CDC · Australia
CDC Hume HU6
Report an error or share evidence ↗
Also recorded as: HU6 · Hume 6
Canberra, ACT · facility
- Facility type
- colocation
- Location evidence
- Approximate city location
- Research status
- Profile reviewed · 63% core-field coverage
Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.
Evidence by field
Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.
- Status Source checked
- CDC’s September investor presentation identifies Eastern Creek 5 and 6, Hume 6 and Marsden Park 1 as delivered and contributing earnings. This is an evidenced status date, not the exact commissioning date.Checked 2026-09-22 · CDC / Infratil ↗
- Address Source checked
- The Hume 6 infrastructure report (Stantec, October 2024) places the project site at 62 Sawmill Circuit, Hume ACT 2620 (Block 99 Section 7); the ACT register entry lists 62 Sawmill Circuit and 5 Tralee Street because the application consolidates the Crown leases of Blocks 99 and 103.Checked 2026-11-03 · ACT Government DA Finder (ACT Planning and Land Authority) ↗ · ACT Planning & Land Authority via Planning Alerts ↗
- Coordinates Not found in checked sources
- No address or building feature for 62 Sawmill Circuit, Hume exists in OpenStreetMap. Approximate city position retained.Checked 2026-11-03 · ACT Government DA Finder (ACT Planning and Land Authority) ↗ · ACT Planning & Land Authority via Planning Alerts ↗
62 Sawmill Circuit, Hume, ACT, 2620
Checked 2026-11-03 · Map coordinates still to be verified
Open this address in maps ↗Capacity & development
Power basis not established · Source as of 2026-09-16
CDC’s September investor presentation identifies Eastern Creek 5 and 6, Hume 6 and Marsden Park 1 as delivered and contributing earnings. This is an evidenced status date, not the exact commissioning date.
Government certification
Certification not verified
No verified certification scope has been assigned to this record. Unknown does not mean uncertified.
What certification covers →Scope and context
- The directory links this entry to CDC Hume Campus Two. It shares a grouped site boundary with its reported parent; a hosted provider or child building is not counted as another independent site.
- First listed from a public Data Center Map listing; identity, address and lifecycle have since been checked against the operator, planning and news sources cited on this record.
Compute, workloads & commercial commitments
Site-specific workloads, GPU inventory and customer contracts are not established by the cited evidence. Electrical capacity and AI-ready specifications alone do not establish these details.
Related operator-wide evidence
These disclosures describe the operator’s portfolio. They are not assigned to this facility or included in its power totals.
CDC reports a 3.9 GW leasable ANZ pipeline
September 2026 investor update reports 3.9 GW leasable pipeline as at 30 June 2026. Earlier 1.7 GW leasable capacity corresponded to a 2.5 GW built capacity pipeline. The definitions differ and cannot be summed.
- Total leasable pipeline
- 3,900 MW leasable 2026-06-30
- Evidence scope
- Operator portfolio · CDC
- Evidence as-of date
- 2026-06-30
How to read this: Includes existing operating and future capacity across Australia and New Zealand. It is not additional pipeline or site-allocated IT capacity and is not additive to facility totals.
Inspect the source
- CDC Infratil investor update, 16 September 2026 ↗
CDC / Infratil · checked 2026-09-22 · published 2026-09-16
Slides: CDC Group snapshot; Then and now; Operating capacity has more than doubled; Construction is progressing; footnotes defining pipeline
CDC Australian operating ICT capacity: approximately 470 MW
CDC reports operating primary ICT capacity of approximately 120 MW in the ACT, 220 MW in NSW and 130 MW in Victoria at 30 June 2026. The regional figures are rounded to the nearest 10 MW.
- Operating primary ICT capacity
- ≈ 470 MW IT 30 June 2026
- Evidence scope
- Operator portfolio · CDC
- Evidence as-of date
- 2026-06-30
How to read this: The portfolio is included once in the operating reconciliation. Brooklyn accounts for the Victorian 130 MW; other named-site allocations remain incomplete. Primary ICT excludes the redundancy and losses in CDC’s earlier built-capacity measure. It is available capacity, not actual consumption.
Inspect the source
- CDC independent valuation, 30 June 2026 ↗
Infratil / CDC · checked 2026-09-22 · published 2026-07-06
PDF page 6 (printed page 5), Leasable Capacity Pipeline by Region, definition, operating rows and rounding footnote; page 5 (printed page 4), quarterly operating additions
Evidence trail
- CDC Hume HU6: directory profile and specifications ↗
Data Center Map · checked 2026-09-11
Public listing 18988; location, overview, specs tabs. Address/location header and labelled technical specification rows.
- CDC Infratil investor update, 16 September 2026 ↗
CDC / Infratil · checked 2026-09-22 · published 2026-09-16
Slides: CDC Group snapshot; Then and now; Operating capacity has more than doubled; Construction is progressing; footnotes defining pipeline
- Hume 6 – HU6 Data Centre Infrastructure Report (Stantec, DA 202443633) ↗
ACT Government DA Finder (ACT Planning and Land Authority) · checked 2026-11-03 · published 2024-10-17
Section 2 'Site Information' and Table 1 (Property Title 'Hume 6 Data Centre'); report dated 17 October 2024
- 62 Sawmill Circuit, 5 Tralee Street, Hume, ACT – DA 202443633 (ACTPLA register entry) ↗
ACT Planning & Land Authority via Planning Alerts · checked 2026-11-03 · published 2025-02-15
Title and Description; sourced 15 Feb 2025
- Natural Earth populated places, 1:10m ↗
Natural Earth · checked 2026-09-10
Australia and New Zealand populated-place features