Macquarie Data Centres · Australia
Macquarie IC3 Super West
Report an error or share evidence ↗
Sydney, NSW · facility
- Facility type
- hyperscale
- Location evidence
- Approximate city location
- Research status
- Profile reviewed · 75% core-field coverage
Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.
Evidence by field
Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.
- Hardware Not found in checked sources
- No installed accelerator model/quantity attributable to this individual facility in this bounded source set.Checked 2026-09-11 · Macquarie Data Centres ↗ · Macquarie Data Centres ↗ · Macquarie Technology Group ↗
- Contracts Not found in checked sources
- Portfolio customers are not mapped to named buildings. Dell/NVIDIA is a supplier collaboration, not a named tenant contract.Checked 2026-09-11 · Macquarie Technology Group ↗ · Macquarie Data Centres ↗
- Capacity Source checked
- 47 MW IT end-state reconciles as 6 MW initial fit-out plus 13 MW next phase plus 28 MW remaining design. These phases replace, rather than add to, the 47 MW campus headline.Checked 2026-09-22 · Macquarie Technology Group ↗ · Macquarie Data Centres ↗
Capacity & development
Power for servers, GPUs, storage & networking (IT power) · 2026 target
First 6 MW mechanical/electrical fit-out had commenced by 26 February 2026 (slide 8). IT-load basis is explicit in the earlier first-phase investor disclosure. September 2026 remains a target; 47 MW end-state is not an additional delivery.
Power for servers, GPUs, storage & networking (IT power) · 2027 target
Additional 13 MW phase expedited, long lead-time equipment secured; June 2027 remains a target, not operating capacity.
Power for servers, GPUs, storage & networking (IT power)
Remaining design capacity is 47 minus the non-overlapping first 6 MW and second 13 MW phases; future deployment follows customer demand.
Proposed or approved design capacity. Included in the planning inventory, not a dated delivery forecast or a claim of committed supply.
Government certification
Certification not verified
No verified certification scope has been assigned to this record. Unknown does not mean uncertified.
What certification covers →Scope and context
- Map location, when supplied, represents the city rather than a verified facility coordinate.
- A target in 2026 does not prove opening. The live operator page still describes construction.
- 47 MW IT end-state reconciles as 6 MW initial fit-out plus 13 MW next phase plus 28 MW remaining design. These phases replace, rather than add to, the 47 MW campus headline.
- The HCF register names both IC3 and IC3e. The unresolved IC3 entry is not evidence that IC3 Super West is currently certified.
Compute, workloads & commercial commitments
IC3 Super West first fit-out and ultimate IT envelope differ
The February 2026 investor briefing reports initial 6 MW mechanical/electrical fit-out underway, targeting September 2026. Current facility marketing states 47 MW IT end-state and still describes construction.
- Initial fit-out phase
- 6 MW Evidence as of 2026-02-26
- End-state IT envelope
- 47 MW Evidence as of 2026-02-26
- Evidence scope
- Named facility · Macquarie Data Centres
- Evidence as-of date
- 2026-02-26
How to read this: No opening inferred from current month. Initial 6 MW is part of 47 MW. Keep construction scope limited to verified fit-out, not all 47 MW. Breadcrumb retains 45 MW while main specification says 47 MW; use explicit current specification with caveat.
Inspect 3 sources
- Macquarie FY26 half-year management briefing ↗
Macquarie Technology Group · checked 2026-09-11 · published 2026-02-26
Slides 7,8 and 19
- Macquarie IC3 Super West facility ↗
Macquarie Data Centres · checked 2026-09-11
IT Load; first purpose-built AI and cloud section
- Macquarie AI data centre solutions ↗
Macquarie Data Centres · checked 2026-09-11
Purpose-built AI and cloud data centres; cooling and high-density sections
Macquarie markets support for AI training and inference
AI solutions describe high-density air/liquid cooling and support for training and inference. These are colocation capabilities centred on the new IC3 Super West offer.
- Evidence scope
- Named facility · Macquarie Data Centres
- Evidence as-of date
- Applicable date not stated
- Workloads described
- Model training · Inference
How to read this: Capability statement, not observed workload allocation, deployed GPU inventory or confirmation the new facility is open. No model or count is published here.
Inspect the source
- Macquarie AI data centre solutions ↗
Macquarie Data Centres · checked 2026-09-11
Purpose-built AI and cloud data centres; cooling and high-density sections
Dell AI Factory with NVIDIA collaboration names IC3 Super West
August 2025 announcement says Dell AI Factory with NVIDIA infrastructure and software will be supported by IC3 Super West for private/enterprise AI and neocloud projects.
- Evidence scope
- Named facility · Macquarie Data Centres
- Evidence as-of date
- 2025-08-08
- Workloads described
- Model training
How to read this: Supplier collaboration and future-capability claim. No specific GPU model, unit count, live deployment or named end-customer contract disclosed. Do not treat Dell/NVIDIA as a capacity tenant.
Inspect the source
- Macquarie and Dell sovereign AI factories collaboration ↗
Macquarie Data Centres · checked 2026-09-11 · published 2025-08-08
Opening collaboration paragraphs; Sovereignty Meets Scalability
Related operator-wide evidence
These disclosures describe the operator’s portfolio. They are not assigned to this facility or included in its power totals.
21 MW installed disclosure is a portfolio total
August 2026 full-year presentation reaffirms 21 MW installed across Macquarie Park, Canberra and Sydney CBD. It does not itemise fitted-out MW by building.
- Portfolio installed capacity
- 21 MW installed; IT boundary not separately defined FY26 presentation published 2026-08-26
- Evidence scope
- Operator portfolio · Macquarie Data Centres
- Evidence as-of date
- 2026-08-26
How to read this: Do not allocate the portfolio figure to individual IC1/IC2/IC3E/IC4/IC5 records. A near match to the 2 + 6 + 12 MW site specifications is not proof of their individual installed allocation. The shared specification table also contains the unbuilt 47 MW SuperWest end-state. This portfolio disclosure is not an extra contribution to site totals.
Inspect 2 sources
- Macquarie FY26 half-year management briefing ↗
Macquarie Technology Group · checked 2026-09-11 · published 2026-02-26
Slides 7,8 and 19
- Macquarie Technology Group FY26 investor presentation ↗
Macquarie Technology Group · checked 2026-09-22 · published 2026-08
Macquarie Park Data Centre Campus IC3 SuperWest; Outlook Data Centres
Evidence trail
- Macquarie IC3 Super West ↗
Macquarie Data Centres · checked 2026-09-10
Introduction; Australia's first purpose-built AI and cloud data centre
- Macquarie FY25 half-year investor presentation ↗
Macquarie Technology Group · checked 2026-09-10
Slide 18, Outlook: Data Centres
- Macquarie Data Centres campus directory ↗
Macquarie Data Centres · checked 2026-09-10
Our Data Centre Locations; Our Colocation Intellicentres table
- Macquarie FY26 half-year management briefing ↗
Macquarie Technology Group · checked 2026-09-10 · published 2026-02-26
Slides 7, 8 and 19
- Macquarie AI data centre solutions ↗
Macquarie Data Centres · checked 2026-09-11
Purpose-built AI and cloud data centres; cooling and high-density sections
- Macquarie and Dell sovereign AI factories collaboration ↗
Macquarie Data Centres · checked 2026-09-11 · published 2025-08-08
Opening collaboration paragraphs; Sovereignty Meets Scalability
- Macquarie FY26 half-year management briefing ↗
Macquarie Technology Group · checked 2026-09-11 · published 2026-02-26
Slides 7,8 and 19
- Macquarie Technology Group FY26 investor presentation ↗
Macquarie Technology Group · checked 2026-09-22 · published 2026-08
Macquarie Park Data Centre Campus IC3 SuperWest; Outlook Data Centres
- Natural Earth populated places, 1:10m ↗
Natural Earth · checked 2026-09-10
Australia and New Zealand populated-place features
- Hosting Certification Framework: Certified Service Providers ↗
Australian Government, Department of Home Affairs · checked 2026-09-22
Data Centre facilities: Certified Strategic Facility and Certified Strategic Enclave lists; reform notice
- IC3 East, Macquarie Park Data Centre Campus ↗
Macquarie Data Centres · checked 2026-09-22
Page heading IC3 East; introductory IC3 description; separate IC3 Super West navigation
- Macquarie IC3 Super West facility ↗
Macquarie Data Centres · checked 2026-09-11
IT Load; first purpose-built AI and cloud section