CDC · Australia
CDC Hume HU3
Report an error or share evidence ↗
Also recorded as: HU3
Canberra, ACT · facility
- Facility type
- colocation
- Location evidence
- Corroborated site location
- Research status
- Profile reviewed · 75% core-field coverage
Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.
Evidence by field
Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.
- Certification Source checked
- Canberra Data Centres, H3: only the named Certified Strategic facility. This does not certify other buildings or the whole parent campus.Checked 2026-09-22 · Australian Government, Department of Home Affairs ↗
- Address Source checked
- A Commonwealth industry-participation record names CDC's Hume project location as 54 and 56 Sheppard Street, Hume; CDC gives 54 Sheppard Street as its contact address in an ACT development application form. The address describes Hume Campus One as a whole.Checked 2026-11-03 · Australian Government Department of Industry, Science and Resources ↗
- Coordinates Source checked
- Building tagged 'CDC Hume Datacentre 3' at house number 56, Sheppard Street matches the campus address. Numbered address or named building matched through OpenStreetMap; not a surveyed boundary or guaranteed entrance. Data © OpenStreetMap contributors (ODbL 1.0).Checked 2026-11-03 · Australian Government Department of Industry, Science and Resources ↗ · OpenStreetMap contributors ↗
- Status Source checked
- Operating per the operator's campus page and Infratil's ANZ map.Checked 2026-11-03 · CDC Data Centres ↗ · Infratil Limited ↗
54 and 56 Sheppard Street, Hume, ACT, 2620
Checked 2026-11-03 · Site coordinates verified
Building tagged 'CDC Hume Datacentre 3' at house number 56, Sheppard Street matches the campus address. Numbered address or named building matched through OpenStreetMap; not a surveyed boundary or guaranteed entrance. Data © OpenStreetMap contributors (ODbL 1.0).
Open this address in maps ↗Capacity & development
Power basis not established
CDC's Canberra page states Hume Campus One is home to three data centres with 21 MW operating; Infratil's September 2025 ANZ map lists HU1, HU2 and HU3 under Hume One. Campus capacity is carried by the CDC Hume Campus One record.
Government certification
Certified Strategic facility
Canberra Data Centres, H3: only the named Certified Strategic facility. This does not certify other buildings or the whole parent campus.
What certification covers →Scope and context
- The directory links this entry to CDC Hume Campus One. It shares a grouped site boundary with its reported parent; a hosted provider or child building is not counted as another independent site.
- First listed from a public Data Center Map listing; identity, address and lifecycle have since been checked against the operator, planning and news sources cited on this record.
Compute, workloads & commercial commitments
Site-specific workloads, GPU inventory and customer contracts are not established by the cited evidence. Electrical capacity and AI-ready specifications alone do not establish these details.
Related operator-wide evidence
These disclosures describe the operator’s portfolio. They are not assigned to this facility or included in its power totals.
CDC reports a 3.9 GW leasable ANZ pipeline
September 2026 investor update reports 3.9 GW leasable pipeline as at 30 June 2026. Earlier 1.7 GW leasable capacity corresponded to a 2.5 GW built capacity pipeline. The definitions differ and cannot be summed.
- Total leasable pipeline
- 3,900 MW leasable 2026-06-30
- Evidence scope
- Operator portfolio · CDC
- Evidence as-of date
- 2026-06-30
How to read this: Includes existing operating and future capacity across Australia and New Zealand. It is not additional pipeline or site-allocated IT capacity and is not additive to facility totals.
Inspect the source
- CDC Infratil investor update, 16 September 2026 ↗
CDC / Infratil · checked 2026-09-22 · published 2026-09-16
Slides: CDC Group snapshot; Then and now; Operating capacity has more than doubled; Construction is progressing; footnotes defining pipeline
CDC Australian operating ICT capacity: approximately 470 MW
CDC reports operating primary ICT capacity of approximately 120 MW in the ACT, 220 MW in NSW and 130 MW in Victoria at 30 June 2026. The regional figures are rounded to the nearest 10 MW.
- Operating primary ICT capacity
- ≈ 470 MW IT 30 June 2026
- Evidence scope
- Operator portfolio · CDC
- Evidence as-of date
- 2026-06-30
How to read this: The portfolio is included once in the operating reconciliation. Brooklyn accounts for the Victorian 130 MW; other named-site allocations remain incomplete. Primary ICT excludes the redundancy and losses in CDC’s earlier built-capacity measure. It is available capacity, not actual consumption.
Inspect the source
- CDC independent valuation, 30 June 2026 ↗
Infratil / CDC · checked 2026-09-22 · published 2026-07-06
PDF page 6 (printed page 5), Leasable Capacity Pipeline by Region, definition, operating rows and rounding footnote; page 5 (printed page 4), quarterly operating additions
Evidence trail
- CDC Hume HU3: directory profile and specifications ↗
Data Center Map · checked 2026-09-11
Public listing 10625; location, overview, specs tabs. Address/location header and labelled technical specification rows.
- Natural Earth populated places, 1:10m ↗
Natural Earth · checked 2026-09-10
Australia and New Zealand populated-place features
- Hosting Certification Framework: Certified Service Providers ↗
Australian Government, Department of Home Affairs · checked 2026-09-22
Data Centre facilities: Certified Strategic Facility and Certified Strategic Enclave lists; reform notice
- CDC Canberra campuses ↗
CDC · checked 2026-09-22
Canberra introduction; Hume One, Hume Two and Fyshwick sections
- Data Centre Facilities 2 - Whole of Government Panel (Canberra Data Centres Pty Ltd AIP plan) ↗
Australian Government Department of Industry, Science and Resources · checked 2026-11-03 · published 2022-09-13
Section '1. General Project Details' > Project location
- CDC Hume HU3: OpenStreetMap way 1010500713 ↗
OpenStreetMap contributors · checked 2026-11-03
Nominatim search result; way 1010500713; latitude -35.3893635, longitude 149.1685061. Checked 3 November 2026.
- Canberra | CDC Data Centres ↗
CDC Data Centres · checked 2026-11-03
Section 'Fyshwick Campus'; Section 'Hume Campus One'; Sections 'At a glance' and 'Hume Campus One'; Section 'Hume Campus Two'
- Infratil Investor Day 2025 – CDC Update (September 2025) ↗
Infratil Limited · checked 2026-11-03 · published 2025-09
Slide 'Our ANZ Presence' (p.4); Slide 'Melbourne Region: 650MW+ in Australia's 2nd global DC hub' and ANZ map ('Melbourne Laverton LV1 LV2'); Slide 'Auckland Region: additional capacity delivered in FY26'