Goodman · Australia
Goodman Project Apollo, Macquarie Park
Report an error or share evidence ↗
Also recorded as: Goodman Macquarie Park · Project Apollo · SSD-74069708
Sydney, NSW · facility
- Facility type
- colocation
- Location evidence
- Approximate city location
- Research status
- Profile reviewed · 75% core-field coverage
Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.
Evidence by field
Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.
- Identity Source checked
- Named Project Apollo consent matches the 4–10 Talavera Road directory site.Checked 2026-09-22 · NSW Department of Planning, Housing and Infrastructure ↗
- Address Source checked
- Consent identifies 4–10 Talavera Road. Precise coordinates remain unverified.Checked 2026-09-22 · NSW Department of Planning, Housing and Infrastructure ↗
- Capacity Source checked
- 135 MW is maximum total facility consumption, outside comparable IT subtotals.Checked 2026-09-22 · NSW Department of Planning, Housing and Infrastructure ↗
4–10 Talavera Road, Macquarie Park, New South Wales
Checked 2026-09-22 · Map coordinates still to be verified
Open this address in maps ↗Capacity & development
Facility power · Source as of 2026-09-02
Approved maximum facility power consumption. Server IT allocation, construction commencement and commissioning dates are unverified.
Proposed or approved design capacity. Included in the planning inventory, not a dated delivery forecast or a claim of committed supply.
Excluded from capacity totals: scope or power basis is not comparable.
Government certification
Certification not verified
No verified certification scope has been assigned to this record. Unknown does not mean uncertified.
What certification covers →Scope and context
- Added from a public Data Center Map listing. Identity and location remain directory-reported until corroborated against operator or planning evidence.
- Project Apollo was approved on 2 September 2026. The 135 MW consent is total facility power, with no separate IT allocation accepted.
Compute, workloads & commercial commitments
Goodman Macquarie Park: disclosed development boundary
Approved Apollo total power consumption across eight halls at 4–10 Talavera Road. It is not an explicit IT-load observation.
- Disclosed campus specification
- 135 MW (facility-power) Project design; planned
- Evidence scope
- Named facility · Goodman
- Evidence as-of date
- Applicable date not stated
How to read this: This observation has its own electrical and physical boundary. It is not an additional contribution to the comparable IT subtotal, a GPU count or a delivery forecast. Approved Apollo total power consumption across eight halls at 4–10 Talavera Road. It is not an explicit IT-load observation.
Inspect the source
- Project Apollo Data Centre: Department assessment report, September 2026 ↗
NSW Department of Planning, Housing and Infrastructure · checked 2026-09-22 · published 2026-09
Executive summary and Table 2 project details
Evidence trail
- Goodman Macquarie Park: directory profile and specifications ↗
Data Center Map · checked 2026-09-11
Public listing 19094; location, overview, specs tabs. Address/location header and labelled technical specification rows.
- Natural Earth populated places, 1:10m ↗
Natural Earth · checked 2026-09-10
Australia and New Zealand populated-place features
- Goodman Project Apollo signed consent ↗
NSW Department of Planning, Housing and Infrastructure · checked 2026-09-22 · published 2026-09-02
Signed consent; Schedule 1, site and development
- Project Apollo Data Centre: Department assessment report, September 2026 ↗
NSW Department of Planning, Housing and Infrastructure · checked 2026-09-22 · published 2026-09
Executive summary and Table 2 project details