CDC · Australia
CDC Maddington DC2
Report an error or share evidence ↗
Perth, WA · facility
- Facility type
- colocation
- Location evidence
- Approximate city location
- Research status
- Profile reviewed · 50% core-field coverage
Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.
Evidence by field
Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.
- Address Source checked
- The Metro Outer Development Assessment Panel agenda (10 September 2025) describes the site as Lots 1, 10 and 1 (Nos 307, 323 and 329) Kenwick Road and Lot 500 (No 582) Bickley Road, Maddington, owned by Canberra Data Centres, with four two-storey buildings in four stages; CDC describes the site as off Bickley Road.Checked 2026-11-03 · Western Australian Planning Commission / Development Assessment Panels (planning.wa.gov.au) ↗ · CDC Data Centres ↗
- Coordinates Not found in checked sources
- No numbered address feature for the Kenwick Road or Bickley Road lots exists in OpenStreetMap. Approximate city position retained.Checked 2026-11-03 · Western Australian Planning Commission / Development Assessment Panels (planning.wa.gov.au) ↗ · CDC Data Centres ↗
- Status Source checked
- Approved as stage 2 of four under DAP/25/02926; no cited source states that construction of this building has begun. Planned, with no capacity accepted.Checked 2026-11-03 · Western Australian Planning Commission / Development Assessment Panels (planning.wa.gov.au) ↗ · CDC Data Centres ↗
307, 323 and 329 Kenwick Road and 582 Bickley Road, Maddington, WA, 6109
Checked 2026-11-03 · Map coordinates still to be verified
Open this address in maps ↗Capacity & development
Power basis not established
Directory reports Planned. No comparable IT capacity or commissioning date has been accepted from this listing.
Government certification
Certification not verified
No verified certification scope has been assigned to this record. Unknown does not mean uncertified.
What certification covers →Scope and context
- The directory links this entry to CDC Maddington Campus. It shares a grouped site boundary with its reported parent; a hosted provider or child building is not counted as another independent site.
- First listed from a public Data Center Map listing; identity, address and lifecycle have since been checked against the operator, planning and news sources cited on this record.
Compute, workloads & commercial commitments
Site-specific workloads, GPU inventory and customer contracts are not established by the cited evidence. Electrical capacity and AI-ready specifications alone do not establish these details.
Related operator-wide evidence
These disclosures describe the operator’s portfolio. They are not assigned to this facility or included in its power totals.
CDC reports a 3.9 GW leasable ANZ pipeline
September 2026 investor update reports 3.9 GW leasable pipeline as at 30 June 2026. Earlier 1.7 GW leasable capacity corresponded to a 2.5 GW built capacity pipeline. The definitions differ and cannot be summed.
- Total leasable pipeline
- 3,900 MW leasable 2026-06-30
- Evidence scope
- Operator portfolio · CDC
- Evidence as-of date
- 2026-06-30
How to read this: Includes existing operating and future capacity across Australia and New Zealand. It is not additional pipeline or site-allocated IT capacity and is not additive to facility totals.
Inspect the source
- CDC Infratil investor update, 16 September 2026 ↗
CDC / Infratil · checked 2026-09-22 · published 2026-09-16
Slides: CDC Group snapshot; Then and now; Operating capacity has more than doubled; Construction is progressing; footnotes defining pipeline
CDC Australian operating ICT capacity: approximately 470 MW
CDC reports operating primary ICT capacity of approximately 120 MW in the ACT, 220 MW in NSW and 130 MW in Victoria at 30 June 2026. The regional figures are rounded to the nearest 10 MW.
- Operating primary ICT capacity
- ≈ 470 MW IT 30 June 2026
- Evidence scope
- Operator portfolio · CDC
- Evidence as-of date
- 2026-06-30
How to read this: The portfolio is included once in the operating reconciliation. Brooklyn accounts for the Victorian 130 MW; other named-site allocations remain incomplete. Primary ICT excludes the redundancy and losses in CDC’s earlier built-capacity measure. It is available capacity, not actual consumption.
Inspect the source
- CDC independent valuation, 30 June 2026 ↗
Infratil / CDC · checked 2026-09-22 · published 2026-07-06
PDF page 6 (printed page 5), Leasable Capacity Pipeline by Region, definition, operating rows and rounding footnote; page 5 (printed page 4), quarterly operating additions
Evidence trail
- CDC Maddington DC2: directory profile and specifications ↗
Data Center Map · checked 2026-09-11
Public listing 15925; location, overview, specs tabs. Address/location header and labelled technical specification rows.
- Metro Outer Development Assessment Panel Agenda – MODAP/102 – City of Gosnells (10 September 2025), Item 3.1 DAP/25/02926 ↗
Western Australian Planning Commission / Development Assessment Panels (planning.wa.gov.au) · checked 2026-11-03 · published 2025-09-10
Part B Item 3.1 heading; Form 1 Responsible Authority Report table (Owner); 'Proposal' section; Part B Item 3.1 heading and 'Proposal' section; Part B Item 3.1 heading, 'Proposal' section and 'Setbacks and Landscaping' table (Warehouse 4 fronts Kenwick Road)
- Maddington | CDC ↗
CDC Data Centres · checked 2026-11-03
Sections 'About the project' and 'Project timeline'; Section 'Project timeline' intro; Section 'About the project'
- Natural Earth populated places, 1:10m ↗
Natural Earth · checked 2026-09-10
Australia and New Zealand populated-place features