Also recorded as: Apollo Place Data Centre

Sydney, NSW · campus

Operating / builtPlanned
Facility type
hyperscale
Location evidence
Approximate city location
Research status
Source-listed profile · 88% core-field coverage

Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.

Evidence by field

Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.

Certification Source checked
AirTrunk Australia, SYD2: only the named Certified Strategic facility. This does not certify other buildings or the whole parent campus.Checked 2026-09-22 · Australian Government, Department of Home Affairs ↗
Capacity Source checked
Operating contribution is approximately 80 MW: derived 50 MW from the first two opened phases plus the explicit 30 MW completed third phase. This is a disclosed-capacity reconstruction, not measured demand.Checked 2026-09-22 · AirTrunk ↗ · Data Center Dynamics ↗ · AirTrunk ↗
Status Source checked
Earlier phases are built; phase 4/ShellC was still under construction in April 2026. Apollo Place is a later phase 5.Checked 2026-09-22 · AirTrunk / Greenbox Architecture ↗ · AirTrunk ↗

Capacity & development

Operating / built30 MW

Power for servers, GPUs, storage & networking (IT power) · Source as of 2024-08-29

Only the third-phase 30 MW increment is evidenced here. AirTrunk confirms completion; contemporaneous DCD reporting explicitly identifies the same expansion as IT capacity. Neither source establishes that the whole 120+ MW campus was fitted out.

Operating / built≈ 50 MW

Power for servers, GPUs, storage & networking (IT power) · Source as of 2023-06-15

Approximately 50 MW for the first two opened phases, derived from the operator 120+ MW campus total less its 70 MW final-two-phase expansion. Both earlier phases were already open in June 2023. Contemporaneous reporting identifies the campus electrical basis as IT load. This rounded derivation is separate from the completed 30 MW phase 3 increment; phase 4 is not assumed operational.

Planned≤ 45 MW

Power basis not established · Source as of 2025-10-09

Approved adjoining Apollo Place extension. The 45 MW approval has no separately verified IT allocation; it remains outside IT subtotals. Its relationship to the operator whole-campus headline is unresolved.

Proposed or approved design capacity. Included in the planning inventory, not a dated delivery forecast or a claim of committed supply.

Excluded from capacity totals: scope or power basis is not comparable.

Historical capacity evidence

Values recorded at the time. These observations are separate from current capacity claims.

2024-08-29 · 30 MW built

Report-date observation for one completed phase. Primary operator announcement proves delivery, trade reporting establishes IT basis for this same June 2023-start expansion. Not a whole-campus observation.

Government certification

Certified Strategic facility

AirTrunk Australia, SYD2: only the named Certified Strategic facility. This does not certify other buildings or the whole parent campus. The adjoining Apollo Place extension has no separately verified certification scope.

What certification covers →

Scope and context

  • Map location, when supplied, represents the city rather than a verified facility coordinate.
  • Do not add Datacom's colocation service within this campus as another physical data centre.
  • Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.
  • Directory reconciliation: The public publisher withholds exact location. This match uses named identity only and does not use hidden embedded coordinates or addresses.
  • The accepted 30 MW is one completed phase, not total campus capacity. The operator used its 120 MW campus headline while this phase was still under construction in November 2023.
  • The adjacent Apollo Place development is approved under SSD-67407231 and linked to the existing 1 Sirius Road site. No separate physical campus or certification scope is inferred.
  • The current operator progress page shows ShellC under construction in April 2026, and the staging drawing identifies phase 4 under construction. The 158+ MW platform headline is not evidence that every phase is operating.

Compute, workloads & commercial commitments

Facility specificationAustraliaReported observation

SYD2 campus specification exceeds the separately evidenced phase

Current operator page gives 120+ MW for the campus. The completed third-phase increment of 30 MW is independently evidenced, but the entire 120 MW cannot be labelled commissioned from these statements.

Whole-campus specification
≥ 120 MW, delivery scope unresolved
Undated live operator page
Evidence scope
Named facility · AirTrunk
Evidence as-of date
Applicable date not stated

How to read this: The 30 MW delivered phase is nested inside the campus specification. Never sum 120 and 30. Full campus IT commissioning remains unresolved.

Inspect 3 sources
Link to this evidence ↗
Explore demand, compute types and commitments →

Evidence trail

  1. AirTrunk company history ↗

    AirTrunk · checked 2026-09-10

    Our history; Coming soon

  2. AirTrunk announces second Melbourne campus ↗

    AirTrunk · checked 2026-09-10 · published 2025-12-24

    Announcement and Australian campus capacity list

  3. AirTrunk Sydney North - SYD2: directory profile and specifications ↗

    Data Center Map · checked 2026-09-11

    Public listing 9647; overview, specs tabs. Address/location header and labelled technical specification rows.

  4. Certified Service Providers ↗

    Australian Government, Department of Home Affairs · checked 2026-09-22

    Data Centre facilities: Certified Strategic Facility and Certified Strategic Enclave lists

  5. Natural Earth populated places, 1:10m ↗

    Natural Earth · checked 2026-09-10

    Australia and New Zealand populated-place features

  6. Hosting Certification Framework: Certified Service Providers ↗

    Australian Government, Department of Home Affairs · checked 2026-09-22

    Data Centre facilities: Certified Strategic Facility and Certified Strategic Enclave lists; reform notice

  7. Third phase of SYD2 completed ahead of schedule ↗

    AirTrunk · checked 2026-09-22 · published 2024-08-29

    First two body paragraphs; article:published_time 2024-08-29 (modified 2024-09-02)

  8. AirTrunk tops off SYD2 data centre expansion ↗

    Data Center Dynamics · checked 2026-09-22 · published 2023-11-15

    Opening four body paragraphs: 120 MW IT campus, latest 30 MW expansion, June 2023 start and November topping out

  9. AirTrunk SYD2 Sydney North profile ↗

    AirTrunk · checked 2026-09-22

    Capacity and campus introduction

  10. Apollo Place Data Centre SSD-67407231 ↗

    NSW Planning Portal · checked 2026-09-22 · published 2025-10-09

    Project description, determination date and decision

  11. Apollo Place submissions report: relationship to existing SYD2 ↗

    Urbis for AirTrunk, filed with NSW Planning · checked 2026-09-22

    Relationship with existing data centre at 1 Sirius Road; site description

  12. AirTrunk Lane Cove staging plan ↗

    AirTrunk / Greenbox Architecture · checked 2026-09-22 · published 2026-04-08

    Single-sheet site plan: Phase 4 Under Construction and Phase 5 To be Constructed; latest drawing issue

  13. AirTrunk SYD2 campus and development progress ↗

    AirTrunk · checked 2026-09-22

    Project Progress, April 2026: Current site with Shell C under construction; Apollo Place section

  14. 70 megawatt expansion underway at AirTrunk SYD2 ↗

    AirTrunk · checked 2026-09-22 · published 2023-06-15

    First-phase and second-phase opening history; 70 MW two-phase expansion