Skip to content
← Back to the atlas

DCI ADL02 Kidman Park: facility evidence profile

DCI Data Centers · Australia

DCI ADL02 Kidman Park

Report an error or share evidence ↗

Adelaide, SA · facility

Operating / built
Facility type
colocation
Location evidence
Approximate city location
Research status
Source-listed profile · 75% core-field coverage

Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.

Evidence by field

Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.

Capacity Source checked
Primary operating IT disclosure accepted with corrected December 2024 date; no 2022 commissioning inferred.Checked 2026-09-22 · DCI Data Centers ↗
Status Source checked
Primary operating IT disclosure accepted with corrected December 2024 date; no 2022 commissioning inferred.Checked 2026-09-22 · DCI Data Centers ↗

Opening & commissioning history

  • 2024-12 · ADL02 launch announced

    Primary announcement is dated December 2024 and states ready for immediate tenant occupancy. The exact opening day is not asserted.

Capacity & development

Operating / built4 MW

Power for servers, GPUs, storage & networking (IT power) · Source as of 2024-12

Completed ADL02 addition of 4 MW at Kidman Park. The 5.4 MW campus total includes ADL01 and is not an additional contribution.

Historical capacity evidence

Values recorded at the time. These observations are separate from current capacity claims.

2024-12 · 4 MW built

New 4 MW ADL02 increment disclosed at launch; campus reaches 5.4 MW with the pre-existing ADL01 capacity.

Government certification

Certification not verified

No verified certification scope has been assigned to this record. Unknown does not mean uncertified.

What certification covers →

Scope and context

  • Map location, when supplied, represents the city rather than a verified facility coordinate.
  • Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.

Compute, workloads & commercial commitments

Site-specific workloads, GPU inventory and customer contracts are not established by the cited evidence. Electrical capacity and AI-ready specifications alone do not establish these details.

Explore demand, compute types and commitments →

Evidence trail

  1. DCI ADL02 Kidman Park ↗

    DCI Data Centers · checked 2026-09-10

    Facility introduction; Key Features

  2. DCI data centre locations ↗

    DCI Data Centers · checked 2026-09-10

    Our Centers and Sites In Development

  3. DCI Adelaide 02: directory profile and specifications ↗

    Data Center Map · checked 2026-09-11

    Public listing 10302; location, overview, specs tabs. Address/location header and labelled technical specification rows.

  4. Natural Earth populated places, 1:10m ↗

    Natural Earth · checked 2026-09-10

    Australia and New Zealand populated-place features

  5. DCI launches ADL02 and discloses Kidman Park total IT load ↗

    DCI Data Centers · checked 2026-09-22 · published 2024-12

    December 2024 dateline; introduction and paragraph beginning The new data centre increases