Skip to content
← Back to the atlas

NEXTDC S6 Sydney: facility evidence profile

NEXTDC · Australia

NEXTDC S6 Sydney

Report an error or share evidence ↗

Sydney, New South Wales · facility

Operating / builtUnder construction
Facility type
colocation
Location evidence
Corroborated site location
Research status
Profile reviewed · 88% core-field coverage

Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.

Evidence by field

Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.

Identity Source checked
The operator identifies NEXTDC S6 Sydney. Certification and location evidence are described separately.Checked 2026-09-11 · NEXTDC ↗ · NEXTDC ↗ · NEXTDC ↗
Capacity Source checked
FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply. FY26 mechanical and electrical fit-out in progress; not commissioned capacity.Checked 2026-09-22 · NEXTDC ↗ · NEXTDC ↗ · NEXTDC, ASX announcement ↗
Status Source checked
Dated development-table lifecycle is used. A target completion date or stale website navigation label does not establish commissioning.Checked 2026-09-11 · NEXTDC ↗
Hardware Not found in checked sources
This facility page does not disclose an installed GPU inventory with model and count. AI-ready or NVIDIA programme capability is not a hardware inventory.Checked 2026-09-11 · NEXTDC ↗
Workloads Source checked
Training and inference are explicitly stated design capabilities; deployment-specific inventory and workload share remain unknown.Checked 2026-09-11 · NEXTDC ↗
Address Source checked
Published street address checked against the cited primary source. Unit or floor is retained where supplied.Checked 2026-09-11 · NEXTDC ↗
Coordinates Source checked
Named NEXTDC - S6 Sydney building, house number 3 and Broadcast Way match the operator address. Numbered address/building matched through OpenStreetMap; not a surveyed boundary or guaranteed entrance. Data © OpenStreetMap contributors (ODbL 1.0).Checked 2026-11-03 · NEXTDC ↗ · OpenStreetMap contributors ↗
Certification Not found in checked sources
NEXTDC excluded this facility from its HCF coverage in its 2 December 2025 announcement. No named match appears in the official register checked 22 September 2026.Checked 2026-09-22 · NEXTDC ↗ · Australian Government, Department of Home Affairs ↗
Published street address

3 Broadcast Way, Artarmon, NSW, 2064

Checked 2026-09-11 · Site coordinates verified

Named NEXTDC - S6 Sydney building, house number 3 and Broadcast Way match the operator address. Numbered address/building matched through OpenStreetMap; not a surveyed boundary or guaranteed entrance. Data © OpenStreetMap contributors (ODbL 1.0).

Open this address in maps ↗

Opening & commissioning history

  • 2024 · Opened to customers

    The half-year accounts state that customer opening occurred during July-December 2024 (1H FY25). Exact month/day was not disclosed. A later launch ceremony would be a separate event.

Capacity & development

Operating / built2.7 MW

Power for servers, GPUs, storage & networking (IT power) · Source as of 2026-06-30

FY26 built capacity at an operational facility: designed IT power of fitted-out halls, not measured electricity demand, utilisation or immediately available supply.

Under construction10.8 MW

Power for servers, GPUs, storage & networking (IT power) · Source as of 2026-06-30

FY26 mechanical and electrical fit-out in progress; not commissioned capacity.

Historical capacity evidence

Values recorded at the time. These observations are separate from current capacity claims.

2025-08-28 · 2.7 MW built

Selected report-date observation of total designed IT power in fitted-out halls. Customer-specific investment may still be required. This disclosure date is not the commissioning date. No earlier annual values are inferred.

2026-08-27 · 2.7 MW built

Selected report-date observation of total designed IT power in fitted-out halls. Customer-specific investment may still be required. This disclosure date is not the commissioning date. No earlier annual values are inferred.

Government certification

Certification not verified

No current named HCF register match was found on 2026-09-22. NEXTDC explicitly excluded NEXTDC S6 Sydney from its HCF coverage in its 2 December 2025 announcement.

What certification covers →

Scope and context

  • Artarmon. The 13.5 MW target includes both phases; installed GPU numbers remain unverified.
  • Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.

Compute, workloads & commercial commitments

Workload capabilityAustraliaAdvertised capability

S6 training and inference design capability

NEXTDC describes S6 as an AI factory for GPU-intensive training, inference and large-scale model operations, with liquid-cooling support.

Evidence scope
Named facility · NEXTDC
Evidence as-of date
Applicable date not stated
Workloads described
Model training · Inference

How to read this: This establishes design capability, not installed GPU inventory or the proportion of its 2.7 MW built capacity serving those workloads. The 13.5 MW design figure includes built and future fit-out.

Inspect the source
Link to this evidence ↗
Related operator-wide evidence

These disclosures describe the operator’s portfolio. They are not assigned to this facility or included in its power totals.

Facility specificationAustraliaReported observation

NEXTDC Australian fitted-out capacity: 277.9 MW

NEXTDC reports 287.9 MW consolidated built capacity at 30 June 2026, including 10 MW at Kuala Lumpur. The derived Australian portfolio is 277.9 MW. Named-site evidence allocates 273.45 MW within this portfolio.

Australian fitted-out capacity
277.9 MW IT
30 June 2026
Evidence scope
Operator portfolio · NEXTDC
Evidence as-of date
2026-06-30

How to read this: Built capacity is the designed power of fitted-out halls. Customer infrastructure may require further investment. The regional table rounds Australia to 278 MW. Named-site capacity is deducted before the remaining portfolio balance is counted.

Inspect the source
  • NEXTDC FY26 Results Presentation ↗

    NEXTDC · checked 2026-09-11 · published 2026-08-27

    PDF pp 4–6 (contracted, billing and forward order book), p 18 (built/in-progress table and definitions; visually checked), pp 30–32 (named development rows)

Link to this evidence ↗
Compute deploymentAustraliaReported observation

Sharon AI GPU service in three NEXTDC east-coast facilities

NEXTDC's customer story states Sharon AI established its NVIDIA DGX-based GPU service in three Tier IV east-coast facilities. Workload examples include fraud detection, weather mapping, genome research and low-latency inference.

Reported NEXTDC facility footprint
3 facilities
Undated customer story reviewed 2026-09-11
Evidence scope
Operator portfolio · NEXTDC
Evidence as-of date
Applicable date not stated
Workloads described
Inference · High-performance computing
Hardware disclosed
NVIDIA DGX (model unspecified) (quantity not disclosed)

How to read this: Facility codes, individual GPU models, GPU counts and contracted MW are not disclosed. Do not attach this deployment to three guessed site records.

Inspect the source
  • SharonAI customer story ↗

    NEXTDC · checked 2026-09-11

    The solution (three east-coast facilities); The benefits (inference); company introduction (NVIDIA DGX)

Link to this evidence ↗
Explore demand, compute types and commitments →

Evidence trail

  1. NEXTDC data centre network ↗

    NEXTDC · checked 2026-09-10

    Australia and New Zealand facility list; lifecycle labels

  2. NEXTDC FY26 Results Presentation ↗

    NEXTDC · checked 2026-09-10 · published 2026-08-27

    Pages 18 and 30–32; page 18 footnotes 2–3 define in-progress and built capacity

  3. NEXTDC S6 facility ↗

    NEXTDC · checked 2026-09-10

    IT capacity, location and facility description

  4. Data Centres Australia | Tier III & IV for 100% Uptime ↗

    NEXTDC · checked 2026-09-11

    Australian and New Zealand facility directory; specification cards and lifecycle labels

  5. S6 Sydney: Australia's First AI Factory by NEXTDC ↗

    NEXTDC · checked 2026-09-11

    Named facility main description and IT design specification

  6. NEXTDC FY26 Results Presentation ↗

    NEXTDC · checked 2026-09-11 · published 2026-08-27

    PDF pp 4–6 (contracted, billing and forward order book), p 18 (built/in-progress table and definitions; visually checked), pp 30–32 (named development rows)

  7. NEXTDC Sydney technical specifications: national facility addresses ↗

    NEXTDC · checked 2026-09-11

    Page 3 national facility address panel; page 5 Sydney locations

  8. NEXTDC S6 Sydney: numbered address map feature ↗

    OpenStreetMap contributors · checked 2026-11-03

    Nominatim exact-address result; way 889434872; house_number 3; latitude -33.8194853, longitude 151.1860083. Checked 3 November 2026.

  9. NEXTDC - S6 Sydney: directory profile and specifications ↗

    Data Center Map · checked 2026-09-11

    Public listing 12445; location, overview, specs tabs. Address/location header and labelled technical specification rows.

  10. NEXTDC FY26 Results Announcement ↗

    NEXTDC, ASX announcement · checked 2026-09-22 · published 2026-08-27

    Development activity: capacity progressed at 30 June 2026; named NSW and Victoria increments; M5 up-to IT capacity

  11. NEXTDC A1 and D1 certification announcement, exceptions ↗

    NEXTDC · checked 2026-09-22 · published 2025-12-02

    Second paragraph, explicitly excepted facilities SC1, NE1, PH1 and S6

  12. Hosting Certification Framework: Certified Service Providers ↗

    Australian Government, Department of Home Affairs · checked 2026-09-22

    Data Centre facilities: Certified Strategic Facility and Certified Strategic Enclave lists; reform notice

  13. NEXTDC Half Year Report and Accounts to 31 December 2024 ↗

    NEXTDC · checked 2026-09-11 · published 2025-02-24

    Directors report, operational developments: A1, D1 and S6 opened to customers during the half-year

  14. NEXTDC FY25 Results Presentation: dated capacity observations ↗

    NEXTDC · checked 2026-09-11 · published 2025-08-28

    Pages 16 and 32-33; built capacity definition, M2/M3/S3/S6 observations