Firmus · Australia
Firmus Bell Bay AI Factory
Report an error or share evidence ↗
Bell Bay, TAS · campus
- Facility type
- hyperscale
- Location evidence
- Approximate city location
- Research status
- Profile reviewed · 50% core-field coverage
Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.
Evidence by field
Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.
- Hardware Not found in checked sources
- No installed site-specific model/quantity verified. GB300 Tasmania programme and Melbourne contracts cannot be allocated by inference.Checked 2026-09-11 · Firmus ↗ · Firmus ↗
- Contracts Not found in checked sources
- No public compute customer contract tied to this exact physical site found in the reviewed sources. Gunvor is an energy agreement and OpenAI is Malaysia-only.Checked 2026-09-11 · Firmus ↗ · Firmus ↗ · Firmus ↗
- Capacity Source checked
- Not an IT figure. Site approval claim from secondary reporting still needs current council verification.Checked 2026-09-22 · Firmus ↗
Lot 1 East Tamar Highway, Long Reach, TAS
Checked 2026-09-11 · Map coordinates still to be verified
Approximate Bell Bay locality point only. The exact facility coordinates remain unresolved; this point must not be used for facility navigation. Data © OpenStreetMap contributors (ODbL 1.0).
Open this address in maps ↗Capacity & development
Power basis not established
Proposed campus on former Gunns Pulp Mill land; two halls counted once. 288 MW grid demand excluded from IT subtotals.
Government certification
Certification not verified
No verified certification scope has been assigned to this record. Unknown does not mean uncertified.
What certification covers →Scope and context
- Proposed campus on former Gunns Pulp Mill land; two halls counted once. 288 MW grid demand excluded from IT subtotals.
- Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.
Compute, workloads & commercial commitments
Bell Bay is designed for frontier-model training
The proposed Bell Bay project describes training and running frontier models, approximately 288 MW maximum grid demand and a direct-to-chip cooling architecture supporting NVIDIA GB300 and Vera Rubin.
- Maximum grid demand
- ≈ 288 MW Undated specification; checked 11 September 2026
- Evidence scope
- Named facility · Firmus
- Evidence as-of date
- Applicable date not stated
- Workloads described
- Model training
- Hardware disclosed
- NVIDIA GB300 (quantity not disclosed); NVIDIA Vera Rubin (quantity not disclosed)
How to read this: Hardware models are design compatibility, not an order, delivery or installation. No IT-load conversion or GPU quantity is supported.
Inspect the source
- Firmus Bell Bay industrial precinct project FAQ ↗
Firmus · checked 2026-09-11
What is the project; Will it use a lot of energy; How does the cooling system work
Firmus Bell Bay AI Factory: disclosed development boundary
Not an IT figure. Site approval claim from secondary reporting still needs current council verification.
- Electricity connection capacity
- ≈ 288 MW (grid-demand) Whole Bell Bay/George Town site; proposed envelope
- Evidence scope
- Named facility · Firmus
- Evidence as-of date
- Applicable date not stated
How to read this: This observation has its own electrical and physical boundary. It is not an additional contribution to the comparable IT subtotal, a GPU count or a delivery forecast. Not an IT figure. Site approval claim from secondary reporting still needs current council verification.
Inspect the source
- Bell Bay Industrial Precinct AI Factory Project - Firmus ↗
Firmus · checked 2026-09-22
Will it use a lot of energy; What is the project
Related operator-wide evidence
These disclosures describe the operator’s portfolio. They are not assigned to this facility or included in its power totals.
South Australia energy agreement covers 600 MW of load
Firmus reports a 12-year electricity supply agreement signed in June 2026 for its first South Australian AI factories and names Gunvor Group.
- Electricity agreement load
- 600 MW Evidence as of 2026-06
- Agreement duration
- 12 years Evidence as of 2026-06
- Evidence scope
- Operator portfolio · Firmus
- Evidence as-of date
- 2026-06
- Workloads described
- Not specified in this evidence
How to read this: This is power procurement, not a compute customer/offtake contract. The source does not allocate 600 MW between sites or identify it as IT load. Existing 1000/1300 MW campus IT envelopes remain approval-dependent.
Inspect the source
- Firmus South Australia community hub ↗
Firmus · checked 2026-09-11
Our South Australian Projects; Policy in Action; Project Approvals
Firmus reports an operating Australian AI factory
September 8 statement identifies two operational sites across the portfolio, one in Australia and one in Singapore.
- Operational Australian site stated at country level
- 1 site Evidence as of 2026-09-08
- Evidence scope
- Operator portfolio · Firmus
- Evidence as-of date
- 2026-09-08
- Workloads described
- Not specified in this evidence
How to read this: Australian site is not named in this passage. The disclosure does not prove Launceston, Bell Bay or Wesley Vale has opened; it must not create a second physical record for a hosted CDC deployment.
Inspect the source
- Firmus adds OpenAI as anchor customer and expands into Malaysia ↗
Firmus · checked 2026-09-11 · published 2026-09-08
Sydney /8 September 2026; opening paragraphs; Australian engineering section
Evidence trail
- Firmus Bell Bay AI Factory project ↗
Firmus · checked 2026-09-11
Project FAQ: site, buildings and power
- Firmus Bell Bay industrial precinct project FAQ ↗
Firmus · checked 2026-09-11
What is the project; Will it use a lot of energy; How does the cooling system work
- Firmus signs multi-year agreement with global hyperscale customer ↗
Firmus · checked 2026-09-11 · published 2026-03-02
Opening paragraphs and paragraph before About Firmus
- Firmus adds OpenAI as anchor customer and expands into Malaysia ↗
Firmus · checked 2026-09-11 · published 2026-09-08
Sydney /8 September 2026; opening paragraphs; Australian engineering section
- Bell Bay: approximate locality map reference ↗
OpenStreetMap contributors · checked 2026-09-11
relation 10579569; named locality Bell Bay, Tasmania; representative point -41.1314240, 146.8657946.
- Firmus George Town Campus: directory profile and specifications ↗
Data Center Map · checked 2026-09-11
Public listing 18086; location, overview, specs tabs. Address/location header and labelled technical specification rows.
- Bell Bay Industrial Precinct AI Factory Project - Firmus ↗
Firmus · checked 2026-09-22
Will it use a lot of energy; What is the project