Skip to content
← Back to the atlas

DCI ADL01 Kidman Park: facility evidence profile

DCI Data Centers · Australia

DCI ADL01 Kidman Park

Report an error or share evidence ↗

Adelaide, SA · facility

Operating / built
Facility type
colocation
Location evidence
Approximate city location
Research status
Source-listed profile · 75% core-field coverage

Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.

Evidence by field

Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.

Capacity Source checked
The two-building boundary and incremental addition are explicit; only subtraction is inferred. No new campus record is created.Checked 2026-09-22 · DCI Data Centers ↗

Capacity & development

Operating / built1.4 MW

Power for servers, GPUs, storage & networking (IT power) · Source as of 2024-12

Derived pre-existing ADL01 IT capacity: the operator states ADL02 adds 4 MW and the combined two-building Kidman Park campus reaches 5.4 MW total IT load. 5.4 minus 4 equals 1.4 MW. Counted once with the separate ADL02 increment.

Historical capacity evidence

Values recorded at the time. These observations are separate from current capacity claims.

2024-12 · 1.4 MW built

Derived complement of the explicitly reported 5.4 MW campus and 4 MW new ADL02 increment. December 2024 is a report date, not ADL01 commissioning.

Government certification

Certification not verified

No verified certification scope has been assigned to this record. Unknown does not mean uncertified.

What certification covers →

Scope and context

  • Map location, when supplied, represents the city rather than a verified facility coordinate.
  • Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.

Compute, workloads & commercial commitments

Site-specific workloads, GPU inventory and customer contracts are not established by the cited evidence. Electrical capacity and AI-ready specifications alone do not establish these details.

Explore demand, compute types and commitments →

Evidence trail

  1. DCI ADL01 Kidman Park ↗

    DCI Data Centers · checked 2026-09-10

    Facility introduction; Key Features

  2. DCI data centre locations ↗

    DCI Data Centers · checked 2026-09-10

    Our Centers and Sites In Development

  3. DCI Adelaide 01: directory profile and specifications ↗

    Data Center Map · checked 2026-09-11

    Public listing 7772; location, overview, specs tabs. Address/location header and labelled technical specification rows.

  4. Natural Earth populated places, 1:10m ↗

    Natural Earth · checked 2026-09-10

    Australia and New Zealand populated-place features

  5. DCI launches ADL02 and discloses Kidman Park total IT load ↗

    DCI Data Centers · checked 2026-09-22 · published 2024-12

    December 2024 dateline; introduction and paragraph beginning The new data centre increases