Julius Avenue Data Centre: facility evidence profile

ISPT · Australia

Julius Avenue Data Centre

Report an error or share evidence ↗

Sydney, NSW · facility

Planned
Facility type
colocation
Location evidence
Approximate city location
Research status
Profile reviewed · 75% core-field coverage

Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.

Evidence by field

Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.

Identity Source checked
Planning report identifies the 6–8 Julius Avenue North Ryde project and ISPT as client.Checked 2026-09-23 · Integrated Group Services for ISPT, lodged with NSW Planning ↗
Address Source checked
The revised planning report identifies the Julius Avenue North Ryde site; map coordinates remain separately unverified.Checked 2026-09-23 · Integrated Group Services for ISPT, lodged with NSW Planning ↗
Capacity Source checked
The later proposal specifies 76 MW IT and 120 MW maximum total power. The earlier 115.2 MW IT / 169 MW total concept is superseded and excluded.Checked 2026-09-23 · Integrated Group Services for ISPT, lodged with NSW Planning ↗ · ISPT, lodged with NSW Planning ↗
Status Source checked
NSW Planning still labels the application More Information Required; no approval or operating status is established.Checked 2026-09-23 · NSW Planning Portal ↗
Published street address

6–8 Julius Avenue, North Ryde, NSW

Checked 2026-09-23 · Map coordinates still to be verified

Open this address in maps ↗

Capacity & development

Planned≤ 76 MW

Power for servers, GPUs, storage & networking (IT power) · Source as of 2025-12-09

Later lodged revision specifies eight halls and 76 MW proposed IT load, rather than the earlier 115.2 MW design. The application remains More Information Required, so this is an unapproved upper design envelope, not an opening forecast.

Proposed or approved design capacity. Included in the planning inventory, not a dated delivery forecast or a claim of committed supply.

Government certification

Certification not verified

No verified certification scope has been assigned to this record. Unknown does not mean uncertified.

What certification covers →

Scope and context

  • Added from a public Data Center Map listing. Identity and location remain directory-reported until corroborated against operator or planning evidence.
  • The accepted 76 MW is a proposed IT design ceiling from the later lodged revision, not capacity in service.

Compute, workloads & commercial commitments

Facility specificationAustraliaAnnouncement

Julius Avenue: revised 76 MW proposed IT load

A later lodged design for 6–8 Julius Avenue specifies 76 MW IT across eight halls, down from an earlier 115.2 MW IT concept.

Proposed IT design ceiling
≤ 76 MW IT
Revision 06 dated 9 December 2025
Evidence scope
Named facility · ISPT
Evidence as-of date
2025-12-09

How to read this: The old 115.2 MW IT design and 169–170 MW whole-site figures are not additions. The current revision says 120 MW maximum whole-site power. The application remains under assessment; design is not installed capacity or a delivery forecast.

Inspect 3 sources
Link to this evidence ↗
Explore demand, compute types and commitments →

Evidence trail

  1. Julius Avenue Data Centre: directory profile and specifications ↗

    Data Center Map · checked 2026-09-11

    Public listing 14116; location, overview, specs tabs. Address/location header and labelled technical specification rows.

  2. Julius Avenue Data Centre, backup power report revision 06 ↗

    Integrated Group Services for ISPT, lodged with NSW Planning · checked 2026-09-23 · published 2025-12-09

    Document control revision 06 and section 2.2 Proposed Development table: eight data halls, 76 MW IT Load, 120 MW Maximum Power Consumption; lodged February 2026.

  3. Julius Avenue earlier environmental impact statement ↗

    ISPT, lodged with NSW Planning · checked 2026-09-23 · published 2025-06

    Earlier EIS proposed-development description: 12 halls, 115.2 MW IT and 169 MW maximum power; superseded by revised December 2025 report.

  4. Julius Avenue Data Centre - NSW Planning Portal ↗

    NSW Planning Portal · checked 2026-09-22

    Project description and current status

  5. Natural Earth populated places, 1:10m ↗

    Natural Earth · checked 2026-09-10

    Australia and New Zealand populated-place features