TenPeaks · New Zealand
TenPeaks Hamilton
Report an error or share evidence ↗
Hamilton, Waikato · facility
- Facility type
- edge
- Location evidence
- Approximate city location
- Research status
- Source-listed profile · 63% core-field coverage
Core-field coverage counts eight basic fields available in the Atlas. It is not an accuracy score or a measure of technical specification completeness. Individual evidence checks appear below.
Capacity & development
Power basis not established
No comparable installed IT capacity verified.
Government certification
Australian HCF not applicable
Australian Hosting Certification Framework does not apply to this New Zealand facility.
What certification covers →Scope and context
- Former Spark facility portfolio; no capacity allocated from group totals.
- Technical details reported by Data Center Map are shown separately from the Atlas's primary-source observations.
Compute, workloads & commercial commitments
Site-specific workloads, GPU inventory and customer contracts are not established by the cited evidence. Electrical capacity and AI-ready specifications alone do not establish these details.
Related operator-wide evidence
These disclosures describe the operator’s portfolio. They are not assigned to this facility or included in its power totals.
TenPeaks launched with more than 23 MW operating across 11 facilities
Spark disclosed the existing operating capacity when completing the sale of 75 percent of its data-centre business to PEP.
- Portfolio operating capacity
- ≥ 23 MW, boundary unspecified 2026-01-30
- Facilities in transaction disclosure
- 11 facilities 2026-01-30
- Evidence scope
- Operator portfolio · TenPeaks
- Evidence as-of date
- 2026-01-30
How to read this: No per-site capacity split and no explicit IT boundary. The transaction count does not prove that Atlas directory entities map one-to-one to these 11 facilities. More than 130 MW was a development pipeline, not operating capacity.
Inspect the source
- Spark completes sale of 75 percent of its data centre business to PEP ↗
Spark New Zealand / NZX · checked 2026-09-22 · published 2026-01-30
MARKET RELEASE Friday 30 January 2026; CEO quote on operating capacity
TenPeaks: over 23 MW built across 11 operating facilities
Spark reported over 23 MW built across the 11 operating facilities that were transferred to TenPeaks in January 2026.
- Built portfolio capacity, electrical basis not stated
- ≥ 23 MW (basis unstated) Spark sale disclosure, 2025; transferred January 2026
- Evidence scope
- Operator portfolio · TenPeaks
- Evidence as-of date
- 2025-08-12
How to read this: The primary disclosure does not say that the 23 MW is IT load or that it is comparable with CDC's leasable primary ICT measure. South Takanini's 12.3 MW is inside this transferred estate, not additional. It is excluded from Atlas operating IT totals until the power boundary is documented.
Inspect 2 sources
- Spark announces data centre business sale ↗
Spark New Zealand · checked 2026-09-23 · published 2025-08-12
Paragraph beginning DC Co has a leading data centre platform: over 23 MW built at 11 operating facilities.
- Spark completes sale of data centre business ↗
Spark New Zealand · checked 2026-09-23 · published 2026-01-30
Sale completion and transfer to TenPeaks paragraphs.
Evidence trail
- TenPeaks national data centre footprint ↗
TenPeaks · checked 2026-09-11
Auckland campuses; A diverse future map labels
- TenPeaks company history ↗
TenPeaks · checked 2026-09-11
Journey milestones
- TenPeaks Hamilton: directory profile and specifications ↗
Data Center Map · checked 2026-09-11
Public listing 5205; location, overview, specs tabs. Address/location header and labelled technical specification rows.
- Natural Earth populated places, 1:10m ↗
Natural Earth · checked 2026-09-10
Australia and New Zealand populated-place features