Skip to content
← Back to the atlas

STACK MEL02 campus: facility evidence profile

STACK Infrastructure · Australia

STACK MEL02 campus

Report an error or share evidence ↗

Melbourne, Victoria · campus

Status unconfirmed
Facility type
hyperscale
Location evidence
Approximate city location
Research status
Source-listed profile · 38% core-field coverage

Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.

Capacity & development

Status unconfirmedNot disclosed

Power basis not established

Campus identity verified; current commissioning or construction status not established by the portfolio page.

Government certification

Certification not verified

No verified certification scope has been assigned to this record. Unknown does not mean uncertified.

What certification covers →

Scope and context

  • Distinct from nearby MEL01; Truganina locality disclosed.
  • Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.
  • Directory reconciliation: Public directory gives only Wyndham Industrial Estate; it supplies no exact street address or precise location verification.
  • Directory reconciliation: The public publisher withholds exact location. This match uses named identity only and does not use hidden embedded coordinates or addresses.

Compute, workloads & commercial commitments

Facility specificationAustraliaReported observation

STACK MEL02 campus: disclosed development boundary

Hold numeric IT promotion until the 250/252 MW discrepancy and lifecycle allocation are resolved.

Disclosed campus specification
252 MW campus capacity; conflicting250MWcriticalheading
ultimate-campus; unknown
Evidence scope
Named facility · STACK Infrastructure
Evidence as-of date
Applicable date not stated

How to read this: This observation has its own electrical and physical boundary. It is not an additional contribution to the comparable IT subtotal, a GPU count or a delivery forecast. Hold numeric IT promotion until the 250/252 MW discrepancy and lifecycle allocation are resolved.

Inspect the source
Link to this evidence ↗
Explore demand, compute types and commitments →

Evidence trail

  1. STACK MEL02 campus ↗

    STACK Infrastructure · checked 2026-09-11

    MEL02 Campus

  2. STACK Infrastructure MEL02: directory profile and specifications ↗

    Data Center Map · checked 2026-09-11

    Public listing 16010; overview, specs tabs. Address/location header and labelled technical specification rows.

  3. Natural Earth populated places, 1:10m ↗

    Natural Earth · checked 2026-09-10

    Australia and New Zealand populated-place features

  4. STACK MEL02 campus specifications ↗

    STACK Infrastructure · checked 2026-09-22

    Page subtitle; MEL02 Campus paragraph; 252 MW headline card