DCI AKL01 Westgate: facility evidence profile

DCI Data Centers · New Zealand

DCI AKL01 Westgate

Report an error or share evidence ↗

Auckland, Auckland · facility

Operating / built
Facility type
colocation
Location evidence
Approximate city location
Research status
Source-listed profile · 75% core-field coverage

Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.

Evidence by field

Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.

Status Source checked
The operator announced completion in April 2023; DCD reported 10 MW on 19 April 2023 without specifying an IT boundary.Checked 2026-09-22 · DCI Data Centers ↗ · Data Center Dynamics ↗
Capacity Source checked
The operator announced completion in April 2023; DCD reported 10 MW on 19 April 2023 without specifying an IT boundary.Checked 2026-09-22 · DCI Data Centers ↗ · Data Center Dynamics ↗

Opening & commissioning history

  • 2023-04 · AKL01 completion announced

    Operator announced completion in April 2023. No MW commissioning increment inferred.

Capacity & development

Operating / built10 MW

Power basis not established · Source as of 2023-04-19

Operator confirms completion in April 2023; DCD reports a 10 MW facility on 19 April 2023. The MW figure is trade-reported with an unspecified electrical boundary, not confirmed installed IT.

Excluded from capacity totals: scope or power basis is not comparable.

Government certification

Australian HCF not applicable

Australia's Hosting Certification Framework does not apply to this New Zealand record.

What certification covers →

Scope and context

  • Map location, when supplied, represents the city rather than a verified facility coordinate.
  • Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.

Compute, workloads & commercial commitments

Site-specific workloads, GPU inventory and customer contracts are not established by the cited evidence. Electrical capacity and AI-ready specifications alone do not establish these details.

Explore demand, compute types and commitments →

Evidence trail

  1. DCI AKL01 Westgate ↗

    DCI Data Centers · checked 2026-09-10

    Facility introduction; Key Features

  2. DCI data centre locations ↗

    DCI Data Centers · checked 2026-09-10

    Our Centers and Sites In Development

  3. DCI Auckland 01: directory profile and specifications ↗

    Data Center Map · checked 2026-09-11

    Public listing 10301; location, overview, specs tabs. Address/location header and labelled technical specification rows.

  4. Natural Earth populated places, 1:10m ↗

    Natural Earth · checked 2026-09-10

    Australia and New Zealand populated-place features

  5. DCI announces completion of AKL01 in Auckland ↗

    DCI Data Centers · checked 2026-09-22 · published 2023-04

    April 2023 dateline and opening paragraphs

  6. DCI completes first data centre in Auckland ↗

    Data Center Dynamics · checked 2026-09-22 · published 2023-04-19

    Dateline and paragraphs on completion and 10 MW