Firmus · Australia
Firmus George Town GEE02
Report an error or share evidence ↗
Launceston, TAS · facility
- Facility type
- Not verified
- Location evidence
- Approximate city location
- Research status
- Directory-listed record · 38% core-field coverage
Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.
Capacity & development
Power basis not established
Directory reports Planned. No comparable IT capacity or commissioning date has been accepted from this listing.
Government certification
Certification not verified
No verified certification scope has been assigned to this record. Unknown does not mean uncertified.
What certification covers →Scope and context
- Added from a public Data Center Map listing. Identity and location remain directory-reported until corroborated against operator or planning evidence.
- The directory links this entry to Firmus George Town Campus. It shares a grouped site boundary with its reported parent; a hosted provider or child building is not counted as another independent site.
Compute, workloads & commercial commitments
Site-specific workloads, GPU inventory and customer contracts are not established by the cited evidence. Electrical capacity and AI-ready specifications alone do not establish these details.
Related operator-wide evidence
These disclosures describe the operator’s portfolio. They are not assigned to this facility or included in its power totals.
South Australia energy agreement covers 600 MW of load
Firmus reports a 12-year electricity supply agreement signed in June 2026 for its first South Australian AI factories and names Gunvor Group.
- Electricity agreement load
- 600 MW Evidence as of 2026-06
- Agreement duration
- 12 years Evidence as of 2026-06
- Evidence scope
- Operator portfolio · Firmus
- Evidence as-of date
- 2026-06
- Workloads described
- Not specified in this evidence
How to read this: This is power procurement, not a compute customer/offtake contract. The source does not allocate 600 MW between sites or identify it as IT load. Existing 1000/1300 MW campus IT envelopes remain approval-dependent.
Inspect the source
- Firmus South Australia community hub ↗
Firmus · checked 2026-09-11
Our South Australian Projects; Policy in Action; Project Approvals
Firmus reports an operating Australian AI factory
September 8 statement identifies two operational sites across the portfolio, one in Australia and one in Singapore.
- Operational Australian site stated at country level
- 1 site Evidence as of 2026-09-08
- Evidence scope
- Operator portfolio · Firmus
- Evidence as-of date
- 2026-09-08
- Workloads described
- Not specified in this evidence
How to read this: Australian site is not named in this passage. The disclosure does not prove Launceston, Bell Bay or Wesley Vale has opened; it must not create a second physical record for a hosted CDC deployment.
Inspect the source
- Firmus adds OpenAI as anchor customer and expands into Malaysia ↗
Firmus · checked 2026-09-11 · published 2026-09-08
Sydney /8 September 2026; opening paragraphs; Australian engineering section
Evidence trail
- Firmus George Town GEE02: directory profile and specifications ↗
Data Center Map · checked 2026-09-11
Public listing 18088; location, overview, specs tabs. Address/location header and labelled technical specification rows.
- Natural Earth populated places, 1:10m ↗
Natural Earth · checked 2026-09-10
Australia and New Zealand populated-place features