Goodman Project Pluto: facility evidence profile

Goodman · Australia

Goodman Project Pluto

Report an error or share evidence ↗

Sydney, NSW · facility

Planned
Facility type
colocation
Location evidence
Approximate city location
Research status
Profile reviewed · 75% core-field coverage

Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.

Evidence by field

Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.

Capacity Source checked
The July 2026 assessment supersedes the directory map's 126 MW value: current design is 68 MW IT and 100 MW total power.Checked 2026-09-22 · NSW Department of Planning, Housing and Infrastructure ↗ · NSW Planning Portal ↗

Capacity & development

Planned68 MW

Power for servers, GPUs, storage & networking (IT power) · Source as of 2026-07-23

Approved nine-hall design IT target across two stages, with no verified commencement or commissioning date.

Proposed or approved design capacity. Included in the planning inventory, not a dated delivery forecast or a claim of committed supply.

Government certification

Certification not verified

No verified certification scope has been assigned to this record. Unknown does not mean uncertified.

What certification covers →

Scope and context

  • Added from a public Data Center Map listing. Identity and location remain directory-reported until corroborated against operator or planning evidence.
  • The July 2026 assessment supersedes the directory map's 126 MW value: current design is 68 MW IT and 100 MW total power.

Compute, workloads & commercial commitments

Site-specific workloads, GPU inventory and customer contracts are not established by the cited evidence. Electrical capacity and AI-ready specifications alone do not establish these details.

Explore demand, compute types and commitments →

Evidence trail

  1. Goodman Project Pluto: directory profile and specifications ↗

    Data Center Map · checked 2026-09-11

    Public listing 10817; location, overview, specs tabs. Address/location header and labelled technical specification rows.

  2. Project Pluto Data Centre: Department assessment report, July 2026 ↗

    NSW Department of Planning, Housing and Infrastructure · checked 2026-09-22 · published 2026-07

    Executive summary and Table 2 project details

  3. Project Pluto Data Centre | Planning Portal - Department of Planning and Environment ↗

    NSW Planning Portal · checked 2026-09-22 · published 2026-07-23