DigiCo ADL2 Adelaide: facility evidence profile

DigiCo · Australia

DigiCo ADL2 Adelaide

Report an error or share evidence ↗

Adelaide, South Australia · facility

Operating / built
Facility type
colocation
Location evidence
Approximate city location
Research status
Source-listed profile · 63% core-field coverage

Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.

Evidence by field

Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.

Identity Source checked
Named operator facility page reviewed; corporate footer office address is not used as a facility location.Checked 2026-09-11 · DigiCo Infrastructure REIT ↗
Capacity Source checked
0.6 MW is explicitly labelled installed IT capacity. Effective installation date is unstated.Checked 2026-09-11 · DigiCo Infrastructure REIT ↗
Status Source checked
Existing facility described with installed IT capacity; no inference from a forecast opening date.Checked 2026-09-11 · DigiCo Infrastructure REIT ↗
Hardware Not found in checked sources
No installed GPU model or quantity disclosed in the reviewed facility page.Checked 2026-09-11 · DigiCo Infrastructure REIT ↗
Contracts Not found in checked sources
No quantified customer IT-capacity commitment is disclosed in this facility profile. Customer-sector descriptions and property ownership are not GPU/MW offtake.Checked 2026-09-11 · DigiCo Infrastructure REIT ↗

Capacity & development

Operating / built0.6 MW

Power for servers, GPUs, storage & networking (IT power)

Installed IT capacity explicitly reported on the current operator page. Its effective date is unstated; this is not a historical commissioning observation.

Government certification

Certification not verified

No verified certification scope has been assigned to this record. Unknown does not mean uncertified.

What certification covers →

Scope and context

  • Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.

Compute, workloads & commercial commitments

Site-specific workloads, GPU inventory and customer contracts are not established by the cited evidence. Electrical capacity and AI-ready specifications alone do not establish these details.

Explore demand, compute types and commitments →

Evidence trail

  1. DigiCo ADL2 facility ↗

    DigiCo Infrastructure REIT · checked 2026-09-11

    Facility description beneath city heading

  2. Adelaide ADL2 - DigiCo Infrastructure REIT ↗

    DigiCo Infrastructure REIT · checked 2026-09-11

    Facility description and Installed IT capacity heading; BNE3 greenfield development paragraph

  3. DigiCo Adelaide ADL2: directory profile and specifications ↗

    Data Center Map · checked 2026-09-11

    Public listing 6039; overview, specs tabs. Address/location header and labelled technical specification rows.

  4. Natural Earth populated places, 1:10m ↗

    Natural Earth · checked 2026-09-10

    Australia and New Zealand populated-place features