CDC · Australia
CDC Eastern Creek Campus
Report an error or share evidence ↗
Sydney, NSW · campus
- Facility type
- hyperscale
- Location evidence
- Approximate city location
- Research status
- Source-listed profile · 63% core-field coverage
Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.
Evidence by field
Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.
- Identity Source checked
- The operator identifies this named campus on its own location page.Checked 2026-09-11 · CDC ↗
- Capacity Source checked
- EC1–EC4 are operational; EC5/EC6 and Marsden Park are under construction. Planned campus envelopes are not current commissioned capacity.Checked 2026-09-11 · CDC ↗
- Hardware Not found in checked sources
- No site-level GPU model and quantity inventory is published in the location page checked.Checked 2026-09-11 · CDC ↗
- Workloads Not found in checked sources
- The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads.Checked 2026-09-11 · CDC ↗
- Contracts Not found in checked sources
- No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked.Checked 2026-09-11 · CDC ↗
- Status Source checked
- The investor presentation confirms EC5 and EC6 delivery in addition to the existing EC1-4. EC5 and EC6 are recorded as operating; no separate building MW allocation is disclosed.Checked 2026-09-22 · CDC / Infratil ↗
Capacity & development
Power basis not established · Source as of 2026-09-16
The investor presentation confirms EC5 and EC6 delivery in addition to the existing EC1-4. EC5 and EC6 are recorded as operating; no separate building MW allocation is disclosed.
Government certification
Certification not verified
No verified certification scope has been assigned to this record. Unknown does not mean uncertified.
What certification covers →Scope and context
- Map location, when supplied, represents the city rather than a verified facility coordinate.
- Campus record includes EC1–EC6; individual buildings are not also counted.
- Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.
- The HCF register names EC1, EC2, EC3 and EC4 as Certified Strategic facilities. Certification is attached to their individual building records; no whole-campus certificate or certified campus MW is inferred.
Compute, workloads & commercial commitments
Site-specific workloads, GPU inventory and customer contracts are not established by the cited evidence. Electrical capacity and AI-ready specifications alone do not establish these details.
Related operator-wide evidence
These disclosures describe the operator’s portfolio. They are not assigned to this facility or included in its power totals.
CDC reports a 3.9 GW leasable ANZ pipeline
September 2026 investor update reports 3.9 GW leasable pipeline as at 30 June 2026. Earlier 1.7 GW leasable capacity corresponded to a 2.5 GW built capacity pipeline. The definitions differ and cannot be summed.
- Total leasable pipeline
- 3,900 MW leasable 2026-06-30
- Evidence scope
- Operator portfolio · CDC
- Evidence as-of date
- 2026-06-30
How to read this: Includes existing operating and future capacity across Australia and New Zealand. It is not additional pipeline or site-allocated IT capacity and is not additive to facility totals.
Inspect the source
- CDC Infratil investor update, 16 September 2026 ↗
CDC / Infratil · checked 2026-09-22 · published 2026-09-16
Slides: CDC Group snapshot; Then and now; Operating capacity has more than doubled; Construction is progressing; footnotes defining pipeline
CDC Australian operating ICT capacity: approximately 470 MW
CDC reports operating primary ICT capacity of approximately 120 MW in the ACT, 220 MW in NSW and 130 MW in Victoria at 30 June 2026. The regional figures are rounded to the nearest 10 MW.
- Operating primary ICT capacity
- ≈ 470 MW IT 30 June 2026
- Evidence scope
- Operator portfolio · CDC
- Evidence as-of date
- 2026-06-30
How to read this: The portfolio is included once in the operating reconciliation. Brooklyn accounts for the Victorian 130 MW; other named-site allocations remain incomplete. Primary ICT excludes the redundancy and losses in CDC’s earlier built-capacity measure. It is available capacity, not actual consumption.
Inspect the source
- CDC independent valuation, 30 June 2026 ↗
Infratil / CDC · checked 2026-09-22 · published 2026-07-06
PDF page 6 (printed page 5), Leasable Capacity Pipeline by Region, definition, operating rows and rounding footnote; page 5 (printed page 4), quarterly operating additions
Evidence trail
- CDC Sydney locations ↗
CDC · checked 2026-09-10
At a glance and named campus sections
- CDC: sydney location and specifications, rechecked ↗
CDC · checked 2026-09-11
At a glance; Eastern Creek Campus; Marsden Park Campus
- CDC Eastern Creek Campus: directory profile and specifications ↗
Data Center Map · checked 2026-09-11
Public listing 10630; location, overview, specs tabs. Address/location header and labelled technical specification rows.
- Natural Earth populated places, 1:10m ↗
Natural Earth · checked 2026-09-10
Australia and New Zealand populated-place features
- Hosting Certification Framework: Certified Service Providers ↗
Australian Government, Department of Home Affairs · checked 2026-09-22
Data Centre facilities: Certified Strategic Facility and Certified Strategic Enclave lists; reform notice
- CDC Infratil investor update, 16 September 2026 ↗
CDC / Infratil · checked 2026-09-22 · published 2026-09-16
Slides: CDC Group snapshot; Then and now; Operating capacity has more than doubled; Construction is progressing; footnotes defining pipeline