IREN · Australia
IREN Bundey campus
Report an error or share evidence ↗
Bundey, SA · campus
- Facility type
- hyperscale
- Location evidence
- Approximate city location
- Research status
- Profile reviewed · 75% core-field coverage
Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.
Evidence by field
Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.
- Status Source checked
- The federal portal records a referral decision; its notice and outcome were not accessible in this check. No state development consent, data-hall construction or operating IT capacity was verified.Checked 2026-09-23 · Australian Government EPBC Act Public Portal ↗
- Capacity Source checked
- The referral explicitly specifies up to 600 MW IT across three proposed halls, distinct from its 800 MW electricity connection. Neither is commissioned capacity.Checked 2026-09-23 · Australian Government EPBC Act Public Portal ↗ · TAS 1 Holdings / Australian Government EPBC Act Public Portal ↗
- Hardware Not found in checked sources
- No Bundey GPU model or count; group/Childress hardware is outside this site.Checked 2026-09-11 · IREN ↗ · IREN ↗ · IREN ↗
- Workloads Not found in checked sources
- General AI purpose is explicit; site-specific training/inference deployment split is not.Checked 2026-09-11 · IREN ↗ · IREN ↗
- Contracts Not found in checked sources
- No exact Bundey compute tenant/offtake identified. Microsoft deployment is Texas.Checked 2026-09-11 · IREN ↗ · IREN ↗ · IREN ↗
- Address Source checked
- The applicant's federal referral identifies Lot 69 Bundey Church Road; precise campus map coordinates remain separately unconfirmed.Checked 2026-09-23 · TAS 1 Holdings / Australian Government EPBC Act Public Portal ↗
Lot 69 Bundey Church Road, Bundey, SA
Checked 2026-09-23 · Map coordinates still to be verified
Approximate Bundey locality point only. The exact facility coordinates remain unresolved; this point must not be used for facility navigation. Data © OpenStreetMap contributors (ODbL 1.0).
Open this address in maps ↗Capacity & development
Power basis not established · Source as of 2026-06-03
Up to 800 MW of transmission-connected project power. This is an upstream electricity boundary, not IT load; the separate proposed IT design is up to 600 MW. Energisation from 2028 is a connection target, not delivery of the full campus.
Excluded from capacity totals: scope or power basis is not comparable.
Power for servers, GPUs, storage & networking (IT power) · Source as of 2026-07-31
Federal referral proposes three halls, each up to 200 MW IT. The 600 MW sum is an ultimate design ceiling; the reviewed records do not establish state development consent, construction or operating supply. It replaces no component already counted at this physical site.
Proposed or approved design capacity. Included in the planning inventory, not a dated delivery forecast or a claim of committed supply.
Government certification
Certification not verified
No verified certification scope has been assigned to this record. Unknown does not mean uncertified.
What certification covers →Scope and context
- 800 MW headline is not treated as IT load; no construction commencement is stated.
- Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.
- The federal referral defines a 600 MW IT design ceiling within an 800 MW electricity project. A referral decision is recorded, but no hall has been verified as operating.
Compute, workloads & commercial commitments
Bundey remains an Australian development project
IREN's 800 MW transmission connection supports a proposed campus whose later federal referral specifies up to 600 MW IT across three halls. Neither figure describes a commissioned Australian GPU deployment.
- Transmission support ceiling
- ≤ 800 MW Evidence as of 2026-08-27
- Evidence scope
- Named facility · IREN
- Evidence as-of date
- 2026-08-27
How to read this: The 800 MW connection is not IT load. The 600 MW IT value is a proposed design limit in a referral, not a consent, construction start or delivery schedule. IREN's overseas compute contracts do not establish a Bundey offtake.
Inspect 3 sources
- IREN announces first Australian campus ↗
IREN · checked 2026-09-11 · published 2026-06-03
Highlights and transmission connection agreement paragraphs
- IREN FY26 results and business update ↗
IREN · checked 2026-09-11 · published 2026-08-27
PDF pp 1-2: Horizon 1 delivered to Microsoft; Executing global expansion
- Bundey Data Centre Campus, EPBC referral 2026/10605 ↗
Australian Government EPBC Act Public Portal · checked 2026-09-23
Project description, Key Project Elements: three halls each up to 200 MW IT; referral project number 2026/10605 and status. Attachment 00-2026-10605 Referral.pdf, sections 1.2 and 2.2, dated 31 July 2026, identifies Lot 69 Bundey Church Road.
IREN Bundey campus: disclosed development boundary
An 800 MW electricity connection supports a proposed 600 MW IT campus design across three halls. Energisation from 2028 is a connection target, not delivery of the whole campus.
- Electricity connection capacity
- ≤ 800 MW (grid-connection) Whole campus connection; proposed envelope
- Evidence scope
- Named facility · IREN
- Evidence as-of date
- Applicable date not stated
How to read this: The 800 MW connection and 600 MW proposed IT design have distinct electrical boundaries and are not additive. A federal referral decision is recorded; state development consent and operating halls are not established by the reviewed records. No completion year for the full design is established.
Inspect 2 sources
- IREN Announces First Australian Data Center Campus - 800MW in South Australia | IREN ↗
IREN · checked 2026-09-22 · published 2026-06-03
Highlights and paragraph starting The transmission connection agreement
- Bundey Data Centre Campus, EPBC referral 2026/10605 ↗
Australian Government EPBC Act Public Portal · checked 2026-09-23
Project description, Key Project Elements: three halls each up to 200 MW IT; referral project number 2026/10605 and status. Attachment 00-2026-10605 Referral.pdf, sections 1.2 and 2.2, dated 31 July 2026, identifies Lot 69 Bundey Church Road.
Bundey: 600 MW proposed IT design within an 800 MW electricity project
The federal referral specifies three proposed data halls of up to 200 MW IT each at Bundey, South Australia.
- Proposed IT design ceiling
- ≤ 600 MW IT Referral dated 31 July 2026
- Electricity project ceiling
- ≤ 800 MW grid/project power Campus proposal
- Evidence scope
- Named facility · IREN
- Evidence as-of date
- 2026-07-31
How to read this: The IT and grid figures are different boundaries and are not additive. The IT figure is an upper design limit in a referral; the reviewed records do not establish state development consent, construction or operating capacity. No site-specific GPU deployment or tenant contract is established by the referral.
Inspect 2 sources
- Bundey Data Centre Campus, EPBC referral 2026/10605 ↗
Australian Government EPBC Act Public Portal · checked 2026-09-23
Project description, Key Project Elements: three halls each up to 200 MW IT; referral project number 2026/10605 and status. Attachment 00-2026-10605 Referral.pdf, sections 1.2 and 2.2, dated 31 July 2026, identifies Lot 69 Bundey Church Road.
- Bundey Data Centre Campus referral attachment ↗
TAS 1 Holdings / Australian Government EPBC Act Public Portal · checked 2026-09-23 · published 2026-07-31
Referral PDF, sections 1.2 and 2.2: applicant ownership by IREN; Lot 69 Bundey Church Road; three proposed halls, each up to 200 MW IT.
Evidence trail
- IREN announces first Australian campus at Bundey ↗
IREN · checked 2026-09-11 · published 2026-06-03
Highlights and introductory paragraph
- IREN announces first Australian campus ↗
IREN · checked 2026-09-11 · published 2026-06-03
Highlights and transmission connection agreement paragraphs
- IREN Bundey campus ↗
IREN · checked 2026-09-11
Capacity tiles and Bundey SA introduction
- IREN FY26 results and business update ↗
IREN · checked 2026-09-11 · published 2026-08-27
PDF pp 1-2: Horizon 1 delivered to Microsoft; Executing global expansion
- IREN Microsoft AI cloud infrastructure agreement ↗
IREN · checked 2026-09-11 · published 2025-11-03
Under the agreement paragraph
- Bundey: approximate locality map reference ↗
OpenStreetMap contributors · checked 2026-09-11
relation 6498090; named locality Bundey, South Australia; representative point -33.8871756, 139.2710946.
- IREN Bundey: directory profile and specifications ↗
Data Center Map · checked 2026-09-11
Public listing 17877; location, overview, specs tabs. Address/location header and labelled technical specification rows.
- IREN Announces First Australian Data Center Campus - 800MW in South Australia | IREN ↗
IREN · checked 2026-09-22 · published 2026-06-03
Highlights and paragraph starting The transmission connection agreement
- Bundey Data Center ↗
IREN · checked 2026-09-22
Bundey: 800 MW Planned 2028 tiles and campus description
- Bundey Data Centre Campus, EPBC referral 2026/10605 ↗
Australian Government EPBC Act Public Portal · checked 2026-09-23
Project description, Key Project Elements: three halls each up to 200 MW IT; referral project number 2026/10605 and status. Attachment 00-2026-10605 Referral.pdf, sections 1.2 and 2.2, dated 31 July 2026, identifies Lot 69 Bundey Church Road.
- Bundey Data Centre Campus referral attachment ↗
TAS 1 Holdings / Australian Government EPBC Act Public Portal · checked 2026-09-23 · published 2026-07-31
Referral PDF, sections 1.2 and 2.2: applicant ownership by IREN; Lot 69 Bundey Church Road; three proposed halls, each up to 200 MW IT.