Skip to content
← Back to the atlas

Macquarie IC3 Super West: facility evidence profile

Macquarie Data Centres · Australia

Macquarie IC3 Super West

Report an error or share evidence ↗

Sydney, NSW · facility

Under constructionPlanned
Facility type
hyperscale
Location evidence
Approximate city location
Research status
Profile reviewed · 75% core-field coverage

Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.

Evidence by field

Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.

Hardware Not found in checked sources
No installed accelerator model/quantity attributable to this individual facility in this bounded source set.Checked 2026-09-11 · Macquarie Data Centres ↗ · Macquarie Data Centres ↗ · Macquarie Technology Group ↗
Contracts Not found in checked sources
Portfolio customers are not mapped to named buildings. Dell/NVIDIA is a supplier collaboration, not a named tenant contract.Checked 2026-09-11 · Macquarie Technology Group ↗ · Macquarie Data Centres ↗
Capacity Source checked
47 MW IT end-state reconciles as 6 MW initial fit-out plus 13 MW next phase plus 28 MW remaining design. These phases replace, rather than add to, the 47 MW campus headline.Checked 2026-09-22 · Macquarie Technology Group ↗ · Macquarie Data Centres ↗

Capacity & development

Under construction6 MW

Power for servers, GPUs, storage & networking (IT power) · 2026 target

First 6 MW mechanical/electrical fit-out had commenced by 26 February 2026 (slide 8). IT-load basis is explicit in the earlier first-phase investor disclosure. September 2026 remains a target; 47 MW end-state is not an additional delivery.

Planned13 MW

Power for servers, GPUs, storage & networking (IT power) · 2027 target

Additional 13 MW phase expedited, long lead-time equipment secured; June 2027 remains a target, not operating capacity.

Planned28 MW

Power for servers, GPUs, storage & networking (IT power)

Remaining design capacity is 47 minus the non-overlapping first 6 MW and second 13 MW phases; future deployment follows customer demand.

Proposed or approved design capacity. Included in the planning inventory, not a dated delivery forecast or a claim of committed supply.

Government certification

Certification not verified

No verified certification scope has been assigned to this record. Unknown does not mean uncertified.

What certification covers →

Scope and context

  • Map location, when supplied, represents the city rather than a verified facility coordinate.
  • A target in 2026 does not prove opening. The live operator page still describes construction.
  • 47 MW IT end-state reconciles as 6 MW initial fit-out plus 13 MW next phase plus 28 MW remaining design. These phases replace, rather than add to, the 47 MW campus headline.
  • The HCF register names both IC3 and IC3e. The unresolved IC3 entry is not evidence that IC3 Super West is currently certified.

Compute, workloads & commercial commitments

Facility specificationAustraliaReported observation

IC3 Super West first fit-out and ultimate IT envelope differ

The February 2026 investor briefing reports initial 6 MW mechanical/electrical fit-out underway, targeting September 2026. Current facility marketing states 47 MW IT end-state and still describes construction.

Initial fit-out phase
6 MW
Evidence as of 2026-02-26
End-state IT envelope
47 MW
Evidence as of 2026-02-26
Evidence scope
Named facility · Macquarie Data Centres
Evidence as-of date
2026-02-26

How to read this: No opening inferred from current month. Initial 6 MW is part of 47 MW. Keep construction scope limited to verified fit-out, not all 47 MW. Breadcrumb retains 45 MW while main specification says 47 MW; use explicit current specification with caveat.

Inspect 3 sources
Link to this evidence ↗
Workload capabilityAustraliaAdvertised capability

Macquarie markets support for AI training and inference

AI solutions describe high-density air/liquid cooling and support for training and inference. These are colocation capabilities centred on the new IC3 Super West offer.

Evidence scope
Named facility · Macquarie Data Centres
Evidence as-of date
Applicable date not stated
Workloads described
Model training · Inference

How to read this: Capability statement, not observed workload allocation, deployed GPU inventory or confirmation the new facility is open. No model or count is published here.

Inspect the source
Link to this evidence ↗
Workload capabilityAustraliaAnnouncement

Dell AI Factory with NVIDIA collaboration names IC3 Super West

August 2025 announcement says Dell AI Factory with NVIDIA infrastructure and software will be supported by IC3 Super West for private/enterprise AI and neocloud projects.

Evidence scope
Named facility · Macquarie Data Centres
Evidence as-of date
2025-08-08
Workloads described
Model training

How to read this: Supplier collaboration and future-capability claim. No specific GPU model, unit count, live deployment or named end-customer contract disclosed. Do not treat Dell/NVIDIA as a capacity tenant.

Inspect the source
Link to this evidence ↗
Related operator-wide evidence

These disclosures describe the operator’s portfolio. They are not assigned to this facility or included in its power totals.

Facility specificationAustraliaReported observation

21 MW installed disclosure is a portfolio total

August 2026 full-year presentation reaffirms 21 MW installed across Macquarie Park, Canberra and Sydney CBD. It does not itemise fitted-out MW by building.

Portfolio installed capacity
21 MW installed; IT boundary not separately defined
FY26 presentation published 2026-08-26
Evidence scope
Operator portfolio · Macquarie Data Centres
Evidence as-of date
2026-08-26

How to read this: Do not allocate the portfolio figure to individual IC1/IC2/IC3E/IC4/IC5 records. A near match to the 2 + 6 + 12 MW site specifications is not proof of their individual installed allocation. The shared specification table also contains the unbuilt 47 MW SuperWest end-state. This portfolio disclosure is not an extra contribution to site totals.

Inspect 2 sources
Link to this evidence ↗
Explore demand, compute types and commitments →

Evidence trail

  1. Macquarie IC3 Super West ↗

    Macquarie Data Centres · checked 2026-09-10

    Introduction; Australia's first purpose-built AI and cloud data centre

  2. Macquarie FY25 half-year investor presentation ↗

    Macquarie Technology Group · checked 2026-09-10

    Slide 18, Outlook: Data Centres

  3. Macquarie Data Centres campus directory ↗

    Macquarie Data Centres · checked 2026-09-10

    Our Data Centre Locations; Our Colocation Intellicentres table

  4. Macquarie FY26 half-year management briefing ↗

    Macquarie Technology Group · checked 2026-09-10 · published 2026-02-26

    Slides 7, 8 and 19

  5. Macquarie AI data centre solutions ↗

    Macquarie Data Centres · checked 2026-09-11

    Purpose-built AI and cloud data centres; cooling and high-density sections

  6. Macquarie and Dell sovereign AI factories collaboration ↗

    Macquarie Data Centres · checked 2026-09-11 · published 2025-08-08

    Opening collaboration paragraphs; Sovereignty Meets Scalability

  7. Macquarie FY26 half-year management briefing ↗

    Macquarie Technology Group · checked 2026-09-11 · published 2026-02-26

    Slides 7,8 and 19

  8. Macquarie Technology Group FY26 investor presentation ↗

    Macquarie Technology Group · checked 2026-09-22 · published 2026-08

    Macquarie Park Data Centre Campus IC3 SuperWest; Outlook Data Centres

  9. Natural Earth populated places, 1:10m ↗

    Natural Earth · checked 2026-09-10

    Australia and New Zealand populated-place features

  10. Hosting Certification Framework: Certified Service Providers ↗

    Australian Government, Department of Home Affairs · checked 2026-09-22

    Data Centre facilities: Certified Strategic Facility and Certified Strategic Enclave lists; reform notice

  11. IC3 East, Macquarie Park Data Centre Campus ↗

    Macquarie Data Centres · checked 2026-09-22

    Page heading IC3 East; introductory IC3 description; separate IC3 Super West navigation

  12. Macquarie IC3 Super West facility ↗

    Macquarie Data Centres · checked 2026-09-11

    IT Load; first purpose-built AI and cloud section