Telstra InfraCo · Australia
Telstra InfraCo Clayton
Report an error or share evidence ↗
Melbourne, Victoria · facility
- Facility type
- colocation
- Location evidence
- Approximate city location
- Research status
- Source-listed profile · 50% core-field coverage
Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.
Evidence by field
Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.
- Identity Source checked
- The operator explicitly names this facility among its seven Australian data centres.Checked 2026-09-11 · Telstra InfraCo ↗
- Status Source checked
- The current operator page says it operates the seven named data centres, supporting the existing operating classification.Checked 2026-09-11 · Telstra InfraCo ↗
- Address Not found in checked sources
- No public street address for this facility was identified in the reviewed operator page and, where applicable, linked brochure. This does not assert that no address is public elsewhere.Checked 2026-09-11 · Telstra InfraCo ↗ · Telstra InfraCo ↗
- Capacity Not found in checked sources
- No commissioned IT total is established. The brochure specifies target power capacity; dual feeds and generator ratings must not be counted as IT load.Checked 2026-09-11 · Telstra InfraCo ↗ · Telstra InfraCo ↗
Capacity & development
Power basis not established
Current operator listing verifies the facility; commissioned IT capacity has not been established.
Government certification
Certification not verified
No verified certification scope has been assigned to this record. Unknown does not mean uncertified.
What certification covers →Scope and context
- Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.
Compute, workloads & commercial commitments
Clayton target power specification
Telstra's brochure lists 20 MW target power capacity for Clayton, explicitly described as two 10 MW feeds.
- Target power capacity, not IT load
- 20 MW Undated current specification, retrieved 11 September 2026
- Evidence scope
- Named facility · Telstra InfraCo
- Evidence as-of date
- Applicable date not stated
How to read this: This is a target electrical specification without a commissioned IT boundary or effective date. It remains outside operating, construction and planned IT subtotals. Redundant feeds are not additive usable IT capacity.
Inspect the source
- Telstra InfraCo data centre colocation brochure ↗
Telstra InfraCo · checked 2026-09-11
Comparison table: Details, Target power capacity, Rack capacity
Evidence trail
- Telstra InfraCo data centre colocation ↗
Telstra InfraCo · checked 2026-09-11
Video transcript 00:00; About our Data Centres
- Telstra InfraCo data centre colocation ↗
Telstra InfraCo · checked 2026-09-11
Video transcript; About our Data Centres
- Telstra InfraCo data centre colocation brochure ↗
Telstra InfraCo · checked 2026-09-11
Comparison table: Details, Target power capacity, Rack capacity
- Telstra Clayton: directory profile and specifications ↗
Data Center Map · checked 2026-09-11
Public listing 10079; location, overview, specs tabs. Address/location header and labelled technical specification rows.
- Natural Earth populated places, 1:10m ↗
Natural Earth · checked 2026-09-10
Australia and New Zealand populated-place features