Microsoft · Australia
Microsoft SYD05
Report an error or share evidence ↗
Also recorded as: Kemps Creek Building One · SSD-10101987 Stage 1
Sydney, NSW · facility
- Facility type
- hyperscale
- Location evidence
- Corroborated site location
- Research status
- Profile reviewed · 75% core-field coverage
Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.
Evidence by field
Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.
- Address Source checked
- Penrith City Council's voluntary planning agreement applies to 769 Mamre Road, Kemps Creek (Lot 2 DP 1271142); the July 2025 DPHI approval letter and the SYD05 operational noise report use the same site. Earlier planning documents cite pre-subdivision parent parcels.Checked 2026-11-03 · Penrith City Council (Your Say Penrith) ↗ · NSW Department of Planning, Housing and Infrastructure (NSW Planning Portal, Major Projects) ↗ · Microsoft Local (document hosted by Microsoft) ↗
- Coordinates Source checked
- Building tagged 'Microsoft SYD05 Data Centre' within The Yards estate, Kemps Creek, matches the planning site. Numbered address or named building matched through OpenStreetMap; not a surveyed boundary or guaranteed entrance. Data © OpenStreetMap contributors (ODbL 1.0).Checked 2026-11-03 · Penrith City Council (Your Say Penrith) ↗ · NSW Department of Planning, Housing and Infrastructure (NSW Planning Portal, Major Projects) ↗ · Microsoft Local (document hosted by Microsoft) ↗ · OpenStreetMap contributors ↗
- Status Source checked
- Handed over to operations per Microsoft, May 2026.Checked 2026-11-03 · Microsoft Local (Microsoft in Your Community) ↗
769 Mamre Road, Kemps Creek, NSW, 2178
Checked 2026-11-03 · Site coordinates verified
Building tagged 'Microsoft SYD05 Data Centre' within The Yards estate, Kemps Creek, matches the planning site. Numbered address or named building matched through OpenStreetMap; not a surveyed boundary or guaranteed entrance. Data © OpenStreetMap contributors (ODbL 1.0).
Open this address in maps ↗Capacity & development
Power basis not established · Source as of 2026-05-14
Microsoft's May 2026 update states Building One (SYD05) has been completed and handed over to operations, supported by the December 2025 operational noise verification report. Capacity is not disclosed.
Government certification
Certification not verified
No verified certification scope has been assigned to this record. Unknown does not mean uncertified.
What certification covers →Scope and context
- The directory links this entry to Microsoft Kemps Creek Campus. It shares a grouped site boundary with its reported parent; a hosted provider or child building is not counted as another independent site.
- First listed from a public Data Center Map listing; identity, address and lifecycle have since been checked against the operator, planning and news sources cited on this record.
Compute, workloads & commercial commitments
Site-specific workloads, GPU inventory and customer contracts are not established by the cited evidence. Electrical capacity and AI-ready specifications alone do not establish these details.
Explore demand, compute types and commitments →Evidence trail
- Microsoft SYD05: directory profile and specifications ↗
Data Center Map · checked 2026-09-11
Public listing 19029; location, overview, specs tabs. Address/location header and labelled technical specification rows.
- Voluntary Planning Agreement - Microsoft Datacenter ↗
Penrith City Council (Your Say Penrith) · checked 2026-11-03 · published 2023-06-07
First and third paragraphs of the notice; First paragraph of the notice
- Approval of Operational Environmental Management Plan (SYD05 & SYD06), Kemps Creek Data Centre (SSD-10101987-PA-29) ↗
NSW Department of Planning, Housing and Infrastructure (NSW Planning Portal, Major Projects) · checked 2026-11-03 · published 2025-07-08
Letter dated 8 July 2025 to Microsoft Datacentre (Australia) Pty Ltd, subject line and first paragraph; list of approved plans; Letter dated 8 July 2025, first paragraph and list of approved plans; Letter dated 8 July 2025, paragraph beginning 'As a specific OEMP'
- Microsoft SYD05 Data Centre - Operational Noise Verification Report (Pulse White Noise Acoustics, report 250792 R0) ↗
Microsoft Local (document hosted by Microsoft) · checked 2026-11-03 · published 2025-12-17
Section 1 'Introduction', first and second paragraphs
- Microsoft SYD05: OpenStreetMap way 1298277645 ↗
OpenStreetMap contributors · checked 2026-11-03
Nominatim search result; way 1298277645; latitude -33.8360973, longitude 150.7729467. Checked 3 November 2026.
- Kemps Creek datacenter project overview ↗
Microsoft Local (Microsoft in Your Community) · checked 2026-11-03 · published 2023-07-15
Section 'May 2026 / Building One' (and lead paragraph); Sections 'May 2026 / Building Two' and 'March 2024 / Preparations begin for second building'