CDC · Australia
CDC Brooklyn BK2
Report an error or share evidence ↗
Also recorded as: BK2
Melbourne, VIC · facility
- Facility type
- colocation
- Location evidence
- Approximate city location
- Research status
- Source-listed profile · 63% core-field coverage
Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.
Evidence by field
Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.
- Status Source checked
- BK1 and BK2 form the two operational Brooklyn buildings. Their capacity is counted only at the parent campus.Checked 2026-09-22 · Invest Victoria, Victorian Government ↗ · CDC / Infratil ↗
- Identity Not found in checked sources
- Brimbank City Council's register lists a second-stage data centre (north side) at 598B Geelong Road, Brooklyn (P569/2023) without naming the applicant; CDC and the Victorian Government confirm two Brooklyn facilities. No cited source ties BK2 to a street number, so none is published.Checked 2026-11-03 · Brimbank City Council via Planning Alerts ↗ · CDC Data Centres ↗
Capacity & development
Power basis not established · Source as of 2026-03-04
BK1 and BK2 form the two operational Brooklyn buildings. Their capacity is counted only at the parent campus.
Government certification
Certification not verified
No verified certification scope has been assigned to this record. Unknown does not mean uncertified.
What certification covers →Scope and context
- Added from a public Data Center Map listing. Identity and location remain directory-reported until corroborated against operator or planning evidence.
- The directory links this entry to CDC Brooklyn Campus One. It shares a grouped site boundary with its reported parent; a hosted provider or child building is not counted as another independent site.
Compute, workloads & commercial commitments
Site-specific workloads, GPU inventory and customer contracts are not established by the cited evidence. Electrical capacity and AI-ready specifications alone do not establish these details.
Related operator-wide evidence
These disclosures describe the operator’s portfolio. They are not assigned to this facility or included in its power totals.
CDC reports a 3.9 GW leasable ANZ pipeline
September 2026 investor update reports 3.9 GW leasable pipeline as at 30 June 2026. Earlier 1.7 GW leasable capacity corresponded to a 2.5 GW built capacity pipeline. The definitions differ and cannot be summed.
- Total leasable pipeline
- 3,900 MW leasable 2026-06-30
- Evidence scope
- Operator portfolio · CDC
- Evidence as-of date
- 2026-06-30
How to read this: Includes existing operating and future capacity across Australia and New Zealand. It is not additional pipeline or site-allocated IT capacity and is not additive to facility totals.
Inspect the source
- CDC Infratil investor update, 16 September 2026 ↗
CDC / Infratil · checked 2026-09-22 · published 2026-09-16
Slides: CDC Group snapshot; Then and now; Operating capacity has more than doubled; Construction is progressing; footnotes defining pipeline
CDC Australian operating ICT capacity: approximately 470 MW
CDC reports operating primary ICT capacity of approximately 120 MW in the ACT, 220 MW in NSW and 130 MW in Victoria at 30 June 2026. The regional figures are rounded to the nearest 10 MW.
- Operating primary ICT capacity
- ≈ 470 MW IT 30 June 2026
- Evidence scope
- Operator portfolio · CDC
- Evidence as-of date
- 2026-06-30
How to read this: The portfolio is included once in the operating reconciliation. Brooklyn accounts for the Victorian 130 MW; other named-site allocations remain incomplete. Primary ICT excludes the redundancy and losses in CDC’s earlier built-capacity measure. It is available capacity, not actual consumption.
Inspect the source
- CDC independent valuation, 30 June 2026 ↗
Infratil / CDC · checked 2026-09-22 · published 2026-07-06
PDF page 6 (printed page 5), Leasable Capacity Pipeline by Region, definition, operating rows and rounding footnote; page 5 (printed page 4), quarterly operating additions
Evidence trail
- CDC Brooklyn BK2: directory profile and specifications ↗
Data Center Map · checked 2026-09-11
Public listing 18987; location, overview, specs tabs. Address/location header and labelled technical specification rows.
- CDC opens its first Victorian campus in Brooklyn ↗
Invest Victoria, Victorian Government · checked 2026-09-22 · published 2026-03-04
Opening paragraph and subsequent Laverton North paragraph
- CDC Infratil investor update, 16 September 2026 ↗
CDC / Infratil · checked 2026-09-22 · published 2026-09-16
Slides: CDC Group snapshot; Then and now; Operating capacity has more than doubled; Construction is progressing; footnotes defining pipeline
- 598B Geelong Road Brooklyn, VIC – P569/2023 (Brimbank City Council register entry) ↗
Brimbank City Council via Planning Alerts · checked 2026-11-03 · published 2023-12-01
Title, Description and reference number; sourced 1 Dec 2023; Title, Description, Planning Authority and reference number; sourced 1 Dec 2023
- Melbourne | CDC Data Centres ↗
CDC Data Centres · checked 2026-11-03
Section 'At a glance'; Section 'At a glance' and 'Laverton Campus'
- Natural Earth populated places, 1:10m ↗
Natural Earth · checked 2026-09-10
Australia and New Zealand populated-place features