Project Atlas Data Centre Eastern Creek: facility evidence profile

Goodman · Australia

Project Atlas Data Centre Eastern Creek

Report an error or share evidence ↗

Sydney, NSW · campus

Planned
Facility type
Not verified
Location evidence
Corroborated site location
Research status
Profile reviewed · 50% core-field coverage

Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.

Evidence by field

Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.

Identity Source checked
Application names Goodman as company proponent.Checked 2026-09-11 · Goodman Property Services (Aust) Pty Limited, lodged on NSW Planning Portal ↗
Address Source checked
Project and application both identify 10 Roberts Road, Eastern Creek.Checked 2026-09-11 · NSW Department of Planning, Housing and Infrastructure ↗ · Goodman Property Services (Aust) Pty Limited, lodged on NSW Planning Portal ↗
Coordinates Source checked
Application Site Co-ordinates fields disclose -33.81738,150.837.Checked 2026-09-11 · Goodman Property Services (Aust) Pty Limited, lodged on NSW Planning Portal ↗
Capacity Not found in checked sources
500 MVA is evidenced, but an IT MW figure is not.Checked 2026-09-11 · NSW Department of Planning, Housing and Infrastructure ↗ · Goodman Property Services (Aust) Pty Limited, lodged on NSW Planning Portal ↗
Status Source checked
Response to Submissions is a planning stage, not evidence of consent or construction.Checked 2026-09-11 · NSW Department of Planning, Housing and Infrastructure ↗
Published street address

10 Roberts Road, Eastern Creek, NSW

Checked 2026-09-11 · Site coordinates verified

The official project page supplies the street address; the submitted application supplies the separate Site Co-ordinates fields. This is the application site-reference point, not a surveyed building entrance.

Open this address in maps ↗

Capacity & development

PlannedNot disclosed

Power basis not established

500 MVA project undergoing assessment, with the portal at Response to Submissions. IT MW and an accepted delivery date remain undisclosed.

Government certification

Certification not verified

No verified certification scope has been assigned to this record. Unknown does not mean uncertified.

What certification covers →

Scope and context

  • Goodman Property Services (Aust) Pty Limited is the disclosed proponent. Two proposed buildings form one campus at 10 Roberts Road, not two additional physical sites.
  • 500 MVA denotes apparent electrical power. No conversion to MW or IT capacity has been made. No postcode was present in the reviewed site-address fields.
  • Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.

Compute, workloads & commercial commitments

Facility specificationAustraliaAnnouncement

Project Atlas discloses 500 MVA, not IT MW

Goodman proposes a two-building data centre campus at 10 Roberts Road, Eastern Creek. The official application and planning summary specify apparent electrical power of 500 MVA.

Proposed campus apparent power
500 MVA
planning application
Proposed data centre buildings
2 buildings
planning application
Evidence scope
Named facility · Goodman
Evidence as-of date
Applicable date not stated

How to read this: No power-factor conversion or IT load is evidenced. This metric is excluded from the MW IT subtotal; assessment is ongoing.

Inspect 2 sources
Link to this evidence ↗
Facility specificationAustraliaReported observation

Project Atlas Data Centre Eastern Creek: disclosed development boundary

Grid connection apparent-power envelope, not IT MW.

Apparent electrical power
500 MVA
Project design; planned
Evidence scope
Named facility · Goodman
Evidence as-of date
Applicable date not stated

How to read this: This observation has its own electrical and physical boundary. It is not an additional contribution to the comparable IT subtotal, a GPU count or a delivery forecast. Grid connection apparent-power envelope, not IT MW.

Inspect the source
Link to this evidence ↗
Explore demand, compute types and commitments →

Evidence trail

  1. Project Atlas Data Centre Eastern Creek, SSD-101067971 ↗

    NSW Department of Planning, Housing and Infrastructure · checked 2026-09-11

    Project header, current status and official development description before Attachments & Resources; exclude public submissions

  2. Project Atlas pre-development application, PDA-100725457 ↗

    Goodman Property Services (Aust) Pty Limited, lodged on NSW Planning Portal · checked 2026-09-11

    Company Info; Description of Development/Infrastructure; Site Details and Site Co-ordinates

  3. Project Atlas: directory profile and specifications ↗

    Data Center Map · checked 2026-09-11

    Public listing 16486; overview, specs tabs. Address/location header and labelled technical specification rows.

  4. Project Atlas Data Centre Eastern Creek | Planning Portal - Department of Planning and Environment ↗

    NSW Planning Portal · checked 2026-09-22

    Project description