DCI Data Centers · Australia
DCI CBR01 Jerrabomberra
Report an error or share evidence ↗
Also recorded as: DCI Poplars Data Centre · CBR02 / Poplars (ABC label) · SSD-64287712
Canberra, NSW · facility
- Facility type
- hyperscale
- Location evidence
- Approximate city location
- Research status
- Source-listed profile · 75% core-field coverage
Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.
Evidence by field
Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.
- Capacity Source checked
- Final assessment allocates 8 + 4 + 8 MW IT across the three stages; count the 20 MW design once.Checked 2026-09-22 · NSW Department of Planning, Housing and Infrastructure ↗ · HDR for DCI Data Centers ↗
- Address Source checked
- The named project is at 2 Wolseley Place, Jerrabomberra NSW. Precise coordinates remain unverified.Checked 2026-09-22 · NSW Department of Planning, Housing and Infrastructure ↗ · HDR for DCI Data Centers ↗
- Identity Source checked
- Planning documents call this CBR01 at Poplars. ABC labels it CBR02; both descriptions refer to this same street-address project.Checked 2026-09-22 · NSW Department of Planning, Housing and Infrastructure ↗ · HDR for DCI Data Centers ↗
2 Wolseley Place, Jerrabomberra, New South Wales
Checked 2026-09-22 · Map coordinates still to be verified
Open this address in maps ↗Capacity & development
Power for servers, GPUs, storage & networking (IT power) · Source as of 2025-11-06
Approved design comprises Stage 1 at 8 MW IT, Stage 2 at 4 MW IT and Stage 3 at 8 MW IT. These sum to 20 MW IT within 25.4 MW total facility power. Construction commencement and commissioning dates are unverified.
Proposed or approved design capacity. Included in the planning inventory, not a dated delivery forecast or a claim of committed supply.
Government certification
Certification not verified
No verified certification scope has been assigned to this record. Unknown does not mean uncertified.
What certification covers →Scope and context
- Map location, when supplied, represents the city rather than a verified facility coordinate.
- Canberra market location; Jerrabomberra is in NSW, not the ACT.
- Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.
- Approved 6 November 2025. CBR01 in primary documents and CBR02 / Poplars in the ABC table refer to the same project; they are not separate sites.
Compute, workloads & commercial commitments
Site-specific workloads, GPU inventory and customer contracts are not established by the cited evidence. Electrical capacity and AI-ready specifications alone do not establish these details.
Explore demand, compute types and commitments →Evidence trail
- DCI data centre locations ↗
DCI Data Centers · checked 2026-09-10
Our Centers and Sites In Development
- DCI Canberra 01: directory profile and specifications ↗
Data Center Map · checked 2026-09-11
Public listing 11352; location, overview, specs tabs. Address/location header and labelled technical specification rows.
- Natural Earth populated places, 1:10m ↗
Natural Earth · checked 2026-09-10
Australia and New Zealand populated-place features
- DCI Poplars final assessment SSD-64287712 ↗
NSW Department of Planning, Housing and Infrastructure · checked 2026-09-22 · published 2025-11-06
Table 2: construction phases; recommendation adopted 6 November 2025
- DCI CBR01 Poplars ESD report ↗
HDR for DCI Data Centers · checked 2026-09-22 · published 2025-01-20
Cover; section 3; section 5.2 energy calculation