NEXTDC · Australia
NEXTDC D1 Darwin
Report an error or share evidence ↗
Darwin, Northern Territory · facility
- Facility type
- colocation
- Location evidence
- Corroborated site location
- Research status
- Source-listed profile · 75% core-field coverage
Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.
Evidence by field
Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.
- Identity Source checked
- The operator identifies NEXTDC D1 Darwin. Certification and location evidence are described separately.Checked 2026-09-11 · NEXTDC ↗
- Capacity Not found in checked sources
- A separate current built/commissioned capacity allocation was not found for D1. Directory design specifications cannot fill the 69.8 MW difference between NEXTDC's Australian aggregate and named-site subtotal.Checked 2026-09-11 · NEXTDC ↗ · NEXTDC ↗
- Address Source checked
- Published street address checked against the cited primary source. Unit or floor is retained where supplied.Checked 2026-09-11 · NEXTDC ↗
- Coordinates Source checked
- Named NEXTDC Darwin D1 building, house number 2 and Harvey Street match the operator address. Numbered address/building matched through OpenStreetMap; not a surveyed boundary or guaranteed entrance. Data © OpenStreetMap contributors (ODbL 1.0).Checked 2026-11-03 · NEXTDC ↗ · OpenStreetMap contributors ↗
- Certification Source checked
- NEXTDC, Darwin 1: only the named Certified Strategic enclave. This is not certification of the whole building or its MW.Checked 2026-09-22 · Australian Government, Department of Home Affairs ↗
2 Harvey Street, Darwin, NT, 0800
Checked 2026-09-11 · Site coordinates verified
Named NEXTDC Darwin D1 building, house number 2 and Harvey Street match the operator address. Numbered address/building matched through OpenStreetMap; not a surveyed boundary or guaranteed entrance. Data © OpenStreetMap contributors (ODbL 1.0).
Open this address in maps ↗Opening & commissioning history
- 2024 · Opened to customers
The half-year accounts state that customer opening occurred during July-December 2024 (1H FY25). Exact month/day was not disclosed. A later launch ceremony would be a separate event.
Capacity & development
Power basis not established
Operator identifies an operational facility. Commissioned IT capacity has not been separately reconciled; directory design MW is not used as live MW.
Government certification
Certified Strategic enclave
NEXTDC, Darwin 1: only the named Certified Strategic enclave. This is not certification of the whole building or its MW.
What certification covers →Scope and context
- Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.
- Directory reconciliation: Directory makes D1 a child of its Darwin campus but gives 2 Harvey Street, while that parent says 2–8 Ryko Court. Do not merge D1/D2 physical sites solely from this directory parent relation.
Compute, workloads & commercial commitments
Site-specific workloads, GPU inventory and customer contracts are not established by the cited evidence. Electrical capacity and AI-ready specifications alone do not establish these details.
Related operator-wide evidence
These disclosures describe the operator’s portfolio. They are not assigned to this facility or included in its power totals.
NEXTDC Australian fitted-out capacity: 277.9 MW
NEXTDC reports 287.9 MW consolidated built capacity at 30 June 2026, including 10 MW at Kuala Lumpur. The derived Australian portfolio is 277.9 MW. Named-site evidence allocates 273.45 MW within this portfolio.
- Australian fitted-out capacity
- 277.9 MW IT 30 June 2026
- Evidence scope
- Operator portfolio · NEXTDC
- Evidence as-of date
- 2026-06-30
How to read this: Built capacity is the designed power of fitted-out halls. Customer infrastructure may require further investment. The regional table rounds Australia to 278 MW. Named-site capacity is deducted before the remaining portfolio balance is counted.
Inspect the source
- NEXTDC FY26 Results Presentation ↗
NEXTDC · checked 2026-09-11 · published 2026-08-27
PDF pp 4–6 (contracted, billing and forward order book), p 18 (built/in-progress table and definitions; visually checked), pp 30–32 (named development rows)
Sharon AI GPU service in three NEXTDC east-coast facilities
NEXTDC's customer story states Sharon AI established its NVIDIA DGX-based GPU service in three Tier IV east-coast facilities. Workload examples include fraud detection, weather mapping, genome research and low-latency inference.
- Reported NEXTDC facility footprint
- 3 facilities Undated customer story reviewed 2026-09-11
- Evidence scope
- Operator portfolio · NEXTDC
- Evidence as-of date
- Applicable date not stated
- Workloads described
- Inference · High-performance computing
- Hardware disclosed
- NVIDIA DGX (model unspecified) (quantity not disclosed)
How to read this: Facility codes, individual GPU models, GPU counts and contracted MW are not disclosed. Do not attach this deployment to three guessed site records.
Inspect the source
- SharonAI customer story ↗
NEXTDC · checked 2026-09-11
The solution (three east-coast facilities); The benefits (inference); company introduction (NVIDIA DGX)
Evidence trail
- NEXTDC data centre network ↗
NEXTDC · checked 2026-09-10
Australia and New Zealand facility list; lifecycle labels
- A1 Adelaide and D1 Darwin achieve Certified Strategic status ↗
NEXTDC · checked 2026-09-10 · published 2025-12-02
Paragraphs 1–2: operated facilities and three operational edge facilities
- Certified Service Providers ↗
Australian Government, Department of Home Affairs · checked 2026-09-22
Data Centre facilities: Certified Strategic Facility and Certified Strategic Enclave lists
- Data Centres Australia | Tier III & IV for 100% Uptime ↗
NEXTDC · checked 2026-09-11
Australian and New Zealand facility directory; specification cards and lifecycle labels
- NEXTDC FY26 Results Presentation ↗
NEXTDC · checked 2026-09-11 · published 2026-08-27
PDF pp 4–6 (contracted, billing and forward order book), p 18 (built/in-progress table and definitions; visually checked), pp 30–32 (named development rows)
- NEXTDC Sydney technical specifications: national facility addresses ↗
NEXTDC · checked 2026-09-11
Page 3 national facility address panel; page 5 Sydney locations
- NEXTDC D1 Darwin: numbered address map feature ↗
OpenStreetMap contributors · checked 2026-11-03
Nominatim exact-address result; way 1307941180; house_number 2; latitude -12.4562909, longitude 130.8439691. Checked 3 November 2026.
- NEXTDC - D1 Darwin: directory profile and specifications ↗
Data Center Map · checked 2026-09-11
Public listing 9410; location, overview, specs tabs. Address/location header and labelled technical specification rows.
- Hosting Certification Framework: Certified Service Providers ↗
Australian Government, Department of Home Affairs · checked 2026-09-22
Data Centre facilities: Certified Strategic Facility and Certified Strategic Enclave lists; reform notice
- NEXTDC Half Year Report and Accounts to 31 December 2024 ↗
NEXTDC · checked 2026-09-11 · published 2025-02-24
Directors report, operational developments: A1, D1 and S6 opened to customers during the half-year