Keppel Morwell AI Data Centre Campus: facility evidence profile

Keppel Data Centres · Australia

Keppel Morwell AI Data Centre Campus

Report an error or share evidence ↗

Morwell, VIC · campus

Planned
Facility type
hyperscale
Location evidence
Approximate city location
Research status
Profile reviewed · 75% core-field coverage

Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.

Evidence by field

Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.

Identity Source checked
Keppel discloses rights to lease the Morwell-area campus site.Checked 2026-09-11 · Keppel Ltd ↗
Coordinates Not found in checked sources
A precise campus coordinate was not established in the primary sources reviewed. No city or estate centroid is presented as an exact site pin.Checked 2026-09-11 · Keppel Ltd ↗
Capacity Source checked
The disclosed maximum is explicitly gross power, not IT load.Checked 2026-09-11 · Keppel Ltd ↗
Status Source checked
Agreement for Lease and pre-development are evidenced, not an operating or under-construction campus.Checked 2026-09-11 · Keppel Ltd ↗
Contracts Not found in checked sources
Release reports active customer discussions, without a signed offtake or tenancy commitment.Checked 2026-09-11 · Keppel Ltd ↗

Capacity & development

Planned≤ 720 MW

Facility power · Source as of 2026-01-15

Up to 720 MW gross power in phases under an Agreement for Lease. Pre-development includes securing planning approvals and power/water contracts; no IT MW or delivery date is disclosed.

Excluded from capacity totals: scope or power basis is not comparable.

Government certification

Certification not verified

No verified certification scope has been assigned to this record. Unknown does not mean uncertified.

What certification covers →

Scope and context

  • The 720 MW gross powerbank is a phased maximum and is excluded from accepted IT capacity. Hyperscaler and neocloud discussions do not establish signed customer contracts.
  • Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.
  • Directory reconciliation: The public publisher withholds exact location. This match uses named identity only and does not use hidden embedded coordinates or addresses.
  • The development is near Morwell. The 123 ha land parcel is controlled through rights to lease from Lightwood Group; no verified street address or site pin is available.

Compute, workloads & commercial commitments

Facility specificationAustraliaAnnouncement

Keppel secures an option to develop a large gross-power campus

Keppel secured rights to lease a 123 ha Morwell-area parcel with up to 720 MW gross power in phases. Its Agreement for Lease supports pre-development while approvals and utility contracts are pursued.

Gross campus powerbank
≤ 720 MW gross power
phased future development
Contiguous parcel under rights to lease
123 ha
January 2026 agreement
Evidence scope
Named facility · Keppel Data Centres
Evidence as-of date
2026-01-15

How to read this: Gross power is not IT capacity or installed capacity. Customer discussions are not signed offtake, and no opening date or street address is disclosed.

Inspect the source
Link to this evidence ↗
Facility specificationAustraliaReported observation

Keppel Morwell AI Data Centre Campus: disclosed development boundary

Already recorded in Atlas. The ultimate campus ceiling is not additive to component phases.

Gross facility power
≤ 720 MW gross power
ultimate-campus; planned
Evidence scope
Named facility · Keppel Data Centres
Evidence as-of date
Applicable date not stated

How to read this: This observation has its own electrical and physical boundary. It is not an additional contribution to the comparable IT subtotal, a GPU count or a delivery forecast. Already recorded in Atlas. The ultimate campus ceiling is not additive to component phases.

Inspect the source
Link to this evidence ↗
Explore demand, compute types and commitments →

Evidence trail

  1. Keppel secures 720MW powerbank for AI data centre campus near Melbourne ↗

    Keppel Ltd · checked 2026-09-11 · published 2026-01-15

    Opening three paragraphs; Agreement for Lease description; CEO quotation on hyperscaler and neocloud discussions

  2. Keppel DC Morwell: directory profile and specifications ↗

    Data Center Map · checked 2026-09-11

    Public listing 16449; overview, specs tabs. Address/location header and labelled technical specification rows.

  3. OpenStreetMap place features for towns outside the Natural Earth set ↗

    OpenStreetMap contributors · checked 2026-11-03

    Nominatim settlement results for Moss Vale, Morwell, Warragul, Arrowsmith, Kogan, Stratford (Taranaki) and Flying Fish Cove (Christmas Island), checked 3 November 2026.