Macquarie Engineering and Technology Campus: facility evidence profile

Macquarie Data Centres · Australia

Macquarie Engineering and Technology Campus

Report an error or share evidence ↗

Sydney, New South Wales · campus

Planned
Facility type
hyperscale
Location evidence
Approximate city location
Research status
Source-listed profile · 63% core-field coverage

Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.

Capacity & development

Planned≈ 200 MW

Power basis not established · Source as of 2026-07-16

Separate proposed campus design. Initial construction target late 2029 is not delivery of all 200 MW; IT basis not explicit in issuer announcement.

Proposed or approved design capacity. Included in the planning inventory, not a dated delivery forecast or a claim of committed supply.

Excluded from capacity totals: scope or power basis is not comparable.

Government certification

Certification not verified

No verified certification scope has been assigned to this record. Unknown does not mean uncertified.

What certification covers →

Scope and context

  • Land between Talavera Road and the M2 in Macquarie Park; exact parcel coordinate not verified. Distinct from IC2/IC3/IC3 SuperWest campus.

Compute, workloads & commercial commitments

Site-specific workloads, GPU inventory and customer contracts are not established by the cited evidence. Electrical capacity and AI-ready specifications alone do not establish these details.

Related operator-wide evidence

These disclosures describe the operator’s portfolio. They are not assigned to this facility or included in its power totals.

Facility specificationAustraliaReported observation

21 MW installed disclosure is a portfolio total

August 2026 full-year presentation reaffirms 21 MW installed across Macquarie Park, Canberra and Sydney CBD. It does not itemise fitted-out MW by building.

Portfolio installed capacity
21 MW installed; IT boundary not separately defined
FY26 presentation published 2026-08-26
Evidence scope
Operator portfolio · Macquarie Data Centres
Evidence as-of date
2026-08-26

How to read this: Do not allocate the portfolio figure to individual IC1/IC2/IC3E/IC4/IC5 records. A near match to the 2 + 6 + 12 MW site specifications is not proof of their individual installed allocation. The shared specification table also contains the unbuilt 47 MW SuperWest end-state. This portfolio disclosure is not an extra contribution to site totals.

Inspect 2 sources
Link to this evidence ↗
Explore demand, compute types and commitments →

Evidence trail

  1. Macquarie Technology Group: land option exercise and proposed campus development, 16 July 2026 ↗

    Macquarie Technology Group · checked 2026-09-22 · published 2026-07-16

    Exercise of land option announcement: proposed engineering and technology campus

  2. Macquarie Technology Group FY26 investor presentation ↗

    Macquarie Technology Group · checked 2026-09-22 · published 2026-08

    Macquarie Park Data Centre Campus IC3 SuperWest; Outlook Data Centres

  3. Natural Earth populated places, 1:10m ↗

    Natural Earth · checked 2026-09-10

    Australia and New Zealand populated-place features