Skip to content
← Back to the atlas

Project Blue Tongue, Davis Road Data Centre: facility evidence profile

Operator not publicly identified · Australia

Project Blue Tongue, Davis Road Data Centre

Report an error or share evidence ↗

Sydney, New South Wales · campus

Planned
Facility type
hyperscale
Location evidence
Approximate city location
Research status
Profile reviewed · 75% core-field coverage

Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.

Evidence by field

Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.

Capacity Source checked
Verified approved design IT boundary only; no inference of installed supply or completion.Checked 2026-09-22 · Cundall / NSW Planning Portal ↗ · NSW Department of Planning, Housing and Infrastructure ↗ · NSW Planning Portal ↗
Address Source checked
Street address and legal parcel are given explicitly by the Department assessment. Postcode is unverified and blank.Checked 2026-09-22 · Cundall / NSW Planning Portal ↗ · NSW Department of Planning, Housing and Infrastructure ↗ · NSW Planning Portal ↗
Identity Not found in checked sources
The site and application are identified, but the operating company is unnamed. Arup/Cundall are the planning consultants, not verified data-centre operators.Checked 2026-09-22 · Cundall / NSW Planning Portal ↗ · NSW Department of Planning, Housing and Infrastructure ↗ · NSW Planning Portal ↗
Published street address

3 Davis Road, Wetherill Park, New South Wales

Checked 2026-09-22 · Map coordinates still to be verified

Open this address in maps ↗

Capacity & development

Planned≤ 132.4 MW

Power for servers, GPUs, storage & networking (IT power) · Source as of 2024-12-20

Approved campus design: 66 MW IT in DC01 + 66 MW in DC02 + 0.43 MW tape store = 132.43 MW maximum IT. The 160.85 MW total power envelope and three 90 MVA transformers are not additional capacity. The final assessment retains the revised ESD design. Construction progress and installed fit-out have not been established; no completion date accepted. Distinct from the existing 2 Davis Road directory record.

Proposed or approved design capacity. Included in the planning inventory, not a dated delivery forecast or a claim of committed supply.

Government certification

Certification not verified

No verified certification scope has been assigned to this record. Unknown does not mean uncertified.

What certification covers →

Scope and context

  • Approved campus design: 66 MW IT in DC01 + 66 MW in DC02 + 0.43 MW tape store = 132.43 MW maximum IT. The 160.85 MW total power envelope and three 90 MVA transformers are not additional capacity. The final assessment retains the revised ESD design. Construction progress and installed fit-out have not been established; no completion date accepted. Distinct from the existing 2 Davis Road directory record.
  • Physical street address and legal parcel are verified from primary planning documents. Exact coordinates are not yet verified. The operator remains publicly unidentified in the reviewed primary record.

Compute, workloads & commercial commitments

Site-specific workloads, GPU inventory and customer contracts are not established by the cited evidence. Electrical capacity and AI-ready specifications alone do not establish these details.

Explore demand, compute types and commitments →

Evidence trail

  1. [PDF] Project Blue Tongue - Major Projects - NSW Government ↗

    Cundall / NSW Planning Portal · checked 2026-09-22 · published 2024-07-30

    Section 6.2 Input Data

  2. Davis Road Data Centre (Cundall): final Department assessment, December 2024 ↗

    NSW Department of Planning, Housing and Infrastructure · checked 2026-09-22 · published 2024-12

    Sections 1.1 and 1.2; section 2 Table 2; Submissions Report discussion

  3. Davis Road Data Centre (Cundall) | Planning Portal - Department of Planning and Environment ↗

    NSW Planning Portal · checked 2026-09-22 · published 2024-12-20

    Project Details: decision and date; SSD-59416728

  4. Natural Earth populated places, 1:10m ↗

    Natural Earth · checked 2026-09-10

    Australia and New Zealand populated-place features