Skip to content
← Back to the atlas

NEXTDC PH1 Port Hedland: facility evidence profile

NEXTDC · Australia

NEXTDC PH1 Port Hedland

Report an error or share evidence ↗

Port Hedland, Western Australia · facility

Operating / built
Facility type
edge
Location evidence
Approximate city location
Research status
Source-listed profile · 50% core-field coverage

Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.

Evidence by field

Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.

Identity Source checked
The operator identifies NEXTDC PH1 Port Hedland. Certification and location evidence are described separately.Checked 2026-09-11 · NEXTDC ↗
Capacity Not found in checked sources
A separate current built/commissioned capacity allocation was not found for PH1. Directory design specifications cannot fill the 69.8 MW difference between NEXTDC's Australian aggregate and named-site subtotal.Checked 2026-09-11 · NEXTDC ↗ · NEXTDC ↗
Address Source checked
Published street address checked against the cited primary source. Unit or floor is retained where supplied.Checked 2026-09-11 · NEXTDC ↗
Coordinates Not found in checked sources
NEXTDC publishes 17 Loreto Circuit, Port Hedland. OpenStreetMap maps Loreto Circuit but not the numbered building, and a street-only result is insufficient for a site marker, so the record shows the approximate town position until an operator map point or mapped building is available. The published address is retained for navigation.Checked 2026-11-03 · NEXTDC ↗
Certification Not found in checked sources
NEXTDC excluded this facility from its HCF coverage in its 2 December 2025 announcement. No named match appears in the official register checked 22 September 2026.Checked 2026-09-22 · NEXTDC ↗ · Australian Government, Department of Home Affairs ↗
Published street address

17 Loreto Circuit, Port Hedland, WA, 6721

Checked 2026-09-11 · Map coordinates still to be verified

NEXTDC publishes 17 Loreto Circuit, Port Hedland. OpenStreetMap maps Loreto Circuit but not the numbered building, and a street-only result is insufficient for a site marker, so the record shows the approximate town position until an operator map point or mapped building is available. The published address is retained for navigation.

Open this address in maps ↗

Capacity & development

Operating / builtNot disclosed

Power basis not established

Operator identifies an operational facility. Commissioned IT capacity has not been separately reconciled; directory design MW is not used as live MW.

Government certification

Certification not verified

No current named HCF register match was found on 2026-09-22. NEXTDC explicitly excluded NEXTDC PH1 Port Hedland from its HCF coverage in its 2 December 2025 announcement.

What certification covers →

Scope and context

  • City map markers are approximate. No exact facility coordinates have been verified in this release.
  • Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.

Compute, workloads & commercial commitments

Site-specific workloads, GPU inventory and customer contracts are not established by the cited evidence. Electrical capacity and AI-ready specifications alone do not establish these details.

Related operator-wide evidence

These disclosures describe the operator’s portfolio. They are not assigned to this facility or included in its power totals.

Facility specificationAustraliaReported observation

NEXTDC Australian fitted-out capacity: 277.9 MW

NEXTDC reports 287.9 MW consolidated built capacity at 30 June 2026, including 10 MW at Kuala Lumpur. The derived Australian portfolio is 277.9 MW. Named-site evidence allocates 273.45 MW within this portfolio.

Australian fitted-out capacity
277.9 MW IT
30 June 2026
Evidence scope
Operator portfolio · NEXTDC
Evidence as-of date
2026-06-30

How to read this: Built capacity is the designed power of fitted-out halls. Customer infrastructure may require further investment. The regional table rounds Australia to 278 MW. Named-site capacity is deducted before the remaining portfolio balance is counted.

Inspect the source
  • NEXTDC FY26 Results Presentation ↗

    NEXTDC · checked 2026-09-11 · published 2026-08-27

    PDF pp 4–6 (contracted, billing and forward order book), p 18 (built/in-progress table and definitions; visually checked), pp 30–32 (named development rows)

Link to this evidence ↗
Compute deploymentAustraliaReported observation

Sharon AI GPU service in three NEXTDC east-coast facilities

NEXTDC's customer story states Sharon AI established its NVIDIA DGX-based GPU service in three Tier IV east-coast facilities. Workload examples include fraud detection, weather mapping, genome research and low-latency inference.

Reported NEXTDC facility footprint
3 facilities
Undated customer story reviewed 2026-09-11
Evidence scope
Operator portfolio · NEXTDC
Evidence as-of date
Applicable date not stated
Workloads described
Inference · High-performance computing
Hardware disclosed
NVIDIA DGX (model unspecified) (quantity not disclosed)

How to read this: Facility codes, individual GPU models, GPU counts and contracted MW are not disclosed. Do not attach this deployment to three guessed site records.

Inspect the source
  • SharonAI customer story ↗

    NEXTDC · checked 2026-09-11

    The solution (three east-coast facilities); The benefits (inference); company introduction (NVIDIA DGX)

Link to this evidence ↗
Explore demand, compute types and commitments →

Evidence trail

  1. NEXTDC data centre network ↗

    NEXTDC · checked 2026-09-10

    Australia and New Zealand facility list; lifecycle labels

  2. A1 Adelaide and D1 Darwin achieve Certified Strategic status ↗

    NEXTDC · checked 2026-09-10 · published 2025-12-02

    Paragraphs 1–2: operated facilities and three operational edge facilities

  3. Data Centres Australia | Tier III & IV for 100% Uptime ↗

    NEXTDC · checked 2026-09-11

    Australian and New Zealand facility directory; specification cards and lifecycle labels

  4. NEXTDC FY26 Results Presentation ↗

    NEXTDC · checked 2026-09-11 · published 2026-08-27

    PDF pp 4–6 (contracted, billing and forward order book), p 18 (built/in-progress table and definitions; visually checked), pp 30–32 (named development rows)

  5. NEXTDC Sydney technical specifications: national facility addresses ↗

    NEXTDC · checked 2026-09-11

    Page 3 national facility address panel; page 5 Sydney locations

  6. NEXTDC - PH1 Port Hedland: directory profile and specifications ↗

    Data Center Map · checked 2026-09-11

    Public listing 9408; location, overview, specs tabs. Address/location header and labelled technical specification rows.

  7. NEXTDC A1 and D1 certification announcement, exceptions ↗

    NEXTDC · checked 2026-09-22 · published 2025-12-02

    Second paragraph, explicitly excepted facilities SC1, NE1, PH1 and S6

  8. Hosting Certification Framework: Certified Service Providers ↗

    Australian Government, Department of Home Affairs · checked 2026-09-22

    Data Centre facilities: Certified Strategic Facility and Certified Strategic Enclave lists; reform notice

  9. Natural Earth populated places, 1:10m ↗

    Natural Earth · checked 2026-09-10

    Australia and New Zealand populated-place features