Macquarie Data Centres · Australia
Macquarie Engineering and Technology Campus
Report an error or share evidence ↗
Sydney, New South Wales · campus
- Facility type
- hyperscale
- Location evidence
- Approximate city location
- Research status
- Source-listed profile · 63% core-field coverage
Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.
Capacity & development
Power basis not established · Source as of 2026-07-16
Separate proposed campus design. Initial construction target late 2029 is not delivery of all 200 MW; IT basis not explicit in issuer announcement.
Proposed or approved design capacity. Included in the planning inventory, not a dated delivery forecast or a claim of committed supply.
Excluded from capacity totals: scope or power basis is not comparable.
Government certification
Certification not verified
No verified certification scope has been assigned to this record. Unknown does not mean uncertified.
What certification covers →Scope and context
- Land between Talavera Road and the M2 in Macquarie Park; exact parcel coordinate not verified. Distinct from IC2/IC3/IC3 SuperWest campus.
Compute, workloads & commercial commitments
Site-specific workloads, GPU inventory and customer contracts are not established by the cited evidence. Electrical capacity and AI-ready specifications alone do not establish these details.
Related operator-wide evidence
These disclosures describe the operator’s portfolio. They are not assigned to this facility or included in its power totals.
21 MW installed disclosure is a portfolio total
August 2026 full-year presentation reaffirms 21 MW installed across Macquarie Park, Canberra and Sydney CBD. It does not itemise fitted-out MW by building.
- Portfolio installed capacity
- 21 MW installed; IT boundary not separately defined FY26 presentation published 2026-08-26
- Evidence scope
- Operator portfolio · Macquarie Data Centres
- Evidence as-of date
- 2026-08-26
How to read this: Do not allocate the portfolio figure to individual IC1/IC2/IC3E/IC4/IC5 records. A near match to the 2 + 6 + 12 MW site specifications is not proof of their individual installed allocation. The shared specification table also contains the unbuilt 47 MW SuperWest end-state. This portfolio disclosure is not an extra contribution to site totals.
Inspect 2 sources
- Macquarie FY26 half-year management briefing ↗
Macquarie Technology Group · checked 2026-09-11 · published 2026-02-26
Slides 7,8 and 19
- Macquarie Technology Group FY26 investor presentation ↗
Macquarie Technology Group · checked 2026-09-22 · published 2026-08
Macquarie Park Data Centre Campus IC3 SuperWest; Outlook Data Centres
Evidence trail
- Macquarie Technology Group: land option exercise and proposed campus development, 16 July 2026 ↗
Macquarie Technology Group · checked 2026-09-22 · published 2026-07-16
Exercise of land option announcement: proposed engineering and technology campus
- Macquarie Technology Group FY26 investor presentation ↗
Macquarie Technology Group · checked 2026-09-22 · published 2026-08
Macquarie Park Data Centre Campus IC3 SuperWest; Outlook Data Centres
- Natural Earth populated places, 1:10m ↗
Natural Earth · checked 2026-09-10
Australia and New Zealand populated-place features