Skip to content
← Back to the atlas

CDC Laverton LV2: facility evidence profile

CDC · Australia

CDC Laverton LV2

Report an error or share evidence ↗

Also recorded as: LV2

Melbourne, VIC · facility

Under construction
Facility type
colocation
Location evidence
Approximate city location
Research status
Source-listed profile · 50% core-field coverage

Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.

Evidence by field

Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.

Status Source checked
Under construction per the operator's campus-wide statement; building-level completion targets are indicative.Checked 2026-11-03 · CDC Data Centres ↗ · Infratil Limited ↗
Identity Not found in checked sources
LV2 code confirmed by Infratil's ANZ map; no cited source gives a street address.Checked 2026-11-03 · CDC Data Centres ↗

Capacity & development

Under constructionNot disclosed

Power basis not established

CDC's Melbourne page states the entirety of the Laverton campus is under construction; Infratil (September 2026) expects buildings 2 and 3 to follow the first building across FY28. No capacity is accepted.

Government certification

Certification not verified

No verified certification scope has been assigned to this record. Unknown does not mean uncertified.

What certification covers →

Scope and context

  • Added from a public Data Center Map listing. Identity and location remain directory-reported until corroborated against operator or planning evidence.
  • The directory links this entry to CDC Laverton Campus. It shares a grouped site boundary with its reported parent; a hosted provider or child building is not counted as another independent site.

Compute, workloads & commercial commitments

Site-specific workloads, GPU inventory and customer contracts are not established by the cited evidence. Electrical capacity and AI-ready specifications alone do not establish these details.

Related operator-wide evidence

These disclosures describe the operator’s portfolio. They are not assigned to this facility or included in its power totals.

Facility specificationANZAnnouncement

CDC reports a 3.9 GW leasable ANZ pipeline

September 2026 investor update reports 3.9 GW leasable pipeline as at 30 June 2026. Earlier 1.7 GW leasable capacity corresponded to a 2.5 GW built capacity pipeline. The definitions differ and cannot be summed.

Total leasable pipeline
3,900 MW leasable
2026-06-30
Evidence scope
Operator portfolio · CDC
Evidence as-of date
2026-06-30

How to read this: Includes existing operating and future capacity across Australia and New Zealand. It is not additional pipeline or site-allocated IT capacity and is not additive to facility totals.

Inspect the source
Link to this evidence ↗
Facility specificationAustraliaOperating deployment

CDC Australian operating ICT capacity: approximately 470 MW

CDC reports operating primary ICT capacity of approximately 120 MW in the ACT, 220 MW in NSW and 130 MW in Victoria at 30 June 2026. The regional figures are rounded to the nearest 10 MW.

Operating primary ICT capacity
≈ 470 MW IT
30 June 2026
Evidence scope
Operator portfolio · CDC
Evidence as-of date
2026-06-30

How to read this: The portfolio is included once in the operating reconciliation. Brooklyn accounts for the Victorian 130 MW; other named-site allocations remain incomplete. Primary ICT excludes the redundancy and losses in CDC’s earlier built-capacity measure. It is available capacity, not actual consumption.

Inspect the source
  • CDC independent valuation, 30 June 2026 ↗

    Infratil / CDC · checked 2026-09-22 · published 2026-07-06

    PDF page 6 (printed page 5), Leasable Capacity Pipeline by Region, definition, operating rows and rounding footnote; page 5 (printed page 4), quarterly operating additions

Link to this evidence ↗
Explore demand, compute types and commitments →

Evidence trail

  1. CDC Laverton LV2: directory profile and specifications ↗

    Data Center Map · checked 2026-09-11

    Public listing 18990; location, overview, specs tabs. Address/location header and labelled technical specification rows.

  2. Melbourne | CDC Data Centres ↗

    CDC Data Centres · checked 2026-11-03

    Section 'At a glance'; Section 'At a glance' and 'Laverton Campus'

  3. Infratil Investor Day 2026 – CDC Update (16 September 2026) ↗

    Infratil Limited · checked 2026-11-03 · published 2026-09-16

    Slide 'Operating capacity has more than doubled over the last 18 months'; Slide 'Construction is progressing to meet FY27-29 deliveries'

  4. Natural Earth populated places, 1:10m ↗

    Natural Earth · checked 2026-09-10

    Australia and New Zealand populated-place features