
      "hardware": [],
      "metrics": [],
      "asOf": "2026-06",
      "sourceIds": [
        "research-transpower-ai-scenario-2026",
        "research-transpower-five-scenarios-2026"
      ],
      "limitations": "One of five alternative futures to 2050 and beyond, not an official forecast. Its assumptions include a stronger digital economy and supportive policy. No graph-derived data centre quantity is accepted; the report’s 73 TWh figure is total national electricity, not data centre use.",
      "asOfPrecision": "month"
    },
    {
      "id": "airtrunk-syd3-design",
      "category": "facility",
      "title": "SYD3’s design envelope is not its operating capacity.",
      "summary": "AirTrunk describes a multi-building Sydney West campus with 42 data halls and a design PUE of 1.15.",
      "geography": "AU",
      "operator": "AirTrunk",
      "scope": "facility",
      "facilityIds": [
        "airtrunk-syd3"
      ],
      "status": "reported",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Campus headline",
          "value": 400,
          "unit": "MW",
          "period": "Undated operator specification; checked 11 September 2026",
          "qualifier": "minimum"
        },
        {
          "label": "Design PUE",
          "value": 1.15,
          "unit": "ratio",
          "period": "Undated operator specification; checked 11 September 2026",
          "qualifier": "reported"
        },
        {
          "label": "Technical data hall area",
          "value": 70000,
          "unit": "m²",
          "period": "Undated operator specification; checked 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "verify-airtrunk-syd3-20260911"
      ],
      "limitations": "The live location page and earlier platform announcement differ on ultimate campus scale. No commissioned IT split or installed GPU fleet is established; the campus headline is excluded from site capacity totals."
    },
    {
      "id": "airtrunk-mel2-design",
      "category": "facility",
      "title": "MEL2’s published footprint describes the proposed campus.",
      "summary": "AirTrunk specifies a Melbourne north-west campus with diverse 66 kV feeds and up to 32 technical data halls.",
      "geography": "AU",
      "operator": "AirTrunk",
      "scope": "facility",
      "facilityIds": [
        "airtrunk-mel2"
      ],
      "status": "reported",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Campus headline",
          "value": 354,
          "unit": "MW",
          "period": "Undated operator specification; checked 11 September 2026",
          "qualifier": "minimum"
        },
        {
          "label": "Design PUE",
          "value": 1.15,
          "unit": "ratio",
          "period": "Undated operator specification; checked 11 September 2026",
          "qualifier": "reported"
        },
        {
          "label": "Technical data hall area",
          "value": 42240,
          "unit": "m²",
          "period": "Undated operator specification; checked 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "verify-airtrunk-mel2-20260911"
      ],
      "limitations": "This is a design specification, not a measured operating allocation. The electrical basis of the campus headline is not defined as IT power and remains outside the comparable totals."
    },
    {
      "id": "cdc-silverdale-one-operating-disclosure",
      "category": "facility",
      "title": "Silverdale One: an explicit operating disclosure with an unresolved power basis.",
      "summary": "CDC’s Auckland location page describes 22 MW as operating capacity for this named campus.",
      "geography": "NZ",
      "operator": "CDC",
      "scope": "facility",
      "facilityIds": [
        "cdc-silverdale-one"
      ],
      "status": "reported",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Operator-reported operating capacity",
          "value": 22,
          "unit": "MW",
          "period": "Undated operator specification; checked 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "verify-cdc-auckland-20260911"
      ],
      "limitations": "The operator does not define whether the number is IT load or total facility power on this page. It is retained as evidence and excluded from the IT power subtotal; no GPU count is inferred."
    },
    {
      "id": "cdc-hobsonville-one-operating-disclosure",
      "category": "facility",
      "title": "Hobsonville One: an explicit operating disclosure with an unresolved power basis.",
      "summary": "CDC’s Auckland location page describes 22 MW as operating capacity for this named campus.",
      "geography": "NZ",
      "operator": "CDC",
      "scope": "facility",
      "facilityIds": [
        "cdc-hobsonville-one"
      ],
      "status": "reported",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Operator-reported operating capacity",
          "value": 22,
          "unit": "MW",
          "period": "Undated operator specification; checked 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "verify-cdc-auckland-20260911"
      ],
      "limitations": "The operator does not define whether the number is IT load or total facility power on this page. It is retained as evidence and excluded from the IT power subtotal; no GPU count is inferred."
    },
    {
      "id": "cdc-hobsonville-two-operating-disclosure",
      "category": "facility",
      "title": "Hobsonville Two: an explicit operating disclosure with an unresolved power basis.",
      "summary": "CDC’s Auckland location page describes 54 MW as operating capacity for this named campus.",
      "geography": "NZ",
      "operator": "CDC",
      "scope": "facility",
      "facilityIds": [
        "cdc-hobsonville-two"
      ],
      "status": "reported",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Operator-reported operating capacity",
          "value": 54,
          "unit": "MW",
          "period": "Undated operator specification; checked 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "verify-cdc-auckland-20260911"
      ],
      "limitations": "The operator does not define whether the number is IT load or total facility power on this page. It is retained as evidence and excluded from the IT power subtotal; no GPU count is inferred."
    },
    {
      "id": "cdc-marsden-planning-consent",
      "category": "facility",
      "title": "Marsden Park has a dated planning approval.",
      "summary": "The NSW Planning Portal records SSD-70889211 as approved on 27 November 2025. The project description comprises six four-storey data centre buildings and associated infrastructure.",
      "geography": "AU",
      "operator": "CDC",
      "scope": "facility",
      "facilityIds": [
        "cdc-marsden-park"
      ],
      "status": "reported",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Approved project power consumption",
          "value": 504,
          "unit": "MW",
          "period": "Planning determination, 27 November 2025",
          "qualifier": "reported"
        },
        {
          "label": "Substation specification",
          "value": 720,
          "unit": "MW",
          "period": "Planning project description",
          "qualifier": "reported"
        }
      ],
      "asOf": "2025-11-27",
      "sourceIds": [
        "verify-cdc-marsden-planning-20260911",
        "verify-cdc-sydney-20260911"
      ],
      "limitations": "The substation rating and project power consumption are different electrical boundaries and cannot be added. Planning consent is separate from commissioning; CDC’s location page independently describes early construction. Neither number is an accepted commissioned IT-power contribution."
    },
    {
      "id": "verify-nextdc-au-built-reconciliation",
      "category": "facility",
      "geography": "AU",
      "operator": "NEXTDC",
      "scope": "operator-portfolio",
      "facilityIds": [],
      "status": "reported",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Australian built capacity",
          "value": 278,
          "unit": "MW",
          "period": "FY26 results published 2026-08-27",
          "qualifier": "reported"
        },
        {
          "label": "Named-site built subtotal",
          "value": 208.2,
          "unit": "MW",
          "period": "FY26 results published 2026-08-27",
          "qualifier": "reported"
        },
        {
          "label": "Unallocated difference",
          "value": 69.8,
          "unit": "MW",
          "period": "FY26 results published 2026-08-27",
          "qualifier": "reported"
        }
      ],
      "asOf": "2026-08-27",
      "title": "NEXTDC Australian built capacity and allocation gap",
      "summary": "FY26 p 18 discloses 288 MW group built capacity, including 10 MW international. Australia is 278 MW. The seven named operational project rows total 208.2 MW, leaving 69.8 MW not allocated to individual sites in the selected evidence.",
      "sourceIds": [
        "verify-nextdc-fy26"
      ],
      "limitations": "The 278 MW is calculated from the disclosed Australian regional rows 119 + 135 + 24. Built is designed power of fitted-out halls, not utilisation or available capacity. Do not add this aggregate to site values or allocate the residual using facility design specifications. Report date is not a commissioning date."
    },
    {
      "id": "verify-nextdc-group-contract-book",
      "category": "contract",
      "geography": "global",
      "operator": "NEXTDC",
      "scope": "operator-portfolio",
      "facilityIds": [],
      "status": "contracted",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Contracted utilisation",
          "value": 740.1,
          "unit": "MW",
          "period": "Pro forma as disclosed 2026-07-21",
          "qualifier": "reported"
        },
        {
          "label": "Billing utilisation",
          "value": 175,
          "unit": "MW",
          "period": "2026-06-30",
          "qualifier": "reported"
        },
        {
          "label": "Forward order book",
          "value": 565.1,
          "unit": "MW",
          "period": "FY26 pro forma contracted minus FY26 billing",
          "qualifier": "reported"
        }
      ],
      "asOf": "2026-08-27",
      "title": "NEXTDC group contracted, billing and forward capacity",
      "summary": "The FY26 presentation reports 740.1 MW pro forma contracted utilisation, 175.0 MW billing and a 565.1 MW forward order book. The forward order book consists of binding customer contracts subject to delivery and contract terms.",
      "sourceIds": [
        "verify-nextdc-fy26"
      ],
      "limitations": "Group portfolio includes international capacity. Contracted capacity includes deferred starts and ramps but excludes options/reservations. Billing means revenue-recognised commitments, not measured electrical demand. Do not add these figures to physical capacity or allocate them to unnamed facilities. April 2026 figures of 667 MW contracted and 544 MW forward are superseded."
    },
    {
      "id": "verify-nextdc-s7-openai-mou",
      "category": "contract",
      "geography": "AU",
      "operator": "NEXTDC",
      "scope": "facility",
      "facilityIds": [
        "nextdc-s7"
      ],
      "status": "announced",
      "workloads": [],
      "hardware": [],
      "metrics": [],
      "asOf": "2025-12-05",
      "title": "OpenAI and NEXTDC S7 memorandum of understanding",
      "summary": "The 5 December 2025 announcement describes a MoU for a planned S7 hyperscale AI campus and GPU supercluster at Eastern Creek, with a first-phase delivery expectation in July–December 2027 subject to approvals.",
      "sourceIds": [
        "verify-nextdc-openai"
      ],
      "limitations": "A MoU is not proof of a binding MW offtake agreement or an operating GPU deployment. No phase MW, GPU model or count is disclosed. Do not assign all 550 MW of the S7 plan to the 2027 first phase. OpenAI's Australian enterprise customers named in the article are not identified as S7 tenants."
    },
    {
      "id": "verify-nextdc-s6-ai-capability",
      "category": "capability",
      "geography": "AU",
      "operator": "NEXTDC",
      "scope": "facility",
      "facilityIds": [
        "nextdc-s6"
      ],
      "status": "capability",
      "workloads": [
        "training",
        "inference"
      ],
      "hardware": [],
      "metrics": [],
      "asOf": null,
      "title": "S6 training and inference design capability",
      "summary": "NEXTDC describes S6 as an AI factory for GPU-intensive training, inference and large-scale model operations, with liquid-cooling support.",
      "sourceIds": [
        "verify-nextdc-s6"
      ],
      "limitations": "This establishes design capability, not installed GPU inventory or the proportion of its 2.7 MW built capacity serving those workloads. The 13.5 MW design figure includes built and future fit-out."
    },
    {
      "id": "verify-nextdc-sharon-dgx-deployment",
      "category": "deployment",
      "geography": "AU",
      "operator": "NEXTDC",
      "scope": "operator-portfolio",
      "facilityIds": [],
      "status": "reported",
      "workloads": [
        "inference",
        "hpc"
      ],
      "hardware": [
        {
          "model": "NVIDIA DGX (model unspecified)",
          "quantity": null,
          "unit": "systems"
        }
      ],
      "metrics": [
        {
          "label": "Reported NEXTDC facility footprint",
          "value": 3,
          "unit": "facilities",
          "period": "Undated customer story reviewed 2026-09-11",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "title": "Sharon AI GPU service in three NEXTDC east-coast facilities",
      "summary": "NEXTDC's customer story states Sharon AI established its NVIDIA DGX-based GPU service in three Tier IV east-coast facilities. Workload examples include fraud detection, weather mapping, genome research and low-latency inference.",
      "sourceIds": [
        "verify-nextdc-sharon-ai"
      ],
      "limitations": "Facility codes, individual GPU models, GPU counts and contracted MW are not disclosed. Do not attach this deployment to three guessed site records."
    },
    {
      "id": "verify-nextdc-sharon-h200-melbourne",
      "category": "deployment",
      "geography": "AU",
      "operator": "NEXTDC",
      "scope": "regional",
      "facilityIds": [],
      "status": "reported",
      "workloads": [],
      "hardware": [
        {
          "model": "NVIDIA H200",
          "quantity": null,
          "unit": "GPUs"
        }
      ],
      "metrics": [],
      "asOf": "2025-06-30",
      "title": "Sharon AI H200 cluster at an unnamed NEXTDC Melbourne facility",
      "summary": "The 30 June 2025 operator article explicitly identifies a Sharon AI H200 supercluster hosted at NEXTDC's Melbourne facility.",
      "sourceIds": [
        "verify-nextdc-h200"
      ],
      "limitations": "The article does not name M1, M2 or M3 or give installed GPU count. Its overseas university examples and other vendors' H200 counts are not Australian facility inventory. Retain regional scope without facility IDs."
    },
    {
      "id": "verify-nextdc-a1-ai-fitout",
      "category": "capability",
      "geography": "AU",
      "operator": "NEXTDC",
      "scope": "facility",
      "facilityIds": [
        "nextdc-a1"
      ],
      "status": "announced",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Fit-out in progress",
          "value": 2,
          "unit": "MW",
          "period": "FY26 results published 2026-08-27",
          "qualifier": "reported"
        }
      ],
      "asOf": "2026-08-27",
      "title": "A1 fit-out for AI deployment",
      "summary": "FY26 p 18 says an additional 2 MW is in progress to support AI deployment.",
      "sourceIds": [
        "verify-nextdc-fy26"
      ],
      "limitations": "Construction purpose is not an operating GPU deployment, workload split or model/count inventory. These MW already exist in the capacity-stage data and are not additive research capacity."
    },
    {
      "id": "verify-nextdc-p2-ai-fitout",
      "category": "capability",
      "geography": "AU",
      "operator": "NEXTDC",
      "scope": "facility",
      "facilityIds": [
        "nextdc-p2"
      ],
      "status": "announced",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Fit-out in progress",
          "value": 4,
          "unit": "MW",
          "period": "FY26 results published 2026-08-27",
          "qualifier": "reported"
        }
      ],
      "asOf": "2026-08-27",
      "title": "P2 fit-out for AI deployment",
      "summary": "FY26 p 18 says an additional 4 MW is in progress to support AI deployment.",
      "sourceIds": [
        "verify-nextdc-fy26"
      ],
      "limitations": "Construction purpose is not an operating GPU deployment, workload split or model/count inventory. These MW already exist in the capacity-stage data and are not additive research capacity."
    },
    {
      "id": "verify-nextdc-m2-liquid-cooling",
      "category": "capability",
      "geography": "AU",
      "operator": "NEXTDC",
      "scope": "facility",
      "facilityIds": [
        "nextdc-m2"
      ],
      "status": "announced",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Fit-out in progress",
          "value": 60,
          "unit": "MW",
          "period": "FY26 results published 2026-08-27",
          "qualifier": "reported"
        }
      ],
      "asOf": "2026-08-27",
      "title": "M2 high-density liquid-to-chip expansion",
      "summary": "FY26 p 18 describes 60 MW of additional high-density liquid-to-chip fit-out at M2.",
      "sourceIds": [
        "verify-nextdc-fy26"
      ],
      "limitations": "Supports the cooling design of the construction phase, not a named GPU deployment or measured workload. Already included in existing stage capacity."
    },
    {
      "id": "verify-nextdc-ge1-subsea",
      "category": "facility",
      "geography": "AU",
      "operator": "NEXTDC",
      "scope": "facility",
      "facilityIds": [
        "nextdc-ge1"
      ],
      "status": "reported",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "In-progress capacity",
          "value": 1,
          "unit": "MW",
          "period": "FY26 results published 2026-08-27",
          "qualifier": "reported"
        }
      ],
      "asOf": "2026-08-27",
      "title": "GE1 subsea-connectivity construction",
      "summary": "The FY26 p 18 development update links 1 MW in progress at GE1 to new or contracted submarine-cable infrastructure.",
      "sourceIds": [
        "verify-nextdc-fy26"
      ],
      "limitations": "The selected disclosure does not identify a compute offtake customer or GPU inventory. Cable infrastructure is distinct from a GPU training deployment; the phase is already included in physical capacity."
    },
    {
      "id": "verify-nextdc-d2-subsea",
      "category": "facility",
      "geography": "AU",
      "operator": "NEXTDC",
      "scope": "facility",
      "facilityIds": [
        "nextdc-d2"
      ],
      "status": "reported",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "In-progress capacity",
          "value": 1.5,
          "unit": "MW",
          "period": "FY26 results published 2026-08-27",
          "qualifier": "reported"
        }
      ],
      "asOf": "2026-08-27",
      "title": "D2 subsea-connectivity construction",
      "summary": "The FY26 p 18 development update links 1.5 MW in progress at D2 to new or contracted submarine-cable infrastructure.",
      "sourceIds": [
        "verify-nextdc-fy26"
      ],
      "limitations": "The selected disclosure does not identify a compute offtake customer or GPU inventory. Cable infrastructure is distinct from a GPU training deployment; the phase is already included in physical capacity."
    },
    {
      "id": "verify-nextdc-sc2-subsea",
      "category": "facility",
      "geography": "AU",
      "operator": "NEXTDC",
      "scope": "facility",
      "facilityIds": [
        "nextdc-sc2"
      ],
      "status": "reported",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "In-progress capacity",
          "value": 1,
          "unit": "MW",
          "period": "FY26 results published 2026-08-27",
          "qualifier": "reported"
        }
      ],
      "asOf": "2026-08-27",
      "title": "SC2 subsea-connectivity construction",
      "summary": "The FY26 p 18 development update links 1 MW in progress at SC2 to new or contracted submarine-cable infrastructure.",
      "sourceIds": [
        "verify-nextdc-fy26"
      ],
      "limitations": "The selected disclosure does not identify a compute offtake customer or GPU inventory. Cable infrastructure is distinct from a GPU training deployment; the phase is already included in physical capacity."
    },
    {
      "id": "verify-datacom-highbrook-upgrade",
      "category": "capability",
      "geography": "NZ",
      "operator": "Datacom",
      "scope": "facility",
      "facilityIds": [
        "datacom-highbrook"
      ],
      "status": "announced",
      "workloads": [],
      "hardware": [],
      "metrics": [],
      "asOf": null,
      "title": "Highbrook acquisition and planned AI-ready upgrade",
      "summary": "Datacom identifies Highbrook as its acquired T4 Auckland facility and says it will be upgraded for AI-ready high-density workloads with liquid cooling.",
      "sourceIds": [
        "verify-datacom-highbrook"
      ],
      "limitations": "Acquisition date, upgrade MW, commencement date, GPU models and installed GPU counts are not stated. Future AI capability does not prove current training or inference deployments. T4 Auckland and Datacom Highbrook are one physical facility."
    },
    {
      "id": "verify-datacom-kapua-expandability",
      "category": "facility",
      "geography": "NZ",
      "operator": "Datacom",
      "scope": "facility",
      "facilityIds": [
        "datacom-kapua"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Expandable usable power",
          "value": 14,
          "unit": "MW",
          "period": "Undated page reviewed 2026-09-11",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "title": "Kapua expandable power specification",
      "summary": "Datacom describes Kapua as able to grow beyond 1,500 racks and to 14 MW usable power.",
      "sourceIds": [
        "verify-datacom-kapua"
      ],
      "limitations": "This is expandability, not a dated installed IT observation or a construction phase. Do not put the 14 MW in current physical-capacity totals."
    },
    {
      "id": "verify-tenpeaks-south-capacity-context",
      "category": "facility",
      "geography": "NZ",
      "operator": "TenPeaks",
      "scope": "facility",
      "facilityIds": [
        "tenpeaks-takanini"
      ],
      "status": "reported",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Reported operating power, basis unspecified",
          "value": 12.3,
          "unit": "MW",
          "period": "Undated campus page reviewed 2026-09-11",
          "qualifier": "reported"
        },
        {
          "label": "Consented Pod 3 power, basis unspecified",
          "value": 15,
          "unit": "MW",
          "period": "Undated campus page reviewed 2026-09-11",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "title": "TenPeaks south disclosed campus capacity context",
      "summary": "Body states 12.3 MW currently operating across two pods, 15 MW consented Pod 3, and future Pods 4/5. IT basis is not explicit. Animated headline is not accepted as the current value.",
      "sourceIds": [
        "verify-tenpeaks-south"
      ],
      "limitations": "IT load is not explicitly distinguished from facility/other power in the selected body text. These values are context only, excluded from IT capacity totals. Consent, development potential and renewable generation are separate from installed server power. No GPU inventory is disclosed."
    },
    {
      "id": "verify-tenpeaks-central-capacity-context",
      "category": "facility",
      "geography": "NZ",
      "operator": "TenPeaks",
      "scope": "facility",
      "facilityIds": [
        "tenpeaks-aotea"
      ],
      "status": "reported",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Proposed additional building power, basis unspecified",
          "value": 15,
          "unit": "MW",
          "period": "Undated campus page reviewed 2026-09-11",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "title": "TenPeaks central disclosed campus capacity context",
      "summary": "Body proposes an additional 15 MW building; IT basis and existing installed amount are unspecified. Animated headline counter is not reliable evidence.",
      "sourceIds": [
        "verify-tenpeaks-central"
      ],
      "limitations": "IT load is not explicitly distinguished from facility/other power in the selected body text. These values are context only, excluded from IT capacity totals. Consent, development potential and renewable generation are separate from installed server power. No GPU inventory is disclosed."
    },
    {
      "id": "verify-tenpeaks-north-capacity-context",
      "category": "facility",
      "geography": "NZ",
      "operator": "TenPeaks",
      "scope": "facility",
      "facilityIds": [
        "tenpeaks-north"
      ],
      "status": "announced",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Initial design power, basis unspecified",
          "value": 40,
          "unit": "MW",
          "period": "Undated campus page reviewed 2026-09-11",
          "qualifier": "reported"
        },
        {
          "label": "Potential campus power, basis unspecified",
          "value": 80,
          "unit": "MW",
          "period": "Undated campus page reviewed 2026-09-11",
          "qualifier": "minimum"
        }
      ],
      "asOf": null,
      "title": "TenPeaks north disclosed campus capacity context",
      "summary": "Body describes 40 MW initial and 80 MW+ potential design scale, with basis not explicitly IT. 5–7 MW renewable generation is a separate metric and cannot enter IT capacity totals.",
      "sourceIds": [
        "verify-tenpeaks-north"
      ],
      "limitations": "IT load is not explicitly distinguished from facility/other power in the selected body text. These values are context only, excluded from IT capacity totals. Consent, development potential and renewable generation are separate from installed server power. No GPU inventory is disclosed."
    },
    {
      "id": "compute-firmus-launceston-envelope-20260911",
      "category": "facility",
      "title": "Launceston discloses 84 MW critical IT design capacity",
      "summary": "Southgate names Launceston and 84 MW Critical IT Load; the Tasmania hub labels its anchor site under construction.",
      "geography": "AU",
      "operator": "Firmus",
      "scope": "facility",
      "facilityIds": [
        "firmus-launceston"
      ],
      "status": "announced",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Disclosed campus critical IT envelope",
          "value": 84,
          "unit": "MW",
          "period": "Undated specification; checked 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "compute-firmus-southgate-20260911",
        "compute-firmus-tasmania-20260911"
      ],
      "limitations": "No commissioned IT quantity, phase-by-phase fit-out or full 84 MW construction boundary is established. Do not turn this envelope into operating or fully fitted construction MW."
    },
    {
      "id": "compute-firmus-wesley-it-20260911",
      "category": "facility",
      "title": "Wesley Vale discloses an initial 23 MW critical IT stage",
      "summary": "The planned project describes 26 MW initial electrical capacity containing 23 MW critical IT, with a later 52 MW electrical maximum.",
      "geography": "AU",
      "operator": "Firmus",
      "scope": "facility",
      "facilityIds": [
        "firmus-wesley-vale"
      ],
      "status": "announced",
      "workloads": [
        "training"
      ],
      "hardware": [],
      "metrics": [
        {
          "label": "Initial critical IT load",
          "value": 23,
          "unit": "MW",
          "period": "Undated specification; checked 11 September 2026",
          "qualifier": "reported"
        },
        {
          "label": "Initial electrical capacity",
          "value": 26,
          "unit": "MW",
          "period": "Undated specification; checked 11 September 2026",
          "qualifier": "approximate"
        },
        {
          "label": "Maximum electrical capacity",
          "value": 52,
          "unit": "MW",
          "period": "Undated specification; checked 11 September 2026",
          "qualifier": "approximate"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "compute-firmus-wesley-20260911"
      ],
      "limitations": "Later IT figure is printed as approximately 46 WM, an apparent unit typo. Hold this figure for clarification; initial 23 MW is inside the ultimate project and cannot be added to 46. Text says train and run frontier models, not evidence of installed GPUs or current inference service."
    },
    {
      "id": "compute-firmus-bellbay-workloads-20260911",
      "category": "capability",
      "title": "Bell Bay is designed for frontier-model training",
      "summary": "The proposed Bell Bay project describes training and running frontier models, approximately 288 MW maximum grid demand and a direct-to-chip cooling architecture supporting NVIDIA GB300 and Vera Rubin.",
      "geography": "AU",
      "operator": "Firmus",
      "scope": "facility",
      "facilityIds": [
        "firmus-bell-bay"
      ],
      "status": "capability",
      "workloads": [
        "training"
      ],
      "hardware": [
        {
          "model": "NVIDIA GB300",
          "quantity": null,
          "unit": "GPU"
        },
        {
          "model": "NVIDIA Vera Rubin",
          "quantity": null,
          "unit": "GPU"
        }
      ],
      "metrics": [
        {
          "label": "Maximum grid demand",
          "value": 288,
          "unit": "MW",
          "period": "Undated specification; checked 11 September 2026",
          "qualifier": "approximate"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "compute-firmus-bellbay-20260911"
      ],
      "limitations": "Hardware models are design compatibility, not an order, delivery or installation. No IT-load conversion or GPU quantity is supported."
    },
    {
      "id": "compute-firmus-sa-power-contract-20260911",
      "category": "contract",
      "title": "South Australia energy agreement covers 600 MW of load",
      "summary": "Firmus reports a 12-year electricity supply agreement signed in June 2026 for its first South Australian AI factories and names Gunvor Group.",
      "geography": "AU",
      "operator": "Firmus",
      "scope": "operator-portfolio",
      "facilityIds": [],
      "status": "contracted",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Electricity agreement load",
          "value": 600,
          "unit": "MW",
          "period": "Evidence as of 2026-06",
          "qualifier": "reported"
        },
        {
          "label": "Agreement duration",
          "value": 12,
          "unit": "years",
          "period": "Evidence as of 2026-06",
          "qualifier": "reported"
        }
      ],
      "asOf": "2026-06",
      "sourceIds": [
        "compute-firmus-sa-20260911"
      ],
      "limitations": "This is power procurement, not a compute customer/offtake contract. The source does not allocate 600 MW between sites or identify it as IT load. Existing 1000/1300 MW campus IT envelopes remain approval-dependent.",
      "asOfPrecision": "month"
    },
    {
      "id": "compute-firmus-melbourne-contract-20260911",
      "category": "contract",
      "title": "A Melbourne GB300 contract is publicly disclosed",
      "summary": "Firmus reported a multi-year, multi-billion-dollar commitment from an unnamed global technology company for approximately 18,400 NVIDIA GB300 GPUs at its Melbourne deployment.",
      "geography": "AU",
      "operator": "Firmus",
      "scope": "regional",
      "facilityIds": [],
      "status": "contracted",
      "workloads": [],
      "hardware": [
        {
          "model": "NVIDIA GB300",
          "quantity": 18400,
          "unit": "GPU",
          "quantityQualifier": "approximate"
        }
      ],
      "metrics": [],
      "asOf": "2026-03-02",
      "sourceIds": [
        "compute-firmus-contract-20260911"
      ],
      "limitations": "The contract announcement does not identify a CDC physical campus, commissioning date or actual installed count. Do not assign it to CDC Brooklyn/Laverton by inference. The 18,400 contracted quantity is not additive to the earlier 18,500 deployment plan."
    },
    {
      "id": "compute-firmus-melbourne-dgx-target-20260911",
      "category": "deployment",
      "title": "Historical Melbourne rollout and DGX Cloud plan",
      "summary": "October 2025 announcement targeted 18,500 ordered GB300 GPUs online in April 2026 and said DGX Cloud would establish a Southgate Melbourne region.",
      "geography": "AU",
      "operator": "Firmus",
      "scope": "regional",
      "facilityIds": [],
      "status": "announced",
      "workloads": [],
      "hardware": [
        {
          "model": "NVIDIA GB300",
          "quantity": 18500,
          "unit": "GPU"
        }
      ],
      "metrics": [],
      "asOf": "2025-10",
      "sourceIds": [
        "compute-firmus-expansion-20260911"
      ],
      "limitations": "Historical target only. Cannot infer achievement from a past target date, or identify the unnamed March 2026 customer as NVIDIA. No exact CDC campus is established.",
      "asOfPrecision": "month"
    },
    {
      "id": "compute-firmus-tasmania-gpu-plan-20260911",
      "category": "deployment",
      "title": "Tasmanian greenfield campus has a 36,800 GB300 plan",
      "summary": "The March 2026 contract release separately describes a Tasmanian greenfield campus under construction with approximately 36,800 NVIDIA GB300 GPUs and late 2026 completion target.",
      "geography": "AU",
      "operator": "Firmus",
      "scope": "regional",
      "facilityIds": [],
      "status": "announced",
      "workloads": [],
      "hardware": [
        {
          "model": "NVIDIA GB300",
          "quantity": 36800,
          "unit": "GPU",
          "quantityQualifier": "approximate"
        }
      ],
      "metrics": [],
      "asOf": "2026-03-02",
      "sourceIds": [
        "compute-firmus-contract-20260911"
      ],
      "limitations": "The passage says Tasmania without naming the physical site. Launceston is a plausible match, not a verified identity mapping. Do not copy this count to any of the three Tasmania records or count it as deployed."
    },
    {
      "id": "compute-firmus-au-operating-disclosure-20260911",
      "category": "deployment",
      "title": "Firmus reports an operating Australian AI factory",
      "summary": "September 8 statement identifies two operational sites across the portfolio, one in Australia and one in Singapore.",
      "geography": "AU",
      "operator": "Firmus",
      "scope": "operator-portfolio",
      "facilityIds": [],
      "status": "reported",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Operational Australian site stated at country level",
          "value": 1,
          "unit": "site",
          "period": "Evidence as of 2026-09-08",
          "qualifier": "reported"
        }
      ],
      "asOf": "2026-09-08",
      "sourceIds": [
        "compute-firmus-openai-20260911"
      ],
      "limitations": "Australian site is not named in this passage. The disclosure does not prove Launceston, Bell Bay or Wesley Vale has opened; it must not create a second physical record for a hosted CDC deployment."
    },
    {
      "id": "compute-firmus-batam-exclusion-20260911",
      "category": "contract",
      "title": "The 170,000-accelerator agreement belongs to Indonesia",
      "summary": "Firmus describes a 360 MW Batam campus and a NVIDIA partnership covering up to 170,000 accelerators across Grace-Blackwell, Vera-Rubin and Vera platforms in 2027-2028.",
      "geography": "global",
      "operator": "Firmus",
      "scope": "regional",
      "facilityIds": [],
      "status": "contracted",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Agreement accelerator maximum",
          "value": 170000,
          "unit": "accelerators",
          "period": "2027-2028",
          "qualifier": "maximum"
        }
      ],
      "asOf": "2026-06",
      "sourceIds": [
        "compute-firmus-batam-20260911"
      ],
      "limitations": "Geography is Batam Indonesia, outside AU/NZ; no ANZ allocation. Model-generation quantities are not broken out. The agreement runs through 2034;170,000 does not mean installed today.",
      "asOfPrecision": "month"
    },
    {
      "id": "compute-firmus-openai-exclusion-20260911",
      "category": "contract",
      "title": "OpenAI contract belongs to two Malaysian sites",
      "summary": "September 8 partnership commits dedicated AI compute at two Malaysian AI factories using Vera Rubin NVL72/DSX with Firmus HyperCube.",
      "geography": "global",
      "operator": "Firmus",
      "scope": "regional",
      "facilityIds": [],
      "status": "contracted",
      "workloads": [],
      "hardware": [
        {
          "model": "NVIDIA Vera Rubin NVL72",
          "quantity": null,
          "unit": "rack-scale systems"
        }
      ],
      "metrics": [],
      "asOf": "2026-09-08",
      "sourceIds": [
        "compute-firmus-openai-20260911"
      ],
      "limitations": "Malaysia only. More than 900 MW is the entire contracted portfolio across customers, not a disclosed OpenAI amount or an Australian total. Country-level operating statements and future Malaysian deployment must stay separate."
    },
    {
      "id": "compute-iren-bundey-development-20260911",
      "category": "facility",
      "title": "Bundey remains an Australian development project",
      "summary": "800 MW refers to the secured transmission-connected project, with energisation planned from 2028. August 2026 results report development progressing but no local GPU deployment.",
      "geography": "AU",
      "operator": "IREN",
      "scope": "facility",
      "facilityIds": [
        "iren-bundey"
      ],
      "status": "announced",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Transmission support ceiling",
          "value": 800,
          "unit": "MW",
          "period": "Evidence as of 2026-08-27",
          "qualifier": "maximum"
        }
      ],
      "asOf": "2026-08-27",
      "sourceIds": [
        "compute-iren-bundey-20260911",
        "compute-iren-bundey-site-20260911",
        "compute-iren-fy26-20260911"
      ],
      "limitations": "800 MW is not explicitly IT load. Grid connection agreement and progressing development do not establish completed energisation or hall construction. Group training/inference services are not proof of a deployed Bundey workload."
    },
    {
      "id": "compute-iren-microsoft-exclusion-20260911",
      "category": "contract",
      "title": "IREN Microsoft GB300 capacity is in Texas",
      "summary": "The five-year Microsoft contract covers four phases totalling 200 MW critical IT at Childress Texas. August 2026 results confirm first 50 MW Horizon 1 delivered; later phases remain at commissioning/construction stages.",
      "geography": "global",
      "operator": "IREN",
      "scope": "regional",
      "facilityIds": [],
      "status": "contracted",
      "workloads": [],
      "hardware": [
        {
          "model": "NVIDIA GB300 NVL72",
          "quantity": null,
          "unit": "rack-scale systems"
        }
      ],
      "metrics": [
        {
          "label": "Total contracted critical IT load",
          "value": 200,
          "unit": "MW",
          "period": "Evidence as of 2026-08-27",
          "qualifier": "reported"
        },
        {
          "label": "Horizon 1 delivered IT capacity",
          "value": 50,
          "unit": "MW",
          "period": "Evidence as of 2026-08-27",
          "qualifier": "reported"
        },
        {
          "label": "Contract duration",
          "value": 5,
          "unit": "years",
          "period": "Evidence as of 2026-08-27",
          "qualifier": "reported"
        }
      ],
      "asOf": "2026-08-27",
      "sourceIds": [
        "compute-iren-microsoft-20260911",
        "compute-iren-fy26-20260911"
      ],
      "limitations": "No Australian allocation and no GPU count disclosed in these sources. These are overlapping total/phase quantities and must not be added."
    },
    {
      "id": "compute-iren-client-portfolio-20260911",
      "category": "contract",
      "title": "IREN discloses a broader AI customer portfolio",
      "summary": "August 2026 results name recent signings with Cohere, Prometheus, Perplexity, Figure AI, Fal AI and Higgsfield AI, plus an unnamed frontier lab.",
      "geography": "global",
      "operator": "IREN",
      "scope": "operator-portfolio",
      "facilityIds": [],
      "status": "contracted",
      "workloads": [],
      "hardware": [],
      "metrics": [],
      "asOf": "2026-08-27",
      "sourceIds": [
        "compute-iren-fy26-20260911"
      ],
      "limitations": "Customer list is portfolio-level. No contract capacity, workload or Australian facility assignment can be inferred for the named customers."
    },
    {
      "id": "compute-macquarie-ic3w-phases-20260911",
      "category": "facility",
      "title": "IC3 Super West first fit-out and ultimate IT envelope differ",
      "summary": "The February 2026 investor briefing reports initial 6 MW mechanical/electrical fit-out underway, targeting September 2026. Current facility marketing states 47 MW IT end-state and still describes construction.",
      "geography": "AU",
      "operator": "Macquarie Data Centres",
      "scope": "facility",
      "facilityIds": [
        "macquarie-ic3-super-west"
      ],
      "status": "reported",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Initial fit-out phase",
          "value": 6,
          "unit": "MW",
          "period": "Evidence as of 2026-02-26",
          "qualifier": "reported"
        },
        {
          "label": "End-state IT envelope",
          "value": 47,
          "unit": "MW",
          "period": "Evidence as of 2026-02-26",
          "qualifier": "reported"
        }
      ],
      "asOf": "2026-02-26",
      "sourceIds": [
        "compute-macquarie-hy26-20260911",
        "compute-macquarie-ic3w-20260911",
        "compute-macquarie-ai-20260911"
      ],
      "limitations": "No opening inferred from current month. Initial 6 MW is part of 47 MW. Keep construction scope limited to verified fit-out, not all 47 MW. Breadcrumb retains 45 MW while main specification says 47 MW; use explicit current specification with caveat."
    },
    {
      "id": "compute-macquarie-ai-capability-20260911",
      "category": "capability",
      "title": "Macquarie markets support for AI training and inference",
      "summary": "AI solutions describe high-density air/liquid cooling and support for training and inference. These are colocation capabilities centred on the new IC3 Super West offer.",
      "geography": "AU",
      "operator": "Macquarie Data Centres",
      "scope": "facility",
      "facilityIds": [
        "macquarie-ic3-super-west"
      ],
      "status": "capability",
      "workloads": [
        "training",
        "inference"
      ],
      "hardware": [],
      "metrics": [],
      "asOf": null,
      "sourceIds": [
        "compute-macquarie-ai-20260911"
      ],
      "limitations": "Capability statement, not observed workload allocation, deployed GPU inventory or confirmation the new facility is open. No model or count is published here."
    },
    {
      "id": "compute-macquarie-dell-capability-20260911",
      "category": "capability",
      "title": "Dell AI Factory with NVIDIA collaboration names IC3 Super West",
      "summary": "August 2025 announcement says Dell AI Factory with NVIDIA infrastructure and software will be supported by IC3 Super West for private/enterprise AI and neocloud projects.",
      "geography": "AU",
      "operator": "Macquarie Data Centres",
      "scope": "facility",
      "facilityIds": [
        "macquarie-ic3-super-west"
      ],
      "status": "announced",
      "workloads": [
        "training"
      ],
      "hardware": [],
      "metrics": [],
      "asOf": "2025-08-08",
      "sourceIds": [
        "compute-macquarie-dell-20260911"
      ],
      "limitations": "Supplier collaboration and future-capability claim. No specific GPU model, unit count, live deployment or named end-customer contract disclosed. Do not treat Dell/NVIDIA as a capacity tenant."
    },
    {
      "id": "compute-macquarie-portfolio-installed-20260911",
      "category": "facility",
      "title": "21 MW installed disclosure is a portfolio total",
      "summary": "February 2026 briefing gives 21 MW installed across the existing Macquarie data centre portfolio and reports two of the three largest hyperscalers as customers.",
      "geography": "AU",
      "operator": "Macquarie Data Centres",
      "scope": "operator-portfolio",
      "facilityIds": [],
      "status": "reported",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Portfolio installed capacity",
          "value": 21,
          "unit": "MW",
          "period": "Evidence as of 2026-02-26",
          "qualifier": "reported"
        }
      ],
      "asOf": "2026-02-26",
      "sourceIds": [
        "compute-macquarie-hy26-20260911"
      ],
      "limitations": "Do not allocate 21 MW or anonymous hyperscaler customers to individual IC1/IC2/IC3E/IC4/IC5 records. It does not make each marketed building IT rating a commissioned observation."
    },
    {
      "id": "compute-datagrid-consented-20260911",
      "category": "facility",
      "title": "Makarewa has consented capacity of up to 240 MW IT",
      "summary": "Council and regional authority describe six data halls in three modules and up to 240 MW IT capacity for AI training, data processing and storage.",
      "geography": "NZ",
      "operator": "Datagrid",
      "scope": "facility",
      "facilityIds": [
        "datagrid-makarewa"
      ],
      "status": "announced",
      "workloads": [
        "training",
        "general-purpose"
      ],
      "hardware": [],
      "metrics": [
        {
          "label": "Consented IT capacity ceiling",
          "value": 240,
          "unit": "MW",
          "period": "Evidence as of 2026-03-13",
          "qualifier": "maximum"
        }
      ],
      "asOf": "2026-03-13",
      "sourceIds": [
        "compute-datagrid-sdc-20260911",
        "compute-datagrid-es-20260911"
      ],
      "limitations": "A consented design maximum, not commissioned capacity or evidence that all halls are under construction. It is excluded from additive capacity subtotals. The operator’s 280 MW headline has a different or unspecified electrical basis."
    },
    {
      "id": "compute-datagrid-road-works-20260911",
      "category": "facility",
      "title": "Datagrid commencement notice is for road access works",
      "summary": "Approved notice lists highway/Taylor Road realignment, road upgrade and haul-road construction, with a 28 July 2026 start.",
      "geography": "NZ",
      "operator": "Datagrid",
      "scope": "facility",
      "facilityIds": [
        "datagrid-makarewa"
      ],
      "status": "reported",
      "workloads": [],
      "hardware": [],
      "metrics": [],
      "asOf": "2026-07-28",
      "sourceIds": [
        "compute-datagrid-commencement-20260911",
        "compute-datagrid-sdc-20260911"
      ],
      "limitations": "Notice is a pre-start declaration, not a completion inspection. Its scope is roads, not data halls or electrical fit-out. Do not use it to move 240 MW into construction."
    },
    {
      "id": "compute-datagrid-power-option-20260911",
      "category": "contract",
      "title": "Datagrid signed a 140 MW electricity price-hedge option",
      "summary": "March 2026 announcement describes a 15-year Power Purchase Option Agreement with Mercury,140 MW/1.2 TWh annually, providing a long-term electricity price hedge for the Southland campus.",
      "geography": "NZ",
      "operator": "Datagrid",
      "scope": "facility",
      "facilityIds": [
        "datagrid-makarewa"
      ],
      "status": "contracted",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Power agreement size",
          "value": 140,
          "unit": "MW",
          "period": "Evidence as of 2026-03-18",
          "qualifier": "reported"
        },
        {
          "label": "Agreement term",
          "value": 15,
          "unit": "years",
          "period": "Evidence as of 2026-03-18",
          "qualifier": "reported"
        },
        {
          "label": "Annual energy under option",
          "value": 1.2,
          "unit": "TWh",
          "period": "per year",
          "qualifier": "reported"
        }
      ],
      "asOf": "2026-03-18",
      "sourceIds": [
        "compute-datagrid-mercury-20260911"
      ],
      "limitations": "Power procurement/price hedge, not guaranteed live physical load, IT capacity or an AI customer offtake. March forecast of June construction is not evidence it started. Full project delivery 2028 is a target."
    },
    {
      "id": "equinix-ae1-technical-capability",
      "category": "facility",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "facility",
      "facilityIds": [
        "equinix-ae1"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Reported colocation floor area",
          "value": 414,
          "unit": "m²",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        },
        {
          "label": "Minimum cabinet power specification",
          "value": 3,
          "unit": "kVA per cabinet",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "title": "AE1 colocation specifications",
      "summary": "Operator specifications disclose 414 m² colocation space, minimum cabinet specification 3 kVA, UPS redundancy N+1 and cooling redundancy N+1.",
      "sourceIds": [
        "equinix-deep-ae1"
      ],
      "limitations": "Facility/service specification, not a dated installed IT load, occupancy, utilised space or GPU inventory. Cabinet apparent power cannot be converted to facility MW without additional electrical and deployment evidence. Absence of a listed cooling product is not proof the technology is absent."
    },
    {
      "id": "equinix-br1-technical-capability",
      "category": "facility",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "facility",
      "facilityIds": [
        "equinix-br1"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Reported colocation floor area",
          "value": 832,
          "unit": "m²",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        },
        {
          "label": "Minimum cabinet power specification",
          "value": 3,
          "unit": "kVA per cabinet",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "title": "BR1 colocation specifications",
      "summary": "Operator specifications disclose 832 m² colocation space, minimum cabinet specification 3 kVA, UPS redundancy N+1 and cooling redundancy N+20%.",
      "sourceIds": [
        "equinix-deep-br1"
      ],
      "limitations": "Facility/service specification, not a dated installed IT load, occupancy, utilised space or GPU inventory. Cabinet apparent power cannot be converted to facility MW without additional electrical and deployment evidence. Absence of a listed cooling product is not proof the technology is absent."
    },
    {
      "id": "equinix-ca1-technical-capability",
      "category": "facility",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "facility",
      "facilityIds": [
        "equinix-ca1"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Reported colocation floor area",
          "value": 577,
          "unit": "m²",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        },
        {
          "label": "Minimum cabinet power specification",
          "value": 3,
          "unit": "kVA per cabinet",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "title": "CA1 colocation specifications",
      "summary": "Operator specifications disclose 577 m² colocation space, minimum cabinet specification 3 kVA, UPS redundancy N+1 and cooling redundancy N+1.",
      "sourceIds": [
        "equinix-deep-ca1"
      ],
      "limitations": "Facility/service specification, not a dated installed IT load, occupancy, utilised space or GPU inventory. Cabinet apparent power cannot be converted to facility MW without additional electrical and deployment evidence. Absence of a listed cooling product is not proof the technology is absent."
    },
    {
      "id": "equinix-me1-technical-capability",
      "category": "facility",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "facility",
      "facilityIds": [
        "equinix-me1"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Reported colocation floor area",
          "value": 3326,
          "unit": "m²",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        },
        {
          "label": "Minimum cabinet power specification",
          "value": 4,
          "unit": "kVA per cabinet",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "title": "ME1 colocation specifications",
      "summary": "Operator specifications disclose 3326 m² colocation space, minimum cabinet specification 4 kVA, UPS redundancy N+1 and cooling redundancy N+1.",
      "sourceIds": [
        "equinix-deep-me1"
      ],
      "limitations": "Facility/service specification, not a dated installed IT load, occupancy, utilised space or GPU inventory. Cabinet apparent power cannot be converted to facility MW without additional electrical and deployment evidence. Absence of a listed cooling product is not proof the technology is absent."
    },
    {
      "id": "equinix-me2-technical-capability",
      "category": "facility",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "facility",
      "facilityIds": [
        "equinix-me2"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Reported colocation floor area",
          "value": 8172,
          "unit": "m²",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        },
        {
          "label": "Minimum cabinet power specification",
          "value": 4,
          "unit": "kVA per cabinet",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "title": "ME2 colocation specifications",
      "summary": "Operator specifications disclose 8172 m² colocation space, minimum cabinet specification 4 kVA, UPS redundancy N+1 and cooling redundancy N+2. High-Density Cooling is explicitly listed as an available product.",
      "sourceIds": [
        "equinix-deep-me2"
      ],
      "limitations": "Facility/service specification, not a dated installed IT load, occupancy, utilised space or GPU inventory. Cabinet apparent power cannot be converted to facility MW without additional electrical and deployment evidence. Absence of a listed cooling product is not proof the technology is absent."
    },
    {
      "id": "equinix-me4-technical-capability",
      "category": "facility",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "facility",
      "facilityIds": [
        "equinix-me4"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Reported colocation floor area",
          "value": 3460,
          "unit": "m²",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        },
        {
          "label": "Minimum cabinet power specification",
          "value": 3,
          "unit": "kVA per cabinet",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "title": "ME4 colocation specifications",
      "summary": "Operator specifications disclose 3460 m² colocation space, minimum cabinet specification 3 kVA, UPS redundancy N+1 and cooling redundancy N+1.",
      "sourceIds": [
        "equinix-deep-me4"
      ],
      "limitations": "Facility/service specification, not a dated installed IT load, occupancy, utilised space or GPU inventory. Cabinet apparent power cannot be converted to facility MW without additional electrical and deployment evidence. Absence of a listed cooling product is not proof the technology is absent."
    },
    {
      "id": "equinix-me5-technical-capability",
      "category": "facility",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "facility",
      "facilityIds": [
        "equinix-me5"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Reported colocation floor area",
          "value": 3150,
          "unit": "m²",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        },
        {
          "label": "Minimum cabinet power specification",
          "value": 2,
          "unit": "kVA per cabinet",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "title": "ME5 colocation specifications",
      "summary": "Operator specifications disclose 3150 m² colocation space, minimum cabinet specification 2 kVA, UPS redundancy N+1 and cooling redundancy N+20%.",
      "sourceIds": [
        "equinix-deep-me5"
      ],
      "limitations": "Facility/service specification, not a dated installed IT load, occupancy, utilised space or GPU inventory. Cabinet apparent power cannot be converted to facility MW without additional electrical and deployment evidence. Absence of a listed cooling product is not proof the technology is absent."
    },
    {
      "id": "equinix-pe1-technical-capability",
      "category": "facility",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "facility",
      "facilityIds": [
        "equinix-pe1"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Reported colocation floor area",
          "value": 464,
          "unit": "m²",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        },
        {
          "label": "Minimum cabinet power specification",
          "value": 2,
          "unit": "kVA per cabinet",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "title": "PE1 colocation specifications",
      "summary": "Operator specifications disclose 464 m² colocation space, minimum cabinet specification 2 kVA, UPS redundancy N+1 and cooling redundancy N+1.",
      "sourceIds": [
        "equinix-deep-pe1"
      ],
      "limitations": "Facility/service specification, not a dated installed IT load, occupancy, utilised space or GPU inventory. Cabinet apparent power cannot be converted to facility MW without additional electrical and deployment evidence. Absence of a listed cooling product is not proof the technology is absent."
    },
    {
      "id": "equinix-pe2-technical-capability",
      "category": "facility",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "facility",
      "facilityIds": [
        "equinix-pe2"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Reported colocation floor area",
          "value": 1170,
          "unit": "m²",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        },
        {
          "label": "Minimum cabinet power specification",
          "value": 3,
          "unit": "kVA per cabinet",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "title": "PE2 colocation specifications",
      "summary": "Operator specifications disclose 1170 m² colocation space, minimum cabinet specification 3 kVA, UPS redundancy N+1 and cooling redundancy N+1.",
      "sourceIds": [
        "equinix-deep-pe2"
      ],
      "limitations": "Facility/service specification, not a dated installed IT load, occupancy, utilised space or GPU inventory. Cabinet apparent power cannot be converted to facility MW without additional electrical and deployment evidence. Absence of a listed cooling product is not proof the technology is absent."
    },
    {
      "id": "equinix-pe3-technical-capability",
      "category": "facility",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "facility",
      "facilityIds": [
        "equinix-pe3"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Reported colocation floor area",
          "value": 1951,
          "unit": "m²",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        },
        {
          "label": "Minimum cabinet power specification",
          "value": 4,
          "unit": "kVA per cabinet",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "title": "PE3 colocation specifications",
      "summary": "Operator specifications disclose 1951 m² colocation space, minimum cabinet specification 4 kVA, UPS redundancy N+1 and cooling redundancy N+1. High-Density Cooling is explicitly listed as an available product.",
      "sourceIds": [
        "equinix-deep-pe3"
      ],
      "limitations": "Facility/service specification, not a dated installed IT load, occupancy, utilised space or GPU inventory. Cabinet apparent power cannot be converted to facility MW without additional electrical and deployment evidence. Absence of a listed cooling product is not proof the technology is absent."
    },
    {
      "id": "equinix-sy1-technical-capability",
      "category": "facility",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "facility",
      "facilityIds": [
        "equinix-sy1"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Reported colocation floor area",
          "value": 3088,
          "unit": "m²",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        },
        {
          "label": "Minimum cabinet power specification",
          "value": 2,
          "unit": "kVA per cabinet",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "title": "SY1 colocation specifications",
      "summary": "Operator specifications disclose 3088 m² colocation space, minimum cabinet specification 2 kVA, UPS redundancy N+1 and cooling redundancy N+1.",
      "sourceIds": [
        "equinix-deep-sy1"
      ],
      "limitations": "Facility/service specification, not a dated installed IT load, occupancy, utilised space or GPU inventory. Cabinet apparent power cannot be converted to facility MW without additional electrical and deployment evidence. Absence of a listed cooling product is not proof the technology is absent."
    },
    {
      "id": "equinix-sy2-technical-capability",
      "category": "facility",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "facility",
      "facilityIds": [
        "equinix-sy2"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Reported colocation floor area",
          "value": 1586,
          "unit": "m²",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        },
        {
          "label": "Minimum cabinet power specification",
          "value": 4,
          "unit": "kVA per cabinet",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "title": "SY2 colocation specifications",
      "summary": "Operator specifications disclose 1586 m² colocation space, minimum cabinet specification 4 kVA, UPS redundancy N+1 and cooling redundancy N+1. High-Density Cooling is explicitly listed as an available product.",
      "sourceIds": [
        "equinix-deep-sy2"
      ],
      "limitations": "Facility/service specification, not a dated installed IT load, occupancy, utilised space or GPU inventory. Cabinet apparent power cannot be converted to facility MW without additional electrical and deployment evidence. Absence of a listed cooling product is not proof the technology is absent."
    },
    {
      "id": "equinix-sy3-technical-capability",
      "category": "facility",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "facility",
      "facilityIds": [
        "equinix-sy3"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Reported colocation floor area",
          "value": 6894,
          "unit": "m²",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        },
        {
          "label": "Minimum cabinet power specification",
          "value": 4,
          "unit": "kVA per cabinet",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "title": "SY3 colocation specifications",
      "summary": "Operator specifications disclose 6894 m² colocation space, minimum cabinet specification 4 kVA, UPS redundancy N+1 and cooling redundancy N+1. High-Density Cooling is explicitly listed as an available product.",
      "sourceIds": [
        "equinix-deep-sy3"
      ],
      "limitations": "Facility/service specification, not a dated installed IT load, occupancy, utilised space or GPU inventory. Cabinet apparent power cannot be converted to facility MW without additional electrical and deployment evidence. Absence of a listed cooling product is not proof the technology is absent."
    },
    {
      "id": "equinix-sy4-technical-capability",
      "category": "facility",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "facility",
      "facilityIds": [
        "equinix-sy4"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Reported colocation floor area",
          "value": 7445,
          "unit": "m²",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        },
        {
          "label": "Minimum cabinet power specification",
          "value": 4,
          "unit": "kVA per cabinet",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "title": "SY4 colocation specifications",
      "summary": "Operator specifications disclose 7445 m² colocation space, minimum cabinet specification 4 kVA, UPS redundancy N+1 and cooling redundancy N+20%.",
      "sourceIds": [
        "equinix-deep-sy4"
      ],
      "limitations": "Facility/service specification, not a dated installed IT load, occupancy, utilised space or GPU inventory. Cabinet apparent power cannot be converted to facility MW without additional electrical and deployment evidence. Absence of a listed cooling product is not proof the technology is absent."
    },
    {
      "id": "equinix-sy5-technical-capability",
      "category": "facility",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "facility",
      "facilityIds": [
        "equinix-sy5"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Reported colocation floor area",
          "value": 4948,
          "unit": "m²",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        },
        {
          "label": "Minimum cabinet power specification",
          "value": 5,
          "unit": "kVA per cabinet",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "title": "SY5 colocation specifications",
      "summary": "Operator specifications disclose 4948 m² colocation space, minimum cabinet specification 5 kVA, UPS redundancy N+1 and cooling redundancy N+1. High-Density Cooling is explicitly listed as an available product.",
      "sourceIds": [
        "equinix-deep-sy5"
      ],
      "limitations": "Facility/service specification, not a dated installed IT load, occupancy, utilised space or GPU inventory. Cabinet apparent power cannot be converted to facility MW without additional electrical and deployment evidence. Absence of a listed cooling product is not proof the technology is absent."
    },
    {
      "id": "equinix-sy6-technical-capability",
      "category": "facility",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "facility",
      "facilityIds": [
        "equinix-sy6"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Reported colocation floor area",
          "value": 2364,
          "unit": "m²",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        },
        {
          "label": "Minimum cabinet power specification",
          "value": 4,
          "unit": "kVA per cabinet",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "title": "SY6 colocation specifications",
      "summary": "Operator specifications disclose 2364 m² colocation space, minimum cabinet specification 4 kVA, UPS redundancy N+1 and cooling redundancy N+1. High-Density Cooling is explicitly listed as an available product.",
      "sourceIds": [
        "equinix-deep-sy6"
      ],
      "limitations": "Facility/service specification, not a dated installed IT load, occupancy, utilised space or GPU inventory. Cabinet apparent power cannot be converted to facility MW without additional electrical and deployment evidence. Absence of a listed cooling product is not proof the technology is absent."
    },
    {
      "id": "equinix-sy7-technical-capability",
      "category": "facility",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "facility",
      "facilityIds": [
        "equinix-sy7"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Reported colocation floor area",
          "value": 1513,
          "unit": "m²",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        },
        {
          "label": "Minimum cabinet power specification",
          "value": 3,
          "unit": "kVA per cabinet",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "title": "SY7 colocation specifications",
      "summary": "Operator specifications disclose 1513 m² colocation space, minimum cabinet specification 3 kVA, UPS redundancy N+1 and cooling redundancy not disclosed in the retrieved specification.",
      "sourceIds": [
        "equinix-deep-sy7"
      ],
      "limitations": "Facility/service specification, not a dated installed IT load, occupancy, utilised space or GPU inventory. Cabinet apparent power cannot be converted to facility MW without additional electrical and deployment evidence. Absence of a listed cooling product is not proof the technology is absent."
    },
    {
      "id": "equinix-sy9x-reported-power",
      "category": "facility",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "facility",
      "facilityIds": [
        "equinix-sy9x"
      ],
      "status": "reported",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Current reported power, basis unspecified",
          "value": 14,
          "unit": "MW",
          "period": "Undated page reviewed 2026-09-11",
          "qualifier": "minimum"
        },
        {
          "label": "Full-build power, basis unspecified",
          "value": 28,
          "unit": "MW",
          "period": "Undated page reviewed 2026-09-11",
          "qualifier": "minimum"
        }
      ],
      "asOf": null,
      "title": "SY9x reported power capacity and electrical-basis caveat",
      "summary": "Current facility prose and the June 2022 opening announcement state more than 14 MW current power capacity and more than 28 MW at full build.",
      "sourceIds": [
        "equinix-deep-sy9x",
        "equinix-deep-sy9x-opening"
      ],
      "limitations": "The installed IT basis is not explicit. The page table's 14kVA Total Sellable Capacity conflicts with its MW prose. Do not correct the unit by guessing; keep physical IT MW unknown. Ultimate and current power are overlapping, not additive. Current phase may have changed since 2022; undated text is not a dated observation."
    },
    {
      "id": "equinix-sy5-full-build-cabinets",
      "category": "facility",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "facility",
      "facilityIds": [
        "equinix-sy5"
      ],
      "status": "announced",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Full-build cabinet target",
          "value": 9220,
          "unit": "cabinets",
          "period": "Undated operator specification reviewed 2026-09-11",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "title": "SY5 full-build cabinet specification",
      "summary": "SY5's current page describes 9,220 cabinets at full build and fibre cross-connect access to SY1/SY2/SY3/SY4.",
      "sourceIds": [
        "equinix-deep-sy5"
      ],
      "limitations": "Full-build target, not current installed cabinets, GPU counts, occupied capacity or MW. Do not multiply it by the minimum cabinet kVA specification to estimate facility power."
    },
    {
      "id": "equinix-pe3-opening-phase",
      "category": "facility",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "facility",
      "facilityIds": [
        "equinix-pe3"
      ],
      "status": "reported",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Opening-phase cabinets",
          "value": 650,
          "unit": "cabinets",
          "period": "Opening announcement 2021-12-08",
          "qualifier": "reported"
        },
        {
          "label": "Full-build cabinet target",
          "value": 1650,
          "unit": "cabinets",
          "period": "Target disclosed 2021-12-08",
          "qualifier": "reported"
        }
      ],
      "asOf": "2021-12-08",
      "title": "PE3 opening-phase and campus connection",
      "summary": "On 8 December 2021 Equinix announced PE3's opening adjacent to PE2 with a secure link bridge. The first phase provided 650 cabinets and over 1,830 m² colocation space; full-build targets were 1,650 cabinets and over 10,600 m².",
      "sourceIds": [
        "equinix-deep-pe3-opening"
      ],
      "limitations": "Opening announcement date does not establish exact electrical commissioning date or MW. Current page area differs from the historical phase specification; phase, date and metric boundaries are preserved. PE2/PE3 share one physical campus; do not merge their distinct building records."
    },
    {
      "id": "equinix-harrison-ai-a100-deployment",
      "category": "deployment",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "regional",
      "facilityIds": [],
      "status": "reported",
      "workloads": [
        "training",
        "hpc"
      ],
      "hardware": [
        {
          "model": "NVIDIA DGX A100",
          "quantity": 8,
          "unit": "systems"
        }
      ],
      "metrics": [],
      "asOf": "2023-02-07",
      "title": "harrison.ai deployed eight DGX A100 systems in Sydney",
      "summary": "Equinix's 7 February 2023 Australian announcement states harrison.ai deployed eight NVIDIA DGX A100 systems at an unnamed Sydney IBX, supporting healthcare model training, data analytics and scientific computing.",
      "sourceIds": [
        "equinix-deep-harrison-ai"
      ],
      "limitations": "Eight systems is not eight GPUs. The press release does not name the facility code or disclose a current 2026 hardware count, system variant, contracted MW or total GPUs. Preserve historical regional deployment scope. Medical performance claims are not independently assessed."
    },
    {
      "id": "equinix-groq-sydney-inference",
      "category": "deployment",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "regional",
      "facilityIds": [],
      "status": "reported",
      "workloads": [
        "inference"
      ],
      "hardware": [
        {
          "model": "Groq LPU Inference Engine (generation unspecified)",
          "quantity": null,
          "unit": "accelerators"
        }
      ],
      "metrics": [],
      "asOf": "2025-11-17",
      "title": "Groq inference deployment at an unnamed Sydney IBX",
      "summary": "The 17 November 2025 Australian announcement describes Groq's Sydney deployment and low-latency GroqCloud inference access for Australia and Asia-Pacific using its LPU Inference Engine.",
      "sourceIds": [
        "equinix-deep-groq"
      ],
      "limitations": "No IBX code, accelerator count or model generation is disclosed. The LPU is a distinct accelerator, not an NVIDIA GPU. Promotional speed/cost comparisons are not independently verified or included."
    },
    {
      "id": "equinix-groq-sydney-expansion",
      "category": "contract",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "regional",
      "facilityIds": [],
      "status": "announced",
      "workloads": [
        "inference"
      ],
      "hardware": [],
      "metrics": [
        {
          "label": "Announced Groq facility power, basis unspecified",
          "value": 4.5,
          "unit": "MW",
          "period": "Australian announcement 2025-11-17",
          "qualifier": "reported"
        }
      ],
      "asOf": "2025-11-17",
      "title": "Groq and Equinix announced a 4.5 MW Sydney inference facility",
      "summary": "The same November 2025 announcement says the partners will establish a 4.5 MW Groq facility in Sydney, separately from its description of an initial deployment.",
      "sourceIds": [
        "equinix-deep-groq"
      ],
      "limitations": "Future-tense statement with no named IBX, electrical basis, installed amount or completion date. It is not evidence that all 4.5 MW was live at announcement, a public quantified lease offtake, or additional physical capacity beyond an existing host campus."
    },
    {
      "id": "equinix-diraq-sydney-announcement",
      "category": "deployment",
      "geography": "AU",
      "operator": "Equinix",
      "scope": "regional",
      "facilityIds": [],
      "status": "announced",
      "workloads": [],
      "hardware": [
        {
          "model": "Diraq silicon-spin quantum computer (eight-qubit chip)",
          "quantity": 1,
          "unit": "planned system"
        }
      ],
      "metrics": [
        {
          "label": "Planned chip qubits",
          "value": 8,
          "unit": "qubits",
          "period": "Announcement 2026-09-01",
          "qualifier": "reported"
        },
        {
          "label": "System power upper bound",
          "value": 20,
          "unit": "kW",
          "period": "Announcement 2026-09-01",
          "qualifier": "maximum"
        }
      ],
      "asOf": "2026-09-01",
      "title": "Diraq quantum system planned for a Sydney Equinix facility",
      "summary": "On 1 September 2026 Diraq and Equinix announced a planned silicon-spin quantum system at an unnamed Sydney facility, with an eight-qubit chip, self-contained cryogenic/control equipment and an October 2026 installation-completion target.",
      "sourceIds": [
        "equinix-deep-diraq"
      ],
      "limitations": "Source says less than 20 kW, not exactly 20 kW. October is a target, not evidence of a commissioned system. No facility code is disclosed. Qubits are not GPUs, and this equipment load must not be added as independent data-centre supply."
    },
    {
      "id": "equinix-inference-exchange-global",
      "category": "capability",
      "geography": "global",
      "operator": "Equinix",
      "scope": "global",
      "facilityIds": [],
      "status": "announced",
      "workloads": [
        "inference"
      ],
      "hardware": [],
      "metrics": [],
      "asOf": "2026-09-02",
      "title": "Global Equinix Inference Exchange announced for Q1 2027",
      "summary": "On 2 September 2026 Equinix announced Inference Exchange with NVIDIA Enterprise Reference Architectures and Together AI, targeting availability from Q1 2027.",
      "sourceIds": [
        "equinix-deep-nvidia-together"
      ],
      "limitations": "Global future service announcement, not evidence of an installed Australian GPU deployment. No named Australian site, GPU quantity, electrical capacity or local deployment date is specified."
    },
    {
      "id": "au-profile-telstra-st-leonards-target-power-20260911",
      "category": "facility",
      "title": "St Leonards target power specification",
      "summary": "Telstra's brochure lists 20 MW target power capacity for St Leonards, explicitly described as two 10 MW feeds.",
      "geography": "AU",
      "operator": "Telstra InfraCo",
      "scope": "facility",
      "facilityIds": [
        "telstra-st-leonards"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Target power capacity, not IT load",
          "value": 20,
          "unit": "MW",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "au-profile-telstra-brochure-20260911"
      ],
      "limitations": "This is a target electrical specification without a commissioned IT boundary or effective date. It remains outside operating, construction and planned IT subtotals. Redundant feeds are not additive usable IT capacity."
    },
    {
      "id": "au-profile-telstra-clayton-target-power-20260911",
      "category": "facility",
      "title": "Clayton target power specification",
      "summary": "Telstra's brochure lists 20 MW target power capacity for Clayton, explicitly described as two 10 MW feeds.",
      "geography": "AU",
      "operator": "Telstra InfraCo",
      "scope": "facility",
      "facilityIds": [
        "telstra-clayton"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Target power capacity, not IT load",
          "value": 20,
          "unit": "MW",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "au-profile-telstra-brochure-20260911"
      ],
      "limitations": "This is a target electrical specification without a commissioned IT boundary or effective date. It remains outside operating, construction and planned IT subtotals. Redundant feeds are not additive usable IT capacity."
    },
    {
      "id": "au-profile-telstra-deakin-target-power-20260911",
      "category": "facility",
      "title": "Deakin target power specification",
      "summary": "Telstra's brochure lists 4.5 MW target power capacity for Deakin.",
      "geography": "AU",
      "operator": "Telstra InfraCo",
      "scope": "facility",
      "facilityIds": [
        "telstra-deakin"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Target power capacity, not IT load",
          "value": 4.5,
          "unit": "MW",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "au-profile-telstra-brochure-20260911"
      ],
      "limitations": "This is a target electrical specification without a commissioned IT boundary or effective date. It remains outside operating, construction and planned IT subtotals. Redundant feeds are not additive usable IT capacity."
    },
    {
      "id": "au-profile-fujitsu-western-sydney-specification-20260911",
      "category": "facility",
      "title": "Fujitsu Western Sydney advertised IT specification",
      "summary": "The current Fujitsu portfolio page advertises 92 MW IT Load for Western Sydney. The current page explicitly calls the 92 MW figure ultimate capacity.",
      "geography": "AU",
      "operator": "Fujitsu",
      "scope": "facility",
      "facilityIds": [
        "fujitsu-western-sydney"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Advertised IT load specification",
          "value": 92,
          "unit": "MW IT",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        },
        {
          "label": "Linked fact sheet site capacity, different basis",
          "value": 60,
          "unit": "MVA",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "au-profile-fujitsu-locations-20260911",
        "au-profile-fujitsu-wsdc-20260911"
      ],
      "limitations": "The current web specification and linked fact sheet differ in electrical basis and sometimes scope. No power factor, commissioned phase, retrofit date or reconciled operating IT figure is disclosed. Neither quantity is added to operating totals."
    },
    {
      "id": "au-profile-fujitsu-noble-park-specification-20260911",
      "category": "facility",
      "title": "Fujitsu Noble Park advertised IT specification",
      "summary": "The current Fujitsu portfolio page advertises 28 MW IT Load for Noble Park. The current page labels the figure IT Load but does not identify a commissioned phase or measurement date.",
      "geography": "AU",
      "operator": "Fujitsu",
      "scope": "facility",
      "facilityIds": [
        "fujitsu-noble-park"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Advertised IT load specification",
          "value": 28,
          "unit": "MW IT",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        },
        {
          "label": "Linked fact sheet site capacity, different basis",
          "value": 12,
          "unit": "MVA",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "au-profile-fujitsu-locations-20260911",
        "au-profile-fujitsu-noble-20260911"
      ],
      "limitations": "The current web specification and linked fact sheet differ in electrical basis and sometimes scope. No power factor, commissioned phase, retrofit date or reconciled operating IT figure is disclosed. Neither quantity is added to operating totals."
    },
    {
      "id": "au-profile-fujitsu-malaga-specification-20260911",
      "category": "facility",
      "title": "Fujitsu Malaga advertised IT specification",
      "summary": "The current Fujitsu portfolio page advertises 10 MW IT Load for Malaga. The current page labels the figure IT Load but does not identify a commissioned phase or measurement date.",
      "geography": "AU",
      "operator": "Fujitsu",
      "scope": "facility",
      "facilityIds": [
        "fujitsu-malaga"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Advertised IT load specification",
          "value": 10,
          "unit": "MW IT",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        },
        {
          "label": "Linked fact sheet site capacity, different basis",
          "value": 5,
          "unit": "MVA",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "au-profile-fujitsu-locations-20260911",
        "au-profile-fujitsu-malaga-20260911"
      ],
      "limitations": "The current web specification and linked fact sheet differ in electrical basis and sometimes scope. No power factor, commissioned phase, retrofit date or reconciled operating IT figure is disclosed. Neither quantity is added to operating totals."
    },
    {
      "id": "au-profile-fujitsu-homebush-specification-20260911",
      "category": "facility",
      "title": "Fujitsu Homebush advertised IT specification",
      "summary": "The current Fujitsu portfolio page advertises 3 MW IT Load for Homebush. The current page labels the figure IT Load but does not identify a commissioned phase or measurement date.",
      "geography": "AU",
      "operator": "Fujitsu",
      "scope": "facility",
      "facilityIds": [
        "fujitsu-homebush"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Advertised IT load specification",
          "value": 3,
          "unit": "MW IT",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        },
        {
          "label": "Linked fact sheet site capacity, different basis",
          "value": 6,
          "unit": "MVA",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "au-profile-fujitsu-locations-20260911",
        "au-profile-fujitsu-homebush-20260911"
      ],
      "limitations": "The current web specification and linked fact sheet differ in electrical basis and sometimes scope. No power factor, commissioned phase, retrofit date or reconciled operating IT figure is disclosed. Neither quantity is added to operating totals."
    },
    {
      "id": "au-profile-fujitsu-north-ryde-specification-20260911",
      "category": "facility",
      "title": "Fujitsu North Ryde advertised IT specification",
      "summary": "The current Fujitsu portfolio page advertises 4.8 MW IT Load for North Ryde. The current page labels the figure IT Load but does not identify a commissioned phase or measurement date.",
      "geography": "AU",
      "operator": "Fujitsu",
      "scope": "facility",
      "facilityIds": [
        "fujitsu-north-ryde"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Advertised IT load specification",
          "value": 4.8,
          "unit": "MW IT",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        },
        {
          "label": "Linked fact sheet site capacity, different basis",
          "value": 4.8,
          "unit": "MVA",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "au-profile-fujitsu-locations-20260911",
        "au-profile-fujitsu-ryde-20260911"
      ],
      "limitations": "The current web specification and linked fact sheet differ in electrical basis and sometimes scope. No power factor, commissioned phase, retrofit date or reconciled operating IT figure is disclosed. Neither quantity is added to operating totals."
    },
    {
      "id": "au-profile-fujitsu-eight-mile-plains-specification-20260911",
      "category": "facility",
      "title": "Fujitsu Eight Mile Plains advertised IT specification",
      "summary": "The current Fujitsu portfolio page advertises 2 MW IT Load for Eight Mile Plains. The current page labels the figure IT Load but does not identify a commissioned phase or measurement date.",
      "geography": "AU",
      "operator": "Fujitsu",
      "scope": "facility",
      "facilityIds": [
        "fujitsu-eight-mile-plains"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Advertised IT load specification",
          "value": 2,
          "unit": "MW IT",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        },
        {
          "label": "Linked fact sheet site capacity, different basis",
          "value": 2,
          "unit": "MVA",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "au-profile-fujitsu-locations-20260911",
        "au-profile-fujitsu-eightmile-20260911"
      ],
      "limitations": "The current web specification and linked fact sheet differ in electrical basis and sometimes scope. No power factor, commissioned phase, retrofit date or reconciled operating IT figure is disclosed. Neither quantity is added to operating totals."
    },
    {
      "id": "au-profile-interactive-site-scope-20260911",
      "category": "facility",
      "title": "Interactive distinguishes six data centres from three physical sites",
      "summary": "Interactive describes six data centres across its Melbourne, Sydney and Brisbane sites and publishes one physical address for each campus.",
      "geography": "AU",
      "operator": "Interactive",
      "scope": "facility",
      "facilityIds": [
        "interactive-melbourne",
        "interactive-sydney",
        "interactive-brisbane"
      ],
      "status": "operating",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Operator-described data centre units",
          "value": 6,
          "unit": "data centres",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        },
        {
          "label": "Physical sites",
          "value": 3,
          "unit": "sites",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "au-profile-interactive-locations-20260911"
      ],
      "limitations": "The six internal data centre units do not establish six physical campuses. No site IT MW or installed GPU count is disclosed."
    },
    {
      "id": "au-profile-5gn-owned-versus-network-20260911",
      "category": "facility",
      "title": "5G Networks separates owned sites from partner reach",
      "summary": "The current operator page says it owns five data centres and partners with over forty more. Its city tables include other operators and network locations.",
      "geography": "AU",
      "operator": "5G Networks",
      "scope": "operator-portfolio",
      "facilityIds": [],
      "status": "reported",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Operator-reported owned data centres",
          "value": 5,
          "unit": "data centres",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "au-profile-5gn-data-centres-20260911"
      ],
      "limitations": "The portfolio count is not a row-by-row verification of ownership. Do not count every point of presence as a 5G Networks facility, allocate partner capacity, or infer the Brisbane owned-site address from a DCI network entry."
    },
    {
      "id": "au-profile-leading-edge-newcastle-modular-specification-20260911",
      "category": "facility",
      "title": "NTL1 Newcastle modular capacity specification",
      "summary": "Leading Edge advertises 1500 kW total site capacity and 375 kW IT load per module for NTL1.",
      "geography": "AU",
      "operator": "Leading Edge Data Centres",
      "scope": "facility",
      "facilityIds": [
        "leading-edge-newcastle"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Total site capacity, basis not specified",
          "value": 1500,
          "unit": "kW",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        },
        {
          "label": "IT load capacity per module",
          "value": 375,
          "unit": "kW IT per module",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "au-profile-ledc-newcastle-20260911"
      ],
      "limitations": "The site total is not explicitly labelled commissioned IT load. Installed module count is unknown. Do not multiply module capacity by an inferred count, add the module and site figures, or infer current operation from the technical specification."
    },
    {
      "id": "au-profile-leading-edge-tamworth-modular-specification-20260911",
      "category": "facility",
      "title": "TMW 1 Tamworth modular capacity specification",
      "summary": "Leading Edge advertises 375 kW total site capacity and 375 kW IT load per module for TMW 1.",
      "geography": "AU",
      "operator": "Leading Edge Data Centres",
      "scope": "facility",
      "facilityIds": [
        "leading-edge-tamworth"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Total site capacity, basis not specified",
          "value": 375,
          "unit": "kW",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        },
        {
          "label": "IT load capacity per module",
          "value": 375,
          "unit": "kW IT per module",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "au-profile-ledc-tamworth-20260911"
      ],
      "limitations": "The site total is not explicitly labelled commissioned IT load. Installed module count is unknown. Do not multiply module capacity by an inferred count, add the module and site figures, or infer current operation from the technical specification."
    },
    {
      "id": "au-profile-leading-edge-dubbo-modular-specification-20260911",
      "category": "facility",
      "title": "DBO1 Dubbo modular capacity specification",
      "summary": "Leading Edge advertises 750 kW total site capacity and 375 kW IT load per module for DBO1.",
      "geography": "AU",
      "operator": "Leading Edge Data Centres",
      "scope": "facility",
      "facilityIds": [
        "leading-edge-dubbo"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Total site capacity, basis not specified",
          "value": 750,
          "unit": "kW",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        },
        {
          "label": "IT load capacity per module",
          "value": 375,
          "unit": "kW IT per module",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "au-profile-ledc-dubbo-20260911"
      ],
      "limitations": "The site total is not explicitly labelled commissioned IT load. Installed module count is unknown. Do not multiply module capacity by an inferred count, add the module and site figures, or infer current operation from the technical specification."
    },
    {
      "id": "au-profile-leading-edge-albury-modular-specification-20260911",
      "category": "facility",
      "title": "ABX1 Albury modular capacity specification",
      "summary": "Leading Edge advertises 750 kW total site capacity and 375 kW IT load per module for ABX1.",
      "geography": "AU",
      "operator": "Leading Edge Data Centres",
      "scope": "facility",
      "facilityIds": [
        "leading-edge-albury"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Total site capacity, basis not specified",
          "value": 750,
          "unit": "kW",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        },
        {
          "label": "IT load capacity per module",
          "value": 375,
          "unit": "kW IT per module",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "au-profile-ledc-albury-20260911"
      ],
      "limitations": "The site total is not explicitly labelled commissioned IT load. Installed module count is unknown. Do not multiply module capacity by an inferred count, add the module and site figures, or infer current operation from the technical specification."
    },
    {
      "id": "au-profile-leading-edge-coffs-harbour-modular-specification-20260911",
      "category": "facility",
      "title": "CFS1 Coffs Harbour modular capacity specification",
      "summary": "Leading Edge advertises 300 kW total site capacity and 150 kW IT load per module for CFS1.",
      "geography": "AU",
      "operator": "Leading Edge Data Centres",
      "scope": "facility",
      "facilityIds": [
        "leading-edge-coffs-harbour"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Total site capacity, basis not specified",
          "value": 300,
          "unit": "kW",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        },
        {
          "label": "IT load capacity per module",
          "value": 150,
          "unit": "kW IT per module",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "au-profile-ledc-coffs-20260911"
      ],
      "limitations": "The site total is not explicitly labelled commissioned IT load. Installed module count is unknown. Do not multiply module capacity by an inferred count, add the module and site figures, or infer current operation from the technical specification."
    },
    {
      "id": "au-profile-leading-edge-wagga-wagga-modular-specification-20260911",
      "category": "facility",
      "title": "WGA1 Wagga Wagga modular capacity specification",
      "summary": "Leading Edge advertises 300 kW total site capacity and 150 kW IT load per module for WGA1.",
      "geography": "AU",
      "operator": "Leading Edge Data Centres",
      "scope": "facility",
      "facilityIds": [
        "leading-edge-wagga-wagga"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Total site capacity, basis not specified",
          "value": 300,
          "unit": "kW",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        },
        {
          "label": "IT load capacity per module",
          "value": 150,
          "unit": "kW IT per module",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "au-profile-ledc-wagga-20260911"
      ],
      "limitations": "The site total is not explicitly labelled commissioned IT load. Installed module count is unknown. Do not multiply module capacity by an inferred count, add the module and site figures, or infer current operation from the technical specification."
    },
    {
      "id": "au-profile-ledc-albury-customer-service-20260911",
      "category": "deployment",
      "title": "Faded Servers hosting service supports Albury operating status",
      "summary": "Leading Edge describes Faded Servers creating a server hosting colocation service from its Murray data centre in Albury, offering local customers rack-unit space.",
      "geography": "AU",
      "operator": "Leading Edge Data Centres",
      "scope": "facility",
      "facilityIds": [
        "leading-edge-albury"
      ],
      "status": "operating",
      "workloads": [
        "general-purpose"
      ],
      "hardware": [],
      "metrics": [],
      "asOf": null,
      "sourceIds": [
        "au-profile-ledc-albury-case-20260911",
        "au-profile-ledc-albury-20260911"
      ],
      "limitations": "This is a public customer service case study, not a disclosed signed compute offtake contract. The page is undated and provides no commissioning date, contracted MW, GPU model or training/inference workload split."
    },
    {
      "id": "au-profile-hostnetworks-protected-power-20260911",
      "category": "facility",
      "title": "Host Networks separates current protected power from upgrade potential",
      "summary": "The Brandl Street facility page specifies 550 kW current protected power and 1.25 MW in a described Tier III upgrade configuration.",
      "geography": "AU",
      "operator": "Edge Centres",
      "scope": "facility",
      "facilityIds": [
        "edgecentres-brisbane"
      ],
      "status": "capability",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Current protected electrical power, not IT load",
          "value": 550,
          "unit": "kW",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        },
        {
          "label": "Protected power in described Tier III upgrade",
          "value": 1.25,
          "unit": "MW",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "au-profile-hostnetworks-facility-20260911"
      ],
      "limitations": "Protected power is not stated to be commissioned IT load. The upgrade quantity is not a verified construction phase. Rack counts, cabinet density, cooling and redundant infrastructure are not used to infer IT MW."
    },
    {
      "id": "au-profile-vocus-connectivity-boundary-20260911",
      "category": "facility",
      "title": "Vocus data centre reach is a connectivity measure",
      "summary": "Vocus says it connects directly to 150 data centres across Australia.",
      "geography": "AU",
      "operator": "Vocus",
      "scope": "operator-portfolio",
      "facilityIds": [],
      "status": "reported",
      "workloads": [],
      "hardware": [],
      "metrics": [
        {
          "label": "Directly connected data centres",
          "value": 150,
          "unit": "data centres",
          "period": "Undated current specification, retrieved 11 September 2026",
          "qualifier": "reported"
        }
      ],
      "asOf": null,
      "sourceIds": [
        "au-profile-vocus-network-20260911"
      ],
      "limitations": "This measures carrier network reach, not ownership or operation of those facilities. No new Vocus owned-site record or capacity is proposed."
    }
  ],
  "facilityRedirects": {
    "t4-auckland": "datacom-highbrook"
  }
}