CDC · Australia
CDC Fyshwick FY2
Report an error or share evidence ↗
Also recorded as: FY2
Canberra, ACT · facility
- Facility type
- colocation
- Location evidence
- Approximate city location
- Research status
- Source-listed profile · 63% core-field coverage
Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.
Evidence by field
Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.
- Certification Source checked
- Canberra Data Centres, F2: only the named Certified Strategic facility. This does not certify other buildings or the whole parent campus.Checked 2026-09-22 · Australian Government, Department of Home Affairs ↗
- Status Source checked
- Operating per the operator's campus page and Infratil's ANZ map.Checked 2026-11-03 · CDC Data Centres ↗ · Infratil Limited ↗
- Identity Not found in checked sources
- No cited source ties a street number to the FY2 building; see FY1.Checked 2026-11-03 · CDC Data Centres ↗ · CDC Data Centres ↗ · Australian Government Department of Industry, Science and Resources ↗
Capacity & development
Power basis not established
CDC's Canberra page states the Fyshwick campus is home to FY1 and FY2 with 45 MW operating; Infratil's March 2026 ANZ map lists FY2 among operating data centres. Campus capacity is carried by the CDC Fyshwick Campus record.
Government certification
Certified Strategic facility
Canberra Data Centres, F2: only the named Certified Strategic facility. This does not certify other buildings or the whole parent campus.
What certification covers →Scope and context
- Added from a public Data Center Map listing. Identity and location remain directory-reported until corroborated against operator or planning evidence.
- The directory links this entry to CDC Fyshwick Campus. It shares a grouped site boundary with its reported parent; a hosted provider or child building is not counted as another independent site.
Compute, workloads & commercial commitments
Site-specific workloads, GPU inventory and customer contracts are not established by the cited evidence. Electrical capacity and AI-ready specifications alone do not establish these details.
Related operator-wide evidence
These disclosures describe the operator’s portfolio. They are not assigned to this facility or included in its power totals.
CDC reports a 3.9 GW leasable ANZ pipeline
September 2026 investor update reports 3.9 GW leasable pipeline as at 30 June 2026. Earlier 1.7 GW leasable capacity corresponded to a 2.5 GW built capacity pipeline. The definitions differ and cannot be summed.
- Total leasable pipeline
- 3,900 MW leasable 2026-06-30
- Evidence scope
- Operator portfolio · CDC
- Evidence as-of date
- 2026-06-30
How to read this: Includes existing operating and future capacity across Australia and New Zealand. It is not additional pipeline or site-allocated IT capacity and is not additive to facility totals.
Inspect the source
- CDC Infratil investor update, 16 September 2026 ↗
CDC / Infratil · checked 2026-09-22 · published 2026-09-16
Slides: CDC Group snapshot; Then and now; Operating capacity has more than doubled; Construction is progressing; footnotes defining pipeline
CDC Australian operating ICT capacity: approximately 470 MW
CDC reports operating primary ICT capacity of approximately 120 MW in the ACT, 220 MW in NSW and 130 MW in Victoria at 30 June 2026. The regional figures are rounded to the nearest 10 MW.
- Operating primary ICT capacity
- ≈ 470 MW IT 30 June 2026
- Evidence scope
- Operator portfolio · CDC
- Evidence as-of date
- 2026-06-30
How to read this: The portfolio is included once in the operating reconciliation. Brooklyn accounts for the Victorian 130 MW; other named-site allocations remain incomplete. Primary ICT excludes the redundancy and losses in CDC’s earlier built-capacity measure. It is available capacity, not actual consumption.
Inspect the source
- CDC independent valuation, 30 June 2026 ↗
Infratil / CDC · checked 2026-09-22 · published 2026-07-06
PDF page 6 (printed page 5), Leasable Capacity Pipeline by Region, definition, operating rows and rounding footnote; page 5 (printed page 4), quarterly operating additions
Evidence trail
- CDC Fyshwick FY2: directory profile and specifications ↗
Data Center Map · checked 2026-09-11
Public listing 10629; location, overview, specs tabs. Address/location header and labelled technical specification rows.
- Natural Earth populated places, 1:10m ↗
Natural Earth · checked 2026-09-10
Australia and New Zealand populated-place features
- Hosting Certification Framework: Certified Service Providers ↗
Australian Government, Department of Home Affairs · checked 2026-09-22
Data Centre facilities: Certified Strategic Facility and Certified Strategic Enclave lists; reform notice
- CDC Canberra campuses ↗
CDC · checked 2026-09-22
Canberra introduction; Hume One, Hume Two and Fyshwick sections
- Canberra | CDC Data Centres ↗
CDC Data Centres · checked 2026-11-03
Section 'Fyshwick Campus'; Section 'Hume Campus One'; Sections 'At a glance' and 'Hume Campus One'; Section 'Hume Campus Two'
- CDC Investor Presentation, 26 March 2026 (Infratil ASX/NZX release attachment) ↗
Infratil Limited · checked 2026-11-03 · published 2026-03-26
Slide 'Track record of development at scale across multiple campuses and regions' (p.6); Slide 'Our ANZ Presence' (p.4)
- Whistleblower Policy | CDC ↗
CDC Data Centres · checked 2026-11-03
Attachment 'WPO Contact Details', item 1 (Company Secretary)
- Data Centre Facilities 2 - Whole of Government Panel (Canberra Data Centres Pty Ltd AIP plan) ↗
Australian Government Department of Industry, Science and Resources · checked 2026-11-03 · published 2022-09-13
Section '1. General Project Details' > Project location