TenPeaks Central Aotea: facility evidence profile

TenPeaks · New Zealand

TenPeaks Central Aotea

Report an error or share evidence ↗

Auckland, Auckland · campus

Operating / built
Facility type
colocation
Location evidence
Approximate city location
Research status
Source-listed profile · 63% core-field coverage

Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.

Evidence by field

Evidence status applies to the named field and cited sources. “Not found” means those sources do not establish the fact; it does not establish absence.

Identity Source checked
Current TenPeaks named campus page reviewed.Checked 2026-09-11 · TenPeaks ↗
Capacity Source checked
Body proposes an additional 15 MW building; IT basis and existing installed amount are unspecified. Animated headline counter is not reliable evidence. No comparable installed IT addition is proposed.Checked 2026-09-11 · TenPeaks ↗
Status Source checked
Existing Mayoral Drive / Airedale campus operating; additional multi-level building in design/site planning.Checked 2026-09-11 · TenPeaks ↗
Hardware Not found in checked sources
GPU models, installed GPU counts and named compute offtake are not disclosed.Checked 2026-09-11 · TenPeaks ↗

Capacity & development

Operating / builtNot disclosed

Power basis not established

No comparable installed IT capacity verified.

Government certification

Australian HCF not applicable

Australian Hosting Certification Framework does not apply to this New Zealand facility.

What certification covers →

Scope and context

  • Former Spark facility portfolio; no capacity allocated from group totals.
  • Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.

Compute, workloads & commercial commitments

Facility specificationNew ZealandReported observation

TenPeaks central disclosed campus capacity context

Body proposes an additional 15 MW building; IT basis and existing installed amount are unspecified. Animated headline counter is not reliable evidence.

Proposed additional building power, basis unspecified
15 MW
Undated campus page reviewed 2026-09-11
Evidence scope
Named facility · TenPeaks
Evidence as-of date
Applicable date not stated

How to read this: IT load is not explicitly distinguished from facility/other power in the selected body text. These values are context only, excluded from IT capacity totals. Consent, development potential and renewable generation are separate from installed server power. No GPU inventory is disclosed.

Inspect the source
Link to this evidence ↗
Related operator-wide evidence

These disclosures describe the operator’s portfolio. They are not assigned to this facility or included in its power totals.

Facility specificationNew ZealandOperating deployment

TenPeaks launched with more than 23 MW operating across 11 facilities

Spark disclosed the existing operating capacity when completing the sale of 75 percent of its data-centre business to PEP.

Portfolio operating capacity
≥ 23 MW, boundary unspecified
2026-01-30
Facilities in transaction disclosure
11 facilities
2026-01-30
Evidence scope
Operator portfolio · TenPeaks
Evidence as-of date
2026-01-30

How to read this: No per-site capacity split and no explicit IT boundary. The transaction count does not prove that Atlas directory entities map one-to-one to these 11 facilities. More than 130 MW was a development pipeline, not operating capacity.

Inspect the source
Link to this evidence ↗
Facility specificationNew ZealandOperating deployment

TenPeaks: over 23 MW built across 11 operating facilities

Spark reported over 23 MW built across the 11 operating facilities that were transferred to TenPeaks in January 2026.

Built portfolio capacity, electrical basis not stated
≥ 23 MW (basis unstated)
Spark sale disclosure, 2025; transferred January 2026
Evidence scope
Operator portfolio · TenPeaks
Evidence as-of date
2025-08-12

How to read this: The primary disclosure does not say that the 23 MW is IT load or that it is comparable with CDC's leasable primary ICT measure. South Takanini's 12.3 MW is inside this transferred estate, not additional. It is excluded from Atlas operating IT totals until the power boundary is documented.

Inspect 2 sources
Link to this evidence ↗
Explore demand, compute types and commitments →

Evidence trail

  1. TenPeaks national data centre footprint ↗

    TenPeaks · checked 2026-09-11

    Auckland campuses; A diverse future map labels

  2. TenPeaks company history ↗

    TenPeaks · checked 2026-09-11

    Journey milestones

  3. Central Data Centre Campus ↗

    TenPeaks · checked 2026-09-11

    Body: Mayoral Drive/Airedale campus and proposed additional 15 MW building

  4. TenPeaks Auckland Central: directory profile and specifications ↗

    Data Center Map · checked 2026-09-11

    Public listing 5170; location, overview, specs tabs. Address/location header and labelled technical specification rows.

  5. Natural Earth populated places, 1:10m ↗

    Natural Earth · checked 2026-09-10

    Australia and New Zealand populated-place features