  "releaseId": "2026-09-22-preview-10",
  "previousReleaseId": "2026-09-22-preview-9",
  "publishedAt": "2026-09-22",
  "note": "Changes between dated publications. New or revised evidence can change an observation without indicating a physical change at the facility. Before and after values are retained for citation.",
  "facilities": [
    {
      "id": "airtrunk-mel1",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "notes",
        "fieldReviews",
        "commissioningEvents"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "airtrunk-mel1-operating",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "cov-airtrunk-story",
              "cov-airtrunk-mel2-announcement"
            ],
            "note": "Operator history confirms the campus has opened. Current commissioned IT MW is not separated from ultimate campus capacity in this evidence."
          }
        ],
        "sourceIds": [
          "cov-airtrunk-story",
          "cov-airtrunk-mel2-announcement",
          "dcm-9645",
          "hcf-register",
          "natural-earth-cities",
          "review-hcf-register-20260922"
        ],
        "notes": [
          "Map location, when supplied, represents the city rather than a verified facility coordinate.",
          "Do not add Datacom's colocation service within this campus as another physical data centre.",
          "Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.",
          "Directory reconciliation: Directory labels the MEL1 parent Facility, but explicitly has Building 1 and Building 2 children. Atlas correctly models the aggregate as campus; preserve that scope.",
          "Directory reconciliation: The public publisher withholds exact location. This match uses named identity only and does not use hidden embedded coordinates or addresses."
        ],
        "fieldReviews": [
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "AirTrunk Australia, MEL1: only the named Certified Strategic facility. This does not certify other buildings or the whole parent campus."
          }
        ],
        "commissioningEvents": null
      },
      "after": {
        "stages": [
          {
            "asOf": "2017-11-16",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 5,
            "mwBasis": "IT",
            "scopeId": "airtrunk-mel1-initial-2017",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "census-airtrunk-mel1-open-2017",
              "census-airtrunk-mel1-initial-it-2019"
            ],
            "note": "Initial 5 MW IT opening tranche. Later completed expansions are separate."
          },
          {
            "asOf": "2023-05",
            "mwQualifier": "minimum",
            "stage": "operating",
            "mw": 20,
            "mwBasis": "IT",
            "scopeId": "airtrunk-mel1-phase4-2023",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "census-airtrunk-mel1-phase4-complete-2023",
              "census-airtrunk-mel1-phase4-it-2024"
            ],
            "note": "Completed May 2023 expansion added 20+ MW IT. This is a separate increment from the 2017 opening tranche."
          },
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "airtrunk-mel1-other-completed-capacity",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "census-airtrunk-mel1-expansion-2024",
              "cov-airtrunk-mel2-announcement"
            ],
            "note": "Other campus phases are not yet separately quantified as completed IT load. The 25 MW subtotal is a documented lower bound, not the campus total."
          }
        ],
        "sourceIds": [
          "cov-airtrunk-story",
          "cov-airtrunk-mel2-announcement",
          "dcm-9645",
          "hcf-register",
          "natural-earth-cities",
          "review-hcf-register-20260922",
          "census-airtrunk-mel1-open-2017",
          "census-airtrunk-mel1-initial-it-2019",
          "census-airtrunk-mel1-phase4-complete-2023",
          "census-airtrunk-mel1-phase4-it-2024",
          "census-airtrunk-mel1-expansion-2024"
        ],
        "notes": [
          "Map location, when supplied, represents the city rather than a verified facility coordinate.",
          "Do not add Datacom's colocation service within this campus as another physical data centre.",
          "Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.",
          "Directory reconciliation: Directory labels the MEL1 parent Facility, but explicitly has Building 1 and Building 2 children. Atlas correctly models the aggregate as campus; preserve that scope.",
          "Directory reconciliation: The public publisher withholds exact location. This match uses named identity only and does not use hidden embedded coordinates or addresses.",
          "At least 25 MW of completed IT capacity is documented in the initial 2017 tranche and May 2023 expansion. Later 185 MW and 276+ MW campus headlines include expansion scope."
        ],
        "fieldReviews": [
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "AirTrunk Australia, MEL1: only the named Certified Strategic facility. This does not certify other buildings or the whole parent campus."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "census-airtrunk-mel1-open-2017",
              "census-airtrunk-mel1-initial-it-2019",
              "census-airtrunk-mel1-phase4-complete-2023",
              "census-airtrunk-mel1-phase4-it-2024",
              "census-airtrunk-mel1-expansion-2024"
            ],
            "note": "Initial 5 MW IT plus separate 20 MW IT expansion are documented. Additional phase capacity remains unallocated."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "census-airtrunk-mel1-open-2017",
              "census-airtrunk-mel1-phase4-complete-2023"
            ],
            "note": "The initial site opened 16 November 2017; a further 20+ MW phase was completed in May 2023."
          }
        ],
        "commissioningEvents": [
          {
            "id": "airtrunk-mel1-initial-2017",
            "label": "Initial 5 MW IT tranche opens",
            "date": "2017-11-16",
            "datePrecision": "day",
            "sourceIds": [
              "census-airtrunk-mel1-open-2017",
              "census-airtrunk-mel1-initial-it-2019"
            ],
            "note": "Primary opening date, initial IT load identified by CIO.",
            "capacityAddition": {
              "scopeId": "airtrunk-mel1-initial-2017",
              "mw": 5,
              "mwBasis": "IT",
              "sourceIds": [
                "census-airtrunk-mel1-open-2017",
                "census-airtrunk-mel1-initial-it-2019"
              ]
            }
          },
          {
            "id": "airtrunk-mel1-phase4-2023",
            "label": "20 MW IT expansion completed",
            "date": "2023-05",
            "datePrecision": "month",
            "sourceIds": [
              "census-airtrunk-mel1-phase4-complete-2023",
              "census-airtrunk-mel1-phase4-it-2024"
            ],
            "note": "Operator completion announcement; month and IT basis corroborated by Capacity Media.",
            "capacityAddition": {
              "scopeId": "airtrunk-mel1-phase4-2023",
              "mw": 20,
              "mwBasis": "IT",
              "sourceIds": [
                "census-airtrunk-mel1-phase4-complete-2023",
                "census-airtrunk-mel1-phase4-it-2024"
              ]
            }
          }
        ]
      }
    },
    {
      "id": "airtrunk-syd1",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "notes",
        "fieldReviews",
        "capacityObservations"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "airtrunk-syd1-operating",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "cov-airtrunk-story",
              "cov-airtrunk-mel2-announcement"
            ],
            "note": "Operator history confirms the campus has opened. Current commissioned IT MW is not separated from ultimate campus capacity in this evidence."
          }
        ],
        "sourceIds": [
          "cov-airtrunk-story",
          "cov-airtrunk-mel2-announcement",
          "dcm-9644",
          "hcf-register",
          "natural-earth-cities",
          "review-hcf-register-20260922"
        ],
        "notes": [
          "Map location, when supplied, represents the city rather than a verified facility coordinate.",
          "Do not add Datacom's colocation service within this campus as another physical data centre.",
          "Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.",
          "Directory reconciliation: The public publisher withholds exact location. This match uses named identity only and does not use hidden embedded coordinates or addresses."
        ],
        "fieldReviews": [
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "AirTrunk Australia, SYD1: only the named Certified Strategic facility. This does not certify other buildings or the whole parent campus."
          }
        ],
        "capacityObservations": null
      },
      "after": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "minimum",
            "stage": "operating",
            "mw": 121,
            "mwBasis": "IT",
            "scopeId": "airtrunk-syd1-completed-campus",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "census-airtrunk-syd1-it-2019",
              "census-airtrunk-syd1-complete-2022",
              "census-airtrunk-syd1-current-20260922",
              "cov-airtrunk-mel2-announcement"
            ],
            "note": "Conservative 121 MW IT lower bound for the completed SYD1 campus. The final building was completed in July 2022 at a reported 130 MW IT campus scale. The later platform announcement states 121+ MW, while the current campus page retains 130+ MW. Their difference is not explained. No hosted tenant or final phase is added separately."
          }
        ],
        "sourceIds": [
          "cov-airtrunk-story",
          "cov-airtrunk-mel2-announcement",
          "dcm-9644",
          "hcf-register",
          "natural-earth-cities",
          "review-hcf-register-20260922",
          "census-airtrunk-syd1-it-2019",
          "census-airtrunk-syd1-complete-2022",
          "census-airtrunk-syd1-current-20260922"
        ],
        "notes": [
          "Map location, when supplied, represents the city rather than a verified facility coordinate.",
          "Do not add Datacom's colocation service within this campus as another physical data centre.",
          "Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.",
          "Directory reconciliation: The public publisher withholds exact location. This match uses named identity only and does not use hidden embedded coordinates or addresses.",
          "SYD1 was reported fully built at 130 MW in July 2022. This profile uses the lower subsequent 121+ MW campus disclosure as its conservative operating contribution; it is not a claim of measured electricity consumption or tenant utilisation."
        ],
        "fieldReviews": [
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "AirTrunk Australia, SYD1: only the named Certified Strategic facility. This does not certify other buildings or the whole parent campus."
          },
          {
            "field": "capacity",
            "outcome": "conflicting",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "census-airtrunk-syd1-it-2019",
              "census-airtrunk-syd1-complete-2022",
              "census-airtrunk-syd1-current-20260922",
              "cov-airtrunk-mel2-announcement"
            ],
            "note": "The completed campus has historical 130 MW IT evidence and newer 121+ MW / 130+ MW operator headlines. A conservative 121 MW contribution is retained; the difference between current headlines is unresolved."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "census-airtrunk-syd1-complete-2022",
              "census-airtrunk-syd1-current-20260922"
            ],
            "note": "The fifth and final building was completed in July 2022 and the campus remains offered by AirTrunk."
          }
        ],
        "capacityObservations": [
          {
            "id": "airtrunk-syd1-built-20220707",
            "scopeId": "airtrunk-syd1-completed-campus",
            "date": "2022-07-07",
            "datePrecision": "day",
            "dateBasis": "reported-on",
            "mw": 130,
            "mwBasis": "IT",
            "measure": "built",
            "scope": "facility-total",
            "includedInHistory": true,
            "sourceIds": [
              "census-airtrunk-syd1-it-2019",
              "census-airtrunk-syd1-complete-2022"
            ],
            "note": "Final-building completion report for the historical 130 MW campus. This is a report date, not a commissioning date for all 130 MW."
          }
        ]
      }
    },
    {
      "id": "airtrunk-syd2",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "notes",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": "2024-08-29",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 30,
            "mwBasis": "IT",
            "scopeId": "airtrunk-syd2-phase-three",
            "sourceIds": [
              "review-airtrunk-syd2-phase3-complete-20260922",
              "review-airtrunk-syd2-phase3-it-20260922"
            ],
            "note": "Only the third-phase 30 MW increment is evidenced here. AirTrunk confirms completion; contemporaneous DCD reporting explicitly identifies the same expansion as IT capacity. Neither source establishes that the whole 120+ MW campus was fitted out.",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown"
          },
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "airtrunk-syd2-other-operating-phases",
            "sourceIds": [
              "review-airtrunk-syd2-phase3-complete-20260922",
              "review-airtrunk-syd2-profile-20260922"
            ],
            "note": "Earlier operating phases exist, but their separately commissioned IT total remains unquantified in this evidence.",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown"
          },
          {
            "asOf": "2025-10-09",
            "mwQualifier": "maximum",
            "stage": "planned",
            "capacityRole": "design-envelope",
            "scopeId": "airtrunk-syd2-apollo-approved-extension",
            "mw": 45,
            "mwBasis": "unknown",
            "sourceIds": [
              "abc-airtrunk-apollo-planning-20260922",
              "abc-airtrunk-apollo-relationship-202505"
            ],
            "note": "Approved adjoining Apollo Place extension. The 45 MW approval has no separately verified IT allocation; it remains outside IT subtotals. Its relationship to the operator whole-campus headline is unresolved.",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown"
          }
        ],
        "sourceIds": [
          "cov-airtrunk-story",
          "cov-airtrunk-mel2-announcement",
          "dcm-9647",
          "hcf-register",
          "natural-earth-cities",
          "review-hcf-register-20260922",
          "review-airtrunk-syd2-phase3-complete-20260922",
          "review-airtrunk-syd2-phase3-it-20260922",
          "review-airtrunk-syd2-profile-20260922",
          "abc-airtrunk-apollo-planning-20260922",
          "abc-airtrunk-apollo-relationship-202505"
        ],
        "notes": [
          "Map location, when supplied, represents the city rather than a verified facility coordinate.",
          "Do not add Datacom's colocation service within this campus as another physical data centre.",
          "Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.",
          "Directory reconciliation: The public publisher withholds exact location. This match uses named identity only and does not use hidden embedded coordinates or addresses.",
          "The accepted 30 MW is one completed phase, not total campus capacity. The operator used its 120 MW campus headline while this phase was still under construction in November 2023.",
          "The adjacent Apollo Place development is approved under SSD-67407231 and linked to the existing 1 Sirius Road site. No separate physical campus or certification scope is inferred."
        ],
        "fieldReviews": [
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "AirTrunk Australia, SYD2: only the named Certified Strategic facility. This does not certify other buildings or the whole parent campus."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-airtrunk-syd2-phase3-complete-20260922",
              "review-airtrunk-syd2-phase3-it-20260922",
              "review-airtrunk-syd2-profile-20260922"
            ],
            "note": "Mixed evidence roles are explicit: primary for completed phase, contemporaneous secondary for IT metric; only the non-overlapping 30 MW increment contributes."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": "2024-08-29",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 30,
            "mwBasis": "IT",
            "scopeId": "airtrunk-syd2-phase-three",
            "sourceIds": [
              "review-airtrunk-syd2-phase3-complete-20260922",
              "review-airtrunk-syd2-phase3-it-20260922"
            ],
            "note": "Only the third-phase 30 MW increment is evidenced here. AirTrunk confirms completion; contemporaneous DCD reporting explicitly identifies the same expansion as IT capacity. Neither source establishes that the whole 120+ MW campus was fitted out.",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown"
          },
          {
            "asOf": "2023-06-15",
            "mwQualifier": "approximate",
            "stage": "operating",
            "mw": 50,
            "mwBasis": "IT",
            "scopeId": "airtrunk-syd2-phases-one-two",
            "sourceIds": [
              "census-airtrunk-syd2-expansion-2023",
              "review-airtrunk-syd2-phase3-it-20260922"
            ],
            "note": "Approximately 50 MW for the first two opened phases, derived from the operator 120+ MW campus total less its 70 MW final-two-phase expansion. Both earlier phases were already open in June 2023. Contemporaneous reporting identifies the campus electrical basis as IT load. This rounded derivation is separate from the completed 30 MW phase 3 increment; phase 4 is not assumed operational.",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown"
          },
          {
            "asOf": "2025-10-09",
            "mwQualifier": "maximum",
            "stage": "planned",
            "capacityRole": "design-envelope",
            "scopeId": "airtrunk-syd2-apollo-approved-extension",
            "mw": 45,
            "mwBasis": "unknown",
            "sourceIds": [
              "abc-airtrunk-apollo-planning-20260922",
              "abc-airtrunk-apollo-relationship-202505"
            ],
            "note": "Approved adjoining Apollo Place extension. The 45 MW approval has no separately verified IT allocation; it remains outside IT subtotals. Its relationship to the operator whole-campus headline is unresolved.",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown"
          }
        ],
        "sourceIds": [
          "cov-airtrunk-story",
          "cov-airtrunk-mel2-announcement",
          "dcm-9647",
          "hcf-register",
          "natural-earth-cities",
          "review-hcf-register-20260922",
          "review-airtrunk-syd2-phase3-complete-20260922",
          "review-airtrunk-syd2-phase3-it-20260922",
          "review-airtrunk-syd2-profile-20260922",
          "abc-airtrunk-apollo-planning-20260922",
          "abc-airtrunk-apollo-relationship-202505",
          "census-airtrunk-syd2-staging-2026",
          "census-airtrunk-syd2-current-staging-20260922",
          "census-airtrunk-syd2-expansion-2023"
        ],
        "notes": [
          "Map location, when supplied, represents the city rather than a verified facility coordinate.",
          "Do not add Datacom's colocation service within this campus as another physical data centre.",
          "Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.",
          "Directory reconciliation: The public publisher withholds exact location. This match uses named identity only and does not use hidden embedded coordinates or addresses.",
          "The accepted 30 MW is one completed phase, not total campus capacity. The operator used its 120 MW campus headline while this phase was still under construction in November 2023.",
          "The adjacent Apollo Place development is approved under SSD-67407231 and linked to the existing 1 Sirius Road site. No separate physical campus or certification scope is inferred.",
          "The current operator progress page shows ShellC under construction in April 2026, and the staging drawing identifies phase 4 under construction. The 158+ MW platform headline is not evidence that every phase is operating."
        ],
        "fieldReviews": [
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "AirTrunk Australia, SYD2: only the named Certified Strategic facility. This does not certify other buildings or the whole parent campus."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "census-airtrunk-syd2-expansion-2023",
              "review-airtrunk-syd2-phase3-it-20260922",
              "review-airtrunk-syd2-phase3-complete-20260922"
            ],
            "note": "Operating contribution is approximately 80 MW: derived 50 MW from the first two opened phases plus the explicit 30 MW completed third phase. This is a disclosed-capacity reconstruction, not measured demand."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "census-airtrunk-syd2-staging-2026",
              "census-airtrunk-syd2-current-staging-20260922"
            ],
            "note": "Earlier phases are built; phase 4/ShellC was still under construction in April 2026. Apollo Place is a later phase 5."
          }
        ]
      }
    },
    {
      "id": "cdc-beard",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": 39,
            "mwBasis": "unknown",
            "scopeId": "cdc-beard-construction",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "cov-cdc-canberra"
            ],
            "note": "Beard/BE1 is explicitly under construction. Published total capacity has no IT-load basis and is excluded from IT subtotals."
          }
        ],
        "sourceIds": [
          "cov-cdc-canberra",
          "verify-cdc-canberra-20260911",
          "dcm-10752",
          "natural-earth-cities"
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-canberra-20260911"
            ],
            "note": "The operator identifies this named campus on its own location page."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-canberra-20260911"
            ],
            "note": "Hume One, Hume Two and Fyshwick are operating; Beard is under construction. The reported 21, 51, 45 and 39 MW do not have an explicit IT power definition on this page."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-canberra-20260911"
            ],
            "note": "No site-level GPU model and quantity inventory is published in the location page checked."
          },
          {
            "field": "workloads",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-canberra-20260911"
            ],
            "note": "The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads."
          },
          {
            "field": "contracts",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-canberra-20260911"
            ],
            "note": "No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-canberra-20260911"
            ],
            "note": "Hume One, Hume Two and Fyshwick are operating; Beard is under construction. The reported 21, 51, 45 and 39 MW do not have an explicit IT power definition on this page."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": "2026-09-16",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "cdc-beard-operating",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "cs-vic-cdc-investor-20260916"
            ],
            "note": "Beard 1 is delivered and contributing earnings. A historical 39 MW building figure has no established IT-load definition and is not treated as operating computing power."
          }
        ],
        "sourceIds": [
          "cov-cdc-canberra",
          "verify-cdc-canberra-20260911",
          "dcm-10752",
          "cs-vic-cdc-investor-20260916",
          "natural-earth-cities"
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-canberra-20260911"
            ],
            "note": "The operator identifies this named campus on its own location page."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-canberra-20260911"
            ],
            "note": "Hume One, Hume Two and Fyshwick are operating; Beard is under construction. The reported 21, 51, 45 and 39 MW do not have an explicit IT power definition on this page."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-canberra-20260911"
            ],
            "note": "No site-level GPU model and quantity inventory is published in the location page checked."
          },
          {
            "field": "workloads",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-canberra-20260911"
            ],
            "note": "The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads."
          },
          {
            "field": "contracts",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-canberra-20260911"
            ],
            "note": "No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "cs-vic-cdc-investor-20260916"
            ],
            "note": "Beard 1 is delivered and contributing earnings. A historical 39 MW building figure has no established IT-load definition and is not treated as operating computing power."
          }
        ]
      }
    },
    {
      "id": "cdc-brooklyn",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "notes",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "cdc-brooklyn-operating",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "cov-cdc-melbourne"
            ],
            "note": "BK1 is explicitly operational. Commissioned MW is not stated here."
          },
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "cdc-brooklyn-remainder",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "cov-cdc-melbourne"
            ],
            "note": "Remaining campus facilities are under construction; incremental MW is not separately established."
          }
        ],
        "sourceIds": [
          "cov-cdc-melbourne",
          "verify-cdc-melbourne-20260911",
          "dcm-10777",
          "natural-earth-cities",
          "review-hcf-register-20260922"
        ],
        "notes": [
          "Map location, when supplied, represents the city rather than a verified facility coordinate.",
          "Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.",
          "The HCF register names Brooklyn 1 as Certified Strategic facilities. Certification is attached to their individual building records; no whole-campus certificate or certified campus MW is inferred."
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-melbourne-20260911"
            ],
            "note": "The operator identifies this named campus on its own location page."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-melbourne-20260911"
            ],
            "note": "BK1 is operating; the remaining Brooklyn facilities and Laverton campus are under construction. Ultimate campus figures are not a phase-by-phase commissioned power schedule."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-melbourne-20260911"
            ],
            "note": "No site-level GPU model and quantity inventory is published in the location page checked."
          },
          {
            "field": "workloads",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-melbourne-20260911"
            ],
            "note": "The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads."
          },
          {
            "field": "contracts",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-melbourne-20260911"
            ],
            "note": "No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-melbourne-20260911"
            ],
            "note": "BK1 is operating; the remaining Brooklyn facilities and Laverton campus are under construction. Ultimate campus figures are not a phase-by-phase commissioned power schedule."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": "2026-06-30",
            "mwQualifier": "approximate",
            "stage": "operating",
            "mw": 130,
            "mwBasis": "IT",
            "scopeId": "cdc-brooklyn-operating",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "census-cdc-valuation-20260630",
              "census-cdc-brooklyn-victoria-20260304",
              "cs-vic-cdc-investor-20260916"
            ],
            "note": "Approximately 130 MW of operating primary ICT capacity, derived from CDC’s Victorian regional total. Brooklyn is CDC’s only operating Victorian campus; the government confirms two operational facilities, while the September investor update places Laverton’s first opening in late FY27. The regional figure is rounded to the nearest 10 MW and is assigned once to the campus, without duplicating BK1 and BK2."
          },
          {
            "asOf": "2026-03-04",
            "mwQualifier": "reported",
            "stage": "planned",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "cdc-brooklyn-remainder",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "census-cdc-brooklyn-victoria-20260304"
            ],
            "note": "A third Brooklyn facility was in planning at the government’s March 2026 campus-opening announcement; incremental ICT capacity is not established."
          }
        ],
        "sourceIds": [
          "cov-cdc-melbourne",
          "verify-cdc-melbourne-20260911",
          "dcm-10777",
          "natural-earth-cities",
          "review-hcf-register-20260922",
          "census-cdc-valuation-20260630",
          "census-cdc-brooklyn-victoria-20260304",
          "cs-vic-cdc-investor-20260916"
        ],
        "notes": [
          "Map location, when supplied, represents the city rather than a verified facility coordinate.",
          "Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.",
          "The HCF register names Brooklyn 1 as Certified Strategic facilities. Certification is attached to their individual building records; no whole-campus certificate or certified campus MW is inferred.",
          "Operating primary ICT capacity is derived from the sole operating Victorian campus and the regional portfolio disclosure. It is a rounded campus allocation, not a building-by-building measure."
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-melbourne-20260911"
            ],
            "note": "The operator identifies this named campus on its own location page."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "census-cdc-valuation-20260630",
              "census-cdc-brooklyn-victoria-20260304",
              "cs-vic-cdc-investor-20260916"
            ],
            "note": "Approximately 130 MW of operating primary ICT capacity, derived from CDC’s Victorian regional total. Brooklyn is CDC’s only operating Victorian campus; the government confirms two operational facilities, while the September investor update places Laverton’s first opening in late FY27. The regional figure is rounded to the nearest 10 MW and is assigned once to the campus, without duplicating BK1 and BK2."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-melbourne-20260911"
            ],
            "note": "No site-level GPU model and quantity inventory is published in the location page checked."
          },
          {
            "field": "workloads",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-melbourne-20260911"
            ],
            "note": "The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads."
          },
          {
            "field": "contracts",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-melbourne-20260911"
            ],
            "note": "No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-melbourne-20260911"
            ],
            "note": "BK1 is operating; the remaining Brooklyn facilities and Laverton campus are under construction. Ultimate campus figures are not a phase-by-phase commissioned power schedule."
          }
        ]
      }
    },
    {
      "id": "cdc-eastern-creek",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "cdc-eastern-creek-operating",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "cov-cdc-sydney"
            ],
            "note": "EC1–EC4 are explicitly operational; current commissioned campus MW is not separately stated."
          },
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "cdc-eastern-creek-ec5-ec6",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "cov-cdc-sydney"
            ],
            "note": "EC5 and EC6 are explicitly under construction; separate incremental MW is unknown."
          }
        ],
        "sourceIds": [
          "cov-cdc-sydney",
          "verify-cdc-sydney-20260911",
          "dcm-10630",
          "natural-earth-cities",
          "review-hcf-register-20260922"
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-sydney-20260911"
            ],
            "note": "The operator identifies this named campus on its own location page."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-sydney-20260911"
            ],
            "note": "EC1–EC4 are operational; EC5/EC6 and Marsden Park are under construction. Planned campus envelopes are not current commissioned capacity."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-sydney-20260911"
            ],
            "note": "No site-level GPU model and quantity inventory is published in the location page checked."
          },
          {
            "field": "workloads",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-sydney-20260911"
            ],
            "note": "The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads."
          },
          {
            "field": "contracts",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-sydney-20260911"
            ],
            "note": "No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-sydney-20260911"
            ],
            "note": "EC1–EC4 are operational; EC5/EC6 and Marsden Park are under construction. Planned campus envelopes are not current commissioned capacity."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": "2026-09-16",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "cdc-eastern-creek-operating",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "cs-vic-cdc-investor-20260916"
            ],
            "note": "The investor presentation confirms EC5 and EC6 delivery in addition to the existing EC1-4. EC5 and EC6 are recorded as operating; no separate building MW allocation is disclosed."
          }
        ],
        "sourceIds": [
          "cov-cdc-sydney",
          "verify-cdc-sydney-20260911",
          "dcm-10630",
          "natural-earth-cities",
          "review-hcf-register-20260922",
          "cs-vic-cdc-investor-20260916"
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-sydney-20260911"
            ],
            "note": "The operator identifies this named campus on its own location page."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-sydney-20260911"
            ],
            "note": "EC1–EC4 are operational; EC5/EC6 and Marsden Park are under construction. Planned campus envelopes are not current commissioned capacity."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-sydney-20260911"
            ],
            "note": "No site-level GPU model and quantity inventory is published in the location page checked."
          },
          {
            "field": "workloads",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-sydney-20260911"
            ],
            "note": "The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads."
          },
          {
            "field": "contracts",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-sydney-20260911"
            ],
            "note": "No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "cs-vic-cdc-investor-20260916"
            ],
            "note": "The investor presentation confirms EC5 and EC6 delivery in addition to the existing EC1-4. EC5 and EC6 are recorded as operating; no separate building MW allocation is disclosed."
          }
        ]
      }
    },
    {
      "id": "cdc-marsden-park",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "cdc-marsden-park-construction",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "cov-cdc-sydney"
            ],
            "note": "Operator describes early construction. Whole-campus planned capacity is not a measured amount currently under construction."
          }
        ],
        "sourceIds": [
          "cov-cdc-sydney",
          "verify-cdc-sydney-20260911",
          "verify-cdc-marsden-planning-20260911",
          "dcm-11304",
          "natural-earth-cities"
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-sydney-20260911"
            ],
            "note": "The operator identifies this named campus on its own location page."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-sydney-20260911"
            ],
            "note": "EC1–EC4 are operational; EC5/EC6 and Marsden Park are under construction. Planned campus envelopes are not current commissioned capacity."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-sydney-20260911"
            ],
            "note": "No site-level GPU model and quantity inventory is published in the location page checked."
          },
          {
            "field": "workloads",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-sydney-20260911"
            ],
            "note": "The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads."
          },
          {
            "field": "contracts",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-sydney-20260911"
            ],
            "note": "No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-sydney-20260911",
              "verify-cdc-marsden-planning-20260911"
            ],
            "note": "NSW approval dated 27 November 2025 (SSD-70889211) is verified. CDC separately describes the campus as in early construction. Approval and construction are separate milestones."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": "2026-09-16",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "cdc-marsden-park-operating",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "cs-vic-cdc-investor-20260916"
            ],
            "note": "Marsden Park 1 is operational; additional buildings are under construction for FY28-29 delivery. Capacity is contained in the NSW portfolio total and is not separately allocated."
          },
          {
            "asOf": "2026-09-16",
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "cdc-marsden-park-construction",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "cs-vic-cdc-investor-20260916"
            ],
            "note": "Later Marsden Park buildings are under construction. Their separate fitted IT capacities have not been allocated."
          }
        ],
        "sourceIds": [
          "cov-cdc-sydney",
          "verify-cdc-sydney-20260911",
          "verify-cdc-marsden-planning-20260911",
          "dcm-11304",
          "cs-vic-cdc-investor-20260916",
          "natural-earth-cities"
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-sydney-20260911"
            ],
            "note": "The operator identifies this named campus on its own location page."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-sydney-20260911"
            ],
            "note": "EC1–EC4 are operational; EC5/EC6 and Marsden Park are under construction. Planned campus envelopes are not current commissioned capacity."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-sydney-20260911"
            ],
            "note": "No site-level GPU model and quantity inventory is published in the location page checked."
          },
          {
            "field": "workloads",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-sydney-20260911"
            ],
            "note": "The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads."
          },
          {
            "field": "contracts",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-cdc-sydney-20260911"
            ],
            "note": "No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "cs-vic-cdc-investor-20260916"
            ],
            "note": "Marsden Park 1 is operational; additional buildings are under construction for FY28-29 delivery. Capacity is contained in the NSW portfolio total and is not separately allocated."
          }
        ]
      }
    },
    {
      "id": "dcm-10635",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "dcm-10635-operator-status",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "review-cdc-sydney-20260922"
            ],
            "note": "CDC expressly identifies EC5 as under construction. No separate installed or in-progress building IT MW is disclosed here; parent-campus and building values are not summed."
          }
        ],
        "sourceIds": [
          "dcm-10635",
          "natural-earth-cities",
          "review-cdc-sydney-20260922"
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-cdc-sydney-20260922"
            ],
            "note": "CDC identifies EC5 within its Eastern Creek campus."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-cdc-sydney-20260922"
            ],
            "note": "The operator lists EC5 as under construction. Separate building-level IT MW is not disclosed."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": "2026-09-16",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "dcm-10635-operating",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "cs-vic-cdc-investor-20260916"
            ],
            "note": "CDC’s September investor presentation identifies Eastern Creek 5 and 6, Hume 6 and Marsden Park 1 as delivered and contributing earnings. This is an evidenced status date, not the exact commissioning date."
          }
        ],
        "sourceIds": [
          "dcm-10635",
          "natural-earth-cities",
          "review-cdc-sydney-20260922",
          "cs-vic-cdc-investor-20260916"
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-cdc-sydney-20260922"
            ],
            "note": "CDC identifies EC5 within its Eastern Creek campus."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "cs-vic-cdc-investor-20260916"
            ],
            "note": "CDC’s September investor presentation identifies Eastern Creek 5 and 6, Hume 6 and Marsden Park 1 as delivered and contributing earnings. This is an evidenced status date, not the exact commissioning date."
          }
        ]
      }
    },
    {
      "id": "dcm-10636",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "dcm-10636-operator-status",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "review-cdc-sydney-20260922"
            ],
            "note": "CDC expressly identifies EC6 as under construction. No separate installed or in-progress building IT MW is disclosed here; parent-campus and building values are not summed."
          }
        ],
        "sourceIds": [
          "dcm-10636",
          "natural-earth-cities",
          "review-cdc-sydney-20260922"
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-cdc-sydney-20260922"
            ],
            "note": "CDC identifies EC6 within its Eastern Creek campus."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-cdc-sydney-20260922"
            ],
            "note": "The operator lists EC6 as under construction. Separate building-level IT MW is not disclosed."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": "2026-09-16",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "dcm-10636-operating",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "cs-vic-cdc-investor-20260916"
            ],
            "note": "CDC’s September investor presentation identifies Eastern Creek 5 and 6, Hume 6 and Marsden Park 1 as delivered and contributing earnings. This is an evidenced status date, not the exact commissioning date."
          }
        ],
        "sourceIds": [
          "dcm-10636",
          "natural-earth-cities",
          "review-cdc-sydney-20260922",
          "cs-vic-cdc-investor-20260916"
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-cdc-sydney-20260922"
            ],
            "note": "CDC identifies EC6 within its Eastern Creek campus."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "cs-vic-cdc-investor-20260916"
            ],
            "note": "CDC’s September investor presentation identifies Eastern Creek 5 and 6, Hume 6 and Marsden Park 1 as delivered and contributing earnings. This is an evidenced status date, not the exact commissioning date."
          }
        ]
      }
    },
    {
      "id": "dcm-11305",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "dcm-11305-unverified",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "dcm-11305"
            ],
            "note": "Directory reports Under Construction. No comparable IT capacity or commissioning date has been accepted from this listing."
          }
        ],
        "sourceIds": [
          "dcm-11305",
          "natural-earth-cities"
        ],
        "fieldReviews": null
      },
      "after": {
        "stages": [
          {
            "asOf": "2026-09-16",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "dcm-11305-operating",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "cs-vic-cdc-investor-20260916"
            ],
            "note": "CDC’s September investor presentation identifies Eastern Creek 5 and 6, Hume 6 and Marsden Park 1 as delivered and contributing earnings. This is an evidenced status date, not the exact commissioning date."
          }
        ],
        "sourceIds": [
          "dcm-11305",
          "cs-vic-cdc-investor-20260916",
          "natural-earth-cities"
        ],
        "fieldReviews": [
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "cs-vic-cdc-investor-20260916"
            ],
            "note": "CDC’s September investor presentation identifies Eastern Creek 5 and 6, Hume 6 and Marsden Park 1 as delivered and contributing earnings. This is an evidenced status date, not the exact commissioning date."
          }
        ]
      }
    },
    {
      "id": "dcm-18986",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "unknown",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "dcm-18986-unverified",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "dcm-18986"
            ],
            "note": "This directory listing does not establish a current commissioned lifecycle. Technical figures remain directory-reported observations, outside capacity totals."
          }
        ],
        "sourceIds": [
          "dcm-18986",
          "natural-earth-cities",
          "review-hcf-register-20260922"
        ],
        "fieldReviews": [
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "Canberra Data Centres, Brooklyn 1: only the named Certified Strategic facility. This does not certify other buildings or the whole parent campus."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": "2026-03-04",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "dcm-18986-operating",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "census-cdc-brooklyn-victoria-20260304",
              "cs-vic-cdc-investor-20260916"
            ],
            "note": "BK1 and BK2 form the two operational Brooklyn buildings. Their capacity is counted only at the parent campus."
          }
        ],
        "sourceIds": [
          "dcm-18986",
          "natural-earth-cities",
          "review-hcf-register-20260922",
          "census-cdc-brooklyn-victoria-20260304",
          "cs-vic-cdc-investor-20260916"
        ],
        "fieldReviews": [
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "Canberra Data Centres, Brooklyn 1: only the named Certified Strategic facility. This does not certify other buildings or the whole parent campus."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "census-cdc-brooklyn-victoria-20260304",
              "cs-vic-cdc-investor-20260916"
            ],
            "note": "BK1 and BK2 form the two operational Brooklyn buildings. Their capacity is counted only at the parent campus."
          }
        ]
      }
    },
    {
      "id": "dcm-18987",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "unknown",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "dcm-18987-unverified",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "dcm-18987"
            ],
            "note": "This directory listing does not establish a current commissioned lifecycle. Technical figures remain directory-reported observations, outside capacity totals."
          }
        ],
        "sourceIds": [
          "dcm-18987",
          "natural-earth-cities"
        ],
        "fieldReviews": null
      },
      "after": {
        "stages": [
          {
            "asOf": "2026-03-04",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "dcm-18987-operating",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "census-cdc-brooklyn-victoria-20260304",
              "cs-vic-cdc-investor-20260916"
            ],
            "note": "BK1 and BK2 form the two operational Brooklyn buildings. Their capacity is counted only at the parent campus."
          }
        ],
        "sourceIds": [
          "dcm-18987",
          "census-cdc-brooklyn-victoria-20260304",
          "cs-vic-cdc-investor-20260916",
          "natural-earth-cities"
        ],
        "fieldReviews": [
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "census-cdc-brooklyn-victoria-20260304",
              "cs-vic-cdc-investor-20260916"
            ],
            "note": "BK1 and BK2 form the two operational Brooklyn buildings. Their capacity is counted only at the parent campus."
          }
        ]
      }
    },
    {
      "id": "dcm-18988",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "dcm-18988-unverified",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "dcm-18988"
            ],
            "note": "Directory reports Under Construction. No comparable IT capacity or commissioning date has been accepted from this listing."
          }
        ],
        "sourceIds": [
          "dcm-18988",
          "natural-earth-cities"
        ],
        "fieldReviews": null
      },
      "after": {
        "stages": [
          {
            "asOf": "2026-09-16",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "dcm-18988-operating",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "cs-vic-cdc-investor-20260916"
            ],
            "note": "CDC’s September investor presentation identifies Eastern Creek 5 and 6, Hume 6 and Marsden Park 1 as delivered and contributing earnings. This is an evidenced status date, not the exact commissioning date."
          }
        ],
        "sourceIds": [
          "dcm-18988",
          "cs-vic-cdc-investor-20260916",
          "natural-earth-cities"
        ],
        "fieldReviews": [
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "cs-vic-cdc-investor-20260916"
            ],
            "note": "CDC’s September investor presentation identifies Eastern Creek 5 and 6, Hume 6 and Marsden Park 1 as delivered and contributing earnings. This is an evidenced status date, not the exact commissioning date."
          }
        ]
      }
    },
    {
      "id": "equinix-sy9x",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "notes",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": "2022-06-14",
            "mwQualifier": "minimum",
            "stage": "operating",
            "mw": 14,
            "mwBasis": "unknown",
            "scopeId": "equinix-sy9x-operating",
            "sourceIds": [
              "equinix-deep-sy9x-opening",
              "review-equinix-sy9x-profile-20260922"
            ],
            "note": "More than 14 MW current power disclosed at opening on 14 June 2022 and repeated on the live page. IT versus total facility basis is not specified; excluded from comparable IT totals. More than 28 MW is the eventual whole-facility target.",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown"
          }
        ],
        "sourceIds": [
          "cov-equinix-availability",
          "loc-equinix-sy9x",
          "equinix-deep-sy9x",
          "equinix-deep-availability",
          "dcm-9140",
          "equinix-deep-sy9x-opening",
          "review-equinix-sy9x-profile-20260922"
        ],
        "notes": [
          "Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.",
          "The facility overview and opening release report more than 14 MW, while the live technical table shows Total Sellable Capacity 14 kVA. This unresolved unit inconsistency is preserved; neither value is converted to installed IT power."
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "sourceIds": [
              "equinix-deep-sy9x"
            ],
            "checkedOn": "2026-09-11",
            "note": "Fresh dedicated facility heading identifies SY9X; service descriptions and facility-specific specification tables were reviewed."
          },
          {
            "field": "status",
            "outcome": "verified",
            "sourceIds": [
              "equinix-deep-sy9x",
              "equinix-deep-availability"
            ],
            "checkedOn": "2026-09-11",
            "note": "The fresh operational-coverage document explicitly lists this named facility's on-site operational coverage; facility page provides current services. Non-24/7 coverage describes staffing, not a non-operating data centre."
          },
          {
            "field": "address",
            "outcome": "verified",
            "sourceIds": [
              "equinix-deep-sy9x"
            ],
            "checkedOn": "2026-09-11",
            "note": "The operator publishes this facility address: 8A Grand Avenue, Rosehill, Lot 9 DP 1275083, Sydney."
          },
          {
            "field": "coordinates",
            "outcome": "verified",
            "sourceIds": [
              "equinix-deep-sy9x"
            ],
            "checkedOn": "2026-09-11",
            "note": "The operator’s named-facility map marker identifies this location. A map view-centre is not a facility coordinate."
          },
          {
            "field": "capacity",
            "outcome": "conflicting",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "equinix-deep-sy9x-opening",
              "review-equinix-sy9x-profile-20260922"
            ],
            "note": "Opening release and facility overview agree on more than 14 MW power. The current technical table says Total Sellable Capacity 14 kVA. Electrical basis and this unit inconsistency remain unresolved; no IT subtotal contribution."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "sourceIds": [
              "equinix-deep-sy9x"
            ],
            "checkedOn": "2026-09-11",
            "note": "No installed GPU/accelerator model-and-quantity inventory is disclosed on this named facility page. DGX-ready branding, cloud connectivity or high-density cooling would describe capability only."
          },
          {
            "field": "workloads",
            "outcome": "verified",
            "sourceIds": [
              "equinix-deep-sy9x"
            ],
            "checkedOn": "2026-09-11",
            "note": "Verified service capability is hyperscale core deployment. No measured training-versus-inference workload split is disclosed. Regional announcements with unnamed facilities are not allocated to this site."
          },
          {
            "field": "contracts",
            "outcome": "not-found",
            "sourceIds": [
              "equinix-deep-sy9x"
            ],
            "checkedOn": "2026-09-11",
            "note": "No quantified named customer compute offtake commitment is disclosed in this named facility page. Cloud on-ramps, generic customer ecosystems and capital/JV agreements are not tenant MW contracts."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": "2022-06-14",
            "mwQualifier": "minimum",
            "stage": "operating",
            "mw": 14,
            "mwBasis": "IT",
            "scopeId": "equinix-sy9x-operating",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "equinix-deep-sy9x-opening",
              "review-equinix-sy9x-profile-20260922",
              "census-equinix-q226",
              "census-equinix-rosehill-scoping-20221220",
              "census-equinix-xscale-it-definition-20201120"
            ],
            "note": "The operator reports more than 14 MW operating at SY9x, distinct from the eventual >28 MW facility. Atlas interprets this as customer IT capacity from xScale’s commercial phase reporting, the operator’s IT-load terminology and the planning distinction between 45 MW gross and 30 MW IT design. This electrical-basis interpretation is inferred across sources, not a directly stated 14 MW IT specification. The separate 14 MW second phase remained under development at 30 June 2026.",
            "basisEvidence": "inferred"
          },
          {
            "asOf": "2026-06-30",
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": 14,
            "mwBasis": "IT",
            "basisEvidence": "inferred",
            "scopeId": "equinix-sy9x-phase-two",
            "includedInTotals": true,
            "expectedYear": 2026,
            "dateConfidence": "target",
            "sourceIds": [
              "census-equinix-q226",
              "census-equinix-xscale-it-definition-20201120"
            ],
            "note": "Sydney 9x-2 is a separate 14 MW phase under development in the June 2026 investor schedule, with a third-quarter 2026 target. IT basis is inferred from the same xScale customer-capacity definition used for the operating phase. A target date is not evidence of completion."
          }
        ],
        "sourceIds": [
          "cov-equinix-availability",
          "loc-equinix-sy9x",
          "equinix-deep-sy9x",
          "equinix-deep-availability",
          "dcm-9140",
          "equinix-deep-sy9x-opening",
          "review-equinix-sy9x-profile-20260922",
          "census-equinix-q226",
          "census-equinix-rosehill-scoping-20221220",
          "census-equinix-xscale-it-definition-20201120"
        ],
        "notes": [
          "Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.",
          "SY9x customer IT capacity is interpreted across primary operator, investor and planning sources. The initial operating phase and the second phase under development are separate. The live table’s 14 kVA entry conflicts with the operator’s MW narrative and is not used."
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "sourceIds": [
              "equinix-deep-sy9x"
            ],
            "checkedOn": "2026-09-11",
            "note": "Fresh dedicated facility heading identifies SY9X; service descriptions and facility-specific specification tables were reviewed."
          },
          {
            "field": "status",
            "outcome": "verified",
            "sourceIds": [
              "equinix-deep-sy9x",
              "equinix-deep-availability"
            ],
            "checkedOn": "2026-09-11",
            "note": "The fresh operational-coverage document explicitly lists this named facility's on-site operational coverage; facility page provides current services. Non-24/7 coverage describes staffing, not a non-operating data centre."
          },
          {
            "field": "address",
            "outcome": "verified",
            "sourceIds": [
              "equinix-deep-sy9x"
            ],
            "checkedOn": "2026-09-11",
            "note": "The operator publishes this facility address: 8A Grand Avenue, Rosehill, Lot 9 DP 1275083, Sydney."
          },
          {
            "field": "coordinates",
            "outcome": "verified",
            "sourceIds": [
              "equinix-deep-sy9x"
            ],
            "checkedOn": "2026-09-11",
            "note": "The operator’s named-facility map marker identifies this location. A map view-centre is not a facility coordinate."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "equinix-deep-sy9x-opening",
              "review-equinix-sy9x-profile-20260922",
              "census-equinix-q226",
              "census-equinix-rosehill-scoping-20221220",
              "census-equinix-xscale-it-definition-20201120"
            ],
            "note": "Operating capacity is explicitly reported; the IT electrical boundary is an explained inference across primary sources."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "sourceIds": [
              "equinix-deep-sy9x"
            ],
            "checkedOn": "2026-09-11",
            "note": "No installed GPU/accelerator model-and-quantity inventory is disclosed on this named facility page. DGX-ready branding, cloud connectivity or high-density cooling would describe capability only."
          },
          {
            "field": "workloads",
            "outcome": "verified",
            "sourceIds": [
              "equinix-deep-sy9x"
            ],
            "checkedOn": "2026-09-11",
            "note": "Verified service capability is hyperscale core deployment. No measured training-versus-inference workload split is disclosed. Regional announcements with unnamed facilities are not allocated to this site."
          },
          {
            "field": "contracts",
            "outcome": "not-found",
            "sourceIds": [
              "equinix-deep-sy9x"
            ],
            "checkedOn": "2026-09-11",
            "note": "No quantified named customer compute offtake commitment is disclosed in this named facility page. Cloud on-ramps, generic customer ecosystems and capital/JV agreements are not tenant MW contracts."
          }
        ]
      }
    },
    {
      "id": "macquarie-ic2",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 6,
            "mwBasis": "IT",
            "scopeId": "macquarie-ic2-operating",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "cov-macquarie-ic2",
              "cov-macquarie-campuses",
              "cov-macquarie-hy26"
            ],
            "note": "Published IT-load specification for an operating facility, not an explicit commissioned fit-out observation. Excluded from commissioned IT subtotals pending reconciliation with the 21 MW portfolio installed-capacity statement."
          }
        ],
        "sourceIds": [
          "cov-macquarie-ic2",
          "cov-macquarie-campuses",
          "cov-macquarie-hy26",
          "compute-macquarie-ai-20260911",
          "compute-macquarie-dell-20260911",
          "compute-macquarie-hy26-20260911",
          "location-macquarie-contact-20260911",
          "dcm-3546",
          "hcf-register",
          "review-hcf-register-20260922"
        ],
        "fieldReviews": [
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "compute-macquarie-ai-20260911",
              "compute-macquarie-dell-20260911",
              "compute-macquarie-hy26-20260911"
            ],
            "note": "No installed accelerator model/quantity attributable to this individual facility in this bounded source set."
          },
          {
            "field": "contracts",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "compute-macquarie-hy26-20260911",
              "compute-macquarie-dell-20260911"
            ],
            "note": "Portfolio customers are not mapped to named buildings. Dell/NVIDIA is a supplier collaboration, not a named tenant contract."
          },
          {
            "field": "address",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "location-macquarie-contact-20260911"
            ],
            "note": "Matched the exact named Intellicentre entry, separate from corporate offices."
          },
          {
            "field": "coordinates",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "location-macquarie-contact-20260911"
            ],
            "note": "Official shared campus destination for IC2 and IC3 East, not a separately surveyed IC2 building footprint."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "Macquarie Technology, IC2: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": "2021-11-08",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 6,
            "mwBasis": "IT",
            "scopeId": "macquarie-ic2-operating",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "census-macquarie-eis-20211108",
              "review-macquarie-sydney-spec-20260922",
              "cs-verify-macquarie-fy26-20260922"
            ],
            "note": "Macquarie commissioned environmental assessment states IC2 was operating at full capacity, unlike partially operating IC3 East. The operator identifies IC2 capacity as6 MW IT. This is allocated within the21 MW installed Australian portfolio, not added on top of it."
          }
        ],
        "sourceIds": [
          "cov-macquarie-ic2",
          "cov-macquarie-campuses",
          "cov-macquarie-hy26",
          "compute-macquarie-ai-20260911",
          "compute-macquarie-dell-20260911",
          "compute-macquarie-hy26-20260911",
          "location-macquarie-contact-20260911",
          "dcm-3546",
          "hcf-register",
          "review-hcf-register-20260922",
          "census-macquarie-eis-20211108",
          "review-macquarie-sydney-spec-20260922",
          "cs-verify-macquarie-fy26-20260922"
        ],
        "fieldReviews": [
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "compute-macquarie-ai-20260911",
              "compute-macquarie-dell-20260911",
              "compute-macquarie-hy26-20260911"
            ],
            "note": "No installed accelerator model/quantity attributable to this individual facility in this bounded source set."
          },
          {
            "field": "contracts",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "compute-macquarie-hy26-20260911",
              "compute-macquarie-dell-20260911"
            ],
            "note": "Portfolio customers are not mapped to named buildings. Dell/NVIDIA is a supplier collaboration, not a named tenant contract."
          },
          {
            "field": "address",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "location-macquarie-contact-20260911"
            ],
            "note": "Matched the exact named Intellicentre entry, separate from corporate offices."
          },
          {
            "field": "coordinates",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "location-macquarie-contact-20260911"
            ],
            "note": "Official shared campus destination for IC2 and IC3 East, not a separately surveyed IC2 building footprint."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "Macquarie Technology, IC2: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "census-macquarie-eis-20211108",
              "review-macquarie-sydney-spec-20260922",
              "cs-verify-macquarie-fy26-20260922"
            ],
            "note": "Macquarie commissioned environmental assessment states IC2 was operating at full capacity, unlike partially operating IC3 East. The operator identifies IC2 capacity as6 MW IT. This is allocated within the21 MW installed Australian portfolio, not added on top of it."
          }
        ]
      }
    },
    {
      "id": "nextdc-b1",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "nextdc-b1-operating",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-directory",
              "nextdc-operating-edge"
            ],
            "note": "Operator identifies an operational facility. Commissioned IT capacity has not been separately reconciled; directory design MW is not used as live MW."
          }
        ],
        "sourceIds": [
          "nextdc-directory",
          "nextdc-operating-edge",
          "hcf-register",
          "verify-nextdc-directory",
          "verify-nextdc-b1",
          "verify-nextdc-fy26",
          "dcm-3118",
          "review-hcf-register-20260922"
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-b1"
            ],
            "note": "The operator identifies NEXTDC B1 Brisbane. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-b1",
              "verify-nextdc-fy26"
            ],
            "note": "A separate current built/commissioned capacity allocation was not found for B1. Directory design specifications cannot fill the 69.8 MW difference between NEXTDC's Australian aggregate and named-site subtotal."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-b1"
            ],
            "note": "This facility page does not disclose an installed GPU inventory with model and count. AI-ready or NVIDIA programme capability is not a hardware inventory."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC, Brisbane 1: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": "2014-06-30",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 2.25,
            "mwBasis": "IT",
            "scopeId": "nextdc-b1-operating",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "census-nextdc-fy14-20140825",
              "verify-nextdc-b1"
            ],
            "note": "NEXTDC FY14 names B1 with2.25 MW built at30 June2014. The current B1 site specification remains2.25 MW IT. This is an established fitted-out allocation within the Australian NEXTDC portfolio total."
          }
        ],
        "sourceIds": [
          "nextdc-directory",
          "nextdc-operating-edge",
          "hcf-register",
          "verify-nextdc-directory",
          "verify-nextdc-b1",
          "verify-nextdc-fy26",
          "dcm-3118",
          "review-hcf-register-20260922",
          "census-nextdc-fy14-20140825"
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-b1"
            ],
            "note": "The operator identifies NEXTDC B1 Brisbane. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "census-nextdc-fy14-20140825",
              "verify-nextdc-b1"
            ],
            "note": "NEXTDC FY14 names B1 with2.25 MW built at30 June2014. The current B1 site specification remains2.25 MW IT. This is an established fitted-out allocation within the Australian NEXTDC portfolio total."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-b1"
            ],
            "note": "This facility page does not disclose an installed GPU inventory with model and count. AI-ready or NVIDIA programme capability is not a hardware inventory."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC, Brisbane 1: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      }
    },
    {
      "id": "nextdc-b2",
      "change": "updated",
      "fields": [
        "stages",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 6,
            "mwBasis": "IT",
            "scopeId": "nextdc-b2-operating",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-b2-page"
            ],
            "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply."
          },
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": 2,
            "mwBasis": "IT",
            "scopeId": "nextdc-b2-construction",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-b2-page"
            ],
            "note": "FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
          }
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-fy26"
            ],
            "note": "The operator identifies NEXTDC B2 Brisbane. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-fy26"
            ],
            "note": "Existing accepted scope values match the named FY26 development disclosures: operating 6 MW IT; construction 2 MW IT. Built means designed power of fitted-out halls; no ultimate-campus amount is added to its included phases."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-fy26"
            ],
            "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC, Brisbane 2: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": "2026-06-30",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 6,
            "mwBasis": "IT",
            "scopeId": "nextdc-b2-operating",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-b2-page"
            ],
            "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply."
          },
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": 2,
            "mwBasis": "IT",
            "scopeId": "nextdc-b2-construction",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-b2-page"
            ],
            "note": "FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
          }
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-fy26"
            ],
            "note": "The operator identifies NEXTDC B2 Brisbane. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-b2-page"
            ],
            "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply. FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-fy26"
            ],
            "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC, Brisbane 2: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      }
    },
    {
      "id": "nextdc-c1",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "nextdc-c1-operating",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-directory",
              "nextdc-operating-edge"
            ],
            "note": "Operator identifies an operational facility. Commissioned IT capacity has not been separately reconciled; directory design MW is not used as live MW."
          }
        ],
        "sourceIds": [
          "nextdc-directory",
          "nextdc-operating-edge",
          "hcf-register",
          "verify-nextdc-directory",
          "verify-nextdc-c1",
          "verify-nextdc-fy26",
          "dcm-3568",
          "review-hcf-register-20260922"
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-c1"
            ],
            "note": "The operator identifies NEXTDC C1 Canberra. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-c1",
              "verify-nextdc-fy26"
            ],
            "note": "A separate current built/commissioned capacity allocation was not found for C1. Directory design specifications cannot fill the 69.8 MW difference between NEXTDC's Australian aggregate and named-site subtotal."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-c1"
            ],
            "note": "This facility page does not disclose an installed GPU inventory with model and count. AI-ready or NVIDIA programme capability is not a hardware inventory."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC, Canberra 1: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": "2020-06-30",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 2,
            "mwBasis": "IT",
            "scopeId": "nextdc-c1-operating",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "census-nextdc-fy20-20200827",
              "nextdc-directory"
            ],
            "note": "NEXTDC FY20 reports2 MW built in the ACT at30 June2020, when C1 was its only Canberra facility. This is fitted-out capacity, separate from the current4.4 MW site specification, and forms part of the Australian NEXTDC portfolio total."
          }
        ],
        "sourceIds": [
          "nextdc-directory",
          "nextdc-operating-edge",
          "hcf-register",
          "verify-nextdc-directory",
          "verify-nextdc-c1",
          "verify-nextdc-fy26",
          "dcm-3568",
          "review-hcf-register-20260922",
          "census-nextdc-fy20-20200827"
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-c1"
            ],
            "note": "The operator identifies NEXTDC C1 Canberra. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "census-nextdc-fy20-20200827",
              "nextdc-directory"
            ],
            "note": "NEXTDC FY20 reports2 MW built in the ACT at30 June2020, when C1 was its only Canberra facility. This is fitted-out capacity, separate from the current4.4 MW site specification, and forms part of the Australian NEXTDC portfolio total."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-c1"
            ],
            "note": "This facility page does not disclose an installed GPU inventory with model and count. AI-ready or NVIDIA programme capability is not a hardware inventory."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC, Canberra 1: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      }
    },
    {
      "id": "nextdc-m1",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "nextdc-m1-operating",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-directory",
              "nextdc-operating-edge"
            ],
            "note": "Operator identifies an operational facility. Commissioned IT capacity has not been separately reconciled; directory design MW is not used as live MW."
          }
        ],
        "sourceIds": [
          "nextdc-directory",
          "nextdc-operating-edge",
          "hcf-register",
          "verify-nextdc-directory",
          "verify-nextdc-m1",
          "verify-nextdc-fy26",
          "dcm-3064",
          "review-hcf-register-20260922"
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-m1"
            ],
            "note": "The operator identifies NEXTDC M1 Melbourne. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-m1",
              "verify-nextdc-fy26"
            ],
            "note": "A separate current built/commissioned capacity allocation was not found for M1. Directory design specifications cannot fill the 69.8 MW difference between NEXTDC's Australian aggregate and named-site subtotal."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-m1"
            ],
            "note": "This facility page does not disclose an installed GPU inventory with model and count. AI-ready or NVIDIA programme capability is not a hardware inventory."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC, Melbourne 1: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": "2020-06-30",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 15,
            "mwBasis": "IT",
            "scopeId": "nextdc-m1-operating",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "census-nextdc-fy20-20200827",
              "verify-nextdc-m1"
            ],
            "note": "Historical fitted-out IT capacity derived from NEXTDC FY20: Victoria built25 MW less M2 installed10 MW equals15 MW at M1. M3 had not been built. The current M1 page advertises16 MW IT design capacity; the extra1 MW is not treated as installed without a dated fit-out disclosure. This allocation is part of the Australian NEXTDC portfolio total."
          }
        ],
        "sourceIds": [
          "nextdc-directory",
          "nextdc-operating-edge",
          "hcf-register",
          "verify-nextdc-directory",
          "verify-nextdc-m1",
          "verify-nextdc-fy26",
          "dcm-3064",
          "review-hcf-register-20260922",
          "census-nextdc-fy20-20200827"
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-m1"
            ],
            "note": "The operator identifies NEXTDC M1 Melbourne. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "census-nextdc-fy20-20200827",
              "verify-nextdc-m1"
            ],
            "note": "Historical fitted-out IT capacity derived from NEXTDC FY20: Victoria built25 MW less M2 installed10 MW equals15 MW at M1. M3 had not been built. The current M1 page advertises16 MW IT design capacity; the extra1 MW is not treated as installed without a dated fit-out disclosure. This allocation is part of the Australian NEXTDC portfolio total."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-m1"
            ],
            "note": "This facility page does not disclose an installed GPU inventory with model and count. AI-ready or NVIDIA programme capability is not a hardware inventory."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC, Melbourne 1: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      }
    },
    {
      "id": "nextdc-m2",
      "change": "updated",
      "fields": [
        "stages",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 60,
            "mwBasis": "IT",
            "scopeId": "nextdc-m2-operating",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-m2-page"
            ],
            "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply."
          },
          {
            "asOf": "2026-06-30",
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": 60,
            "mwBasis": "IT",
            "scopeId": "nextdc-m2-construction",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-m2-page",
              "review-nextdc-fy26-announcement-20260827"
            ],
            "note": "FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
          }
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-fy26"
            ],
            "note": "The operator identifies NEXTDC M2 Melbourne. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-nextdc-fy26-announcement-20260827",
              "nextdc-fy26"
            ],
            "note": "The issuer announcement specifically dates 60 MW IT in progress to 30 June 2026. Other stage values retain their separately cited scope and dates; this is not commissioned capacity."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-fy26"
            ],
            "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC, Melbourne 2: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": "2026-06-30",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 60,
            "mwBasis": "IT",
            "scopeId": "nextdc-m2-operating",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-m2-page"
            ],
            "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply."
          },
          {
            "asOf": "2026-06-30",
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": 60,
            "mwBasis": "IT",
            "scopeId": "nextdc-m2-construction",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-m2-page",
              "review-nextdc-fy26-announcement-20260827"
            ],
            "note": "FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
          }
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-fy26"
            ],
            "note": "The operator identifies NEXTDC M2 Melbourne. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-m2-page",
              "review-nextdc-fy26-announcement-20260827"
            ],
            "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply. FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-fy26"
            ],
            "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC, Melbourne 2: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      }
    },
    {
      "id": "nextdc-m3",
      "change": "updated",
      "fields": [
        "stages",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 60,
            "mwBasis": "IT",
            "scopeId": "nextdc-m3-operating",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-m3-page"
            ],
            "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply."
          },
          {
            "asOf": "2026-06-30",
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": 165,
            "mwBasis": "IT",
            "scopeId": "nextdc-m3-construction",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-m3-page",
              "review-nextdc-fy26-announcement-20260827"
            ],
            "note": "FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
          }
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-fy26"
            ],
            "note": "The operator identifies NEXTDC M3 Melbourne. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-nextdc-fy26-announcement-20260827",
              "nextdc-fy26"
            ],
            "note": "The issuer announcement specifically dates 165 MW IT in progress to 30 June 2026. Other stage values retain their separately cited scope and dates; this is not commissioned capacity."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-fy26"
            ],
            "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
          },
          {
            "field": "address",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "nextdc-addresses-2026"
            ],
            "note": "Published street address checked against the cited primary source. Unit or floor is retained where supplied."
          },
          {
            "field": "coordinates",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "nextdc-addresses-2026",
              "loc-osm-nextdc-m3"
            ],
            "note": "Exact house number 25, Indwe Street, West Footscray matches NEXTDC. A registry result at number 27 was not used. Numbered address/building matched through OpenStreetMap; not a surveyed boundary or guaranteed entrance. Data © OpenStreetMap contributors (ODbL 1.0)."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC, Melbourne 3: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": "2026-06-30",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 60,
            "mwBasis": "IT",
            "scopeId": "nextdc-m3-operating",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-m3-page"
            ],
            "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply."
          },
          {
            "asOf": "2026-06-30",
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": 165,
            "mwBasis": "IT",
            "scopeId": "nextdc-m3-construction",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-m3-page",
              "review-nextdc-fy26-announcement-20260827"
            ],
            "note": "FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
          }
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-fy26"
            ],
            "note": "The operator identifies NEXTDC M3 Melbourne. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-m3-page",
              "review-nextdc-fy26-announcement-20260827"
            ],
            "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply. FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-fy26"
            ],
            "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
          },
          {
            "field": "address",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "nextdc-addresses-2026"
            ],
            "note": "Published street address checked against the cited primary source. Unit or floor is retained where supplied."
          },
          {
            "field": "coordinates",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "nextdc-addresses-2026",
              "loc-osm-nextdc-m3"
            ],
            "note": "Exact house number 25, Indwe Street, West Footscray matches NEXTDC. A registry result at number 27 was not used. Numbered address/building matched through OpenStreetMap; not a surveyed boundary or guaranteed entrance. Data © OpenStreetMap contributors (ODbL 1.0)."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC, Melbourne 3: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      }
    },
    {
      "id": "nextdc-p1",
      "change": "updated",
      "fields": [
        "stages",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 5.5,
            "mwBasis": "IT",
            "scopeId": "nextdc-p1-operating",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-p1-page"
            ],
            "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply."
          },
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": 2,
            "mwBasis": "IT",
            "scopeId": "nextdc-p1-construction",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-p1-page"
            ],
            "note": "FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
          }
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-fy26"
            ],
            "note": "The operator identifies NEXTDC P1 Perth. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-fy26"
            ],
            "note": "Existing accepted scope values match the named FY26 development disclosures: operating 5.5 MW IT; construction 2 MW IT. Built means designed power of fitted-out halls; no ultimate-campus amount is added to its included phases."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-fy26"
            ],
            "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC, Perth 1: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": "2026-06-30",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 5.5,
            "mwBasis": "IT",
            "scopeId": "nextdc-p1-operating",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-p1-page"
            ],
            "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply."
          },
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": 2,
            "mwBasis": "IT",
            "scopeId": "nextdc-p1-construction",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-p1-page"
            ],
            "note": "FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
          }
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-fy26"
            ],
            "note": "The operator identifies NEXTDC P1 Perth. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-p1-page"
            ],
            "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply. FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-fy26"
            ],
            "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC, Perth 1: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      }
    },
    {
      "id": "nextdc-p2",
      "change": "updated",
      "fields": [
        "stages",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 6,
            "mwBasis": "IT",
            "scopeId": "nextdc-p2-operating",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-p2-page"
            ],
            "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply."
          },
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": 4,
            "mwBasis": "IT",
            "scopeId": "nextdc-p2-construction",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-p2-page"
            ],
            "note": "FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
          }
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-fy26"
            ],
            "note": "The operator identifies NEXTDC P2 Perth. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-fy26"
            ],
            "note": "Existing accepted scope values match the named FY26 development disclosures: operating 6 MW IT; construction 4 MW IT. Built means designed power of fitted-out halls; no ultimate-campus amount is added to its included phases."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-fy26"
            ],
            "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC, Perth 2: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": "2026-06-30",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 6,
            "mwBasis": "IT",
            "scopeId": "nextdc-p2-operating",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-p2-page"
            ],
            "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply."
          },
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": 4,
            "mwBasis": "IT",
            "scopeId": "nextdc-p2-construction",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-p2-page"
            ],
            "note": "FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
          }
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-fy26"
            ],
            "note": "The operator identifies NEXTDC P2 Perth. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-p2-page"
            ],
            "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply. FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-fy26"
            ],
            "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC, Perth 2: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      }
    },
    {
      "id": "nextdc-s1",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "nextdc-s1-operating",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-directory",
              "nextdc-operating-edge"
            ],
            "note": "Operator identifies an operational facility. Commissioned IT capacity has not been separately reconciled; directory design MW is not used as live MW."
          }
        ],
        "sourceIds": [
          "nextdc-directory",
          "nextdc-operating-edge",
          "hcf-register",
          "verify-nextdc-directory",
          "verify-nextdc-s1",
          "verify-nextdc-fy26",
          "dcm-3571",
          "review-hcf-register-20260922"
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-s1"
            ],
            "note": "The operator identifies NEXTDC S1 Sydney. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-s1",
              "verify-nextdc-fy26"
            ],
            "note": "A separate current built/commissioned capacity allocation was not found for S1. Directory design specifications cannot fill the 69.8 MW difference between NEXTDC's Australian aggregate and named-site subtotal."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-s1"
            ],
            "note": "This facility page does not disclose an installed GPU inventory with model and count. AI-ready or NVIDIA programme capability is not a hardware inventory."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC, Sydney 1: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": "2020-06-30",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 16,
            "mwBasis": "IT",
            "scopeId": "nextdc-s1-operating",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "census-nextdc-fy20-20200827",
              "verify-nextdc-s1"
            ],
            "note": "Historical fitted-out IT capacity derived from NEXTDC FY20: NSW built38 MW less S2 installed22 MW equals16 MW at S1. S3 was under development, with no built allocation. The current S1 operator specification remains16 MW IT. This allocation is part of the Australian NEXTDC portfolio total."
          }
        ],
        "sourceIds": [
          "nextdc-directory",
          "nextdc-operating-edge",
          "hcf-register",
          "verify-nextdc-directory",
          "verify-nextdc-s1",
          "verify-nextdc-fy26",
          "dcm-3571",
          "review-hcf-register-20260922",
          "census-nextdc-fy20-20200827"
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-s1"
            ],
            "note": "The operator identifies NEXTDC S1 Sydney. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "census-nextdc-fy20-20200827",
              "verify-nextdc-s1"
            ],
            "note": "Historical fitted-out IT capacity derived from NEXTDC FY20: NSW built38 MW less S2 installed22 MW equals16 MW at S1. S3 was under development, with no built allocation. The current S1 operator specification remains16 MW IT. This allocation is part of the Australian NEXTDC portfolio total."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-s1"
            ],
            "note": "This facility page does not disclose an installed GPU inventory with model and count. AI-ready or NVIDIA programme capability is not a hardware inventory."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC, Sydney 1: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      }
    },
    {
      "id": "nextdc-s2",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "nextdc-s2-operating",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-directory",
              "nextdc-operating-edge"
            ],
            "note": "Operator identifies an operational facility. Commissioned IT capacity has not been separately reconciled; directory design MW is not used as live MW."
          }
        ],
        "sourceIds": [
          "nextdc-directory",
          "nextdc-operating-edge",
          "hcf-register",
          "verify-nextdc-directory",
          "verify-nextdc-s2",
          "verify-nextdc-fy26",
          "dcm-8570",
          "review-hcf-register-20260922"
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-s2"
            ],
            "note": "The operator identifies NEXTDC S2 Sydney. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-s2",
              "verify-nextdc-fy26"
            ],
            "note": "A separate current built/commissioned capacity allocation was not found for S2. Directory design specifications cannot fill the 69.8 MW difference between NEXTDC's Australian aggregate and named-site subtotal."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-s2"
            ],
            "note": "This facility page does not disclose an installed GPU inventory with model and count. AI-ready or NVIDIA programme capability is not a hardware inventory."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC, Sydney 2: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": "2021-06-30",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 30,
            "mwBasis": "IT",
            "scopeId": "nextdc-s2-built-it",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "census-nextdc-fy21-20210827",
              "verify-nextdc-s2"
            ],
            "note": "NEXTDC reported the final S2 data halls fitted out at 30 June 2021, bringing built capacity to 30 MW. Its current facility page continues to advertise 30 MW IT capacity. This is a historical installed-capacity observation, not a newly inferred commissioning date."
          }
        ],
        "sourceIds": [
          "nextdc-directory",
          "nextdc-operating-edge",
          "hcf-register",
          "verify-nextdc-directory",
          "verify-nextdc-s2",
          "verify-nextdc-fy26",
          "dcm-8570",
          "review-hcf-register-20260922",
          "census-nextdc-fy21-20210827"
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-s2"
            ],
            "note": "The operator identifies NEXTDC S2 Sydney. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "census-nextdc-fy21-20210827",
              "verify-nextdc-s2"
            ],
            "note": "NEXTDC reported the final S2 data halls fitted out at 30 June 2021, bringing built capacity to 30 MW. Its current facility page continues to advertise 30 MW IT capacity. This is a historical installed-capacity observation, not a newly inferred commissioning date."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-s2"
            ],
            "note": "This facility page does not disclose an installed GPU inventory with model and count. AI-ready or NVIDIA programme capability is not a hardware inventory."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC, Sydney 2: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      }
    },
    {
      "id": "nextdc-s3",
      "change": "updated",
      "fields": [
        "stages",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 68,
            "mwBasis": "IT",
            "scopeId": "nextdc-s3-operating",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-s3-page"
            ],
            "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply. The 68 MW built and 12 MW in-progress split comes from the FY26 results; the facility page supports the 80 MW overall specification only."
          },
          {
            "asOf": "2026-06-30",
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": 12,
            "mwBasis": "IT",
            "scopeId": "nextdc-s3-construction",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-s3-page",
              "review-nextdc-fy26-announcement-20260827"
            ],
            "note": "FY26 mechanical and electrical fit-out in progress; not commissioned capacity. The 68 MW built and 12 MW in-progress split comes from the FY26 results; the facility page supports the 80 MW overall specification only."
          }
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-fy26"
            ],
            "note": "The operator identifies NEXTDC S3 Sydney. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-nextdc-fy26-announcement-20260827",
              "nextdc-fy26"
            ],
            "note": "The issuer announcement specifically dates 12 MW IT in progress to 30 June 2026. Other stage values retain their separately cited scope and dates; this is not commissioned capacity."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-fy26"
            ],
            "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
          },
          {
            "field": "address",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "nextdc-addresses-2026"
            ],
            "note": "Published street address checked against the cited primary source. Unit or floor is retained where supplied."
          },
          {
            "field": "coordinates",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "nextdc-addresses-2026",
              "loc-peeringdb-12094"
            ],
            "note": "Public registry point matched to the named facility and operator-published numbered street address. This locates the building, not its suite, entrance or surveyed boundary."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC, Sydney 3: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": "2026-06-30",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 68,
            "mwBasis": "IT",
            "scopeId": "nextdc-s3-operating",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-s3-page"
            ],
            "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply. The 68 MW built and 12 MW in-progress split comes from the FY26 results; the facility page supports the 80 MW overall specification only."
          },
          {
            "asOf": "2026-06-30",
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": 12,
            "mwBasis": "IT",
            "scopeId": "nextdc-s3-construction",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-s3-page",
              "review-nextdc-fy26-announcement-20260827"
            ],
            "note": "FY26 mechanical and electrical fit-out in progress; not commissioned capacity. The 68 MW built and 12 MW in-progress split comes from the FY26 results; the facility page supports the 80 MW overall specification only."
          }
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-fy26"
            ],
            "note": "The operator identifies NEXTDC S3 Sydney. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-s3-page",
              "review-nextdc-fy26-announcement-20260827"
            ],
            "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply. The 68 MW built and 12 MW in-progress split comes from the FY26 results; the facility page supports the 80 MW overall specification only. FY26 mechanical and electrical fit-out in progress; not commissioned capacity. The 68 MW built and 12 MW in-progress split comes from the FY26 results; the facility page supports the 80 MW overall specification only."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-fy26"
            ],
            "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
          },
          {
            "field": "address",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "nextdc-addresses-2026"
            ],
            "note": "Published street address checked against the cited primary source. Unit or floor is retained where supplied."
          },
          {
            "field": "coordinates",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "nextdc-addresses-2026",
              "loc-peeringdb-12094"
            ],
            "note": "Public registry point matched to the named facility and operator-published numbered street address. This locates the building, not its suite, entrance or surveyed boundary."
          },
          {
            "field": "certification",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC, Sydney 3: only the named Certified Strategic enclave. This is not certification of the whole building or its MW."
          }
        ]
      }
    },
    {
      "id": "nextdc-s6",
      "change": "updated",
      "fields": [
        "stages",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 2.7,
            "mwBasis": "IT",
            "scopeId": "nextdc-s6-operating",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-s6-page"
            ],
            "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply."
          },
          {
            "asOf": "2026-06-30",
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": 10.8,
            "mwBasis": "IT",
            "scopeId": "nextdc-s6-construction",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-s6-page",
              "review-nextdc-fy26-announcement-20260827"
            ],
            "note": "FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
          }
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-s6",
              "verify-nextdc-fy26"
            ],
            "note": "The operator identifies NEXTDC S6 Sydney. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-nextdc-fy26-announcement-20260827",
              "nextdc-fy26"
            ],
            "note": "The issuer announcement specifically dates 10.8 MW IT in progress to 30 June 2026. Other stage values retain their separately cited scope and dates; this is not commissioned capacity."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-fy26"
            ],
            "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-s6"
            ],
            "note": "This facility page does not disclose an installed GPU inventory with model and count. AI-ready or NVIDIA programme capability is not a hardware inventory."
          },
          {
            "field": "workloads",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-s6"
            ],
            "note": "Training and inference are explicitly stated design capabilities; deployment-specific inventory and workload share remain unknown."
          },
          {
            "field": "address",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "nextdc-addresses-2026"
            ],
            "note": "Published street address checked against the cited primary source. Unit or floor is retained where supplied."
          },
          {
            "field": "coordinates",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "nextdc-addresses-2026",
              "loc-peeringdb-14692"
            ],
            "note": "Public registry point matched to the named facility and operator-published numbered street address. This locates the building, not its suite, entrance or surveyed boundary."
          },
          {
            "field": "certification",
            "outcome": "not-found",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-nextdc-hcf-exceptions-20251202",
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC excluded this facility from its HCF coverage in its 2 December 2025 announcement. No named match appears in the official register checked 22 September 2026."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": "2026-06-30",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 2.7,
            "mwBasis": "IT",
            "scopeId": "nextdc-s6-operating",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-s6-page"
            ],
            "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply."
          },
          {
            "asOf": "2026-06-30",
            "mwQualifier": "reported",
            "stage": "construction",
            "mw": 10.8,
            "mwBasis": "IT",
            "scopeId": "nextdc-s6-construction",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-s6-page",
              "review-nextdc-fy26-announcement-20260827"
            ],
            "note": "FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
          }
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-directory",
              "verify-nextdc-s6",
              "verify-nextdc-fy26"
            ],
            "note": "The operator identifies NEXTDC S6 Sydney. Certification and location evidence are described separately."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "nextdc-fy26",
              "nextdc-s6-page",
              "review-nextdc-fy26-announcement-20260827"
            ],
            "note": "FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply. FY26 mechanical and electrical fit-out in progress; not commissioned capacity."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-fy26"
            ],
            "note": "Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-s6"
            ],
            "note": "This facility page does not disclose an installed GPU inventory with model and count. AI-ready or NVIDIA programme capability is not a hardware inventory."
          },
          {
            "field": "workloads",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "verify-nextdc-s6"
            ],
            "note": "Training and inference are explicitly stated design capabilities; deployment-specific inventory and workload share remain unknown."
          },
          {
            "field": "address",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "nextdc-addresses-2026"
            ],
            "note": "Published street address checked against the cited primary source. Unit or floor is retained where supplied."
          },
          {
            "field": "coordinates",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "nextdc-addresses-2026",
              "loc-peeringdb-14692"
            ],
            "note": "Public registry point matched to the named facility and operator-published numbered street address. This locates the building, not its suite, entrance or surveyed boundary."
          },
          {
            "field": "certification",
            "outcome": "not-found",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-nextdc-hcf-exceptions-20251202",
              "review-hcf-register-20260922"
            ],
            "note": "NEXTDC excluded this facility from its HCF coverage in its 2 December 2025 announcement. No named match appears in the official register checked 22 September 2026."
          }
        ]
      }
    },
    {
      "id": "stack-mel01",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "notes",
        "fieldReviews",
        "capacityObservations"
      ],
      "before": {
        "stages": [
          {
            "asOf": "2023-08-22",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 36,
            "mwBasis": "unknown",
            "scopeId": "stack-mel01a-completed",
            "sourceIds": [
              "review-stack-mel01a-opening-20260922"
            ],
            "note": "MEL01A first phase was completed on 22 August 2023. The operator states 36 MW but does not specify the electrical boundary. This excludes the later whole-campus design and is not counted in comparable IT totals.",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown"
          }
        ],
        "sourceIds": [
          "exp-stack-mel01",
          "exp-stack-opening",
          "natural-earth-cities",
          "review-stack-mel01a-opening-20260922"
        ],
        "notes": [
          "Truganina campus. MEL01A, B, C and D remain within one physical-site record. Marketing campus power and the 2023 completion announcement require phase reconciliation before MW aggregation.",
          "Only the first MEL01A 36 MW delivery is quantified here; later campus plans and buildings cannot be added as delivered capacity."
        ],
        "fieldReviews": [
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-stack-mel01a-opening-20260922"
            ],
            "note": "Completed first-building disclosure is preserved with unknown basis. No conversion from another operator’s use of the term critical capacity."
          }
        ],
        "capacityObservations": null
      },
      "after": {
        "stages": [
          {
            "asOf": "2023-08-22",
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": 36,
            "mwBasis": "IT",
            "scopeId": "stack-mel01a-completed",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "review-stack-mel01a-opening-20260922",
              "census-stack-mel01-critical-brochure",
              "census-stack-critical-definition-2021",
              "census-stack-mel01a-staged-fitout-2025"
            ],
            "note": "MEL01A is a 36 MW critical-capacity building delivered in 2023. The contractor reports staged hall fit-out continuing alongside live operations in June 2025. The fully fitted IT subtotal is not disclosed, so the 36 MW design rating remains outside the operating subtotal."
          },
          {
            "asOf": "2025-11-26",
            "mwQualifier": "reported",
            "stage": "unknown",
            "mw": 36,
            "mwBasis": "IT",
            "scopeId": "stack-mel01b-completed",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "census-stack-mel01b-complete-2025",
              "census-stack-mel01-critical-brochure",
              "census-stack-critical-definition-2021"
            ],
            "note": "MEL01B construction completion was reported in November 2025. Its 36 MW critical design capacity is separate from MEL01A; completion of all IT fit-out and operational availability is not established."
          }
        ],
        "sourceIds": [
          "exp-stack-mel01",
          "exp-stack-opening",
          "natural-earth-cities",
          "review-stack-mel01a-opening-20260922",
          "census-stack-mel01-critical-brochure",
          "census-stack-critical-definition-2021",
          "census-stack-mel01b-complete-2025",
          "census-stack-mel01a-staged-fitout-2025"
        ],
        "notes": [
          "Truganina campus. MEL01A, B, C and D remain within one physical-site record. Marketing campus power and the 2023 completion announcement require phase reconciliation before MW aggregation.",
          "Only the first MEL01A 36 MW delivery is quantified here; later campus plans and buildings cannot be added as delivered capacity.",
          "MEL01A and MEL01B are separately completed 36 MW buildings, together 72 MW critical design capacity. Commissioned hall capacity has not been separated from completed shells and staged fit-out. The later 180 MW campus plan also includes MEL01C and MEL01D.",
          "STACK defines critical capacity at the server data-hall boundary. The separate 135 MW utility substation is not equipment capacity."
        ],
        "fieldReviews": [
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "census-stack-mel01-critical-brochure",
              "census-stack-critical-definition-2021",
              "census-stack-mel01a-staged-fitout-2025"
            ],
            "note": "Electrical basis is verified as critical equipment capacity. The 36 MW rating of each building is not a verified fully fitted IT subtotal."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "review-stack-mel01a-opening-20260922",
              "census-stack-mel01b-complete-2025",
              "census-stack-mel01a-staged-fitout-2025"
            ],
            "note": "MEL01A has live halls and staged fit-out. MEL01B construction was completed in November 2025; operational hall delivery is not separately quantified."
          }
        ],
        "capacityObservations": [
          {
            "id": "stack-mel01a-built-20230822",
            "scopeId": "stack-mel01a-completed",
            "date": "2023-08-22",
            "datePrecision": "day",
            "dateBasis": "reported-on",
            "mw": 36,
            "mwBasis": "IT",
            "measure": "built",
            "scope": "phase",
            "includedInHistory": false,
            "sourceIds": [
              "review-stack-mel01a-opening-20260922",
              "census-stack-mel01-critical-brochure",
              "census-stack-critical-definition-2021"
            ],
            "note": "Completed buildingA, critical equipment load. Building design capacity; fitted hall capacity is not established."
          },
          {
            "id": "stack-mel01b-built-20251126",
            "scopeId": "stack-mel01b-completed",
            "date": "2025-11-26",
            "datePrecision": "day",
            "dateBasis": "reported-on",
            "mw": 36,
            "mwBasis": "IT",
            "measure": "built",
            "scope": "phase",
            "includedInHistory": false,
            "sourceIds": [
              "census-stack-mel01b-complete-2025",
              "census-stack-mel01-critical-brochure",
              "census-stack-critical-definition-2021"
            ],
            "note": "Reported buildingB completion, critical equipment load. This observation does not establish tenant utilisation or an exact commissioning day. Building design capacity; fitted hall capacity is not established."
          }
        ]
      }
    }
  ],
  "sources": [
    {
      "id": "census-airtrunk-mel1-expansion-2024",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-airtrunk-mel1-expansion-2024",
        "title": "AirTrunk expands MEL1 to 185MW capacity",
        "url": "https://airtrunk.com/airtrunk-expands-mel1-to-185mw-capacity/",
        "publisher": "AirTrunk",
        "accessedAt": "2026-09-22",
        "publishedAt": null,
        "locator": "Opening three paragraphs",
        "summary": "Announces remaining three phases delivering 100+ MW new IT load toward a 185 MW campus. Subtracting two rounded headlines does not establish a commissioned 85 MW base."
      }
    },
    {
      "id": "census-airtrunk-mel1-initial-it-2019",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-airtrunk-mel1-initial-it-2019",
        "title": "AirTrunk reveals new Sydney data centre",
        "url": "https://www.cio.com/article/207694/airtrunk-reveals-new-sydney-data-centre.html",
        "publisher": "CIO",
        "accessedAt": "2026-09-22",
        "publishedAt": "2019-11-20",
        "locator": "Paragraph beginning MEL1, which is located in Derrimut",
        "summary": "Specifies MEL1 initial capacity as 5 MW IT load, separately from its original 50 MW plan and later 130 MW expansion."
      }
    },
    {
      "id": "census-airtrunk-mel1-open-2017",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-airtrunk-mel1-open-2017",
        "title": "AirTrunk opens Melbourne’s largest hyperscale data centre campus",
        "url": "https://airtrunk.com/airtrunk-opens-melbournes-largest-hyperscale-data-centre-campus/",
        "publisher": "AirTrunk",
        "accessedAt": "2026-09-22",
        "publishedAt": "2017-11-16",
        "locator": "Dateline and opening paragraphs; ultimate capacity paragraph",
        "summary": "Confirms the campus opened on 16 November 2017. The 50 MW IT headline is explicitly eventual capacity, not the opening tranche."
      }
    },
    {
      "id": "census-airtrunk-mel1-phase4-complete-2023",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "publishedDatePrecision",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "publishedDatePrecision": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-airtrunk-mel1-phase4-complete-2023",
        "title": "AirTrunk MEL1 Melbourne 20+MW expansion completed",
        "url": "https://airtrunk.com/airtrunk-mel1-melbourne-20mw-expansion-completed/",
        "publisher": "AirTrunk",
        "accessedAt": "2026-09-22",
        "publishedAt": "2023-05",
        "publishedDatePrecision": "month",
        "locator": "Opening completion statement and phase-four video; month corroborated by July 2024 Capacity report",
        "summary": "Operator confirms completion of a separate 20+ MW expansion in 33 weeks. Contemporary reporting identifies this as May 2023 and establishes IT load."
      }
    },
    {
      "id": "census-airtrunk-mel1-phase4-it-2024",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-airtrunk-mel1-phase4-it-2024",
        "title": "AirTrunk plans huge expansion of Melbourne campus",
        "url": "https://capacityglobal.com/news/airtrunk-plans-huge-expansion-of-melbourne-campus/",
        "publisher": "Capacity Media",
        "accessedAt": "2026-09-22",
        "publishedAt": "2024-07-01",
        "locator": "Paragraph beginning An additional expansion of the site; CEO expansion announcement",
        "summary": "Explicitly states that the May 2023 completed expansion added 20 MW of IT load. Separately describes a future 100+ MW addition toward 185 MW; that future amount is not an operating figure."
      }
    },
    {
      "id": "census-airtrunk-syd1-complete-2022",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-airtrunk-syd1-complete-2022",
        "title": "AirTrunk completes fifth building at 130MW Sydney campus",
        "url": "https://www.datacenterdynamics.com/en/news/airtrunk-completes-fifth-building-at-130mw-sydney-campus/",
        "publisher": "Data Center Dynamics",
        "accessedAt": "2026-09-22",
        "publishedAt": "2022-07-07",
        "locator": "Opening paragraphs and quoted AirTrunk announcement; fifth and final building",
        "summary": "Reports completion of the final 40+ MW building at the 130 MW campus, directly quoting AirTrunk. The 40 MW phase is part of the campus, not additive to it."
      }
    },
    {
      "id": "census-airtrunk-syd1-current-20260922",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-airtrunk-syd1-current-20260922",
        "title": "AirTrunk SYD1 Sydney West",
        "url": "https://airtrunk.com/location/syd1-sydney-west/",
        "publisher": "AirTrunk",
        "accessedAt": "2026-09-22",
        "publishedAt": null,
        "locator": "Key features: capacity and size",
        "summary": "Current operator page continues to give 130+ MW, five-building campus context and 42 data halls. The newer platform announcement uses the lower 121+ MW headline without reconciling the numbers."
      }
    },
    {
      "id": "census-airtrunk-syd1-it-2019",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-airtrunk-syd1-it-2019",
        "title": "AirTrunk confirms major Australian expansion",
        "url": "https://airtrunk.com/airtrunk-confirms-major-australian-expansion-including-a-new-110-mw-hyperscale-data-centre-in-sydneys-north/",
        "publisher": "AirTrunk",
        "accessedAt": "2026-09-22",
        "publishedAt": "2019-11-19",
        "locator": "Dateline and first paragraph; SYD1 and MEL1 adjacent land expansion",
        "summary": "Explicitly identifies the expanded SYD1 130+ MW campus metric as IT load. This announcement alone is a design statement, paired with later final-building completion."
      }
    },
    {
      "id": "census-airtrunk-syd2-current-staging-20260922",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-airtrunk-syd2-current-staging-20260922",
        "title": "AirTrunk SYD2 campus and development progress",
        "url": "https://airtrunk.com/location/syd2-sydney-north/",
        "publisher": "AirTrunk",
        "accessedAt": "2026-09-22",
        "publishedAt": null,
        "locator": "Project Progress, April 2026: Current site with Shell C under construction; Apollo Place section",
        "summary": "Current operator profile shows Shell C still under construction in April 2026. Apollo Place is phase 5. The 120+ MW campus and 158+ MW platform figures cannot be treated as fully completed operating capacity."
      }
    },
    {
      "id": "census-airtrunk-syd2-expansion-2023",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-airtrunk-syd2-expansion-2023",
        "title": "70 megawatt expansion underway at AirTrunk SYD2",
        "url": "https://airtrunk.com/70-megawatt-expansion-underway-at-airtrunk-syd2/",
        "publisher": "AirTrunk",
        "accessedAt": "2026-09-22",
        "publishedAt": "2023-06-15",
        "locator": "First-phase and second-phase opening history; 70 MW two-phase expansion",
        "summary": "Confirms phase 1 opened in early 2021 and phase 2 in early 2023. Describes 70 MW of later phases and 120+ MW end state, without a directly stated commissioned MW subtotal for phases 1 and 2."
      }
    },
    {
      "id": "census-airtrunk-syd2-staging-2026",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-airtrunk-syd2-staging-2026",
        "title": "AirTrunk Lane Cove staging plan",
        "url": "https://airtrunk.com/wp-content/uploads/2026/07/AirTrunk-Lane-Cove-Staging-Plan-Jul-2026.pdf",
        "publisher": "AirTrunk / Greenbox Architecture",
        "accessedAt": "2026-09-22",
        "publishedAt": "2026-04-08",
        "locator": "Single-sheet site plan: Phase 4 Under Construction and Phase 5 To be Constructed; latest drawing issue",
        "summary": "Distinguishes built phases from phase 4 construction and the future Apollo phase 5. Completion is defined as handover to the customer. The PDF does not provide a usable IT MW split. July is the file publication folder; April 8 is the drawing issue date."
      }
    },
    {
      "id": "census-aws-52-turner-withdrawn-20260922",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-aws-52-turner-withdrawn-20260922",
        "title": "52 Turner Road Data Centre, SSD-60185233",
        "url": "https://www.planningportal.nsw.gov.au/major-projects/projects/52-turner-road-data-centre",
        "publisher": "NSW Planning Portal",
        "accessedAt": "2026-09-22",
        "publishedAt": null,
        "locator": "Current Status: Withdrawn; project description40 MW",
        "summary": "Official portal confirms withdrawal of the 52 Turner Road 40 MW project. This is separate from the existing Smeaton Grange/Bluett campus."
      }
    },
    {
      "id": "census-aws-existing-sydney-2024",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-aws-existing-sydney-2024",
        "title": "Amazon plans new data centres in Melbourne and Sydney",
        "url": "https://www.datacenterdynamics.com/en/news/amazon-planning-new-data-centers-in-melbourne-and-sydney-australia/",
        "publisher": "Data Center Dynamics",
        "accessedAt": "2026-09-22",
        "publishedAt": "2024-02-14",
        "locator": "Existing SYD52 Smeaton Grange and Eastern Creek campus paragraphs; proposed52 Turner project",
        "summary": "Describes AWS operating an Eastern Creek campus and an existing Smeaton Grange facility. The 40 MW IT figure belongs to proposed 52 Turner Road and cannot establish existing facility power."
      }
    },
    {
      "id": "census-cdc-brooklyn-20250409",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "publishedAt",
        "accessedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "publishedAt": null,
        "accessedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-cdc-brooklyn-20250409",
        "title": "CDC hosts Melbourne data centre site visit",
        "url": "https://infratil.com/news/cdc-hosts-melbourne-data-centre-site-visit/",
        "publisher": "Infratil",
        "publishedAt": "2025-04-09",
        "accessedAt": "2026-09-22",
        "locator": "First three paragraphs",
        "summary": "Infratil identifies Brooklyn as CDC’s first Melbourne campus, operational since 2024, and Laverton construction as beginning in February 2025."
      }
    },
    {
      "id": "census-cdc-brooklyn-victoria-20260304",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "publishedAt",
        "accessedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "publishedAt": null,
        "accessedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-cdc-brooklyn-victoria-20260304",
        "title": "CDC opens its first Victorian campus in Brooklyn",
        "url": "https://invest.vic.gov.au/news-and-events/news/2026/march/cdc-data-centres-officially-opens-its-first-melbourne-campus,-expanding-its-ability-to-deliver-secure-and-sustainable-solutions",
        "publisher": "Invest Victoria, Victorian Government",
        "publishedAt": "2026-03-04",
        "accessedAt": "2026-09-22",
        "locator": "Opening paragraph and subsequent Laverton North paragraph",
        "summary": "The Victorian Government identifies Brooklyn as CDC’s first Victorian campus with two operational facilities, a third facility being planned and a second campus progressing at Laverton North."
      }
    },
    {
      "id": "census-cdc-valuation-20260630",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "publishedAt",
        "accessedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "publishedAt": null,
        "accessedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-cdc-valuation-20260630",
        "title": "CDC independent valuation, 30 June 2026",
        "url": "https://infratil.com/news/cdc-independent-valuation-30-june-2026/cdc-independent-valuation-30-june-2026/",
        "publisher": "Infratil / CDC",
        "publishedAt": "2026-07-06",
        "accessedAt": "2026-09-22",
        "locator": "PDF page 6 (printed page 5), Leasable Capacity Pipeline by Region, definition, operating rows and rounding footnote; page 5 (printed page 4), quarterly operating additions",
        "summary": "CDC defines leasable capacity as primary ICT capacity that can be contracted or is generating revenue. Its 30 June 2026 operating figures, rounded to the nearest 10 MW, are ACT 120 MW, NSW 220 MW, Victoria 130 MW and New Zealand 80 MW. The earlier built-capacity metric included broader infrastructure, redundancy and power losses."
      }
    },
    {
      "id": "census-dci-syd02-progress-202607",
      "change": "added",
      "fields": [
        "id",
        "title",
        "publisher",
        "url",
        "accessedAt",
        "publishedAt",
        "publishedDatePrecision",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "publisher": null,
        "url": null,
        "accessedAt": null,
        "publishedAt": null,
        "publishedDatePrecision": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-dci-syd02-progress-202607",
        "title": "DCI advances SYD02 expansion in Sydney as key construction milestones near completion",
        "publisher": "DCI Data Centers",
        "url": "https://dcidatacenters.com/news/dci-advances-syd02-expansion-in-sydney-as-key-construction-milestones-near-completion/",
        "accessedAt": "2026-09-22",
        "publishedAt": "2026-07",
        "publishedDatePrecision": "month",
        "locator": "Four approved construction stages; July2026 progress",
        "summary": "Demolition and tank relocation nearing completion, with main datahall building and substation next. The63 MW expansion remains future capacity, despite the old2022 completion target reported in secondary coverage."
      }
    },
    {
      "id": "census-digital-q226",
      "change": "added",
      "fields": [
        "id",
        "title",
        "publisher",
        "url",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "publisher": null,
        "url": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-digital-q226",
        "title": "Digital Realty Second Quarter 2026 Financial Supplement",
        "publisher": "Digital Realty / US SEC",
        "url": "https://www.sec.gov/Archives/edgar/data/1297996/000110465926086270/dlr-20260723xex99d1.htm",
        "accessedAt": "2026-09-22",
        "publishedAt": "2026-07-23",
        "locator": "Printed page22, Occupancy Analysis, Sydney row and footnotes1/3, 100% share column",
        "summary": "Sydney has 30 MW white-space IT capacity at 30 June 2026. IT capacity is UPS-backed power dedicated to operated data-centre capacity; occupancy excludes active and future development."
      }
    },
    {
      "id": "census-digital-q425",
      "change": "added",
      "fields": [
        "id",
        "title",
        "publisher",
        "url",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "publisher": null,
        "url": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-digital-q425",
        "title": "Digital Realty Fourth Quarter 2025 Financial Supplement",
        "publisher": "Digital Realty / US SEC",
        "url": "https://www.sec.gov/Archives/edgar/data/1297996/000110465926010887/dlr-20260205xex99d1.htm",
        "accessedAt": "2026-09-22",
        "publishedAt": "2026-02-05",
        "locator": "Occupancy Analysis, Melbourne row, white-space IT load column and footnote6",
        "summary": "At 31 December 2025 Melbourne reports 9.6 MW white-space IT load across two data centres. Later 2026 reports combine Melbourne with other markets and do not provide a separate metro figure."
      }
    },
    {
      "id": "census-equinix-q226",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "publishedAt",
        "accessedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "publishedAt": null,
        "accessedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-equinix-q226",
        "title": "Equinix Q2 2026 earnings presentation",
        "url": "https://d1io3yog0oux5.cloudfront.net/_f9ad8b88d669de65a966b7e00da37b99/equinix/db/2183/27054/earnings_presentation/Equinix+Q2+26+Earnings+Presentation+Final.pdf",
        "publisher": "Equinix",
        "publishedAt": "2026-07-29",
        "accessedAt": "2026-09-22",
        "locator": "PDF page 27, xScale Data Center Expansion, Sydney 9x-2 row, phase capacity / leasing columns and under-development totals",
        "summary": "At 30 June 2026, the separate Sydney 9x-2 phase had 14 MW of capacity under development, with a Q3 2026 opening target and zero MW leased. Phase MW are reported alongside customer leasing MW. The target does not establish completion."
      }
    },
    {
      "id": "census-equinix-rosehill-scoping-20221220",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "publishedAt",
        "accessedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "publishedAt": null,
        "accessedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-equinix-rosehill-scoping-20221220",
        "title": "Rosehill data centre stage 2 scoping letter",
        "url": "https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=PDA-53190476%2120230110T011149.990+GMT",
        "publisher": "Patch Planning for Equinix Hyperscale 2, lodged with NSW Planning",
        "publishedAt": "2022-12-20",
        "accessedAt": "2026-09-22",
        "locator": "PDF page 5, section 3 Project Overview, Table 3 Comparison Table; page 2 identifies the existing operating building at 8A Grand Avenue",
        "summary": "The applicant distinguishes the existing building at 8A Grand Avenue from the proposed second building at 8 Grand Avenue. Each has a 45 MW total power design and a 30 MW IT-load design. This defines the electrical boundary; it does not say the entire existing building IT design is commissioned."
      }
    },
    {
      "id": "census-equinix-xscale-it-definition-20201120",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "publishedAt",
        "accessedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "publishedAt": null,
        "accessedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-equinix-xscale-it-definition-20201120",
        "title": "How hyperscale data centres can power cloud provider success",
        "url": "https://blog.equinix.com/blog/2020/11/20/how-hyperscale-data-centers-can-power-cloud-provider-success/",
        "publisher": "Equinix",
        "publishedAt": "2020-11-20",
        "accessedAt": "2026-09-22",
        "locator": "Paragraph beginning Over the last two years, Japanese xScale programme capacity",
        "summary": "Equinix describes the Japanese xScale programme’s capacity in MW of IT load and discusses sold phase capacity. This supports interpretation of xScale commercial phase MW but is not a site-specific SY9x IT certification."
      }
    },
    {
      "id": "census-fujitsu-locations-20260922",
      "change": "added",
      "fields": [
        "id",
        "title",
        "publisher",
        "url",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "publisher": null,
        "url": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-fujitsu-locations-20260922",
        "title": "Fujitsu Australian data centre locations",
        "publisher": "Fujitsu",
        "url": "https://global.fujitsu/en-apac/local/about-data-centres",
        "accessedAt": "2026-09-22",
        "publishedAt": null,
        "locator": "Greystanes opening description and per-facility IT-load specifications",
        "summary": "The HTML explicitly calls Greystanes 92 MW ultimate capacity. Site specifications also list Noble Park 28, Malaga 10, Homebush 3, North Ryde 4.8 and Eight Mile Plains 2 MW IT; these do not by themselves confirm installed fit-out."
      }
    },
    {
      "id": "census-fujitsu-sale-20260720",
      "change": "added",
      "fields": [
        "id",
        "title",
        "publisher",
        "url",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "publisher": null,
        "url": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-fujitsu-sale-20260720",
        "title": "Fujitsu signs agreement to sell Australian data centre business to Next Capital",
        "publisher": "Fujitsu",
        "url": "https://global.fujitsu/en-apac/newsroom/australia/2026/20-07",
        "accessedAt": "2026-09-22",
        "publishedAt": "2026-07-20",
        "locator": "Media statement: agreement, conditions, continued operation",
        "summary": "Issuer confirms sale agreement and continued operation pending completion later2026. Does not report capacity or define the reported secondary25 MW portfolio figure."
      }
    },
    {
      "id": "census-macquarie-eis-20211108",
      "change": "added",
      "fields": [
        "id",
        "title",
        "publisher",
        "url",
        "publishedAt",
        "accessedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "publisher": null,
        "url": null,
        "publishedAt": null,
        "accessedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-macquarie-eis-20211108",
        "title": "Macquarie IC3 Super West Environmental Impact Statement SSD-24299707",
        "publisher": "Willowtree Planning for Macquarie Data Centres",
        "url": "https://www.macquariedatacentres.com/wp-content/uploads/sites/5/2024/03/Environmental-Impact-Statement-SSD-24299707.pdf",
        "publishedAt": "2021-11-08",
        "accessedAt": "2026-09-22",
        "locator": "Mechanical equipment: Existing IC2 and IC3e, immediately before Table45",
        "summary": "Assessment says IC2 is operating at full capacity while IC3 East is only partially operating. Combined with operator IC2 6 MW IT specification, supports IC2 allocation within the existing21 MW portfolio."
      }
    },
    {
      "id": "census-microsoft-syd05-operations-2025",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-microsoft-syd05-operations-2025",
        "title": "Microsoft SYD05 Operational Noise Verification Report",
        "url": "https://local.microsoft.com/wp-content/uploads/2026/05/250792-SYD05-Operational-Noise-Verification-Report-R0.pdf",
        "publisher": "Pulse White Noise Acoustics / Microsoft",
        "accessedAt": "2026-09-22",
        "publishedAt": "2025-12-17",
        "locator": "Cover report date; attended equipment measurements and compliance assessment",
        "summary": "Primary operator-published report of operating equipment at SYD05. It predates the May 2026 public update and confirms operations, but contains no building IT MW quantity. Noise model test load is not a capacity measure."
      }
    },
    {
      "id": "census-nextdc-fy14-20140825",
      "change": "added",
      "fields": [
        "id",
        "title",
        "publisher",
        "url",
        "publishedAt",
        "accessedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "publisher": null,
        "url": null,
        "publishedAt": null,
        "accessedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-nextdc-fy14-20140825",
        "title": "NEXTDC FY14 Full-Year Results",
        "publisher": "NEXTDC",
        "url": "https://announcements.asx.com.au/asxpdf/20140825/pdf/42rq18h8bwnbd3.pdf",
        "publishedAt": "2014-08-25",
        "accessedAt": "2026-09-22",
        "locator": "Facilities capacities and contracted utilisation; detailed table MW built row, B1 column",
        "summary": "Detailed facility table reports B1 built2.25 MW, equal to its full planned capacity. The current operator B1 specification remains2.25 MW IT."
      }
    },
    {
      "id": "census-nextdc-fy20-20200827",
      "change": "added",
      "fields": [
        "id",
        "title",
        "publisher",
        "url",
        "publishedAt",
        "accessedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "publisher": null,
        "url": null,
        "publishedAt": null,
        "accessedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-nextdc-fy20-20200827",
        "title": "NEXTDC FY20 Full-Year Results",
        "publisher": "NEXTDC",
        "url": "https://www.nextdc.com/storage/app/media/ASX%20Announcments/2104835.pdf",
        "publishedAt": "2020-08-27",
        "accessedAt": "2026-09-22",
        "locator": "Facilities capacity table, at 30 June 2020; S2 installed22 MW; M2 technical specifications installed10 MW; fitted-out capacity definition",
        "summary": "Historical built-capacity table distinguishes NSW38, VIC25 and ACT2 MW. Together with named S2 and M2 installed figures, it supports S1=16 MW, M1=15 MW and C1=2 MW at that date."
      }
    },
    {
      "id": "census-nextdc-fy21-20210827",
      "change": "added",
      "fields": [
        "id",
        "title",
        "publisher",
        "url",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "publisher": null,
        "url": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-nextdc-fy21-20210827",
        "title": "NEXTDC FY21 Full-Year Results",
        "publisher": "NEXTDC",
        "url": "https://www.nextdc.com/hubfs/ASX%20Announcements/2021-FY21-Results-Presentation.pdf",
        "accessedAt": "2026-09-22",
        "publishedAt": "2021-08-27",
        "locator": "Facility capacity and contracted utilisation, at 30 June 2021; built-capacity definition",
        "summary": "Final S2 data halls were fitted out, bringing built capacity to 30 MW. Built capacity means designed power of fitted-out halls; customer infrastructure may require further investment."
      }
    },
    {
      "id": "census-stack-critical-definition-2021",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-stack-critical-definition-2021",
        "title": "Inside STACK’s Basis of Design data centre",
        "url": "https://www.stackinfra.com/resources/thought-leadership/whats-it-like-inside-stack-infrastructures-newest-basis-of-design-data-center/",
        "publisher": "STACK Infrastructure",
        "accessedAt": "2026-09-22",
        "publishedAt": "2021-02-15",
        "locator": "Mechanical galleries, UPS rooms and Data halls sections",
        "summary": "STACK explains critical capacity as data-hall server load: four halls each support 6 MW, totalling the stated 24 MW critical capacity. Cooling plant is separately described; power distribution supplies the IT equipment. This establishes STACK terminology, not Melbourne commissioning."
      }
    },
    {
      "id": "census-stack-mel01-critical-brochure",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-stack-mel01-critical-brochure",
        "title": "STACK MEL01 campus brochure",
        "url": "https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf",
        "publisher": "STACK Infrastructure",
        "accessedAt": "2026-09-22",
        "publishedAt": null,
        "locator": "Page 1: MEL01A and MEL01B building descriptions and Substantial Scalability",
        "summary": "Defines the two buildings as 36 MW each and 72 MW critical capacity in aggregate. The separate 135 MW utility substation is not the critical equipment load. This brochure is used for electrical basis and building scope, not delivery date."
      }
    },
    {
      "id": "census-stack-mel01a-staged-fitout-2025",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-stack-mel01a-staged-fitout-2025",
        "title": "Ready, set, stack",
        "url": "https://www.agcoombs.com.au/news-and-publications/news/ready-set-stack/",
        "publisher": "A.G. Coombs",
        "accessedAt": "2026-09-22",
        "publishedAt": "2025-06-13",
        "locator": "Getting the sequence right section; MEL01A description",
        "summary": "The mechanical-services contractor describes live utilisation of some MEL01A data halls while the remaining fit-out is completed. The 36 MW building rating does not establish that every hall was fitted or available. No commissioned hall count is published."
      }
    },
    {
      "id": "census-stack-mel01b-complete-2025",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-stack-mel01b-complete-2025",
        "title": "STACK completes construction of MEL01B",
        "url": "https://www.datacenterdynamics.com/en/news/stack-tops-out-swiss-data-center-completes-construction-in-melbourne/",
        "publisher": "Data Center Dynamics",
        "accessedAt": "2026-09-22",
        "publishedAt": "2025-11-26",
        "locator": "Opening Melbourne section and quoted Erilyan completion announcement",
        "summary": "Reports contractor-confirmed completion of MEL01B, 36 MW across 12 data halls. MEL01A is a separate 36 MW building; C and D remain future 54 MW buildings. Direct LinkedIn retrieval is unsupported by Firecrawl, so the trade report is the retrievable completion evidence."
      }
    }
  ],
  "research": [
    {
      "id": "review-cdc-au-operating-leasable-20260922",
      "change": "updated",
      "fields": [
        "title",
        "summary",
        "metrics",
        "sourceIds",
        "limitations"
      ],
      "before": {
        "title": "CDC discloses 470 MW operating leasable capacity in Australia",
        "summary": "June 2026 valuation table allocates 120 MW to ACT, 220 MW to NSW and 130 MW to Victoria. The sum is 470 MW on the investor-defined leasable basis.",
        "metrics": [
          {
            "label": "Australian operating leasable capacity",
            "value": 470,
            "unit": "MW leasable",
            "period": "2026-06-30",
            "qualifier": "reported"
          },
          {
            "label": "ACT operating leasable capacity",
            "value": 120,
            "unit": "MW leasable",
            "period": "2026-06-30",
            "qualifier": "reported"
          },
          {
            "label": "NSW operating leasable capacity",
            "value": 220,
            "unit": "MW leasable",
            "period": "2026-06-30",
            "qualifier": "reported"
          },
          {
            "label": "VIC operating leasable capacity",
            "value": 130,
            "unit": "MW leasable",
            "period": "2026-06-30",
            "qualifier": "reported"
          }
        ],
        "sourceIds": [
          "cs-vic-cdc-investor-20260916"
        ],
        "limitations": "Regional components sum to the Australian total and are not additional to it. No allocation to individual campus buildings is supplied. Leasable replaces the earlier built metric and is not explicitly defined as comparable IT power."
      },
      "after": {
        "title": "CDC Australian operating ICT capacity: approximately 470 MW",
        "summary": "CDC reports operating primary ICT capacity of approximately 120 MW in the ACT, 220 MW in NSW and 130 MW in Victoria at 30 June 2026. The regional figures are rounded to the nearest 10 MW.",
        "metrics": [
          {
            "label": "Operating primary ICT capacity",
            "value": 470,
            "unit": "MW IT",
            "period": "30 June 2026",
            "qualifier": "approximate"
          }
        ],
        "sourceIds": [
          "census-cdc-valuation-20260630"
        ],
        "limitations": "The portfolio is included once in the operating reconciliation. Brooklyn accounts for the Victorian 130 MW; other named-site allocations remain incomplete. Primary ICT excludes the redundancy and losses in CDC’s earlier built-capacity measure. It is available capacity, not actual consumption."
      }
    },
    {
      "id": "review-cdc-nz-operating-leasable-20260922",
      "change": "updated",
      "fields": [
        "title",
        "summary",
        "metrics",
        "sourceIds",
        "limitations"
      ],
      "before": {
        "title": "CDC discloses 80 MW operating leasable capacity in New Zealand",
        "summary": "June 2026 valuation table records 80 MW operating capacity for New Zealand on a leasable basis.",
        "metrics": [
          {
            "label": "New Zealand operating leasable capacity",
            "value": 80,
            "unit": "MW leasable",
            "period": "2026-06-30",
            "qualifier": "reported"
          }
        ],
        "sourceIds": [
          "cs-vic-cdc-investor-20260916"
        ],
        "limitations": "Separate definition from the undated 98 MW campus operating sum. These are overlapping disclosures and must never be added. Leasable basis is not explicitly identified as IT power."
      },
      "after": {
        "title": "CDC New Zealand operating ICT capacity: approximately 80 MW",
        "summary": "CDC reports approximately 80 MW of operating primary ICT capacity in New Zealand at 30 June 2026, rounded to the nearest 10 MW.",
        "metrics": [
          {
            "label": "Operating primary ICT capacity",
            "value": 80,
            "unit": "MW IT",
            "period": "30 June 2026",
            "qualifier": "approximate"
          }
        ],
        "sourceIds": [
          "census-cdc-valuation-20260630"
        ],
        "limitations": "The portfolio is included once in the operating reconciliation. Capacity is not allocated between individual Auckland buildings. Primary ICT is distinct from the operator’s earlier gross built-capacity measure."
      }
    },
    {
      "id": "review-equinix-sy9x-operating-20260922",
      "change": "updated",
      "fields": [
        "summary",
        "sourceIds",
        "limitations"
      ],
      "before": {
        "summary": "Opening announcement and current facility page agree on more than 14 MW power capacity with a greater-than-28 MW full-build target.",
        "sourceIds": [
          "equinix-deep-sy9x-opening",
          "review-equinix-sy9x-profile-20260922"
        ],
        "limitations": "The electrical boundary is unspecified. This is the same capacity held in the profile stage, not an extra contribution. Live rechecking does not make September 2026 the source-effective date."
      },
      "after": {
        "summary": "The operator reports more than 14 MW operating at SY9x, distinct from the eventual >28 MW facility. Atlas interprets this as customer IT capacity from xScale’s commercial phase reporting, the operator’s IT-load terminology and the planning distinction between 45 MW gross and 30 MW IT design. This electrical-basis interpretation is inferred across sources, not a directly stated 14 MW IT specification. The separate 14 MW second phase remained under development at 30 June 2026.",
        "sourceIds": [
          "equinix-deep-sy9x-opening",
          "review-equinix-sy9x-profile-20260922",
          "census-equinix-q226",
          "census-equinix-rosehill-scoping-20221220",
          "census-equinix-xscale-it-definition-20201120"
        ],
        "limitations": "The 14 MW operating lower bound uses an explicit cross-source inference for its IT boundary. The second 14 MW phase was under development at 30 June 2026; eventual capacity is not counted as already operating."
      }
    },
    {
      "id": "verify-nextdc-au-built-reconciliation",
      "change": "updated",
      "fields": [
        "metrics",
        "title",
        "summary",
        "limitations"
      ],
      "before": {
        "metrics": [
          {
            "label": "Australian built capacity",
            "value": 278,
            "unit": "MW IT built",
            "period": "2026-06-30",
            "qualifier": "reported"
          },
          {
            "label": "Named-site built subtotal",
            "value": 208.2,
            "unit": "MW IT built",
            "period": "2026-06-30",
            "qualifier": "reported"
          },
          {
            "label": "Unallocated difference",
            "value": 69.8,
            "unit": "MW IT built",
            "period": "2026-06-30",
            "qualifier": "reported"
          }
        ],
        "title": "NEXTDC Australian built capacity and allocation gap",
        "summary": "FY26 p 18 discloses 288 MW group built capacity, including 10 MW international. Australia is 278 MW. The seven named operational project rows total 208.2 MW, leaving 69.8 MW not allocated to individual sites in the selected evidence.",
        "limitations": "The Australian total is 119 + 135 + 24 MW from the June 2026 regional table. Built is designed power of fitted-out halls, not utilisation or available capacity. Do not add 278 MW to its 208.2 MW site subset; do not allocate the residual using target IT specifications. Published 27 August 2026; source-effective date is 30 June 2026."
      },
      "after": {
        "metrics": [
          {
            "label": "Australian fitted-out capacity",
            "value": 277.9,
            "unit": "MW IT",
            "period": "30 June 2026",
            "qualifier": "reported"
          }
        ],
        "title": "NEXTDC Australian fitted-out capacity: 277.9 MW",
        "summary": "NEXTDC reports 287.9 MW consolidated built capacity at 30 June 2026, including 10 MW at Kuala Lumpur. The derived Australian portfolio is 277.9 MW. Named-site evidence allocates 273.45 MW within this portfolio.",
        "limitations": "Built capacity is the designed power of fitted-out halls. Customer infrastructure may require further investment. The regional table rounds Australia to 278 MW. Named-site capacity is deducted before the remaining portfolio balance is counted."
      }
    }
  ],
  "operatingPortfolios": [
    {
      "id": "cdc-act-operating-20260630",
      "change": "added",
      "fields": [
        "id",
        "operator",
        "country",
        "region",
        "label",
        "mw",
        "asOf",
        "mwBasis",
        "mwQualifier",
        "sourceIds",
        "coveredFacilityIds",
        "note"
      ],
      "before": {
        "id": null,
        "operator": null,
        "country": null,
        "region": null,
        "label": null,
        "mw": null,
        "asOf": null,
        "mwBasis": null,
        "mwQualifier": null,
        "sourceIds": null,
        "coveredFacilityIds": null,
        "note": null
      },
      "after": {
        "id": "cdc-act-operating-20260630",
        "operator": "CDC",
        "country": "AU",
        "region": "ACT",
        "label": "CDC ACT operating ICT capacity",
        "mw": 120,
        "asOf": "2026-06-30",
        "mwBasis": "IT",
        "mwQualifier": "approximate",
        "sourceIds": [
          "census-cdc-valuation-20260630"
        ],
        "coveredFacilityIds": [
          "cdc-beard",
          "cdc-fyshwick",
          "dcm-10628",
          "dcm-10629",
          "cdc-hume-one",
          "cdc-hume-two",
          "dcm-10623",
          "dcm-10624",
          "dcm-10625",
          "dcm-10626",
          "dcm-10627",
          "dcm-18988"
        ],
        "note": "Operating leasable capacity: primary ICT capacity that is contractable or generating revenue. Source rounds each regional figure to the nearest 10 MW. This is capacity available for customers, not electricity consumption, contracted capacity or actual utilisation. Named-site capacity forms part of this portfolio total and is counted once."
      }
    },
    {
      "id": "cdc-nsw-operating-20260630",
      "change": "added",
      "fields": [
        "id",
        "operator",
        "country",
        "region",
        "label",
        "mw",
        "asOf",
        "mwBasis",
        "mwQualifier",
        "sourceIds",
        "coveredFacilityIds",
        "note"
      ],
      "before": {
        "id": null,
        "operator": null,
        "country": null,
        "region": null,
        "label": null,
        "mw": null,
        "asOf": null,
        "mwBasis": null,
        "mwQualifier": null,
        "sourceIds": null,
        "coveredFacilityIds": null,
        "note": null
      },
      "after": {
        "id": "cdc-nsw-operating-20260630",
        "operator": "CDC",
        "country": "AU",
        "region": "NSW",
        "label": "CDC NSW operating ICT capacity",
        "mw": 220,
        "asOf": "2026-06-30",
        "mwBasis": "IT",
        "mwQualifier": "approximate",
        "sourceIds": [
          "census-cdc-valuation-20260630"
        ],
        "coveredFacilityIds": [
          "cdc-eastern-creek",
          "dcm-10631",
          "dcm-10632",
          "dcm-10633",
          "dcm-10634",
          "dcm-10635",
          "dcm-10636",
          "dcm-18770",
          "cdc-marsden-park",
          "dcm-11305",
          "dcm-11306",
          "dcm-11307",
          "dcm-11308",
          "dcm-11309",
          "dcm-11310"
        ],
        "note": "Operating leasable capacity: primary ICT capacity that is contractable or generating revenue. Source rounds each regional figure to the nearest 10 MW. This is capacity available for customers, not electricity consumption, contracted capacity or actual utilisation. Named-site capacity forms part of this portfolio total and is counted once."
      }
    },
    {
      "id": "cdc-nz-operating-20260630",
      "change": "added",
      "fields": [
        "id",
        "operator",
        "country",
        "label",
        "mw",
        "asOf",
        "mwBasis",
        "mwQualifier",
        "sourceIds",
        "coveredFacilityIds",
        "note"
      ],
      "before": {
        "id": null,
        "operator": null,
        "country": null,
        "label": null,
        "mw": null,
        "asOf": null,
        "mwBasis": null,
        "mwQualifier": null,
        "sourceIds": null,
        "coveredFacilityIds": null,
        "note": null
      },
      "after": {
        "id": "cdc-nz-operating-20260630",
        "operator": "CDC",
        "country": "NZ",
        "label": "CDC New Zealand operating ICT capacity",
        "mw": 80,
        "asOf": "2026-06-30",
        "mwBasis": "IT",
        "mwQualifier": "approximate",
        "sourceIds": [
          "census-cdc-valuation-20260630"
        ],
        "coveredFacilityIds": [
          "dcm-10619",
          "dcm-18638",
          "dcm-17359",
          "dcm-17360",
          "cdc-hobsonville-one",
          "cdc-hobsonville-two",
          "cdc-silverdale-one",
          "dcm-18798"
        ],
        "note": "Operating leasable capacity: primary ICT capacity that is contractable or generating revenue. Source rounds each regional figure to the nearest 10 MW. This is capacity available for customers, not electricity consumption, contracted capacity or actual utilisation. Named-site capacity forms part of this portfolio total and is counted once."
      }
    },
    {
      "id": "cdc-vic-operating-20260630",
      "change": "added",
      "fields": [
        "id",
        "operator",
        "country",
        "region",
        "label",
        "mw",
        "asOf",
        "mwBasis",
        "mwQualifier",
        "sourceIds",
        "coveredFacilityIds",
        "note"
      ],
      "before": {
        "id": null,
        "operator": null,
        "country": null,
        "region": null,
        "label": null,
        "mw": null,
        "asOf": null,
        "mwBasis": null,
        "mwQualifier": null,
        "sourceIds": null,
        "coveredFacilityIds": null,
        "note": null
      },
      "after": {
        "id": "cdc-vic-operating-20260630",
        "operator": "CDC",
        "country": "AU",
        "region": "VIC",
        "label": "CDC VIC operating ICT capacity",
        "mw": 130,
        "asOf": "2026-06-30",
        "mwBasis": "IT",
        "mwQualifier": "approximate",
        "sourceIds": [
          "census-cdc-valuation-20260630"
        ],
        "coveredFacilityIds": [
          "dcm-18986",
          "dcm-18987",
          "cdc-brooklyn",
          "cdc-laverton",
          "dcm-18989",
          "dcm-18990"
        ],
        "note": "Operating leasable capacity: primary ICT capacity that is contractable or generating revenue. Source rounds each regional figure to the nearest 10 MW. This is capacity available for customers, not electricity consumption, contracted capacity or actual utilisation. Named-site capacity forms part of this portfolio total and is counted once."
      }
    },
    {
      "id": "census-digital-melbourne-20251231",
      "change": "added",
      "fields": [
        "id",
        "operator",
        "country",
        "label",
        "mw",
        "mwBasis",
        "mwQualifier",
        "asOf",
        "sourceIds",
        "coveredFacilityIds",
        "note"
      ],
      "before": {
        "id": null,
        "operator": null,
        "country": null,
        "label": null,
        "mw": null,
        "mwBasis": null,
        "mwQualifier": null,
        "asOf": null,
        "sourceIds": null,
        "coveredFacilityIds": null,
        "note": null
      },
      "after": {
        "id": "census-digital-melbourne-20251231",
        "operator": "Digital Realty",
        "country": "AU",
        "label": "Digital Realty Melbourne operating IT capacity",
        "mw": 9.6,
        "mwBasis": "IT",
        "mwQualifier": "reported",
        "asOf": "2025-12-31",
        "sourceIds": [
          "census-digital-q425"
        ],
        "coveredFacilityIds": [
          "digital-realty-mel11",
          "dcm-11357",
          "dcm-11358"
        ],
        "note": "Latest separately disclosed Melbourne white-space IT load: 9.6 MW at 31 December 2025 across two investor-report data centres. Later reports combine Melbourne with other APAC markets. Public MEL10/MEL11/MEL12 profiles do not establish how this operating figure is allocated; their design ratings cannot be added on top."
      }
    },
    {
      "id": "census-digital-sydney-20260630",
      "change": "added",
      "fields": [
        "id",
        "operator",
        "country",
        "label",
        "mw",
        "mwBasis",
        "mwQualifier",
        "asOf",
        "sourceIds",
        "coveredFacilityIds",
        "note"
      ],
      "before": {
        "id": null,
        "operator": null,
        "country": null,
        "label": null,
        "mw": null,
        "mwBasis": null,
        "mwQualifier": null,
        "asOf": null,
        "sourceIds": null,
        "coveredFacilityIds": null,
        "note": null
      },
      "after": {
        "id": "census-digital-sydney-20260630",
        "operator": "Digital Realty",
        "country": "AU",
        "label": "Digital Realty Sydney operating IT capacity",
        "mw": 30,
        "mwBasis": "IT",
        "mwQualifier": "approximate",
        "asOf": "2026-06-30",
        "sourceIds": [
          "census-digital-q226"
        ],
        "coveredFacilityIds": [
          "digital-realty-syd10",
          "digital-realty-syd11",
          "dcm-11698"
        ],
        "note": "Operator reports 30 MW of operating white-space IT load in Sydney, at 100% share, rounded to whole MW. The investor table counts four data centres; the public profiles do not allocate the reported capacity among buildings. All known Sydney records are covered so any later named-site allocation is deducted, never added on top. No occupancy discount is applied: installed capacity includes available space."
      }
    },
    {
      "id": "census-macquarie-au-installed-fy26",
      "change": "added",
      "fields": [
        "id",
        "operator",
        "country",
        "label",
        "mw",
        "asOf",
        "mwBasis",
        "mwQualifier",
        "sourceIds",
        "coveredFacilityIds",
        "note",
        "basisEvidence"
      ],
      "before": {
        "id": null,
        "operator": null,
        "country": null,
        "label": null,
        "mw": null,
        "asOf": null,
        "mwBasis": null,
        "mwQualifier": null,
        "sourceIds": null,
        "coveredFacilityIds": null,
        "note": null,
        "basisEvidence": null
      },
      "after": {
        "id": "census-macquarie-au-installed-fy26",
        "operator": "Macquarie Data Centres",
        "country": "AU",
        "label": "Macquarie Australian installed capacity",
        "mw": 21,
        "asOf": "2026-06-30",
        "mwBasis": "IT",
        "mwQualifier": "reported",
        "sourceIds": [
          "cs-verify-macquarie-fy26-20260922",
          "review-macquarie-sydney-spec-20260922"
        ],
        "coveredFacilityIds": [
          "macquarie-ic1",
          "macquarie-ic2",
          "macquarie-ic3-east",
          "macquarie-ic4",
          "macquarie-ic5"
        ],
        "note": "FY26 issuer presentation reports 21 MW installed across Macquarie Park, Canberra and Sydney CBD. IC3 SuperWest and METC are future additions, excluded from this installed figure. IT basis is supported by the presentation using additive 47 MW SuperWest IT capacity and the operator IT-load specifications; the 21 MW sentence itself says installed capacity, without repeating IT. Named-site allocations are included within the 21 MW portfolio, with only the unallocated balance additional to them.",
        "basisEvidence": "inferred"
      }
    },
    {
      "id": "census-nextdc-au-built-fy26",
      "change": "added",
      "fields": [
        "id",
        "operator",
        "country",
        "label",
        "mw",
        "asOf",
        "mwBasis",
        "mwQualifier",
        "sourceIds",
        "coveredFacilityIds",
        "note"
      ],
      "before": {
        "id": null,
        "operator": null,
        "country": null,
        "label": null,
        "mw": null,
        "asOf": null,
        "mwBasis": null,
        "mwQualifier": null,
        "sourceIds": null,
        "coveredFacilityIds": null,
        "note": null
      },
      "after": {
        "id": "census-nextdc-au-built-fy26",
        "operator": "NEXTDC",
        "country": "AU",
        "label": "NEXTDC Australian fitted-out capacity",
        "mw": 277.9,
        "asOf": "2026-06-30",
        "mwBasis": "IT",
        "mwQualifier": "reported",
        "sourceIds": [
          "review-nextdc-fy26-announcement-20260827",
          "nextdc-fy26"
        ],
        "coveredFacilityIds": [
          "nextdc-a1",
          "nextdc-b1",
          "nextdc-b2",
          "nextdc-c1",
          "nextdc-d1",
          "nextdc-d2",
          "nextdc-gc1",
          "nextdc-ge1",
          "nextdc-m1",
          "nextdc-m2",
          "nextdc-m3",
          "nextdc-m4",
          "nextdc-m5",
          "nextdc-ne1",
          "nextdc-p1",
          "nextdc-p2",
          "nextdc-ph1",
          "nextdc-s1",
          "nextdc-s2",
          "nextdc-s3",
          "nextdc-s4",
          "nextdc-s5",
          "nextdc-s6",
          "nextdc-s7",
          "nextdc-sc1",
          "nextdc-sc2"
        ],
        "note": "Australian built capacity derived from 287.9 MW consolidated fitted-out capacity less 10 MW in Kuala Lumpur. The regional table rounds Australia to 278 MW. Built means designed power of fitted-out halls; further customer infrastructure can be required. Named-site allocations form part of this portfolio; the reconciliation adds only its remaining balance."
      }
    }
  ]
}