  "releaseId": "2026-09-23-preview-11",
  "previousReleaseId": "2026-09-22-preview-10",
  "publishedAt": "2026-09-23",
  "note": "Changes between dated publications. New or revised evidence can change an observation without indicating a physical change at the facility. Before and after values are retained for citation.",
  "facilities": [
    {
      "id": "dcm-14116",
      "change": "updated",
      "fields": [
        "stages",
        "evidenceStatus",
        "sourceIds",
        "notes",
        "address",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "planned",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "dcm-14116-unverified",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "dcm-14116"
            ],
            "note": "Directory reports Planned. No comparable IT capacity or commissioning date has been accepted from this listing."
          }
        ],
        "evidenceStatus": "directory-reported",
        "sourceIds": [
          "dcm-14116",
          "natural-earth-cities"
        ],
        "notes": [
          "Added from a public Data Center Map listing. Identity, technical specifications and location remain directory-reported until corroborated against operator or planning evidence."
        ],
        "address": null,
        "fieldReviews": null
      },
      "after": {
        "stages": [
          {
            "asOf": "2025-12-09",
            "mwQualifier": "maximum",
            "stage": "planned",
            "capacityRole": "design-envelope",
            "mw": 76,
            "mwBasis": "IT",
            "basisEvidence": "explicit",
            "scopeId": "julius-avenue-current-proposed-it-design",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "census-julius-revised-20251209",
              "cs-verify-ispt-data-2-20260922"
            ],
            "note": "Later lodged revision specifies eight halls and 76 MW proposed IT load, rather than the earlier 115.2 MW design. The application remains More Information Required, so this is an unapproved upper design envelope, not an opening forecast."
          }
        ],
        "evidenceStatus": "profile-reviewed",
        "sourceIds": [
          "dcm-14116",
          "census-julius-revised-20251209",
          "census-julius-previous-202506",
          "cs-verify-ispt-data-2-20260922",
          "natural-earth-cities"
        ],
        "notes": [
          "The accepted 76 MW is a proposed IT design ceiling from the later lodged revision, not capacity in service."
        ],
        "address": {
          "street": "6–8 Julius Avenue",
          "locality": "North Ryde",
          "region": "NSW",
          "postalCode": "",
          "country": "AU",
          "sourceIds": [
            "census-julius-revised-20251209"
          ],
          "verifiedOn": "2026-09-23"
        },
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-23",
            "sourceIds": [
              "census-julius-revised-20251209"
            ],
            "note": "Planning report identifies the 6–8 Julius Avenue North Ryde project and ISPT as client."
          },
          {
            "field": "address",
            "outcome": "verified",
            "checkedOn": "2026-09-23",
            "sourceIds": [
              "census-julius-revised-20251209"
            ],
            "note": "The revised planning report identifies the Julius Avenue North Ryde site; map coordinates remain separately unverified."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-23",
            "sourceIds": [
              "census-julius-revised-20251209",
              "census-julius-previous-202506"
            ],
            "note": "The later proposal specifies 76 MW IT and 120 MW maximum total power. The earlier 115.2 MW IT / 169 MW total concept is superseded and excluded."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-23",
            "sourceIds": [
              "cs-verify-ispt-data-2-20260922"
            ],
            "note": "NSW Planning still labels the application More Information Required; no approval or operating status is established."
          }
        ]
      }
    },
    {
      "id": "dcm-14686",
      "change": "updated",
      "fields": [
        "stages",
        "evidenceStatus",
        "sourceIds",
        "notes",
        "address",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "planned",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "dcm-14686-unverified",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "dcm-14686"
            ],
            "note": "Directory reports Planned. No comparable IT capacity or commissioning date has been accepted from this listing."
          }
        ],
        "evidenceStatus": "directory-reported",
        "sourceIds": [
          "dcm-14686",
          "natural-earth-cities"
        ],
        "notes": [
          "Added from a public Data Center Map listing. Identity, technical specifications and location remain directory-reported until corroborated against operator or planning evidence."
        ],
        "address": null,
        "fieldReviews": null
      },
      "after": {
        "stages": [
          {
            "asOf": "2026-02-17",
            "mwQualifier": "maximum",
            "stage": "planned",
            "capacityRole": "design-envelope",
            "mw": 60,
            "mwBasis": "IT",
            "basisEvidence": "explicit",
            "scopeId": "project-mars-proposed-it-design",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "census-mars-esd-20260217",
              "cs-verify-mars-0-20260922"
            ],
            "note": "Applicant ESD report defines 60 MW maximum site IT load and 81 MW maximum whole-site load. This application remains at Response to Submissions; the 60 MW is an unapproved IT design ceiling, not construction or operating capacity."
          }
        ],
        "evidenceStatus": "profile-reviewed",
        "sourceIds": [
          "dcm-14686",
          "census-mars-esd-20260217",
          "cs-verify-mars-0-20260922",
          "natural-earth-cities"
        ],
        "notes": [
          "60 MW is the proposed site IT design limit. Total facility electricity demand and an earlier portal headline are not additional IT capacity."
        ],
        "address": {
          "street": "12 Mars Road",
          "locality": "Lane Cove West",
          "region": "NSW",
          "postalCode": "2066",
          "country": "AU",
          "sourceIds": [
            "census-mars-esd-20260217"
          ],
          "verifiedOn": "2026-09-23"
        },
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-23",
            "sourceIds": [
              "census-mars-esd-20260217"
            ],
            "note": "Applicant's final-lodgement report identifies Project Mars at 12 Mars Road, Lane Cove West."
          },
          {
            "field": "address",
            "outcome": "verified",
            "checkedOn": "2026-09-23",
            "sourceIds": [
              "census-mars-esd-20260217"
            ],
            "note": "The planning report identifies 12 Mars Road; a street-level map point has not been independently verified."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-23",
            "sourceIds": [
              "census-mars-esd-20260217"
            ],
            "note": "60 MW maximum IT load is explicitly distinct from 81 MW maximum total site load and portal's approximately 90 MW description."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-23",
            "sourceIds": [
              "cs-verify-mars-0-20260922"
            ],
            "note": "NSW Planning lists Response to Submissions; no approval or construction start is verified."
          }
        ]
      }
    },
    {
      "id": "dcm-18798",
      "change": "updated",
      "fields": [
        "region",
        "city",
        "lat",
        "lon",
        "locationPrecision",
        "stages",
        "evidenceStatus",
        "sourceIds",
        "notes",
        "fieldReviews"
      ],
      "before": {
        "region": "Unspecified",
        "city": "New Plymouth",
        "lat": -39.055639,
        "lon": 174.074813,
        "locationPrecision": "city",
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "planned",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "dcm-18798-unverified",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "dcm-18798"
            ],
            "note": "Directory reports Planned. No comparable IT capacity or commissioning date has been accepted from this listing."
          }
        ],
        "evidenceStatus": "directory-reported",
        "sourceIds": [
          "dcm-18798",
          "natural-earth-cities"
        ],
        "notes": [
          "Added from a public Data Center Map listing. Identity, technical specifications and location remain directory-reported until corroborated against operator or planning evidence."
        ],
        "fieldReviews": null
      },
      "after": {
        "region": "Taranaki",
        "city": "Stratford",
        "lat": null,
        "lon": null,
        "locationPrecision": "unknown",
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "maximum",
            "stage": "planned",
            "mw": 250,
            "mwBasis": "unknown",
            "scopeId": "cdc-stratford-concept-power",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "census-contact-stratford-fy26"
            ],
            "note": "Contact and CDC describe a 250 MW data centre concept at Stratford and intend to seek resource consent. The electrical boundary is not stated as IT; no approval, construction or operating capacity is evidenced."
          }
        ],
        "evidenceStatus": "directory-verified",
        "sourceIds": [
          "dcm-18798",
          "census-contact-stratford-fy26"
        ],
        "notes": [
          "Contact and CDC are exploring a site at Stratford, Taranaki; 250 MW is a pre-consent project concept, not an operating centre."
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-23",
            "sourceIds": [
              "census-contact-stratford-fy26"
            ],
            "note": "Contact and CDC identify the same proposed Stratford project."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-23",
            "sourceIds": [
              "census-contact-stratford-fy26"
            ],
            "note": "Contact says resource consent will be sought; the project is at concept, design and engagement stage."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-23",
            "sourceIds": [
              "census-contact-stratford-fy26"
            ],
            "note": "The concept is described as 250 MW without an explicit IT electrical boundary, so it remains outside comparable totals."
          }
        ]
      }
    },
    {
      "id": "iren-bundey",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "notes",
        "fieldReviews",
        "address"
      ],
      "before": {
        "stages": [
          {
            "asOf": "2026-06-03",
            "mwQualifier": "maximum",
            "stage": "planned",
            "mw": 800,
            "mwBasis": "unknown",
            "scopeId": "iren-bundey-capacity",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "cs-other-iren-bundey-20260922",
              "cs-other-iren-bundey-site-20260922"
            ],
            "note": "Up to 800 MW supported by the transmission connection agreement. This is a grid electrical boundary, not disclosed IT load. Start of energisation from 2028 is a connection target, not full data-centre commissioning."
          }
        ],
        "sourceIds": [
          "exp-iren-bundey",
          "compute-iren-bundey-20260911",
          "compute-iren-bundey-site-20260911",
          "compute-iren-fy26-20260911",
          "compute-iren-microsoft-20260911",
          "loc-osm-locality-iren-bundey",
          "dcm-17877",
          "cs-other-iren-bundey-20260922",
          "cs-other-iren-bundey-site-20260922"
        ],
        "notes": [
          "800 MW headline is not treated as IT load; no construction commencement is stated.",
          "Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations."
        ],
        "fieldReviews": [
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "cs-other-iren-bundey-20260922",
              "cs-other-iren-bundey-site-20260922"
            ],
            "note": "Planned campus and energisation target; no whole-campus commissioning inferred."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-22",
            "sourceIds": [
              "cs-other-iren-bundey-20260922",
              "cs-other-iren-bundey-site-20260922"
            ],
            "note": "800 MW connection support confirmed; IT allocation not supplied."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "compute-iren-bundey-20260911",
              "compute-iren-bundey-site-20260911",
              "compute-iren-fy26-20260911"
            ],
            "note": "No Bundey GPU model or count; group/Childress hardware is outside this site."
          },
          {
            "field": "workloads",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "compute-iren-bundey-20260911",
              "compute-iren-fy26-20260911"
            ],
            "note": "General AI purpose is explicit; site-specific training/inference deployment split is not."
          },
          {
            "field": "contracts",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "compute-iren-bundey-20260911",
              "compute-iren-fy26-20260911",
              "compute-iren-microsoft-20260911"
            ],
            "note": "No exact Bundey compute tenant/offtake identified. Microsoft deployment is Texas."
          },
          {
            "field": "address",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "compute-iren-bundey-20260911",
              "compute-iren-bundey-site-20260911"
            ],
            "note": "Locality and 1300-acre land area, but no public street address established here."
          }
        ],
        "address": null
      },
      "after": {
        "stages": [
          {
            "asOf": "2026-06-03",
            "mwQualifier": "maximum",
            "stage": "planned",
            "mw": 800,
            "mwBasis": "unknown",
            "scopeId": "iren-bundey-capacity",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "cs-other-iren-bundey-20260922",
              "census-bundey-epbc-20260731"
            ],
            "note": "Up to 800 MW of transmission-connected project power. This is an upstream electricity boundary, not IT load; the separate proposed IT design is up to 600 MW. Energisation from 2028 is a connection target, not delivery of the full campus."
          },
          {
            "asOf": "2026-07-31",
            "mwQualifier": "maximum",
            "stage": "planned",
            "capacityRole": "design-envelope",
            "mw": 600,
            "mwBasis": "IT",
            "basisEvidence": "explicit",
            "scopeId": "iren-bundey-campus-proposed-it-design",
            "includedInTotals": true,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "census-bundey-epbc-20260731",
              "census-bundey-epbc-attachment-20260731"
            ],
            "note": "Federal referral proposes three halls, each up to 200 MW IT. The 600 MW sum is an ultimate design ceiling; the reviewed records do not establish state development consent, construction or operating supply. It replaces no component already counted at this physical site."
          }
        ],
        "sourceIds": [
          "exp-iren-bundey",
          "compute-iren-bundey-20260911",
          "compute-iren-bundey-site-20260911",
          "compute-iren-fy26-20260911",
          "compute-iren-microsoft-20260911",
          "loc-osm-locality-iren-bundey",
          "dcm-17877",
          "cs-other-iren-bundey-20260922",
          "cs-other-iren-bundey-site-20260922",
          "census-bundey-epbc-20260731",
          "census-bundey-epbc-attachment-20260731"
        ],
        "notes": [
          "800 MW headline is not treated as IT load; no construction commencement is stated.",
          "Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.",
          "The federal referral defines a 600 MW IT design ceiling within an 800 MW electricity project. A referral decision is recorded, but no hall has been verified as operating."
        ],
        "fieldReviews": [
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-23",
            "sourceIds": [
              "census-bundey-epbc-20260731"
            ],
            "note": "The federal portal records a referral decision; its notice and outcome were not accessible in this check. No state development consent, data-hall construction or operating IT capacity was verified."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-23",
            "sourceIds": [
              "census-bundey-epbc-20260731",
              "census-bundey-epbc-attachment-20260731"
            ],
            "note": "The referral explicitly specifies up to 600 MW IT across three proposed halls, distinct from its 800 MW electricity connection. Neither is commissioned capacity."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "compute-iren-bundey-20260911",
              "compute-iren-bundey-site-20260911",
              "compute-iren-fy26-20260911"
            ],
            "note": "No Bundey GPU model or count; group/Childress hardware is outside this site."
          },
          {
            "field": "workloads",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "compute-iren-bundey-20260911",
              "compute-iren-fy26-20260911"
            ],
            "note": "General AI purpose is explicit; site-specific training/inference deployment split is not."
          },
          {
            "field": "contracts",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "compute-iren-bundey-20260911",
              "compute-iren-fy26-20260911",
              "compute-iren-microsoft-20260911"
            ],
            "note": "No exact Bundey compute tenant/offtake identified. Microsoft deployment is Texas."
          },
          {
            "field": "address",
            "outcome": "verified",
            "checkedOn": "2026-09-23",
            "sourceIds": [
              "census-bundey-epbc-attachment-20260731"
            ],
            "note": "The applicant's federal referral identifies Lot 69 Bundey Church Road; precise campus map coordinates remain separately unconfirmed."
          }
        ],
        "address": {
          "street": "Lot 69 Bundey Church Road",
          "locality": "Bundey",
          "region": "SA",
          "postalCode": "",
          "country": "AU",
          "sourceIds": [
            "census-bundey-epbc-attachment-20260731"
          ],
          "verifiedOn": "2026-09-23"
        }
      }
    },
    {
      "id": "leading-edge-coffs-harbour",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "notes",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "unknown",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "leading-edge-coffs-harbour-unquantified",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "exp-ledc-coffs-harbour"
            ],
            "note": "Named location and technical specification verified; current opening/construction status remains unconfirmed."
          }
        ],
        "sourceIds": [
          "exp-ledc-coffs-harbour",
          "au-profile-ledc-coffs-20260911",
          "au-profile-ledc-dubbo-opening-20260911",
          "dcm-12161",
          "natural-earth-cities"
        ],
        "notes": [
          "Historic opening targets are not used as evidence that the site is operating.",
          "Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations."
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "au-profile-ledc-coffs-20260911"
            ],
            "note": "The operator technical profile identifies CFS1 in Coffs Harbour."
          },
          {
            "field": "address",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "au-profile-ledc-coffs-20260911"
            ],
            "note": "No public street address is given in the reviewed location profile. The downloadable information flow is gated; no form was submitted."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "au-profile-ledc-coffs-20260911"
            ],
            "note": "The page labels 300 kW as total site capacity and separately specifies 150 kW IT load per module. Installed module count and commissioned IT load are not given; no module count is inferred by division."
          },
          {
            "field": "status",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "au-profile-ledc-coffs-20260911",
              "au-profile-ledc-dubbo-opening-20260911"
            ],
            "note": "The technical profile and a historical pipeline list establish a named location, but neither establishes current operation or construction. Status remains unknown."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "au-profile-ledc-coffs-20260911"
            ],
            "note": "The reviewed location specification does not publish a deployed GPU model or count. Modular IT capacity is not a hardware inventory."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "leading-edge-coffs-harbour-unquantified",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "census-ledc-nsw-network-20260923",
              "exp-ledc-coffs-harbour"
            ],
            "note": "NSW Government lists Coffs Harbour in the six-site operating regional network. Current installed module count and commissioned IT MW are undisclosed."
          }
        ],
        "sourceIds": [
          "exp-ledc-coffs-harbour",
          "au-profile-ledc-coffs-20260911",
          "au-profile-ledc-dubbo-opening-20260911",
          "dcm-12161",
          "census-ledc-nsw-network-20260923",
          "natural-earth-cities"
        ],
        "notes": [
          "Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations."
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "au-profile-ledc-coffs-20260911"
            ],
            "note": "The operator technical profile identifies CFS1 in Coffs Harbour."
          },
          {
            "field": "address",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "au-profile-ledc-coffs-20260911"
            ],
            "note": "No public street address is given in the reviewed location profile. The downloadable information flow is gated; no form was submitted."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "au-profile-ledc-coffs-20260911"
            ],
            "note": "The page labels 300 kW as total site capacity and separately specifies 150 kW IT load per module. Installed module count and commissioned IT load are not given; no module count is inferred by division."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-23",
            "sourceIds": [
              "census-ledc-nsw-network-20260923"
            ],
            "note": "NSW Government names Coffs Harbour among the six regional data centres in the operating network; no site opening date is supplied."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "au-profile-ledc-coffs-20260911"
            ],
            "note": "The reviewed location specification does not publish a deployed GPU model or count. Modular IT capacity is not a hardware inventory."
          }
        ]
      }
    },
    {
      "id": "leading-edge-wagga-wagga",
      "change": "updated",
      "fields": [
        "stages",
        "sourceIds",
        "notes",
        "fieldReviews"
      ],
      "before": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "unknown",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "leading-edge-wagga-wagga-unquantified",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "exp-ledc-wagga-wagga"
            ],
            "note": "Named location and technical specification verified; current opening/construction status remains unconfirmed."
          }
        ],
        "sourceIds": [
          "exp-ledc-wagga-wagga",
          "au-profile-ledc-wagga-20260911",
          "au-profile-ledc-dubbo-opening-20260911",
          "dcm-12160",
          "natural-earth-cities"
        ],
        "notes": [
          "Historic opening targets are not used as evidence that the site is operating.",
          "Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations."
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "au-profile-ledc-wagga-20260911"
            ],
            "note": "The operator technical profile identifies WGA1 in Wagga Wagga."
          },
          {
            "field": "address",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "au-profile-ledc-wagga-20260911"
            ],
            "note": "No public street address is given in the reviewed location profile. The downloadable information flow is gated; no form was submitted."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "au-profile-ledc-wagga-20260911"
            ],
            "note": "The page labels 300 kW as total site capacity and separately specifies 150 kW IT load per module. Installed module count and commissioned IT load are not given; no module count is inferred by division."
          },
          {
            "field": "status",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "au-profile-ledc-wagga-20260911",
              "au-profile-ledc-dubbo-opening-20260911"
            ],
            "note": "The technical profile and a historical pipeline list establish a named location, but neither establishes current operation or construction. Status remains unknown."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "au-profile-ledc-wagga-20260911"
            ],
            "note": "The reviewed location specification does not publish a deployed GPU model or count. Modular IT capacity is not a hardware inventory."
          }
        ]
      },
      "after": {
        "stages": [
          {
            "asOf": null,
            "mwQualifier": "reported",
            "stage": "operating",
            "mw": null,
            "mwBasis": "unknown",
            "scopeId": "leading-edge-wagga-wagga-unquantified",
            "includedInTotals": false,
            "expectedYear": null,
            "dateConfidence": "unknown",
            "sourceIds": [
              "census-ledc-nsw-network-20260923",
              "exp-ledc-wagga-wagga"
            ],
            "note": "NSW Government lists Wagga Wagga in the six-site operating regional network. Current installed module count and commissioned IT MW are undisclosed."
          }
        ],
        "sourceIds": [
          "exp-ledc-wagga-wagga",
          "au-profile-ledc-wagga-20260911",
          "au-profile-ledc-dubbo-opening-20260911",
          "dcm-12160",
          "census-ledc-nsw-network-20260923",
          "natural-earth-cities"
        ],
        "notes": [
          "Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations."
        ],
        "fieldReviews": [
          {
            "field": "identity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "au-profile-ledc-wagga-20260911"
            ],
            "note": "The operator technical profile identifies WGA1 in Wagga Wagga."
          },
          {
            "field": "address",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "au-profile-ledc-wagga-20260911"
            ],
            "note": "No public street address is given in the reviewed location profile. The downloadable information flow is gated; no form was submitted."
          },
          {
            "field": "capacity",
            "outcome": "verified",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "au-profile-ledc-wagga-20260911"
            ],
            "note": "The page labels 300 kW as total site capacity and separately specifies 150 kW IT load per module. Installed module count and commissioned IT load are not given; no module count is inferred by division."
          },
          {
            "field": "status",
            "outcome": "verified",
            "checkedOn": "2026-09-23",
            "sourceIds": [
              "census-ledc-nsw-network-20260923"
            ],
            "note": "NSW Government names Wagga Wagga among the six regional data centres in the operating network; no site opening date is supplied."
          },
          {
            "field": "hardware",
            "outcome": "not-found",
            "checkedOn": "2026-09-11",
            "sourceIds": [
              "au-profile-ledc-wagga-20260911"
            ],
            "note": "The reviewed location specification does not publish a deployed GPU model or count. Modular IT capacity is not a hardware inventory."
          }
        ]
      }
    }
  ],
  "sources": [
    {
      "id": "census-bundey-epbc-20260731",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-bundey-epbc-20260731",
        "title": "Bundey Data Centre Campus, EPBC referral 2026/10605",
        "url": "https://epbcpublicportal.environment.gov.au/all-referrals/project-referral-summary/?id=77e70095-c98c-f111-ab0f-7c1e5262fe21",
        "publisher": "Australian Government EPBC Act Public Portal",
        "accessedAt": "2026-09-23",
        "publishedAt": null,
        "locator": "Project description, Key Project Elements: three halls each up to 200 MW IT; referral project number 2026/10605 and status. Attachment 00-2026-10605 Referral.pdf, sections 1.2 and 2.2, dated 31 July 2026, identifies Lot 69 Bundey Church Road.",
        "summary": "The proposed Bundey campus has three data halls of up to 200 MW IT each, 600 MW IT design in total, within an 800 MW electricity-supply project. The federal portal records a referral decision, but its notice was not accessible in this check. No state development consent or commissioned halls were verified."
      }
    },
    {
      "id": "census-bundey-epbc-attachment-20260731",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-bundey-epbc-attachment-20260731",
        "title": "Bundey Data Centre Campus referral attachment",
        "url": "https://epbcpublicportal.environment.gov.au/_entity/sharepointdocumentlocation/5c72ac54-e89c-f111-b8db-70a8a5564bc0/2ab10dab-d681-4911-b881-cc99413f07b6?file=00-2026-10605%20Referral.pdf",
        "publisher": "TAS 1 Holdings / Australian Government EPBC Act Public Portal",
        "accessedAt": "2026-09-23",
        "publishedAt": "2026-07-31",
        "locator": "Referral PDF, sections 1.2 and 2.2: applicant ownership by IREN; Lot 69 Bundey Church Road; three proposed halls, each up to 200 MW IT.",
        "summary": "TAS 1 Holdings, wholly owned by IREN, refers the Bundey campus for assessment. The submission identifies the site and proposed IT design; it does not establish development approval or construction."
      }
    },
    {
      "id": "census-contact-stratford-fy26",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-contact-stratford-fy26",
        "title": "Contact Energy FY26 results presentation",
        "url": "https://contact.co.nz/getContentAsset/28d0e1b3-8180-45ab-8bd1-de98c97139f5/a677e4b4-b3c2-492c-ae74-9399720288b8/2026-full-year-results-presentation.pdf?language=en",
        "publisher": "Contact Energy",
        "accessedAt": "2026-09-23",
        "publishedAt": "2026-08-10",
        "locator": "Slide 28: Stratford site and proposed 250 MW data centre concept; Contact and CDC will seek resource consent.",
        "summary": "Contact and CDC are exploring a 250 MW data centre at Stratford. Work remains at consenting, design, customer engagement and development planning; 250 MW has no stated IT boundary."
      }
    },
    {
      "id": "census-julius-previous-202506",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "publishedDatePrecision",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "publishedDatePrecision": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-julius-previous-202506",
        "title": "Julius Avenue earlier environmental impact statement",
        "url": "https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-80018208%2120250630T045831.272%20GMT",
        "publisher": "ISPT, lodged with NSW Planning",
        "accessedAt": "2026-09-23",
        "publishedAt": "2025-06",
        "publishedDatePrecision": "month",
        "locator": "Earlier EIS proposed-development description: 12 halls, 115.2 MW IT and 169 MW maximum power; superseded by revised December 2025 report.",
        "summary": "Earlier project version, retained to explain why older public sources show 115.2 MW IT or about 170 MW total power. These figures are not additive to the revised proposal."
      }
    },
    {
      "id": "census-julius-revised-20251209",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-julius-revised-20251209",
        "title": "Julius Avenue Data Centre, backup power report revision 06",
        "url": "https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-80018208%2120260210T052434.821+GMT",
        "publisher": "Integrated Group Services for ISPT, lodged with NSW Planning",
        "accessedAt": "2026-09-23",
        "publishedAt": "2025-12-09",
        "locator": "Document control revision 06 and section 2.2 Proposed Development table: eight data halls, 76 MW IT Load, 120 MW Maximum Power Consumption; lodged February 2026.",
        "summary": "The revised Julius Avenue proposal specifies 76 MW IT load and 120 MW maximum total power. This supersedes the earlier 115.2 MW IT / approximately 169 MW total-power concept."
      }
    },
    {
      "id": "census-ledc-nsw-network-20260923",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-ledc-nsw-network-20260923",
        "title": "Leading Edge Data Centres regional NSW network",
        "url": "https://www.investregional.nsw.gov.au/success-story/leading-edge-data-centres",
        "publisher": "Invest Regional NSW, NSW Government",
        "accessedAt": "2026-09-23",
        "publishedAt": null,
        "locator": "Opening paragraphs naming six interconnected Tier III data centres, including Coffs Harbour and Wagga Wagga.",
        "summary": "NSW Government identifies six operating regional data centres in Newcastle, Albury, Wagga Wagga, Tamworth, Dubbo and Coffs Harbour. It does not disclose commissioned IT MW or an opening date for each."
      }
    },
    {
      "id": "census-mars-esd-20260217",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-mars-esd-20260217",
        "title": "Project Mars data centre ESD report, Issue B",
        "url": "https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-82052708%2120260218T235834.826+GMT",
        "publisher": "HDR for Project Mars applicant, lodged with NSW Planning",
        "accessedAt": "2026-09-23",
        "publishedAt": "2026-02-17",
        "locator": "Energy-use calculation: 60 MW Maximum Site IT Load, PUE 1.35, 81 MW Maximum Total Site Load; site at 12 Mars Road, Lane Cove West.",
        "summary": "The applicant's final-lodgement ESD report states 60 MW maximum IT load and 81 MW maximum total-site electricity use. Neither is commissioned or approved."
      }
    },
    {
      "id": "census-nztech-centres-202509",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "publishedDatePrecision",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "publishedDatePrecision": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-nztech-centres-202509",
        "title": "New Zealand Data Centres report",
        "url": "https://cdc.com/media/q0zh1opo/nztech-data-centres-report.pdf",
        "publisher": "NZTech",
        "accessedAt": "2026-09-23",
        "publishedAt": "2025-09",
        "publishedDatePrecision": "month",
        "locator": "Executive summary: 56 data centres and 104 MW; New Zealand Data Centre Locations (July 2025 input); Understanding deployed capacity and appendix Calculating Current Deployable Capacity.",
        "summary": "NZTech estimates 104 MW of deployable whole-facility capacity across 56 New Zealand centres. The measure includes cooling and support infrastructure, so it is not installed IT load."
      }
    },
    {
      "id": "census-spark-dc-sale-20250812",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-spark-dc-sale-20250812",
        "title": "Spark announces data centre business sale",
        "url": "https://www.spark.co.nz/online/about/our-company/news/Spark-announces-sale-of-of-data-centre-business",
        "publisher": "Spark New Zealand",
        "accessedAt": "2026-09-23",
        "publishedAt": "2025-08-12",
        "locator": "Paragraph beginning DC Co has a leading data centre platform: over 23 MW built at 11 operating facilities.",
        "summary": "The transferred data centre estate had more than 23 MW built across 11 operating facilities. The release does not define that MW as IT load."
      }
    },
    {
      "id": "census-spark-tenpeaks-sale-20260130",
      "change": "added",
      "fields": [
        "id",
        "title",
        "url",
        "publisher",
        "accessedAt",
        "publishedAt",
        "locator",
        "summary"
      ],
      "before": {
        "id": null,
        "title": null,
        "url": null,
        "publisher": null,
        "accessedAt": null,
        "publishedAt": null,
        "locator": null,
        "summary": null
      },
      "after": {
        "id": "census-spark-tenpeaks-sale-20260130",
        "title": "Spark completes sale of data centre business",
        "url": "https://www.spark.co.nz/online/about/our-company/news/Spark-completes-sale-of-data-centre-business-to-PEP",
        "publisher": "Spark New Zealand",
        "accessedAt": "2026-09-23",
        "publishedAt": "2026-01-30",
        "locator": "Sale completion and transfer to TenPeaks paragraphs.",
        "summary": "Spark completed the sale of its data centre business to TenPeaks, avoiding separate Spark and TenPeaks capacity counts for the same estate."
      }
    },
    {
      "id": "cs-verify-ispt-data-2-20260922",
      "change": "updated",
      "fields": [
        "summary"
      ],
      "before": {
        "summary": "Julius Avenue proposal total power consumption up to 170 MW; More Information Required."
      },
      "after": {
        "summary": "The NSW Planning project page still shows the earlier approximately 170 MW whole-site power proposal and More Information Required status. A later lodged report specifies 76 MW IT and 120 MW maximum site power."
      }
    },
    {
      "id": "cs-verify-mars-0-20260922",
      "change": "updated",
      "fields": [
        "summary"
      ],
      "before": {
        "summary": "Project Mars remains Response to Submissions; approximately 90 MW overall power consumption, not IT load."
      },
      "after": {
        "summary": "The NSW Planning project page describes approximately 90 MW overall power and Response to Submissions. The applicant's lodged ESD report separately specifies 60 MW maximum IT and 81 MW maximum site power."
      }
    }
  ],
  "research": [
    {
      "id": "census-bundey-it-design-20260731",
      "change": "added",
      "fields": [
        "id",
        "category",
        "geography",
        "operator",
        "scope",
        "facilityIds",
        "status",
        "workloads",
        "hardware",
        "title",
        "summary",
        "metrics",
        "asOf",
        "sourceIds",
        "limitations"
      ],
      "before": {
        "id": null,
        "category": null,
        "geography": null,
        "operator": null,
        "scope": null,
        "facilityIds": null,
        "status": null,
        "workloads": null,
        "hardware": null,
        "title": null,
        "summary": null,
        "metrics": null,
        "asOf": null,
        "sourceIds": null,
        "limitations": null
      },
      "after": {
        "id": "census-bundey-it-design-20260731",
        "category": "facility",
        "geography": "AU",
        "operator": "IREN",
        "scope": "facility",
        "facilityIds": [
          "iren-bundey"
        ],
        "status": "announced",
        "workloads": [],
        "hardware": [],
        "title": "Bundey: 600 MW proposed IT design within an 800 MW electricity project",
        "summary": "The federal referral specifies three proposed data halls of up to 200 MW IT each at Bundey, South Australia.",
        "metrics": [
          {
            "label": "Proposed IT design ceiling",
            "value": 600,
            "unit": "MW IT",
            "period": "Referral dated 31 July 2026",
            "qualifier": "maximum"
          },
          {
            "label": "Electricity project ceiling",
            "value": 800,
            "unit": "MW grid/project power",
            "period": "Campus proposal",
            "qualifier": "maximum"
          }
        ],
        "asOf": "2026-07-31",
        "sourceIds": [
          "census-bundey-epbc-20260731",
          "census-bundey-epbc-attachment-20260731"
        ],
        "limitations": "The IT and grid figures are different boundaries and are not additive. The IT figure is an upper design limit in a referral; the reviewed records do not establish state development consent, construction or operating capacity. No site-specific GPU deployment or tenant contract is established by the referral."
      }
    },
    {
      "id": "census-julius-it-design-20251209",
      "change": "added",
      "fields": [
        "id",
        "category",
        "geography",
        "operator",
        "scope",
        "facilityIds",
        "status",
        "workloads",
        "hardware",
        "title",
        "summary",
        "metrics",
        "asOf",
        "sourceIds",
        "limitations"
      ],
      "before": {
        "id": null,
        "category": null,
        "geography": null,
        "operator": null,
        "scope": null,
        "facilityIds": null,
        "status": null,
        "workloads": null,
        "hardware": null,
        "title": null,
        "summary": null,
        "metrics": null,
        "asOf": null,
        "sourceIds": null,
        "limitations": null
      },
      "after": {
        "id": "census-julius-it-design-20251209",
        "category": "facility",
        "geography": "AU",
        "operator": "ISPT",
        "scope": "facility",
        "facilityIds": [
          "dcm-14116"
        ],
        "status": "announced",
        "workloads": [],
        "hardware": [],
        "title": "Julius Avenue: revised 76 MW proposed IT load",
        "summary": "A later lodged design for 6–8 Julius Avenue specifies 76 MW IT across eight halls, down from an earlier 115.2 MW IT concept.",
        "metrics": [
          {
            "label": "Proposed IT design ceiling",
            "value": 76,
            "unit": "MW IT",
            "period": "Revision 06 dated 9 December 2025",
            "qualifier": "maximum"
          }
        ],
        "asOf": "2025-12-09",
        "sourceIds": [
          "census-julius-revised-20251209",
          "census-julius-previous-202506",
          "cs-verify-ispt-data-2-20260922"
        ],
        "limitations": "The old 115.2 MW IT design and 169–170 MW whole-site figures are not additions. The current revision says 120 MW maximum whole-site power. The application remains under assessment; design is not installed capacity or a delivery forecast."
      }
    },
    {
      "id": "census-mars-it-design-20260217",
      "change": "added",
      "fields": [
        "id",
        "category",
        "geography",
        "operator",
        "scope",
        "facilityIds",
        "status",
        "workloads",
        "hardware",
        "title",
        "summary",
        "metrics",
        "asOf",
        "sourceIds",
        "limitations"
      ],
      "before": {
        "id": null,
        "category": null,
        "geography": null,
        "operator": null,
        "scope": null,
        "facilityIds": null,
        "status": null,
        "workloads": null,
        "hardware": null,
        "title": null,
        "summary": null,
        "metrics": null,
        "asOf": null,
        "sourceIds": null,
        "limitations": null
      },
      "after": {
        "id": "census-mars-it-design-20260217",
        "category": "facility",
        "geography": "AU",
        "operator": "Goodman",
        "scope": "facility",
        "facilityIds": [
          "dcm-14686"
        ],
        "status": "announced",
        "workloads": [],
        "hardware": [],
        "title": "Project Mars: 60 MW maximum proposed IT load",
        "summary": "The applicant's ESD report for 12 Mars Road gives a maximum 60 MW IT load, within 81 MW maximum whole-site electricity demand.",
        "metrics": [
          {
            "label": "Proposed IT design ceiling",
            "value": 60,
            "unit": "MW IT",
            "period": "Applicant report dated 17 February 2026",
            "qualifier": "maximum"
          }
        ],
        "asOf": "2026-02-17",
        "sourceIds": [
          "census-mars-esd-20260217",
          "cs-verify-mars-0-20260922"
        ],
        "limitations": "The project is at Response to Submissions, not approved or built. The 81 MW full-site figure and portal's approximately 90 MW description are not separate IT increments."
      }
    },
    {
      "id": "census-nztech-deployable-facility-202509",
      "change": "added",
      "fields": [
        "id",
        "category",
        "geography",
        "operator",
        "scope",
        "facilityIds",
        "status",
        "workloads",
        "hardware",
        "title",
        "summary",
        "metrics",
        "asOf",
        "sourceIds",
        "limitations"
      ],
      "before": {
        "id": null,
        "category": null,
        "geography": null,
        "operator": null,
        "scope": null,
        "facilityIds": null,
        "status": null,
        "workloads": null,
        "hardware": null,
        "title": null,
        "summary": null,
        "metrics": null,
        "asOf": null,
        "sourceIds": null,
        "limitations": null
      },
      "after": {
        "id": "census-nztech-deployable-facility-202509",
        "category": "facility",
        "geography": "NZ",
        "operator": null,
        "scope": "national",
        "facilityIds": [],
        "status": "reported",
        "workloads": [],
        "hardware": [],
        "title": "New Zealand: 56 centres and 104 MW of deployable facility power",
        "summary": "NZTech's 2025 report estimates 56 operating data centres and 104 MW of deployable whole-facility power, including cooling and support systems.",
        "metrics": [
          {
            "label": "Deployable whole-facility power",
            "value": 104,
            "unit": "MW facility power",
            "period": "2025 report; exact capacity date unstated",
            "qualifier": "approximate"
          },
          {
            "label": "Operating centres in report inventory",
            "value": 56,
            "unit": "centres",
            "period": "July 2025 location input",
            "qualifier": "reported"
          }
        ],
        "asOf": null,
        "sourceIds": [
          "census-nztech-centres-202509"
        ],
        "limitations": "This is estimated power for the whole facility, not installed customer IT load. The report uses operator inputs and proxies, excludes duplicated leased colocation capacity, and has a different inventory and date from the Atlas. It cannot be added to or subtracted from the 2026 CDC ICT portfolio figure."
      }
    },
    {
      "id": "census-tenpeaks-built-20260130",
      "change": "added",
      "fields": [
        "id",
        "category",
        "geography",
        "operator",
        "scope",
        "facilityIds",
        "status",
        "workloads",
        "hardware",
        "title",
        "summary",
        "metrics",
        "asOf",
        "sourceIds",
        "limitations"
      ],
      "before": {
        "id": null,
        "category": null,
        "geography": null,
        "operator": null,
        "scope": null,
        "facilityIds": null,
        "status": null,
        "workloads": null,
        "hardware": null,
        "title": null,
        "summary": null,
        "metrics": null,
        "asOf": null,
        "sourceIds": null,
        "limitations": null
      },
      "after": {
        "id": "census-tenpeaks-built-20260130",
        "category": "facility",
        "geography": "NZ",
        "operator": "TenPeaks",
        "scope": "operator-portfolio",
        "facilityIds": [],
        "status": "operating",
        "workloads": [],
        "hardware": [],
        "title": "TenPeaks: over 23 MW built across 11 operating facilities",
        "summary": "Spark reported over 23 MW built across the 11 operating facilities that were transferred to TenPeaks in January 2026.",
        "metrics": [
          {
            "label": "Built portfolio capacity, electrical basis not stated",
            "value": 23,
            "unit": "MW (basis unstated)",
            "period": "Spark sale disclosure, 2025; transferred January 2026",
            "qualifier": "minimum"
          }
        ],
        "asOf": "2025-08-12",
        "sourceIds": [
          "census-spark-dc-sale-20250812",
          "census-spark-tenpeaks-sale-20260130"
        ],
        "limitations": "The primary disclosure does not say that the 23 MW is IT load or that it is comparable with CDC's leasable primary ICT measure. South Takanini's 12.3 MW is inside this transferred estate, not additional. It is excluded from Atlas operating IT totals until the power boundary is documented."
      }
    },
    {
      "id": "compute-iren-bundey-development-20260911",
      "change": "updated",
      "fields": [
        "summary",
        "sourceIds",
        "limitations"
      ],
      "before": {
        "summary": "800 MW refers to the secured transmission-connected project, with energisation planned from 2028. August 2026 results report development progressing but no local GPU deployment.",
        "sourceIds": [
          "compute-iren-bundey-20260911",
          "compute-iren-bundey-site-20260911",
          "compute-iren-fy26-20260911"
        ],
        "limitations": "800 MW is not explicitly IT load. Grid connection agreement and progressing development do not establish completed energisation or hall construction. Group training/inference services are not proof of a deployed Bundey workload."
      },
      "after": {
        "summary": "IREN's 800 MW transmission connection supports a proposed campus whose later federal referral specifies up to 600 MW IT across three halls. Neither figure describes a commissioned Australian GPU deployment.",
        "sourceIds": [
          "compute-iren-bundey-20260911",
          "compute-iren-fy26-20260911",
          "census-bundey-epbc-20260731"
        ],
        "limitations": "The 800 MW connection is not IT load. The 600 MW IT value is a proposed design limit in a referral, not a consent, construction start or delivery schedule. IREN's overseas compute contracts do not establish a Bundey offtake."
      }
    },
    {
      "id": "cs-national-envelope-1-20260922",
      "change": "updated",
      "fields": [
        "summary",
        "sourceIds",
        "limitations"
      ],
      "before": {
        "summary": "2028 is start of energisation, not verified delivery of all IT capacity.",
        "sourceIds": [
          "cs-other-iren-bundey-20260922",
          "cs-other-iren-bundey-site-20260922"
        ],
        "limitations": "This observation has its own electrical and physical boundary. It is not an additional contribution to the comparable IT subtotal, a GPU count or a delivery forecast. 2028 is start of energisation, not verified delivery of all IT capacity."
      },
      "after": {
        "summary": "An 800 MW electricity connection supports a proposed 600 MW IT campus design across three halls. Energisation from 2028 is a connection target, not delivery of the whole campus.",
        "sourceIds": [
          "cs-other-iren-bundey-20260922",
          "census-bundey-epbc-20260731"
        ],
        "limitations": "The 800 MW connection and 600 MW proposed IT design have distinct electrical boundaries and are not additive. A federal referral decision is recorded; state development consent and operating halls are not established by the reviewed records. No completion year for the full design is established."
      }
    }
  ],
  "operatingPortfolios": [
    {
      "id": "cdc-act-operating-20260630",
      "change": "updated",
      "fields": [
        "coveredFacilityIds"
      ],
      "before": {
        "coveredFacilityIds": [
          "cdc-beard",
          "cdc-fyshwick",
          "dcm-10628",
          "dcm-10629",
          "cdc-hume-one",
          "cdc-hume-two",
          "dcm-10623",
          "dcm-10624",
          "dcm-10625",
          "dcm-10626",
          "dcm-10627",
          "dcm-18988"
        ]
      },
      "after": {
        "coveredFacilityIds": [
          "cdc-beard",
          "cdc-fyshwick",
          "cdc-hume-one",
          "cdc-hume-two",
          "dcm-18988"
        ]
      }
    },
    {
      "id": "cdc-nsw-operating-20260630",
      "change": "updated",
      "fields": [
        "coveredFacilityIds"
      ],
      "before": {
        "coveredFacilityIds": [
          "cdc-eastern-creek",
          "dcm-10631",
          "dcm-10632",
          "dcm-10633",
          "dcm-10634",
          "dcm-10635",
          "dcm-10636",
          "dcm-18770",
          "cdc-marsden-park",
          "dcm-11305",
          "dcm-11306",
          "dcm-11307",
          "dcm-11308",
          "dcm-11309",
          "dcm-11310"
        ]
      },
      "after": {
        "coveredFacilityIds": [
          "cdc-eastern-creek",
          "dcm-10631",
          "dcm-10632",
          "dcm-10633",
          "dcm-10634",
          "dcm-10635",
          "dcm-10636",
          "cdc-marsden-park",
          "dcm-11305"
        ]
      }
    },
    {
      "id": "cdc-nz-operating-20260630",
      "change": "updated",
      "fields": [
        "coveredFacilityIds"
      ],
      "before": {
        "coveredFacilityIds": [
          "dcm-10619",
          "dcm-18638",
          "dcm-17359",
          "dcm-17360",
          "cdc-hobsonville-one",
          "cdc-hobsonville-two",
          "cdc-silverdale-one",
          "dcm-18798"
        ]
      },
      "after": {
        "coveredFacilityIds": [
          "cdc-hobsonville-one",
          "cdc-hobsonville-two",
          "cdc-silverdale-one"
        ]
      }
    },
    {
      "id": "cdc-vic-operating-20260630",
      "change": "updated",
      "fields": [
        "coveredFacilityIds"
      ],
      "before": {
        "coveredFacilityIds": [
          "dcm-18986",
          "dcm-18987",
          "cdc-brooklyn",
          "cdc-laverton",
          "dcm-18989",
          "dcm-18990"
        ]
      },
      "after": {
        "coveredFacilityIds": [
          "dcm-18986",
          "dcm-18987",
          "cdc-brooklyn"
        ]
      }
    },
    {
      "id": "census-digital-melbourne-20251231",
      "change": "updated",
      "fields": [
        "coveredFacilityIds"
      ],
      "before": {
        "coveredFacilityIds": [
          "digital-realty-mel11",
          "dcm-11357",
          "dcm-11358"
        ]
      },
      "after": {
        "coveredFacilityIds": [
          "digital-realty-mel11"
        ]
      }
    },
    {
      "id": "census-digital-sydney-20260630",
      "change": "updated",
      "fields": [
        "coveredFacilityIds"
      ],
      "before": {
        "coveredFacilityIds": [
          "digital-realty-syd10",
          "digital-realty-syd11",
          "dcm-11698"
        ]
      },
      "after": {
        "coveredFacilityIds": [
          "digital-realty-syd10",
          "digital-realty-syd11"
        ]
      }
    },
    {
      "id": "census-nextdc-au-built-fy26",
      "change": "updated",
      "fields": [
        "coveredFacilityIds"
      ],
      "before": {
        "coveredFacilityIds": [
          "nextdc-a1",
          "nextdc-b1",
          "nextdc-b2",
          "nextdc-c1",
          "nextdc-d1",
          "nextdc-d2",
          "nextdc-gc1",
          "nextdc-ge1",
          "nextdc-m1",
          "nextdc-m2",
          "nextdc-m3",
          "nextdc-m4",
          "nextdc-m5",
          "nextdc-ne1",
          "nextdc-p1",
          "nextdc-p2",
          "nextdc-ph1",
          "nextdc-s1",
          "nextdc-s2",
          "nextdc-s3",
          "nextdc-s4",
          "nextdc-s5",
          "nextdc-s6",
          "nextdc-s7",
          "nextdc-sc1",
          "nextdc-sc2"
        ]
      },
      "after": {
        "coveredFacilityIds": [
          "nextdc-a1",
          "nextdc-b1",
          "nextdc-b2",
          "nextdc-c1",
          "nextdc-d1",
          "nextdc-m1",
          "nextdc-m2",
          "nextdc-m3",
          "nextdc-ne1",
          "nextdc-p1",
          "nextdc-p2",
          "nextdc-ph1",
          "nextdc-s1",
          "nextdc-s2",
          "nextdc-s3",
          "nextdc-s6",
          "nextdc-sc1"
        ]
      }
    }
  ]
}