CDC Silverdale Campus One
Report an error or share evidence ↗
Auckland, Auckland · campus
- Facility type
- hyperscale
- Location evidence
- Approximate city location
- Research status
- Source-listed profile · 63% core-field coverage
Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.
Evidence by field
Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.
- Identity Source checked
- The operator identifies this named campus on its own location page.Checked 2026-09-11 · CDC ↗
- Capacity Source checked
- The three campuses explicitly report operating capacity of 22, 22 and 54 MW respectively. The page does not define IT versus whole-facility electrical power.Checked 2026-09-11 · CDC ↗
- Hardware Not found in checked sources
- No site-level GPU model and quantity inventory is published in the location page checked.Checked 2026-09-11 · CDC ↗
- Workloads Not found in checked sources
- The checked location page does not allocate installed power or hardware between LLM training, inference and other workloads.Checked 2026-09-11 · CDC ↗
- Contracts Not found in checked sources
- No named, site-allocated customer contract or leased-power quantity is disclosed on the location page checked.Checked 2026-09-11 · CDC ↗
- Status Source checked
- The three campuses explicitly report operating capacity of 22, 22 and 54 MW respectively. The page does not define IT versus whole-facility electrical power.Checked 2026-09-11 · CDC ↗
Capacity & development
Power basis not established
Explicit operating capacity at campus scope; IT versus total facility power is not defined, so excluded from IT subtotals.
Excluded from capacity totals: scope or power basis is not comparable.
Government certification
Australian HCF not applicable
Australia's Hosting Certification Framework does not apply to this New Zealand record.
What certification covers →Scope and context
- Map location, when supplied, represents the city rather than a verified facility coordinate.
- Campus buildings are not counted as additional facility records.
Compute, workloads & commercial commitments
Silverdale One: an explicit operating disclosure with an unresolved power basis.
CDC’s Auckland location page describes 22 MW as operating capacity for this named campus.
- Operator-reported operating capacity
- 22 MW Undated operator specification; checked 11 September 2026
- Evidence scope
- Named facility · CDC
- Evidence as-of date
- Applicable date not stated
How to read this: The operator does not define whether the number is IT load or total facility power on this page. It is retained as evidence and excluded from the IT power subtotal; no GPU count is inferred.
Inspect the source
- CDC: auckland location and specifications, rechecked ↗
CDC · checked 2026-09-11
Silverdale Campus One; Hobsonville Campus One and Two
Related operator-wide evidence
These disclosures describe the operator’s portfolio. They are not assigned to this facility or included in its power totals.
CDC reports a 3.9 GW leasable ANZ pipeline
September 2026 investor update reports 3.9 GW leasable pipeline as at 30 June 2026. Earlier 1.7 GW leasable capacity corresponded to a 2.5 GW built capacity pipeline. The definitions differ and cannot be summed.
- Total leasable pipeline
- 3,900 MW leasable 2026-06-30
- Evidence scope
- Operator portfolio · CDC
- Evidence as-of date
- 2026-06-30
How to read this: Includes existing operating and future capacity across Australia and New Zealand. It is not additional pipeline or site-allocated IT capacity and is not additive to facility totals.
Inspect the source
- CDC Infratil investor update, 16 September 2026 ↗
CDC / Infratil · checked 2026-09-22 · published 2026-09-16
Slides: CDC Group snapshot; Then and now; Operating capacity has more than doubled; Construction is progressing; footnotes defining pipeline
CDC New Zealand operating ICT capacity: approximately 80 MW
CDC reports approximately 80 MW of operating primary ICT capacity in New Zealand at 30 June 2026, rounded to the nearest 10 MW.
- Operating primary ICT capacity
- ≈ 80 MW IT 30 June 2026
- Evidence scope
- Operator portfolio · CDC
- Evidence as-of date
- 2026-06-30
How to read this: The portfolio is included once in the operating reconciliation. Capacity is not allocated between individual Auckland buildings. Primary ICT is distinct from the operator’s earlier gross built-capacity measure.
Inspect the source
- CDC independent valuation, 30 June 2026 ↗
Infratil / CDC · checked 2026-09-22 · published 2026-07-06
PDF page 6 (printed page 5), Leasable Capacity Pipeline by Region, definition, operating rows and rounding footnote; page 5 (printed page 4), quarterly operating additions
Evidence trail
- CDC Auckland locations ↗
CDC · checked 2026-09-10
Silverdale One, Hobsonville One, Hobsonville Two sections
- CDC: auckland location and specifications, rechecked ↗
CDC · checked 2026-09-11
Silverdale Campus One; Hobsonville Campus One and Two
- Natural Earth populated places, 1:10m ↗
Natural Earth · checked 2026-09-10
Australia and New Zealand populated-place features