Skip to content
← Back to the atlas

Leading Edge Wagga Wagga: facility evidence profile

Leading Edge Data Centres · Australia

Leading Edge Wagga Wagga

Report an error or share evidence ↗

Also recorded as: WGA1 Wagga Wagga

Wagga Wagga, New South Wales · facility

Operating / built
Facility type
edge
Location evidence
Approximate city location
Research status
Source-listed profile · 50% core-field coverage

Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.

Evidence by field

Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.

Identity Source checked
The operator technical profile identifies WGA1 in Wagga Wagga.Checked 2026-09-11 · Leading Edge Data Centres ↗
Address Not found in checked sources
No public street address is given in the reviewed location profile. The downloadable information flow is gated; no form was submitted.Checked 2026-09-11 · Leading Edge Data Centres ↗
Capacity Source checked
The page labels 300 kW as total site capacity and separately specifies 150 kW IT load per module. Installed module count and commissioned IT load are not given; no module count is inferred by division.Checked 2026-09-11 · Leading Edge Data Centres ↗
Status Source checked
NSW Government names Wagga Wagga among the six regional data centres in the operating network; no site opening date is supplied.Checked 2026-09-23 · Invest Regional NSW, NSW Government ↗
Hardware Not found in checked sources
The reviewed location specification does not publish a deployed GPU model or count. Modular IT capacity is not a hardware inventory.Checked 2026-09-11 · Leading Edge Data Centres ↗

Capacity & development

Operating / builtNot disclosed

Power basis not established

NSW Government lists Wagga Wagga in the six-site operating regional network. Current installed module count and commissioned IT MW are undisclosed.

Government certification

Certification not verified

No verified certification scope has been assigned to this record. Unknown does not mean uncertified.

What certification covers →

Scope and context

  • Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.

Compute, workloads & commercial commitments

Facility specificationAustraliaAdvertised capability

WGA1 Wagga Wagga modular capacity specification

Leading Edge advertises 300 kW total site capacity and 150 kW IT load per module for WGA1.

Total site capacity, basis not specified
300 kW
Undated current specification, retrieved 11 September 2026
IT load capacity per module
150 kW IT per module
Undated current specification, retrieved 11 September 2026
Evidence scope
Named facility · Leading Edge Data Centres
Evidence as-of date
Applicable date not stated

How to read this: The site total is not explicitly labelled commissioned IT load. Installed module count is unknown. Do not multiply module capacity by an inferred count, add the module and site figures, or infer current operation from the technical specification.

Inspect the source
Link to this evidence ↗
Explore demand, compute types and commitments →

Evidence trail

  1. Leading Edge Wagga Wagga facility ↗

    Leading Edge Data Centres · checked 2026-09-11

    Facility overview and capabilities

  2. Leading Edge WGA1 Wagga Wagga technical profile ↗

    Leading Edge Data Centres · checked 2026-09-11

    WGA1; Total Site Capacity; Technical Specifications

  3. Leading Edge opens Dubbo data centre ↗

    Leading Edge Data Centres · checked 2026-09-11 · published 2021-12-13

    Opening announcement; ribbon-cutting paragraph

  4. Leading Edge DC Wagga Wagga: directory profile and specifications ↗

    Data Center Map · checked 2026-09-11

    Public listing 12160; location, overview, specs tabs. Address/location header and labelled technical specification rows.

  5. Leading Edge Data Centres regional NSW network ↗

    Invest Regional NSW, NSW Government · checked 2026-09-23

    Opening paragraphs naming six interconnected Tier III data centres, including Coffs Harbour and Wagga Wagga.

  6. Natural Earth populated places, 1:10m ↗

    Natural Earth · checked 2026-09-10

    Australia and New Zealand populated-place features