CDC Fyshwick FY1: facility evidence profile

CDC · Australia

CDC Fyshwick FY1

Report an error or share evidence ↗

Also recorded as: FY1

Canberra, ACT · facility

Operating / built
Facility type
colocation
Location evidence
Approximate city location
Research status
Source-listed profile · 63% core-field coverage

Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.

Evidence by field

Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.

Certification Source checked
Canberra Data Centres, F1: only the named Certified Strategic facility. This does not certify other buildings or the whole parent campus.Checked 2026-09-22 · Australian Government, Department of Home Affairs ↗
Status Source checked
Operating per the operator's campus page and Infratil's timeline.Checked 2026-11-03 · CDC Data Centres ↗ · Infratil Limited ↗
Identity Not found in checked sources
No cited source ties a street number to the FY1 building. CDC's corporate postal address is 11 Tom Price Street, Fyshwick, and a Commonwealth industry-participation record gives the Fyshwick project location as 2 Leonora Street; neither is published as the facility address.Checked 2026-11-03 · CDC Data Centres ↗ · CDC Data Centres ↗ · Australian Government Department of Industry, Science and Resources ↗

Opening & commissioning history

  • 2015 · Fyshwick 1 becomes operational

    Infratil's March 2026 CDC presentation timeline. Year precision only.

Capacity & development

Operating / builtNot disclosed

Power basis not established

CDC's Canberra page states the Fyshwick campus is home to FY1 and FY2 with 45 MW operating; Infratil's March 2026 timeline records Fyshwick 1 becoming operational in 2015. Campus capacity is carried by the CDC Fyshwick Campus record, not repeated here.

Government certification

Certified Strategic facility

Canberra Data Centres, F1: only the named Certified Strategic facility. This does not certify other buildings or the whole parent campus.

What certification covers →

Scope and context

  • Added from a public Data Center Map listing. Identity and location remain directory-reported until corroborated against operator or planning evidence.
  • The directory links this entry to CDC Fyshwick Campus. It shares a grouped site boundary with its reported parent; a hosted provider or child building is not counted as another independent site.

Compute, workloads & commercial commitments

Site-specific workloads, GPU inventory and customer contracts are not established by the cited evidence. Electrical capacity and AI-ready specifications alone do not establish these details.

Related operator-wide evidence

These disclosures describe the operator’s portfolio. They are not assigned to this facility or included in its power totals.

Facility specificationANZAnnouncement

CDC reports a 3.9 GW leasable ANZ pipeline

September 2026 investor update reports 3.9 GW leasable pipeline as at 30 June 2026. Earlier 1.7 GW leasable capacity corresponded to a 2.5 GW built capacity pipeline. The definitions differ and cannot be summed.

Total leasable pipeline
3,900 MW leasable
2026-06-30
Evidence scope
Operator portfolio · CDC
Evidence as-of date
2026-06-30

How to read this: Includes existing operating and future capacity across Australia and New Zealand. It is not additional pipeline or site-allocated IT capacity and is not additive to facility totals.

Inspect the source
Link to this evidence ↗
Facility specificationAustraliaOperating deployment

CDC Australian operating ICT capacity: approximately 470 MW

CDC reports operating primary ICT capacity of approximately 120 MW in the ACT, 220 MW in NSW and 130 MW in Victoria at 30 June 2026. The regional figures are rounded to the nearest 10 MW.

Operating primary ICT capacity
≈ 470 MW IT
30 June 2026
Evidence scope
Operator portfolio · CDC
Evidence as-of date
2026-06-30

How to read this: The portfolio is included once in the operating reconciliation. Brooklyn accounts for the Victorian 130 MW; other named-site allocations remain incomplete. Primary ICT excludes the redundancy and losses in CDC’s earlier built-capacity measure. It is available capacity, not actual consumption.

Inspect the source
  • CDC independent valuation, 30 June 2026 ↗

    Infratil / CDC · checked 2026-09-22 · published 2026-07-06

    PDF page 6 (printed page 5), Leasable Capacity Pipeline by Region, definition, operating rows and rounding footnote; page 5 (printed page 4), quarterly operating additions

Link to this evidence ↗
Explore demand, compute types and commitments →

Evidence trail

  1. CDC Fyshwick FY1: directory profile and specifications ↗

    Data Center Map · checked 2026-09-11

    Public listing 10628; location, overview, specs tabs. Address/location header and labelled technical specification rows.

  2. Natural Earth populated places, 1:10m ↗

    Natural Earth · checked 2026-09-10

    Australia and New Zealand populated-place features

  3. Hosting Certification Framework: Certified Service Providers ↗

    Australian Government, Department of Home Affairs · checked 2026-09-22

    Data Centre facilities: Certified Strategic Facility and Certified Strategic Enclave lists; reform notice

  4. CDC Canberra campuses ↗

    CDC · checked 2026-09-22

    Canberra introduction; Hume One, Hume Two and Fyshwick sections

  5. Canberra | CDC Data Centres ↗

    CDC Data Centres · checked 2026-11-03

    Section 'Fyshwick Campus'; Section 'Hume Campus One'; Sections 'At a glance' and 'Hume Campus One'; Section 'Hume Campus Two'

  6. CDC Investor Presentation, 26 March 2026 (Infratil ASX/NZX release attachment) ↗

    Infratil Limited · checked 2026-11-03 · published 2026-03-26

    Slide 'Track record of development at scale across multiple campuses and regions' (p.6); Slide 'Our ANZ Presence' (p.4)

  7. Whistleblower Policy | CDC ↗

    CDC Data Centres · checked 2026-11-03

    Attachment 'WPO Contact Details', item 1 (Company Secretary)

  8. Data Centre Facilities 2 - Whole of Government Panel (Canberra Data Centres Pty Ltd AIP plan) ↗

    Australian Government Department of Industry, Science and Resources · checked 2026-11-03 · published 2022-09-13

    Section '1. General Project Details' > Project location