Goodman Project Mars: facility evidence profile

Goodman · Australia

Goodman Project Mars

Report an error or share evidence ↗

Sydney, NSW · facility

Planned
Facility type
colocation
Location evidence
Approximate city location
Research status
Profile reviewed · 75% core-field coverage

Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.

Evidence by field

Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.

Identity Source checked
Applicant's final-lodgement report identifies Project Mars at 12 Mars Road, Lane Cove West.Checked 2026-09-23 · HDR for Project Mars applicant, lodged with NSW Planning ↗
Address Source checked
The planning report identifies 12 Mars Road; a street-level map point has not been independently verified.Checked 2026-09-23 · HDR for Project Mars applicant, lodged with NSW Planning ↗
Capacity Source checked
60 MW maximum IT load is explicitly distinct from 81 MW maximum total site load and portal's approximately 90 MW description.Checked 2026-09-23 · HDR for Project Mars applicant, lodged with NSW Planning ↗
Status Source checked
NSW Planning lists Response to Submissions; no approval or construction start is verified.Checked 2026-09-23 · NSW Planning Portal ↗
Published street address

12 Mars Road, Lane Cove West, NSW, 2066

Checked 2026-09-23 · Map coordinates still to be verified

Open this address in maps ↗

Capacity & development

Planned≤ 60 MW

Power for servers, GPUs, storage & networking (IT power) · Source as of 2026-02-17

Applicant ESD report defines 60 MW maximum site IT load and 81 MW maximum whole-site load. This application remains at Response to Submissions; the 60 MW is an unapproved IT design ceiling, not construction or operating capacity.

Proposed or approved design capacity. Included in the planning inventory, not a dated delivery forecast or a claim of committed supply.

Government certification

Certification not verified

No verified certification scope has been assigned to this record. Unknown does not mean uncertified.

What certification covers →

Scope and context

  • Added from a public Data Center Map listing. Identity and location remain directory-reported until corroborated against operator or planning evidence.
  • 60 MW is the proposed site IT design limit. Total facility electricity demand and an earlier portal headline are not additional IT capacity.

Compute, workloads & commercial commitments

Facility specificationAustraliaAnnouncement

Project Mars: 60 MW maximum proposed IT load

The applicant's ESD report for 12 Mars Road gives a maximum 60 MW IT load, within 81 MW maximum whole-site electricity demand.

Proposed IT design ceiling
≤ 60 MW IT
Applicant report dated 17 February 2026
Evidence scope
Named facility · Goodman
Evidence as-of date
2026-02-17

How to read this: The project is at Response to Submissions, not approved or built. The 81 MW full-site figure and portal's approximately 90 MW description are not separate IT increments.

Inspect 2 sources
Link to this evidence ↗
Explore demand, compute types and commitments →

Evidence trail

  1. Goodman Project Mars: directory profile and specifications ↗

    Data Center Map · checked 2026-09-11

    Public listing 14686; location, overview, specs tabs. Address/location header and labelled technical specification rows.

  2. Project Mars data centre ESD report, Issue B ↗

    HDR for Project Mars applicant, lodged with NSW Planning · checked 2026-09-23 · published 2026-02-17

    Energy-use calculation: 60 MW Maximum Site IT Load, PUE 1.35, 81 MW Maximum Total Site Load; site at 12 Mars Road, Lane Cove West.

  3. Project Mars Data Centre - NSW Planning Portal ↗

    NSW Planning Portal · checked 2026-09-22

    Project description and current status

  4. Natural Earth populated places, 1:10m ↗

    Natural Earth · checked 2026-09-10

    Australia and New Zealand populated-place features